Rehabilitation and Upgradation of NH-43 from Km 130+000 to 180+000 (Kanker to Bedma Section) Two
Project : Lane with Paved Shoulder in State of Chhattisgarh under NHDP-IV Phase through Engineering,
Procurement & Constructions (EPC) Basis Contract.
Title :
Design of RCC Abutment (A1 & A2) with Pile Foundation of MJBR at Chainage : K.M. 140+290
R0
References :
1 Standard Specifications & Code of Practice for Road Bridges: IRC : 06-2017 (Loads & Stresses).
2 Guidelines for the Design of Small Bridges & Culverts : IRC : 13-2004
3 Code of Practice for Concrete Road Bridges : IRC : 112-2011
Design of Abutment of Major Bridge A1 &
A2 _Pile Foundation
1 140+290 140+290
Design of Abutment
SALIENT FEATURES OF THE BRIDGE :
REINFORCING STEEL
Grade of Reinforcement fyk = Fe 500 Mpa
Design yield strength of reinforcement fyd = 0.870 *fyk
= 435 Mpa
Modulus of Elasticity Es = 200000 Mpa
3
RCC Density = 2.5 t/m
3
Dry density of earth = 2.0 t/m
ANALYSES ASSUMPTION
Enviromental parameters
Relative humidity = 70 %
Exposure condition = Moderate
SEISMIC PARAMETER
Seismic Zone = III
Type of soil = medium
Zone factor Z = 0.16
Importance factor I = 1.2
Response Reduction Factor, Rlong. = 3
(Amendment no. 1/May 2015/
Response Reduction Factor, Rtrans. = 1 IRC:6-2014 clause 219.5)
Response Reduction Factor, Rvert. = 3
Design of Abutment
LEVEL DETAILS :
Formation level = 341.500 m
Ground Level = 335.039 m
Pile Cap Top Level = 334.539 m
Thickness of Pile Cap = 1.80 m
Pile Cap Bottom Level = 332.739 m
Length of pile below pile cap bottom = 22.00 m
Pile Founding Level = 310.739 m
1.92
0.15
Cap Top : 339.260
1.65 3.2 c/c of bearing
Sign Convention :
MTT
MLL
Design of Abutment
ABUTMENT COMPONENT :-
0.300 0.300
3.50 FRL 341.500
0.300 4
2.240
1
1 2 0.500
3
0.000
6.96
9a
0.360 0.900 0.050
1.310 8.761
9 4.221
6
0.000
GL 335.039
7 1.8
Pile Cap Bottom 332.739
5.100
Design of Abutment
1.2
12.900
13.500
5.100
ABUTMENT FOUNDATION PLAN
1.310
1.65
3.2
1.6
12.900
1.6
3.2
1.65
0.500
c/L brg
ABUTMENT CAP PLAN
Design of Abutment
12.900
0.500
0.000
0.000
12.900
Return wall
14 1 2 0.500 6.961 2.1 14.62 36.55 4.38 -1.5 0
15 0.5 2 0 6.961 2.1 0.00 0.00 1.80 0 0
Earth column
12 0.5 13.5 7.0 0.00 0.00 0.00 4.12 -1.05 0.00
13 1 13.5 7.0 0.000 0.00 0.00 5.28 -1.05 0.00
fcm = 45 Mpa
t = 25550 days
to = 90 days
fo = fRHbfcmbto
RH = Relative humidity
= 70 %
ho = 1800 mm
fRH = 1.247
fo = 1.364
bH = 1479
12.9
0.220
1.650 3.200
Super-structure Cross-section
Girder Cross-Section :
0.750 0.750
1 0.150 1 0.150
2 0.075 2 0.023
3
3
0.25 1.700 1.700
4 0.150
5 0.250
0.600 0.600
0.400
0.300
0.600 0.25
12.9
0.5 0 11.9 0 0.5
0.050 thick WC
23.50
22.50
CLASS A
TYPE 1 6.8 6.8 6.8 6.8 11.4 11.4 2.7 2.7
DIST 3 3 3 4.3 1.2 3.2 1.1
Forces due to LL about base slab toe : Max Reaction Min Reaction
Vertical Load (CW LL Reaction) = 156 Tonne 44 Tonne
Lever arm about Cg of Pile group (along L-L axis) = 0m 0m
Moment MTT = 0.00 Tm 0.0 Tm
Lever arm about c/L base (along T-T axis) = 0.25 m 0.25 m
Moment MLL = 38.31 Tm 10.86 Tm
0.5 5.95
0.5 5.95
0.5 5.95
C/L
IV) Class A 4 Lane
27.7 27.7 27.7 27.7 27.7 27.7 27.7 27.7
0.4 1.8 1.7 1.8 1.7 1.8 1.7 1.8
|| || ||
0.5 5.95
0.5 5.95
0.5 5.95
Ecc = 0.25 m
Design of Abutment
0.5 5.95
Ecc = -0.616 m
0.5 5.95
0.5 5.95
0.5 5.95
0.5 5.95
Design of Abutment
As per clause 214.2 of IRC:6, horizontal braking force F h, for each span is:
For Class A Single lane Fh = 0.2 x 55.40 = 11.08 t
Design of Abutment
= MAX(11.44 , 15.9)
= 15.90 tonne
FLongitudinal = 15.90 tonne
2
LL surcharge intensity q = 2.4 t/m
Ka Dry = 0.297
1) LWL CONDITION
Ka = 0.297
Ka' = 0.308
3
gdry = 2 t/m
3
gsub = 1 t/m
d = 20 o
dsubmerged = 10 o
2
q = 2.4 t/m
L = 12.9 m
B = 2.1 m
FRL 341.500
6.461 4
1
2
LWL 335.039 0.7128 t/m
2
3.838 t/m
2.300 2 5
3
PCB 332.739
2 2
Kagh = 4.546 t/m Ka*q 0.7392 t/m
2) HFL CONDITION
Ka = 0.297
Ka' = 0.308
3
gdry = 2 t/m
3
gsub = 1 t/m
d = 20 o
dsubmerged = 10 o
2
q = 2.4 t/m
L = 12.9 m
B = 2.1 m
FRL 341.500
5.812 4
1
2
HFL 335.688 0.7128 t/m
2
3.452 t/m
2.949 2 5
3
PCB 332.739
2 2
Kagh = 4.361 t/m Ka*q 0.7392 t/m
2
LL surcharge intensity q = 2.4 t/m
Ka Dry = 0.297
1) LWL CONDITION
