LAMPRELL ENERGY LTD

Lamprcll REQUEST FOR INSPECTION


RFI no: 2005-S003-NBPG-RFI-05955_R00 Project: ARO 2005 Client: ARO

Request Date: 18-May-2021 Date of Inspection: 22-May-2021 Time of Inspection: 15:00

Facility: Hamriyah - Phase I Location: PAD - 09

Request By: Sudhakar Company: LEL Designation: Quality Inspector

TO: ARO PTC, IMI, ABS CC: ARO DC, IMI, LEL QC, LEL PMT

Equipment
Sub Base Equipment Tag No: 01-01-04 Client Discipline: STR
Description:

PO: NAP MR: NAP GRN: NAP

SUB BASE (TROLLEY BEAM FITUP WITH TIE BEAM)


Detail 10M , 8M [sht 4/4 ], Plan view in sht 1/4

Inspection or
Test Scope:

Inspection or Applicable
Fit up inspection 200-00-00-S003-PRO-51015_R00 Visual inspection Procedure
Test Type: Procedure:

ITP LEL/IMI ARO ABS


ITP Reference: Intervention
200-01-01-S003-PLN-51008_RB Sub Base Structure-ITP Point: A2 A2 A2

Reference Documentation: ( All documentation necessary to complete the inspection or test e.g. drawings, documentation, procedures, certification,)

200-00-00-S003-PRO-51001_R00 In-Process Inspection Procedure

2005-01-01-S003-DSS-19146 -R01 AFC

Acceptance
Criteria: S116E -CTS- REV0- ARO DRILLING 12-Jan-2020 and SHIPBUILDING CONTRACT FOR HULL NO. P20D0001 19-Jan-20

Inspection or Test Report(s) Cross Reference: (Cross References to all documentation used to record the results and findings of the inspection or test e.g. Completed procedures, ITRs, Test charts, Inspection reports etc.)

Comments:(Any comments relevant to the Inspection or Test with identification of the party making the comment)

Entity LEL IMI ARO TPI ABS

Name Sudhakar NAP

Designation QC Inspector NAP

Signature NAP

Official Stamp NAP

Date NAP

Form: 19/2112/LGQCF031
Rev.: 02
Date: June 2020 Page: 1 of 1