Design Stage
FEED Design development as Per The Scope of Work (Phase - Bathymetric and Marine Survey & Studies (550,000 x 1.5) = 825,000 SR) and also provide
4 Lump Sum Optional - design the Facility no. 28,29,30,31)
2) Jetty and berth area (Facility no. 28,29,30,31)
Tendering Stage
Supervision Stage
Engineering fees as for the office support works during the EPC
stage (inspection, testing & commissioning, reporting, review 1 Engr. x 2 Months x 5 Discipline
6 Lump Sum Firm 1.00 663,750.00 400,000.00 263,750.00 1 CAD x 1 Months x 5 Discipline
and endorse the Detailed Design, MAR review, and others as
per the scope of work)
Legend:
1*) Bidders should quote in the unit of the measures specified by NPCC only.
2*) 'F' = Firm Scope , 'O' = Optional Scope.
NOTE: Quoted rate(s) shall remain firm and shall not be subject to revision or escalation through out the period
NATIONAL PETROLEUM CONSTRUCTION COMPANY
APPENDIX B - SCHEDULE OF PRICES & RATES
NPCC ENQUIRY NO : YRD-MGT-2022/366/A/MJ
Quoted Discounted
7.2 Electrical Engineer (inspection) SAR/Day - 1.00 2,500.00 2000
Others
8 Drawings Printout (full size) - if requested by NPCC SAR/Set - - 3 Set x 397 Drawings x 20 SR/ Drawings = 23,820 SR
Legend:
1*) Bidders should quote in the unit of the measures specified by NPCC only.
2*) 'F' = Firm Scope , 'O' = Optional Scope.
NOTE: Quoted rate(s) shall remain firm and shall not be subject to revision or escalation through out the period
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
2 FEED Design development as Per The Scope of Work (Phase -1) 706,592.47 70% of design Cost of Phase 1
3 FEED Design development as Per The Scope of Work (Phase -2) 170,373.00 70% of design Cost of Phase 2
SUMMARY OF COST
Sr./ Hourly
Designation Monthly Salary
No. Salary
375,842.34
I FEED Design development (Phase -2) Jetty and berth area (Facility no. 28,29,30,31)
II Bathymetric and Marine Survey (Assessment Thirdy Party Price x 1.5) 605,000.00
Page 4 of 59
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
Ref. No. ESTIMATED NO. OF DRAWINGS ESTIMATED MAN-HOURS UNIT RATE (SR)
TOTAL AMOUNT
(Master FACILITIES
(SR)
Yard Plan)
AR SE ME EE & TE CE/ LS Total CAD ENGR. TOTAL CAD ENGR.
A BUILDING WORKS
5 AUTO BLASTING AND PAINTING MACHINE 2 2 3 3 10 270 185 455 75 165 50,775.00
7, 8 & 9 GANTRY CRANES LAYOUT (25 MT & 10 MT) 0 8 0 8 240 160 400 75 165 44,400.00
B SITE WORKS
PHASE 2
A BUILDING WORKS
26 & 27 GANTRY CRANES LAYOUT (COPY OF # 8 & 9) 0 8 0 0 8 120 60 180 75 165 18,900.00
B SITE WORKS
OPTIONAL COST
Page 5 of 5
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL 3
FURNITURE LAYOUT 0
SUB TOTAL 4
6
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 3
SUB TOTAL 4
CLIENT OFFICES
7
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL 3
QC FACILITY OFFICES
SUB TOTAL 0
SUB TOTAL 0
MESS HALL
FURNITURE LAYOUT 0
8
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
MISCELLANEOUS DETAILS 0
SUB TOTAL 4
CLINIC
SUB TOTAL 3
MOSQUE
9
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL 6
CLOSED WAREHOUSE 1
SUB TOTAL 3
CLOSED WAREHOUSE 2
SUB TOTAL 3
AR-A0-CRN-102 DETAILS 0
SUB TOTAL 0
10
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
AR-A0-CRN-202 DETAILS 0
SUB TOTAL 0
SUB TOTAL 1
SUB TOTAL 1
