You are on page 1of 95

CUADRO DE INGRESO Y SALIDA DE MATERIALES

CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2020


OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE DICIEMBRE DEL 2020
M M J V S D L M M J V S D L M M J V S D L M M J V S D D L TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MATERIALES DE FERRETERIA
ENTRADA 24 24.00 24.00
1 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/4 VAR 0.00 24.00
SALIDA 0.00 0.00
ENTRADA 130 130.00 130.00
2 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 3/8 VAR 0.00 130.00
SALIDA 0.00 0.00
ENTRADA 24 24.00 24.00
3 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/2 VAR 0.00 24.00
SALIDA 0.00 0.00
ENTRADA 50 50.00 50.00
4 ALAMBRE NEGRO Nº 16 KG 0.00 50.00
SALIDA 0.00 0.00
ENTRADA 90 90.00 90.00
5 ALAMBRE Nº 8 KG 0.00 90.00
SALIDA 0.00 0.00
ENTRADA 20 20.00 20.00
6 CLAVO FO N° C/C 2" KG 0.00 20.00
SALIDA 0.00 0.00
ENTRADA 15 15.00 15.00
7 CLAVO FO N° C/C 3" KG 0.00 15.00
SALIDA 0.00 0.00
ENTRADA 25 25.00 25.00
8 CLAVO FO N° C/C 4" KG 0.00 25.00
SALIDA 0.00 0.00
ENTRADA 300 300.00 300.00
9 CEMENTO PORTLAND TIPO I BLS 0.00 300.00
SALIDA 0.00 0.00
ENTRADA 2 2.00 2.00
10 LACA DESMOLDANTE GLN 0.00 2.00
SALIDA 0.00 0.00
ENTRADA 2500 2500.00 2500.00
11 LADRILLO K.K . 9 X 12 X12 X 24 CM UND 0.00 2500.00
SALIDA 0.00 0.00
ENTRADA 40 40.00 40.00
12 OCRE KG 0.00 40.00
SALIDA 0.00 0.00
ENTRADA 6 6.00 6.00
13 PINTURA LATEX GLN 0.00 6.00
SALIDA 0.00 0.00
ENTRADA 12 12.00 12.00
14 IMPRIMANTE GLN 0.00 12.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
15 PINTURA ESMALTE SINTETICO GLN 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 8 8.00 8.00
16 YESO DE 25 KG UND 0.00 8.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
17 CAJA RECTANGULAR DE CONCRETO PARA AGUA BLS 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
18 TAPA CON MARCO DE F° G° PARA CAJA DE AGUA UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
19 CAJA DE REGISTRO DE CONCRETO 12" X 24" CON FON UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 3 3.00 3.00
20 CAJA DE REGISTRO DE CONCRETO 12" X 24" SIN FOND UND 0.00 3.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
21 SUMIDERO DE BRONCE CON TAPA DE 4" UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
22 SOMBRERO DE VENTILACION DE PVC 2" UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
23 POZO PERCOLADOR CON TAPA DE CONCRETO DE D=1 UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 0.5 0.50 0.50
24 PEGAMENTO PARA PVC GLN 0.00 0.50
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
25 TAPA CON MARCO DE F° G° PARA CAJA DESAGUE 12" X PZA 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
26 TUBERIA PVC SAL 2" X 5 M UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 3 3.00 3.00
27 TUBERIA PVC SAP CALSE 10 DE 1" UND 0.00 3.00
SALIDA 0.00 0.00
ENTRADA 5 5.00 5.00
28 TUBERIA PVC SAL DE 4" X 5 M UND 0.00 5.00
SALIDA 0.00 0.00

1
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2020
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE DICIEMBRE DEL 2020
M M J V S D L M M J V S D L M M J V S D L M M J V S D D L TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ENTRADA 1 1.00 1.00
29 VALVULA DE COMPUERTA PVC DE 1" UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
30 UNIDAD ABRAZADERA TERMOPLASTICA DE 2" A 1" UND 0.00 1.00
SALIDA 0.00 0.00
ENTRADA 2 2.00 2.00
31 NIPLE DE PVC D=1 ROSCADO UND 0.00 2.00
SALIDA 0.00 0.00
ENTRADA 2 2.00 2.00
32 UNION SP PVC SAP P/AGUA 1" UND 0.00 2.00
SALIDA 0.00 0.00
ENTRADA 2 2.00 2.00
33 CODO 45° PARA AGUA DE 1" UND 0.00 2.00
SALIDA 0.00 0.00
ENTRADA 5 5.00 5.00
34 CODO 90° PARA DESAGUE 4" UND 0.00 5.00
SALIDA 0.00 0.00
MADERA
ENTRADA 50 50.00 50.00
1 MADERA 2" X 2" X 12 FT UND 0.00 50.00
SALIDA 0.00 0.00
ENTRADA 12 12.00 12.00
2 MADERA 2" X 3" X 12 FT UND 0.00 12.00
SALIDA 0.00 0.00
ENTRADA 8 8.00 8.00
3 TABLAS DE 8" X 1" X 12 FT UND 0.00 8.00
SALIDA 0.00 0.00
ENTRADA 10 10.00 10.00
4 ROLLIZOS DE 3M UND 0.00 10.00
SALIDA 0.00 0.00
ENTRADA 40 40.00 40.00
5 ROLLIZOS DE 4M UND 0.00 40.00
SALIDA 0.00 0.00
ENTRADA 2 2.00 2.00
6 ROLLIZOS DE 5M UND 0.00 2.00
SALIDA 0.00 0.00
ENTRADA 24 24.00 24.00
7 TRIPLAY DE 1.20 X 2.40 X 6MM UND 0.00 24.00
SALIDA 0.00 0.00
MADERA
ENTRADA 0.00 0.00
1 MADERA 1 1/2"X8"X10' UND 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
2 MADERA CORRIENTE 2" x 3" x 10' UND 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
3 MADERA CORRIENTE 1" x 8" x 10' UND 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
4 MADERA CORRIENTE 2" x 4" x 10' UND 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
5 ROLLIZO DE 4"X4m UND 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
6 MADERA CORRIENTE DE 1/2"x8"x10' UND 0.00 0.00
SALIDA 0.00 0.00

