The document lists 32 lifted shells by type and status at a facility on 01-11-21. It notes 9 shells undergoing final inspection and leak testing, 4 process inspection shells, and 2 IGBT test shells. The daily dispatch included 9 shells and the plan for 01-Nov is to dispatch another 9 shells including types LACCN, LSCN, SL TCB, and SL SCZ. A total of 32 shells are listed at various stages of the process.
The document lists 32 lifted shells by type and status at a facility on 01-11-21. It notes 9 shells undergoing final inspection and leak testing, 4 process inspection shells, and 2 IGBT test shells. The daily dispatch included 9 shells and the plan for 01-Nov is to dispatch another 9 shells including types LACCN, LSCN, SL TCB, and SL SCZ. A total of 32 shells are listed at various stages of the process.
The document lists 32 lifted shells by type and status at a facility on 01-11-21. It notes 9 shells undergoing final inspection and leak testing, 4 process inspection shells, and 2 IGBT test shells. The daily dispatch included 9 shells and the plan for 01-Nov is to dispatch another 9 shells including types LACCN, LSCN, SL TCB, and SL SCZ. A total of 32 shells are listed at various stages of the process.