Ka = 0.297
Ka' = 0.308
3
gdry = 2 t/m
3
gsub = 1 t/m
d = 20 o
dsubmerged = 10 o
2
q = 2.4 t/m
L = 12.9 m
B = 2.1 m
FRL 341.500
6.461 4
1
2
LWL 335.039 0.7128 t/m
2
3.838 t/m
0.500 2 5
3
PCT 334.539
2 2
Kagh = 3.992 t/m Ka*q 0.7392 t/m
2) HFL CONDITION
Ka = 0.297
Ka' = 0.308
3
gdry = 2 t/m
3
gsub = 1 t/m
d = 20 o
dsubmerged = 10 o
2
q = 2.4 t/m
L = 12.9 m
B = 2.1 m
FRL 341.500
5.812 4
1
2
HFL 335.688 0.7128 t/m
2
3.452 t/m
1.149 2 5
3
PCT 334.539
2 2
Kagh = 3.806 t/m Ka*q 0.7392 t/m
Forces @ Pile cap bottom & Their Lever arm from pile cap bottom
Description W ey
Tonne m
Total Super-Structure DL = 435 8.14
Total Super-Structure SIDL = 47 9.24
Total Surfacing weight = 60 8.79
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.108
Total weight of sup DL, SIDL & surfacing = 541 Tonne
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.130
Total weight of sup DL, SIDL & surfacing = 541.4 Tonne
SEISMIC VERTICAL :
Reaction due to DL, SIDL & Surfacing @ Pile cap bottom
Description V MTT MLL
Tonne Tm Tm
Total Super-Structure DL = 217.3 0.0 0.0
Total Super-Structure SIDL = 23.5 0.0 0.0
Total Surfacing weight = 29.9 0.0 0.0
Live load Reaction & Their Lever arm from Pile cap bottom
Description W MTT MLL ey
Tonne Tm Tm m
Maximum Live Load = 155.8 0.0 38.3 10.0
SEISMIC LONGITUDINAL :
No Live Load seismic component is considered in longitudinal direction
* 20% of braking force is considered
Fh = 7.16 x 0.2
= 1.43 Tonne
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.130
SEISMIC VERTICAL :
Vertical seismic coefficent AhT = 0.072
Max Live Load Reaction Case :
Maximum Live Load reaction = 155.83 Tonne
Seismic Component = 11.22 Tonne
MLL = 2.76 Tm
MTT = 0.00 Tm
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.130
Total weight of Sub-structure = 478.4 Tonne
SEISMIC VERTICAL :
Horizontal seismic coefficent Av = 0.072
Total weight of Sub-structure = 478.4 Tonne
----
LOAD COMBINATION
FOR MAXIMUM PILE CAPACITY
LC-5 SIS Span Dislodge Sx=1,Sz=0.3,Sy=0.3 FORCES @ PILE CAP BOTTOM LC-5
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
Seismic Longitudinal 0.5
11) Sub-structure Component 51.7 104.5 0.5
Seismic Transverse 0.15
15) Sub-structure Component 62.0 104.5 0.15
Seismic Vertical Downward 0.15
19) Sub-structure Component 34.4 -1.3 0.0 0.15
LC-5 SIS Span Dislodge Sx=1,Sz=0.3,Sy=0.3 595.802 25.83 9.29923 -21.211 15.6788
LC-6 SIS Span Dislodge Sx=0.3,Sz=1,Sy=0.3 FORCES @ PILE CAP BOTTOM LC-6
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
Seismic Longitudinal 0.15
11) Sub-structure Component 51.7 104.5 0.15
Seismic Transverse 0.5
15) Sub-structure Component 62.0 104.5 0.5
Seismic Vertical Downward 0.15
19) Sub-structure Component 34.4 -1.3 0.0 0.15
LC-6 SIS Span Dislodge Sx=0.3,Sz=1,Sy=0.3 595.802 7.75 30.9974 -57.7949 52.2628
Design of Abutment
LC-7 SIS Span Dislodge Sx=1,Sz=0.3,Sy=-0.3 FORCES @ PILE CAP BOTTOM LC-7
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
Seismic Longitudinal 0.5
11) Sub-structure Component 51.7 104.5 0.5
Seismic Transverse 0.15
15) Sub-structure Component 62.0 104.5 0.15
Seismic Vertical Downward 0.15
19) Sub-structure Component 34.4 -1.3 0.0 -0.15
LC-7 SIS Span Dislodge Sx=1,Sz=0.3,Sy=-0.3 585.47 25.83 9.29923 -20.8123 15.6788
LC-8 SIS Span Dislodge Sx=0.3,Sz=1,Sy=-0.3 FORCES @ PILE CAP BOTTOM LC-8
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
Seismic Longitudinal 0.15
11) Sub-structure Component 51.7 104.5 0.15
Seismic Transverse 0.5
15) Sub-structure Component 62.0 104.5 0.5
Seismic Vertical Downward 0.15
19) Sub-structure Component 34.4 -1.3 0.0 -0.15
LC-8 SIS Span Dislodge Sx=0.3,Sz=1,Sy=-0.3 585.47 7.75 30.9974 -57.3963 52.2628
4.000
T
2 6
2.000
12
L 13.500 S r2 25.92 160
3 7 2.000
4.000 Condition
Non-Seismic Seismic Case
4 8
0.75 Maximum Reaction Over Pile = 216 Tonne 150 Tonne
0.750 Minimum Reaction Over Pile = 41 Tonne 67 Tonne
Maximum Horizontal Force/ Pile = 46.25 Tonne 15 Tonne
2.55 2.55
5.1
Pile capacity vertical = 342 Tonne OK
Pile capacity Horizontal = 60 Tonne OK
Design of Abutment
Resultant
S.No. Forces @ cg. Of pile cap bottom Pile Reaction over Pile No.