GENERATOR
SUB TOTAL 1
OPEN SHEDS
SUB TOTAL 1
BEAM SHOP
SUB TOTAL 2
PLATE SHOP
11
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL 2
PIPE/TUBE SHOP
SUB TOTAL 2
SUB TOTAL 3
SUB TOTAL 2
SUB TOTAL 4
TOTAL DRAWINGS = 55
12
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 2
SUB TOTAL = 2
8
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SE-A0-304 SCHEDULE 0
SUB TOTAL = 2
CLIENT OFFICES
SUB TOTAL = 2
QC FACILITY OFFICES
SE-A0-504 SCHEDULE 0
SUB TOTAL = 0
9
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SE-A0-604 SCHEDULE 0
SUB TOTAL = 0
MESS HALL
SE-A0-704 SCHEDULE 0
SUB TOTAL = 3
CLINIC
SUB TOTAL = 2
10
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
MOSQUE
SUB TOTAL = 4
CLOSED WAREHOUSE 1
SUB TOTAL = 3
CLOSED WAREHOUSE 2
SUB TOTAL = 3
11
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 2
SUB TOTAL = 8
SUB TOTAL = 1
SUB TOTAL = 1
GENERATOR
SUB TOTAL = 1
OPEN SHEDS
LAYOUT PLANS
SE-A0-SHD-100 1
MISCELLANEOUS DETAILS
12
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
BEAM SHOP
LAYOUT PLANS 1
SE-A0-BM-100
MISCELLANEOUS DETAILS 1
SUB TOTAL = 2
PLATE SHOP
SUB TOTAL = 2
PIPE/TUBE SHOP
SUB TOTAL = 2
SUB TOTAL = 2
SUB TOTAL = 2
13
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 4
TOTAL DRAWINGS = 53
14
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 1
SUB TOTAL = 1
HVAC DRAWINGS
15
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
PG-A0-101
1
PG-A0-102 FLOOR PLAN / ROOF PLAN DRAINAGE SYSTEM LAYOUT
PG-A0-103 0
SUB TOTAL = 2
SUB TOTAL = 1
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
16
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 1
CLIENT OFFICES
HVAC DRAWINGS
17
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 1
QC FACILITY OFFICES
HVAC DRAWINGS
SUB TOTAL = 0
PLUMBING DRAWINGS
PG-A0-501
PG-A0-503
SUB TOTAL = 0
18
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 0
HVAC DRAWINGS
SUB TOTAL = 0
PLUMBING DRAWINGS
AR-A0-601 0
AR-A0-603 0
SUB TOTAL = 0
SUB TOTAL = 0
MESS HALL
HVAC DRAWINGS
19
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 1
CLINIC
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
20
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
MOSQUE
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 1
CLOSED WAREHOUSE 1
HVAC DRAWINGS
21
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 1
CLOSED WAREHOUSE 2
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
22
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 0
HVAC DRAWINGS
23
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 0
PLUMBING DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 1
GENERATOR ROOM
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 1
OPEN SHEDS
24
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
HVAC DRAWINGS
SUB TOTAL = 0
PLUMBING DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 0
BEAM SHOP
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 0
FP-A0-BM-1900 ELEVATION A & B / C & D / SECTION 1 & 2 / DETAILS & ROOF PLAN DRAINAGE LAYOUT 1
SUB TOTAL = 1
PLATE SHOP
HVAC DRAWINGS
25
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
PG-A0-PL-2000 0
SUB TOTAL = 0
FP-A0-PL-2000 ELEVATION A & B / C & D / SECTION 1 & 2 / DETAILS & ROOF PLAN DRAINAGE LAYOUT 1
SUB TOTAL = 1
PIPE/TUBE SHOP
