Position of Lifted Shells as on 01-11-21 8:57

SHELL 10TH TIG Desp


S.NO BUILD LOWERED STANDS LEAK REMARKS
NO STD WELD date
I - WORK IN PROCESSS SHELLS AT SHOP 22,14 & 26 - 25
1 12 SL TCB 04.05.21 √ √ 01/11
2 38 SL SCZ 07.05.21 √ √ 01/11
3 13 SL TCB 07.05.21 √ √ 01/11
4 37 SL SCZ 08.05.21 √ √ 01/11
5 25 SPIC AC 31.08.21 √ √ BARE SHELL
6 210 DETC 07.09.21 √ √ √
7 26 SPIC AC 09.09.21 √
8 35 KOL TC 18.09.21
9 27 SPIC AC 18.09.21 √ √ BARE SHELL
10 212 DETC 22.09.21 √ √ √
11 28 SPIC AC 25.09.21 01/11
12 36 KOL TC 01.10.21
13 207 DETC 01.10.21 √ √ √
14 213 DETC 15.10.21 √ √ √
15 77 ARMV AC 18.10.21 √ √
16 214 DETC 19.10.21 √ √ √
17 215 DETC 23.10.21 √ √
18 216 DETC 23.10.21 √
19 217 DETC 27.10.21
20 3431 LSCN 29.10.21 √ √ 01/11
21 3432 LSCN 29.10.21 √ √ 01/11
22 3433 LSCN 29.10.21 √ √ 01/11
23 1988 LACCN 29.10.21 √ √ 01/11
24 1989 LACCN 29.10.21 01/11 √ 01/11
25 218 DETC 29.10.21
II- SHELLS IN DESPATCH LINE - 2
1,2 IGBT DPC 140,141.
III - LIFTING OUT TURN - 5
1 1886 LS DD 30.10.21 01/11 01/11
2 1955 LACCN 30.10.21 01/11 01/11
3 3434 LSCN 30.10.21 01/11 01/11
4 3462 LSCN 30.10.21 01/11 01/11
5 35 KOL DTC 30.10.21
TOTAL SHELLS - 32
YESTERDAY'S DESPATCH
DAY: 6 WEEK:
LSCN 3430, LS DD 1884, 1885, MEMU DMC 200,
30-Oct 54 MONTH:
MEMU TC 562, 563, 564,597
174 YEAR: 950

31-Oct KOL MC 69,70,71,72, DETC 199, 211 6

TODAYS DESPATCH PLAN - SHELL NOS


LACCN 1988, 1989,LSCN 3431,3432,3433, SL TCB 12,13,
01-Nov 9
SL SCZ 37, 38
SUMMARY
DETC 9 SPIC AC - 4 IGBT DPC -2
SPART ARMV - 1 SV DPC - ARTV -
KOL METRO DTC - 1 TC -2 MC - TOTAL - 32
SRILANKA SCZ - 2 TCB - 2 TC G AC -
MEMU DMC - TC -
LHB LS DD - 1 LSCN - 5 LACCN - 3 LSCZ - 0