horizontal
Description V HL HT MTT MLL 1 2 3 4 5 6 7 8 9 10 11 12 force
Tonne Tonne Tonne Tm Tm Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 NS Span Dislodge 591 0 0 -73 0 79 79 79 79 69 69 69 69 0.0
LC-2 NS No LL,Service Condition 938 368 0 1103 0 41 41 41 41 194 194 194 194 46.0
LC-3 NS DL Max LL Reaction Case 1093 370 0 1119 38 60 59 59 58 216 215 214 213 46.3
LC-4 NS DL Min LL Reaction Case, FP 982 370 0 1119 11 45 45 45 45 201 201 200 200 46.3
ANNEXURE-II
BASE PRESSURE & DESIGN OF FOUNDATION
LOAD COMBINATION
LC-2 NS(1) No LL,Service Condition EP Lead FORCES @ PILE CAP BOTTOM LC-2
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1.35
2) Earth fill 0.0 0.0 0.0 1.35
3) Super-structure DL 217.3 0.0 0.0 1.35
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1.35
5) Surfacing 29.9 0.0 0.0 1.75
6) Longitudinal Forces Frictional Component only 13.5 91.9 1.5
8) Earth Pressure LWL (O/S)
Horizontal Component 272.8 890.4 1.5
Vertical Component 76.30 -160.2 1.5
9) Surcharge Pressure LWL(O/S) 81.3 353.8 1.2
LC-3 NS(1) Max LL Reaction Case Lead,EP AccompFORCES @ PILE CAP BOTTOM LC-3
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1.35
2) Earth fill 0.0 0.0 0.0 1.35
3) Super-structure DL 217.3 0.0 0.0 1.35
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1.35
5) Surfacing 29.9 0.0 0.0 1.75
6.1) Live Load Vertical Load Max Reaction 155.8 0.0 38.3 1.5
7) Longitudinal Forces LL 15.9 108.0 1.5
8) Earth Pressure LWL (O/S)
Horizontal Component 272.8 890.4 1.5
Vertical Component 76.3 -160.2 1.5
9) Surcharge Pressure LWL(O/S) 81.3 353.8 1.2
LC-4 NS(1) Max LL Reaction Case Accomp,EP LeadFORCES @ PILE CAP BOTTOM LC-4
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1.35
2) Earth fill 0.0 0.0 0.0 1.35
3) Super-structure DL 217.3 0.0 0.0 1.35
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1.35
5) Surfacing 29.9 0.0 0.0 1.75
6.1) Live Load Vertical Load Max Reaction 155.8 0.0 38.3 1.15
7) Longitudinal Forces LL 15.9 108.0 1.15
8) Earth Pressure LWL (O/S)
Horizontal Component 272.8 890.4 1.5
Vertical Component 76.3 -160.2 1.5
9) Surcharge Pressure LWL(O/S) 81.3 353.8 1.2
LC-6 NS(2) No LL,Service Condition EP Lead FORCES @ PILE CAP BOTTOM LC-6
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
3) Super-structure DL 217.3 0.0 0.0 1
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1
5) Surfacing 29.9 0.0 0.0 1
6) Longitudinal Forces Frictional Component only 13.5 91.9 1.3
8) Earth Pressure LWL (O/S)
Horizontal Component 272.8 890.4 1
Vertical Component 76.3 -160.2 1
9) Surcharge Pressure LWL(O/S) 81.3 353.8 1.2
LC-7 NS(2) Max LL Reaction Case Lead,EP AccompFORCES @ PILE CAP BOTTOM LC-7
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
Design of Abutment
LC-8 NS(2) Max LL Reaction Case Accomp,EP LeadFORCES @ PILE CAP BOTTOM LC-8
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
3) Super-structure DL 217.3 0.0 0.0 1
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1
5) Surfacing 29.9 0.0 0.0 1
6.1) Live Load Vertical Load Max Reaction 155.8 0.0 38.3 1
7) Longitudinal Forces LL 15.9 108.0 1
8) Earth Pressure LWL (O/S)
Horizontal Component 272.8 890.4 1
Vertical Component 76.3 -160.2 1
9) Surcharge Pressure LWL(O/S) 81.3 353.8 1
LC-9 SIS Span Dislodge Sx=1,Sz=0.3,Sy=0.3 FORCES @ PILE CAP BOTTOM LC-9
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1.35
2) Earth fill 0.0 0.0 0.0 1.35
Seismic Longitudinal 0.75
11) Sub-structure Component 51.7 104.5 0.75
Seismic Transverse 0.225
15) Sub-structure Component 62.0 104.5 0.225
Seismic Vertical Downward 0.225
19) Sub-structure Component 34.4 -1.3 0.0 0.225
