Stone Masonry Revetment
Stone Masonry Revetment
FORM WR-07
WORK REPORT
B. Work sequence
No Step Duration (hour)
C. Human resources
No Students’ name Tasks (same as point B)
D. Material
No Material Specification Vol. Unit
Cement/lime
Water
PVC pipe
Nylon cord
E. Equipment
No Tool Specification Vol. Unit Function
Hand hoe
Shovel
Trowel
Chisel
Steel brush
Bucket
Stone hammer
Roll meter
Sand sieve
Wood saw
F. Working drawing
Please draw the plan, cross (Figure 7.10), and long section of the masonry.
Please calculate the volume of excavation and backfill. The soil profile is
assumed uniform along the revetment. See Figure 7. 6.
FORM JSA–07
JOB SAFETY ANALISYS
FORM WIR–07
WORK INSPECTION REPORT (Individul Task)
Title of Work: Stone masonry for revetment