DAFTAR MATERIAL

PEKERJAAN
TAHUN
MATERIAL TAHAP

NO BARANG VOLUME JUMLAH MATERIAL HARGA JUMLAH KETERANGA

1 Plywood 12 mm (rangka Panel) 24 m2


2 Plywood 9 mm (Penutup Panel) 24 m2
1 HPL Type Kayu 01 24 m2
2 HPL Type Kayu 02 24 m2
2 HPL Type Warna Putih 12 m2
3 Lem Foz 4 Klg
4 Paku Beton 5
5 Paku L 15
6 Paku I 10
7 Paku U 10
8 Paku Mur 5
9 Mata Router 10
10 Amplas 5
11 Cutter dan mata Cutter 15
12
13
14
15
16

DEBI MAZED
KETERANGAN
DEBI MAZEDA
PEKERJAAN INTERIOR
PEKERJAAN : VOLUME LUASAN : #REF! Rp 200,000
PERIHAL :
LOKASI : #REF!
MANDOR : WARNO

BOBOT REALISASI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH (Rp) PEKERJAAN KEMAJUAN PEKERJAAN
(%) PEKERJAAN (%) (%)
1 2 3 4 5 6 7 8 9
2 PEKERJAN LANTAI 1
1 PEKERJAAN KONG LIONG PINTU LIFT LANTAI 1
a. Kong Lion Pintu dan Pintu (t:2,45 m, lebar : 90 cm) 1.00 unit Rp 1,500,000.00 1,500,000.00
2 PEKERJAAN Backdrop Foto Wall (TINGGI RUANGAN T: 3,25m)
Rp 200,000.00 1,960,000.00
a. Panel Backdrop ( T: 2.3 m , L : 3.6 m) 9.80

- Rangka Bakcdrop Plywood 12mm

- Pelapis Backdrop Plywood 09 mm

- Finisih HPL Taco Type 01

- Finish HPL Taco Type 02 (Accessories HPL)

- Finish HPL Taco Warna Putih (Accessories HPL)


Rp 200,000.00 1,480,000.00
b. Panel Pelapis Meja Beton 7.40

- Rangka Bakcdrop Plywood 12mm

- Pelapis Backdrop Plywood 09 mm

- Finisih HPL Taco Type 01

- Finish HPL Taco Type 02 (Accessories HPL)

- Finish HPL Taco Warna Putih (Accessories HPL)

3 PEKERJAAN Panel Dinding(TINGGI RUANGAN T: 3,25m)


Rp 200,000.00 1,960,000.00
a. Panel Backdrop ( T: 2.3 m , L : 3.6 m) 9.80

- Rangka Bakcdrop Plywood 12mm

- Pelapis Backdrop Plywood 09 mm

- Finisih HPL Taco Type 01

- Finish HPL Taco Type 02 (Accessories HPL)

- Finish HPL Taco Warna Putih (Accessories HPL)


4,940,000.00
JUMLAH VOLUME 18.20

3 PEKERJAN LANTAI 2
1 PEKERJAAN KONG LIONG PINTU LIFT LANTAI 2
a. Kong Lion Pintu Lift Basement (t:2,45 m, lebar : 30 cm) 1.00 m1 #REF! #REF!
#REF! #REF!
b. Kong Lion Pintu Masuk Lorong (2,5 x2,2 cm) #REF! m1

JUMLAH VOLUME #REF! #REF!


TOTAL #REF!

JUMLAH BORONGAN UPAH : #REF! Rp 71,809,235.00


UPAH BORONGAN PERMETER MAJU : #REF!
PROSENTASE PEKERJAAN #REF!
BIAYA TRANSPORTASI TUKANG :
JUMLAH KASBON SAMPAI MINGGU INI :
TOTAL MINGGUAN YANG SUDAH DIAMBIL :
SISA JUMLAH YANG DITERIMA MINGGU INI :

PIHAK I PIHAK II