LC-9 SIS Span Dislodge Sx=1,Sz=0.3,Sy=0.3 805.108 38.7468 13.9488 -20.8253 23.5183
LC-10 SIS Span Dislodge Sx=0.3,Sz=1,Sy=0.3 FORCES @ PILE CAP BOTTOM LC-10
S.N. Description V HL HT MTT MLL
Design of Abutment
LC-10 SIS Span Dislodge Sx=0.3,Sz=1,Sy=0.3 805.108 11.624 46.4962 -75.7013 78.3942
LC-11 SIS Span Dislodge Sx=1,Sz=0.3,Sy=-0.3 FORCES @ PILE CAP BOTTOM LC-11
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1.35
2) Earth fill 0.0 0.0 0.0 1.35
Seismic Longitudinal 0.75
11) Sub-structure Component 51.7 104.5 0.75
Seismic Transverse 0.225
15) Sub-structure Component 62.0 104.5 0.225
Seismic Vertical Downward 0.225
19) Sub-structure Component 34.4 -1.3 0.0 -0.225
LC-11 SIS Span Dislodge Sx=1,Sz=0.3,Sy=-0.3 789.609 38.7468 13.9488 -20.2273 23.5183
LC-12 SIS Span Dislodge Sx=0.3,Sz=1,Sy=-0.3 FORCES @ PILE CAP BOTTOM LC-12
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1.35
2) Earth fill 0.0 0.0 0.0 1.35
Seismic Longitudinal 0.225
11) Sub-structure Component 51.7 104.5 0.225
Seismic Transverse 0.75
15) Sub-structure Component 62.0 104.5 0.75
Seismic Vertical Downward 0.225
19) Sub-structure Component 34.4 -1.3 0.0 -0.225
LC-12 SIS Span Dislodge Sx=0.3,Sz=1,Sy=-0.3 789.609 11.624 46.4962 -75.1033 78.3942
0.75 0.75
Pile Co-ordinates
1 6
S.No. L T
1 -1.8 6
2 -1.8 2
3 -1.8 -2
T 4 -1.8 -6
5 1.8 6
L 2 6 1.8 2
12 13.5 7 1.8 -2
8 1.8 -6
0 0 0
0 0 0
0 0 0
0 0 0
S r2 25.92 160
5 1
0.75
0.75
2.55 2.55
5.1
Resultant
S.No. Forces @ Pile cap Bootom Pile Reaction over Pile No.
horizontal
Description V HL HT MTT MLL 1 2 3 4 5 6 7 8 9 10 11 12 force
Tonne Tonne Tonne Tm Tm Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 NS(1) Span Dislodge 797.36 0 0 -98.9205 0 107 107 107 107 93 93 93 93 0.0
LC-2 NS(1) No LL,Service Condition EP Lead 1289.2 527.08 0 1558.746 0 53 53 53 53 269 269 269 269 65.9
LC-3 NS(1) Max LL Reaction Case Lead,EP Accomp
1523 530.631 0 1582.86 57.4619 83 81 80 78 302 301 300 298 66.3
LC-4 NS(1) Max LL Reaction Case Accomp,EP 1468.4
Lead 525.066 0 1545.063 44.0541 78 77 76 75 293 291 290 289 65.6
LC-9 SIS Span Dislodge Sx=1,Sz=0.3,Sy=0.3 805.11 38.7468 13.9488 -20.8253 23.5183 103 102 102 101 100 99 99 98 5.1
LC-10 SIS Span Dislodge Sx=0.3,Sz=1,Sy=0.3 805.11 11.624 46.4962 -75.7013 78.3942 109 107 105 103 98 96 94 92 6.0
LC-11 SIS Span Dislodge Sx=1,Sz=0.3,Sy=-0.3 789.61 38.7468 13.9488 -20.2273 23.5183 101 100 100 99 98 98 97 96 5.1
LC-12 SIS Span Dislodge Sx=0.3,Sz=1,Sy=-0.3 789.61 11.624 46.4962 -75.1033 78.3942 107 105 103 101 96 94 93 91 6.0
LC-13 SIS No LL,Service Condition EP Lead Sx=1,Sz=0.3,Sy=0.3
1199 165.201 43.685 652.8885 178.161 111 107 102 98 202 197 193 189 21.4
LC-14 SIS No LL,Service Condition EP Lead Sx=0.3,Sz=1,Sy=0.3
1199 49.5602 145.617 126.2036 593.869 163 149 134 119 181 166 151 136 19.2
LC-15 SIS No LL,Service Condition EP Lead Sx=1,Sz=0.3,Sy=-0.3
1150.5 165.201 43.685 654.0845 178.161 105 101 96 92 196 191 187 183 21.4
LC-16 SIS No LL,Service Condition EP Lead Sx=0.3,Sz=1,Sy=-0.3
1150.5 49.5602 145.617 127.3996 593.869 157 142 128 113 175 160 145 130 19.2
LC-17 SIS Max LL Reaction Case EP Lead Sx=1,Sz=0.3,Sy=0.3
1231.2 168.381 45.5026 674.487 204.176 115 110 105 99 208 203 198 193 21.8
LC-18 SIS DL Max LL Reaction Case EP Lead Sx=0.3,Sz=1,Sy=0.3
1231.2 52.7407 151.675 147.8021 662.131 168 152 135 119 189 172 156 139 20.1
LC-19 SIS DL Max LL Reaction Case EP Lead Sx=1,Sz=0.3,Sy=-0.3
1180.7 168.381 45.5026 675.683 203.68 108 103 98 93 202 197 192 187 21.8
LC-20 SIS DL Max LL Reaction Case EP Lead Sx=0.3,Sz=1,Sy=-0.3
1180.7 52.7407 147.434 148.9981 619.388 160 145 129 114 181 166 150 135 19.6
Design of Abutment
