SITE ID: SMB00013 Regional:SUMATERA Photographer

NO 照片 photo

Solar panel
string(holder fuse
side)

string 1# Voltage test string 1# Voltage test string 2# Voltage test string 2# Voltage te
Close Cirkuit Open Cirkuit Close Cirkuit Open Cirkuit

S/N SSC Solar


Panel
Panel

S/N 1 SSC ALL VIEW 1 S/N 2 SSC ALL VIEW 2

Fuse test
inspection

Fuse 8 Fuse 9 Fuse 10 Fuse 11

Batteries S/N
Battery 1 Battery 2 Battery 3 Battery 4
Batteries S/N

Battery 8 Battery 9 Battery 10 Battery 11

Battery 1 Battery 1 Battery 2 Battery 2


Batteries
voltage test
Battery 1 Battery 1 Battery 2 Battery 2
Batteries
voltage test

Battery 4 Battery 5 Battery 5 Battery 6

SCC screen
photo

SCC Subrack Module SSC All View SCC SN


Photo of the
solar panel
surrounding

Facing South photo 2 photo 3 photo 4

FSU/SNMP

Serial Number Site Info Time setting Charge Controller

Tightening
Tightening
screw at both
ends of the
fuse

Fuse bolt Fuse bolt Fuse bolt Fuse bolt


Photographer: Bonex Butar-Butar
照片 photo

string 2# Voltage test string 3# Voltage test string 6# Voltage test Open string 7# Voltage test
Open Cirkuit Close Cirkuit Cirkuit
SSC ALL VIEW 2 S/N 3 SSC ALL VIEW 3 Fuse 7

Fuse 11 Fuse 12 Fuse 13 Fuse 14


Battery 4 Battery 5 Battery 6 Battery 7

Battery 11 Battery 12 Battery 13 Battery 14

Battery 2 Battery 3 Battery 3 Battery 4


Battery 2 Battery 3 Battery 3 Battery 4

Battery 6 Battery 6 Battery 7 Battery 7


photo 4 photo 5

Charge Controller Battery Controller Measurement BMS


Fuse bolt Fuse bolt Fuse bolt Fuse bolt