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
PG-A0-PT-2100 0
SUB TOTAL = 0
FP-A0-PT-2100 ELEVATION A & B / C & D / SECTION 1 & 2 / DETAILS & ROOF PLAN DRAINAGE LAYOUT 1
SUB TOTAL = 1
HVAC DRAWINGS
26
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
PG-A0-FAB-2200 0
SUB TOTAL = 0
FP-A0-FAB-2200 FLOOR PLAN PLAN FIRE PROTECTION LAYOUT ROOF PLAN DRAINAGE LAYOUT 1
SUB TOTAL = 1
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
PG-A0-PNT-2300 1
SUB TOTAL = 1
FP-A0-PNT-2300 FLOOR PLAN PLAN FIRE PROTECTION LAYOUT ROOF PLAN DRAINAGE LAYOUT 1
SUB TOTAL = 1
HVAC DRAWINGS
27
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
SUB TOTAL = 3
TOTAL DRAWINGS = 57
28
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL = 1
SUB TOTAL = 5
SUB TOTAL = 5
28
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 5
CLIENT OFFICES
SUB TOTAL = 5
QC FACILITY OFFICES
SUB TOTAL = 0
29
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 0
MESS HALL
SUB TOTAL = 6
CLINIC
SUB TOTAL = 4
MOSQUE
30
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 5
CLOSED WAREHOUSE 1
SUB TOTAL = 5
CLOSED WAREHOUSE 2
SUB TOTAL = 5
31
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GROUND FLOOR LIGHTING , POWER LAYOUT PLAN, LOAD SCHEDULE & SINGLE LINE
EE-A0-DPMP-100 1
DIAGRAM
GROUND FLOOR DATA/VOICE, CCTV, FIRE ALARM SYSTEM LAYOUT PLAN & RISER
TC-A0-DPMP-101 1
DIAGRAM
SUB TOTAL = 2
TC-A0-DPMP-201 GROUND FLOOR DATA/VOICE, CCTV & FIRE ALARM SYSTEM LAYOUT PLAN 1
SUB TOTAL = 2
GENERATOR ROOM
SUB TOTAL = 6
BEAM SHOP
SUB TOTAL = 3
PLATE SHOP
32
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 3
PIPE/TUBE SHOP
SUB TOTAL = 3
SUB TOTAL = 3
SUB TOTAL = 3
33
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 8
TOTAL DRAWINGS = 79
34
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SURVEY
DEMOLITION
CIVIL
ROAD
CE-A1-015 ENLARGED SITE GRADING & STORM DRAINAGE PLAN (SCALE 1 : 1000) 2
CE-A1-025 ENLARGE POTABLE/ FIRE WATER SYSTEM LAYOUT PLAN (SCALE 1 : 1000) 2
34
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB-TOTAL 1 27
STRUCTURAL-INFRASTRUCTURE
SUB-TOTAL 2 4
LANDSCAPE
LS-A1-002 ENLARGED MASTER PLAN & SITE FURNITURE LAYOUT PLAN (SCALE 1 : 1000) 2
35
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB-TOTAL 3 6
ELECTRICAL
TELECOM
EE-A1-009 MISCELLANEOUS DETAILS (FDT DETAILS, DUCT BANK DETAILS- FOC DETAILS) 1
SUB-TOTAL 4 11
36
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL = 3
COLD WAREHOUSE
SUB TOTAL = 4
37
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
AR-A0-WRHS-205 1
RAMPS, DOCKS AND STEPS SCHEDULE AND DETAILS / DETAILS
SUB TOTAL = 4
AR-A0-CRN-102 DETAILS 0
SUB TOTAL = 0
AR-A0-CRN-202 DETAILS 0
SUB TOTAL = 0
OPEN SHEDS
SUB TOTAL = 1
SUB ASSEMBLY SHOP SCHEDULE AND LAYOUT PLAN / FINISHING SCHEDULE / ROOF
AR-A0-ASS-100 1
PLAN
SUB TOTAL = 4
TOTAL DRAWINGS = 16
38
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL 2
COLD WAREHOUSE
SUB TOTAL 3
SUB TOTAL = 3
3
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 2
SUB TOTAL = 8
OPEN SHEDS
LAYOUT PLANS
SE-A0-SHD-100 1
MISCELLANEOUS DETAILS
SUB TOTAL = 1
SUB TOTAL = 2
TOTAL DRAWINGS = 21
4
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 1
SUB TOTAL = 1
COLD WAREHOUSE
HVAC DRAWINGS
5