LC-9 103 102 102 101 100 99 99 98 0 0 0 0 5.1 508 297 103 0 5
LC-10 109 107 105 103 98 96 94 92 0 0 0 0 6.0 522 283 109 0 6
LC-11 101 100 100 99 98 98 97 96 0 0 0 0 5.1 499 291 101 0 5
LC-12 107 105 103 101 96 94 93 91 0 0 0 0 6.0 512 278 107 0 6
LC-13 111 107 102 98 202 197 193 189 0 0 0 0 21.4 620 579 202 0 21
LC-14 163 149 134 119 181 166 151 136 0 0 0 0 19.2 745 454 181 0 19
LC-15 105 101 96 92 196 191 187 183 0 0 0 0 21.4 589 561 196 0 21
LC-16 157 142 128 113 175 160 145 130 0 0 0 0 19.2 715 436 175 0 19
LC-17 115 110 105 99 208 203 198 193 0 0 0 0 21.8 637 595 208 0 22
LC-18 168 152 135 119 189 172 156 139 0 0 0 0 20.1 764 468 189 0 20
LC-19 108 103 98 93 202 197 192 187 0 0 0 0 21.8 605 576 202 0 22
LC-20 160 145 129 114 181 166 150 135 0 0 0 0 19.6 730 451 181 0 20
Design of Abutment
4 8
0.75 0.75
1.638
2.1 2.1
5.1
CALCULATING DESIGN BM & SF AT THE FACE OF ABUTMENT SHAFT IN THE LONGITUDINAL DIRECTION :
2 2
Weight of soil over pile cap = 13.92 T/m 1 T/m
Load Factor = 1.35
Factored weight of soil over pile cap = 18.8 T/m2 1.4 T/m2
Downward Force = 39.5 T/m 2.8 T/m
Lever arm from face of Abut shaft = 1.1 m 1.1 m
Downward moment = 41.4 Tm/m 3.0 Tm/m
2 2
Factored weight of soil over pile cap = 18.79 T/m 1.35 T/m
Downward Shear Force = 9.02 T/m 0.65 T/m
2
= 1417 mm /m
Distribution steel = 20% of Ast. Main Reinf. (Refer clause 16.6.1 of IRC :112-2011, Pg 181)
2
= 449 mm /m
(SLS) CHECK FOR STRESSES (RARE & QUASI PERMANENT LOAD COMBINATIONS)
2
Reinf. modulus of elasticity Es = 200000 N/mm
Description Stress Check For Rare Combination Stress Check For QP Combination
Design Moment = 51.24 Tm = 20.79 Tm
Total Depth at section = 1.8 m = 1.8 m
deff = 1.715 m = 1.715 m
width b = 1m = 1m
2 2
Ast, provided = 2244 mm /m = 2244 mm /m
Modular ratio = 8.70 = 12.38
dc (depth of neutral axis) = 240.00 mm = 282.16 mm
INA (Transformed) = 4.71E+10 mm4 = 6.45E+10 mm4
2 2
Compressive stress in concrete sc = 2.61 N/mm = 0.91 N/mm
2 2
Permissible Compressive stress = 16.8 N/mm OK = 12.6 N/mm OK
2 2
Tensile stress in steel ss = 140 N/mm = 57 N/mm
2 2
Permissible tensile stress = 300 N/mm OK = 400 N/mm OK
Design of Abutment
h = 1.8 m , b = 1m
k = 0.65
fcteff = fctm
= 2.77 Mpa
Act = Area of concrete within tensile zone just before the first crack form, section behaves
elastically until the tensile fiber stress reaches fctm. hence Neutral axis depth will be
considered for gross section
Act = b * h/2
2
= 0.9 m
2 2
Asmin = 1297 mm /m < 2244 mm /m OK
Design of Abutment
Clear cover c = 75 mm
Bar dia feq = 20.00 mm
5 (c +feq/2) = 425 mm
width b = 1m
2
Ac,eff = hc,eff *b = 0.213 m
Es = 200000 Mpa
Ecm' = 16154 Mpa */ (for Long term loading)
ae = Es/Ecm
ae = 12.38
= 0.00017
(ULS) CHECK FOR SHEAR FORCE (Section At deff from face of Abutment Shaft)
Factored Shear Force VED = 20.90 T/m
scp = 0 Mpa
VRdc = Max ( 0.12 k (80 r1 fck )0.33 + 0.15 scp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(nmin +0.15scp ) bw d
vEd.red = VEd.red / ud
u = Length of perimeter
= 8.10 m
2
vEd.red = 0.11982 N/mm
K = 1+ 200/d ≤ 2
= 1.333
a = 3.6 m
rly = 0.0013
rlz = 0.0008
rl = rly *rlz
= 0.001 %
= 0.2824 Mpa
n = 0.6 [ 1- fck/310 ]
= 0.53226
Check
vEd.red < vRdc
0.120 Mpa < 0.229 Mpa OK
Design of Abutment
vEd = VEd.red / uo d
uo = 3.770 m
Check
vEd < vRd.max
0.446 Mpa < 4.16 Mpa OK
Design of Abutment
Clear cover = 75 mm
1.2 Dia of bar = 32 mm
Nos. of Bars = 25 Nos
Effective cover = 91 mm
Reinf Circular dia = 1018 mm
Spacing = 128 mm (1 layer)
Area of steel provided = 20106 mm2
Material Properties:
2
fck = 35 N/mm % steel provided = 1.78 %
2
fyk = 500 N/mm
2
Es = 200000 N/mm Minimum % steel = 0.4 % OK
3000
1 2047.9 178.8
0
1.2 2244.5 111.9 0 100 200 300 400 500
1.4 2349.9 74.2 -500
1.6 2412.3 50.2
1.8 2450.0 34.6 -1000
2 2472.6 24.8
-1500
Mu (Tm)
Design of Abutment
3000
2000
Series2
Pu ( T )
1500
Series3
1000
500
0
0 100 200 300 400 500
-500
-1000
-1500
Mu (Tm)
Design of Abutment
N Value = 60 1.2
*/ As Recommended in Geotech Report (Average value adopted) Lf
Le
Modulus of subgrade reaction for Granular soil
3
ɳh = 10000 kN/m */ As per IS2911-2010
3
= 1 kg/cm
L1 + L f = 9.95 m 9.95 m
3
Pile Head deflection Q *(L1 +Lf) / 12 EI = 11.54 mm 3.7 mm
Check OK
Check Not Required
Design of Abutment
Material Properties
fck = 35 Mpa fyk = 500 Mpa
fcd = acc fck/ym gs = 1.15
acc = 0.67 fywd = 0.8 fyk /gs
gm = 1.5 fywd = 348 Mpa
q = 0.5 sin-1 [ 2*VNS / (acw * bw * z * v1 * fcd) ] ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
Variation of q
o
q
o
45 ≥ ≥ 21.80
z = 0.9 * d = 0.76 m
q = 6.30 deg
VRdmax = acw * bw * z * n1 * fcd / ( cot q +tan q) ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
acw = 1
z = 0.9*d
= 0.6
z = 0.9 * d = 0.76 m
bw = 0.85 m
z = 0.9 d = 0.76 m
qdesign = 21.8014
Asw,min /s = 87 mm2 /m
ANNEXURE-II
BASE PRESSURE & DESIGN OF FOUNDATION - SLS CHECK
LOAD COMBINATION
LC-2 RARE, NS DL, SIDL, EP,LL maxm Reaction case Forces about toe LC-2
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
3) Super-structure DL 217.3 0.0 0.0 1
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1
5) Surfacing 29.9 0.0 0.0 1.2
6.1) Live Load Vertical Load Max Reaction 155.8 0.0 38.3 1
7) Longitudinal Forces LL 15.9 108.0 1
LC-3 RARE, NS DL, SIDL, EP,LL min Reaction case Forces about toe LC-3
S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 590.6 -73.3 0.0 1
2) Earth fill 0.0 0.0 0.0 1
3) Super-structure DL 217.3 0.0 0.0 1
4) SIDL (excluding surfacing) 23.5 0.0 0.0 1
5) Surfacing 29.9 0.0 0.0 1.2
6.2) Live Load Vertical Load Min Reaction 44.2 0.0 10.9 1
7) Longitudinal Forces LL 15.9 108.0 1
LC-3 RARE, NS DL, SIDL, EP,LL min Reaction case911.48727 15.902318 0 34.718179 10.85718
Design of Abutment
Resultant
S.N. Description Forces about toe Pile Reaction over Pile No.
horizontal
V HL HT MTT MLL 1 2 3 4 5 6 7 8 9 10 11 12 force
Tonne Tonne Tonne Tm Tm Tonne Tonne Tonne Tonne Tonne
LC-1 QP, NS DL, SIDL ,EP 867 14 0 19 0 107 107 107 107 110 110 110 109.7 1.7
LC-2 127 126 125 124 132 131 130 129 0 0 2.0 634 389 132 0 2.0
LC-3 112 112 111 111 117 116 116 116 0 0 2.0 563 349 117 0 2.0
0.75
0.75 5
1
Pile Dia = 1.2 m
Depth of pile cap = 1.8 m
Density of RCC = 2.5 t/m3
FRL to pile cap top = 7.0 m
Earth fill over pile cap = 0.5 m
13.5 2 Density of soil = 2 t/m3
4 8
0.75
2.1 2.1
Design of Abutment
CALCULATING DESIGN BM & SF AT THE FACE OF Abutment SHAFT : (Quasi Permanent Load Case) in Longitudina Direction
Pile Nos. 1+2+3+4+5+6 7+8+9+10+11+12
Maximum Reaction = 538.2 T 329.1 T
Distance from c/Lpile to face of Abut shaft = 1.35 m 1.35 m
Dia of Pile = 1.2 m 1.2 m
Effective portion of Pile = 1.2 m 1.2 m
Effective force from Pile = 538.2 T 329.1 T
Effective force from Pile / m = 39.9 tm/m 24.4 tm/m
Lever arm from face of Abut shaft = 1.35 m 1.35 m
Moment at the face of Abut shaft/m = 53.8 tm/m 32.9 tm/m
2 2
Weight of soil over pile cap = 13.92 T/m 1 T/m
Load Factor = 1
Factored weight of pile cap = 13.922 T/m2 1 T/m2
Downward Force = 29.24 T/m 2.10 T/m
Lever arm from face of Abut shaft = 1.05 m 1.05 m
Dowanward moment = 30.70 Tm/m 2.21 Tm/m
CALCULATING DESIGN BM & SF AT THE FACE OF Abutment shaft: (Rare Case) in Longitudian Direction
Pile Nos. 1+2 3+4
Maximum Reaction = 633.7 T 389.5 T
Distance from c/Lpile to face of Abut shaft = 1.35 m 1.35 m
Dia of Pile = 1.2 m 1.2 m