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
SUB TOTAL = 1
HVAC DRAWINGS
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 2
6
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
OPEN SHEDS
HVAC DRAWINGS
SUB TOTAL = 0
PLUMBING DRAWINGS
SUB TOTAL = 0
SUB TOTAL = 0
HVAC DRAWINGS
7
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 1
PLUMBING DRAWINGS
SUB TOTAL = 1
SUB TOTAL = 1
TOTAL DRAWINGS = 13
8
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
GENERAL DRAWINGS
SUB TOTAL = 1
BUILDINGS
COLD WAREHOUSE
SUB TOTAL = 5
SUB TOTAL = 5
9
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB TOTAL = 5
TOTAL DRAWINGS = 16
10
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SURVEY
DEMOLITION
CIVIL
ROAD
CE-A1-015 ENLARGED SITE GRADING & STORM DRAINAGE PLAN (SCALE 1 : 1000) 1
CE-A1-025 ENLARGE POTABLE/ FIRE WATER SYSTEM LAYOUT PLAN (SCALE 1 : 1000) 1
11
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB-TOTAL 1 15
STRUCTURAL-INFRASTRUCTURE
SUB-TOTAL 2 1
LANDSCAPE
LS-A1-002 ENLARGED MASTER PLAN & SITE FURNITURE LAYOUT PLAN (SCALE 1 : 1000) 1
12
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
SUB-TOTAL 3 3
ELECTRICAL
TELECOM
EE-A1-009 MISCELLANEOUS DETAILS (FDT DETAILS, DUCT BANK DETAILS- FOC DETAILS) 0
SUB-TOTAL 4 6
13
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
NO. OF
DRAWING NO. DRAWING TITLE
ESTIMATED DWG
ARCHITECTURAL
SUB TOTAL = 6
SUB TOTAL = 5
STRUCTURAL
SUB TOTAL = 8
SUB TOTAL = 5
1
ENGINEERING CONSULTANCY SERVICES FOR PACKAGE 2, CONSTRUCTION OF NPCC KSA YARD FACILITIES
MAN-HOUR DETAIL FOR PREPARATIONS OF NPCC DOCUMENTS
ESTIMATED
TOTAL AMOUNT
S/ NO. DESCRIPTIONS MAN-HOUR UNIT RATES (SR)
(SR)
DETAILS
1 ARCHITECTURAL
BILL OF QUANTITIES (BOQ) 160 160 25,600.00
TECHNICAL SPECIFICATION 192 160 30,720.00
DESIGN ANALYSIS REPORS/ DESIGN CRITERIA 48 160 7,680.00
FF&E MASTER FOLLOW 96 160 15,360.00
3 D RENDERING 336 160 53,760.00
SUB-TOTAL FOR ARCHITECTURAL 832 133,120.00
2 STRUCTRUAL
BILL OF QUANTITIES (BOQ) 160 160 25,600.00
TECHNICAL SPECIFICATION 144 160 23,040.00
DESIGN ANALYSIS REPORS/ DESIGN CRITERIA 48 160 7,680.00
STRUCTURAL DESIGN CALCULATIONS 320 160 51,200.00
SUB-TOTAL FOR STRUCTURAL 672 107,520.00
3 MECHANICAL
BILL OF QUANTITIES (BOQ) 160 160 25,600.00
TECHNICAL SPECIFICATION 192 160 30,720.00
DESIGN ANALYSIS REPORS/ DESIGN CRITERIA 48 160 7,680.00
FF&E MASTER FOLLOW 96 160 15,360.00
DESIGN CALCULATIONS/ HYDRAULIC ANALYSIS 336 160 53,760.00
SUB-TOTAL FOR MECHANICAL 832 133,120.00
4 ELECTRICAL AND TELECOM
BILL OF QUANTITIES (BOQ) 160 160 25,600.00
TECHNICAL SPECIFICATION 192 160 30,720.00
DESIGN ANALYSIS REPORS/ DESIGN CRITERIA 48 160 7,680.00
ELECTRICAL & TELECOM DRAWINGS & CALCULATIO 336 160 53,760.00
SUB-TOTAL FOR ELECTRICAL 736 117,760.00
5 CIVIL/ LANDSCAPE
BILL OF QUANTITIES (BOQ) 96 160 15,360.00
TECHNICAL SPECIFICATION 192 160 30,720.00
DESIGN ANALYSIS REPORS/ DESIGN CRITERIA 48 160 7,680.00
SCHEDULE OF SD, PW, FW, SS & IRR 96 160 15,360.00
DESIGN CALCULATIONS ( SD, PW, FW, SS & IRR) 192 160 30,720.00
LANDSCAPE PRESENTATION 48 160 7,680.00
SUB-TOTAL FOR CIVIL 672 107,520.00
TOTAL MAN-HOUR FOR DOCUMENTS 3744 599,040.00
165
617760
Remarks
1 Engr. x 12 days
1 Engr. x 24 days
1 Engr. x 6 days
1 Engr. x 12 days
1 Engr. x 24 days
1 Engr. x 6 days