Effective portion of Pile = 1.2 m 1.2 m
Effective force from Pile = 633.7 T 389.5 T
Effective force from Pile / m = 46.9 tm/m 28.9 tm/m
Lever arm from face of Abut shaft = 1.35 m 1.35 m
Moment at the face of Abut shaft/m = 63.4 tm/m 38.9 tm/m
2 2
Weight of soil over pile cap = 1 T/m 1 T/m
Load Factor = 1
Factored weight of pile cap = 1 T/m2 1 T/m2
Downward Force = 2.10 T/m 2.10 T/m
Lever arm from face of Abut shaft = 1.05 m 1.05 m
Dowanward moment = 2.21 Tm/m 2.21 Tm/m
2
Reinf. modulus of elasticity Es = 200000 N/mm
2
Aeff = = 1.11 m
cgy = = 0.0104 m
Ix = = 0.0953 m^4
Transformed propertise
Properties of Reinforcement About Principal axis About Principal axis
Reinforcement in compression Layer 1 Layer 1
a = Cos-1(d1/r) = 3.142 radian
= 180 deg
2 2
Asc = 2*r*a*Ast/m = 0.02454 m 0.30754 m
cgyc = r*sin(a)/a = 2E-17 m 2E-17 m
4 4
Ixc = Ast/m* r3 * ( cos(a )*sin(a) + a ) = 0.00322 m 0.04039 m
Reinforcement in tension
2 2
Ast = As-Asc = 0m 0m
Cgyt = - Asc*Cgyc/Ast = -0.5125 m -0.5125 m
4 4
Ixt = Ix - Ixc = 0m 0m
Design of Abutment
ex = M/P = 0.07895 m
P = 1167540 N
M = 92182.9 N*m
d1 = -0.542 Craked
Check
Stress at neutral axis must be zero
Stres at point y = -0.5415 m
Results
% steel provided = 3.556 %
Maximum compressive stress
y = 0.6 m
s = 1.532 N/m^2
Maximum tensile stress
y = -0.509 m
s = 0.35 N/mm^2
Design of Abutment
2.55 1.8
0
5.1
1 Sub-structure 168.53 4.09 -0.11 0.00 168.53 2.29 -0.11 0.00 -18.5 0.0
3 Super-structure 217.28 8.14 0.00 0.00 217.28 6.34 0.00 0.00 0.0 0.0
4 SIDL (excluding surfacing) 23.50 9.24 0.00 0.00 23.50 7.44 0.00 0.00 0.0 0.0
5 Surfacing 29.92 8.79 0.00 0.00 29.92 6.99 0.00 0.00 0.0 0.0
18.1 LIVE LOAD (Max Reaction) 20.2 10.0 15.0 8.16 0.0 122.1
18.2 LIVE LOAD (Min Reaction) 5.7 10.0 4.2 8.16 0.0 34.6
21 SUP DL +SIDL +SURFACING19.49 0.00 0.00 14.44 0.00 0.00 0.0 0.0
22.1 LIVE LOAD (Max Reaction) 11.22 0.00 0.25 8.31 0.00 0.25 0.0 2.0
22.2 LIVE LOAD (Min Reaction) 3.18 0.00 0.2 2.36 0.00 0.25 0.0 0.6
Design of Abutment
ANNEXURE-II
BASE PRESSURE & DESIGN OF FOUNDATION
LOAD COMBINATION
Cc = 0.361*fck*xu*b xu ≤ D
0.447*fck*(1 - 4*g/21)*b *D xu > D
g = 16 / ( 7xu / D - 3 )2
fci = 0 esi ≤ 0
0.447fck esi ≥ 0.002
0.447fck [ 2 * (esi / 0.002) -(esi / 0.002)2 ] otherwise
Mc = Cc * ( 0.5D - x )
Ms = S Csi * yi
x = 0.416 xu xu ≤ D
(0.5 - 8*g /49)*{D/ (1-4*g/21)} xu > D
0.0035 * xu - D/ 2 + yi xu ≤ D
xu
esi =
0.002* 1+ yi - D/14 xu > D
xu -3D/7
Design of Abutment
Reinforcement in Transverse Direction : (As per Clause 16.3.2 of IRC 112-2011, Pg 174)
2
Total vertical reinf. = 49819 mm
Reinforcement in transvesre direction = 0.25 times vertical reinf
= 12455 mm2
2
Cross -sectional area Ac = 11610000 mm
Minimum reinf. = 0.001 Ac
= 11610 mm2
T T= a a
12900 MEDT MEDL
+ ≤ 1
As4 MEDT MRDL
L
As3
fck = 35 Mpa
As2 fcd = 15.6 Mpa
fyd = 435 Mpa
Ac = 11610000 mm2
L= 900 As = 49819 mm2
2
Confined area of concrete = 9920000 mm
Provide 6 bar of 16 mm dia bar as longitudinal steel on top face of abutment cap. ( Provided steel = 1206.37 mm^2
Provide 6 bar of 16 mm dia bar as longitudinal steel on bottom face of abutment cap. ( Provided steel = 1206.37 mm^2
Provide 4 bar of 16 mm dia bar as longitudinal steel onside face of abutment cap. ( Provided steel = 804.25 mm^2
Total Steel = 3216.99 mm^2 OK
]
Design of Abutment
0.300
Moment due to Bracket = 1.96 t-m
Approach Slab
Moment due to SIDL = 3.45 t-m
0.3 0.6
Moment due to 70RT axle = 12.1 t-m 0.3 2.24
0.3
Moment due to Braking Force = 33.9 t-m
ULS DESIGN :
Design Bending Moment MED = 5.97 T-m
Clear Cover = 40 mm
2
= 590 mm /m
scp = 0 Mpa
VRdc = Max ( 0.12 k (80 r1 fck )0.33 + 0.15 scp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(nmin +0.15scp ) bw d
(SLS) CHECK FOR STRESSES (RARE & QUASI PERMANENT LOAD COMBINATIONS)
2
Reinf. modulus of elasticity Es = 200000 N/mm
Description Stress Check For Rare Combination Stress Check For QP Combination
Design Moment = 3.98 Tm = 3.98 Tm
Total Depth at section = 0.3 m = 0.3 m
deff = 0.252 m = 0.252 m
width b = 1m = 1m
2 2
Ast, provided = 1340 mm /m = 1340 mm /m
Modular ratio = 15.32 = 15.32
dc (depth of neutral axis) = 83 mm = 83 mm
INA (Transformed) = 7.77E+08 mm4 = 7.77E+08 mm4
2 2
Compressive stress in concrete sc = 4.27 N/mm = 4.27 N/mm
2 2
Permissible Compressive stress = 16.8 N/mm OK = 12.6 N/mm OK
2 2
Tensile stress in steel ss = 133 N/mm = 133 N/mm
2 2
Permissible tensile stress = 300 N/mm OK = 400 N/mm OK
h = 0.3 m , b = 1m
k = 1
fcteff = fctm
= 2.77 Mpa
Act = Area of concrete within tensile zone just before the first crack form, section behaves
elastically until the tensile fiber stress reaches fctm. hence Neutral axis depth will be
considered for gross section
Act = b * h/2
2
= 0.15 m
2 2
Asmin = 333 mm /m < 1340 mm /m OK
Design of Abutment
Clear cover c = 40 mm
Bar dia feq = 16 mm
5 (c +feq/2) = 240 mm
width b = 1m
2
Ac,eff = hc,eff *b = 0.07225 m
Es = 200000 Mpa
Ecm' = 13055 Mpa */ (for Long term loading)
ae = Es/Ecm
ae = 15.32
soil properties
density 20.00
F fill soil 30.00
delta 20.00
earth pressure coeff ka 0.279
equivalent fluid density 5.58
density as per IRC 6-2014
cl. 217.1 4.80
concrete
grade of conc M35
density 25
rectangular part
(slab fixed at two adjacent edges)table 26/11a free
width a 2.10
depth b 8.76
thickness 0.50
b/2= 4.381 > a
loads
earth pressure at bottom 48.902 b free
ll surcharge 6.698
analysis (ref. Roark & Young)
a/b 0.240
rectangular loading a
beta1 -0.009
beta2 0.055
max. stress (along b) -19.210
max. stress (along a) 113.460
moment about a mz1 -1.681
moment about b mx1 41.418
triangular loading
beta1 0.110
beta2 0.121
max. stress (along b) 1657.35
max. stress (along a) 1814.71
moment about a mz2 145.019
moment about b mx2 662.443
total moment
moment about a mz1+mz2 143.338
moment about b mx1+mx2 703.860
MJBR
AButment_Pile foundation
Coeffic to consider the influence of concrete strength α = 0.67 A2.10 Page : 244 of 112
MJBR
AButment_Pile foundation
150
12
Wall_Hor
21.50 75 500 133 419 Okay 258.4 216.5 1204 1281 6606 OK
izontal 150
0
Section Under/Over Reinforced Check Moment Offered by Steel Reinforcement at Comp. Face
Neutral Axis
Max Neutral Moment of
Depth as per Ast
Axis Depth Moment to resistance
Ast prov Prov Moment of Min steel Bar dia Spacing Ast prov
be resisted offered by
Xumax = Section resistance Ast
Section xu= Section steel
0.617d Check offered by Check
steel check
(0.87fy*Ast)/
(mm2) (mm) (t-m) (t-m) mm2 mm mm mm2
(0.36*fck*b)
12 150 1583
under Wall
Wall vertical 11743 257.2 46.28 105.58 203.09 OK 2349
reinforced vertical
0 150
12 150 6606
under Wall_Horiz
Wall_Horizontal 6606 258.4 108.60 21.50 107.29 OK 1321
reinforced ontal
0 150
MJBR
AButment_Pile foundation
Top &
Ast
Effective Depth Provided Overall depth provided Bar dia spacing Bottom
Moment, Moment provided
stress= Section
Section Clear Cover Rare Quasipermanent
M*Y/I={M*( check
combination Combinations
D/2)}/{(b*D
(mm) (mm) (mm) (mm) (mm2) ^3)/12}
16 150
Wall vertical 75 70.39 66.24 417 500 11743.4 1.93 Uncracked
0 150
12 150
Wall_Horizontal 75 14.33 14.50 419 500 6605.6 1.64 Uncracked
0 150
MJBR
AButment_Pile foundation
Wall vertical 75.63 1570605853 5.42 OK 152.98 OK 16000 102.64 1221067393 4.45 OK 170.55 OK
Wall_Horizontal 110.19 779768376 3.24 OK 56.77 OK 16000 146.41 1223987223 1.39 OK 32.30 OK