2
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2020
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE DICIEMBRE DEL 2020
M M J V S D L M M J V S D L M M J V S D L M M J V S D D L TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
AGREGADOS
ENTRADA 0.00 0.00
1 HORMIGON PUESTO EN OBRA M3 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
2 PIEDRA MEDIANA PUESTO EN OBRA M3 0.00 0.00
SALIDA 0.00 0.00
ENTRADA 0.00 0.00
3 ARENA FINA M3 0.00 0.00
SALIDA 0.00 0.00
HERRAMIENTAS
ENTRADA 2 2.00 2.00
1 CARRETILLAS BUGGIE UND 0.00 0.00
SALIDA 2 2.00 2.00
ENTRADA 5 5.00 5.00
2 PICO UND 0.00 0.00
SALIDA 5 5.00 5.00
ENTRADA 5 5.00 5.00
3 PALA UND 0.00 0.00
SALIDA 5 5.00 5.00
ENTRADA 100 100.00 100.00
4 CORDEL M 0.00 0.00
SALIDA 100 100.00 100.00
ENTRADA 2 2.00 2.00
5 REGLA DE ALUMINIO X 9M UND 0.00 0.00
SALIDA 2 2.00 2.00
ENTRADA 2 2.00 2.00
6 FLEXOMETRO UND 0.00 0.00
SALIDA 2 2.00 2.00
ENTRADA 4 4.00 4.00
7 HOJA DE SIERRA UND 0.00 4.00
SALIDA 0.00 0.00
ENTRADA 4 4.00 4.00
8 BROCHA UND 0.00 4.00
SALIDA 0.00 0.00
ENTRADA 2 2.00 2.00
9 ESCOBA UND 0.00 0.00
SALIDA 2 2.00 2.00
ENTRADA 5 5.00 5.00
10 LIJAR UND 0.00 5.00
SALIDA 0.00 0.00
ENTRADA 1 1.00 1.00
11 WINCHA DE 30 M UND 0.00 0.00
SALIDA 1 1.00 1.00
ENTRADA 20 20.00 20.00
12 MANGUERA DE NIVEL M 0.00 0.00
SALIDA 20 20.00 20.00
ENTRADA 4 4.00 4.00
13 ZARANDA M 0.00 4.00
SALIDA 0.00 0.00
ENTRADA 5 5.00 5.00
14 PLASTICO DOBLE DE 1.2 M KG 0.00 5.00
SALIDA 0.00 0.00
ENTRADA 10 10.00 10.00
15 BOTAS DE JEBE COM PUNTA DE ACERO PAR 0.00 0.00
SALIDA 10 10.00 10.00
ENTRADA 10 10.00 10.00
16 CASCOS DE PROTECCION CON TAPASOL UND 0.00 0.00
SALIDA 10 10.00 10.00
ENTRADA 10 10.00 10.00
17 MAMELUCO DE 2 PIEZAS UND 0.00 0.00
SALIDA 10 10.00 10.00
ENTRADA 20 20.00 20.00
18 GUANTES DE CUERO PAR 0.00 10.00
SALIDA 10 10.00 10.00
ENTRADA 20 20.00 20.00
19 GUANTES DE JEBE PAR 0.00 20.00
SALIDA 0.00 0.00
ENTRADA 10 10.00 10.00
20 LENTES DE SEGURIDAD TRANSPARENTE UND 0.00 0.00
SALIDA 10 10.00 10.00
ENTRADA 3 3.00 3.00
21 CHALECO PERSONAL TECNICO UND 0.00 0.00
SALIDA 3 3.00 3.00
ENTRADA 3 3.00 3.00
22 CASCO DE PROTECCIÓN PERSONAL TECNICO UND 0.00 0.00
SALIDA 3 3.00 3.00
ENTRADA 3 3.00 3.00
23 LENTES DE SEGURIDAD OSCURO UND 0.00 0.00
SALIDA 3 3.00 3.00

3
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2020
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE DICIEMBRE DEL 2020
M M J V S D L M M J V S D L M M J V S D L M M J V S D D L TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ENTRADA 2 2.00 2.00
24 ALCOHOL EN GEL LT 0.00 1.00
SALIDA 1 1.00 1.00
ENTRADA 2 2.00 2.00
25 ALCOHOL ETILICO AL 70º LT 0.00 1.00
SALIDA 1 1.00 1.00
ENTRADA 2 2.00 2.00
26 DETERGENTE X 5 KG UND 0.00 1.00
SALIDA 1 1.00 1.00
ENTRADA 4 4.00 4.00
27 JABON LIQUIDO UND 0.00 3.00
SALIDA 1 1.00 1.00
ENTRADA 1 1.00 1.00
28 LAVADERO PORTATILES DE MANO UND 0.00 0.00
SALIDA 1 1.00 1.00
ENTRADA 2 2.00 2.00
29 LEJIA (HIPOCLORITO DE SODIO) AL 5% UND 0.00 1.00
SALIDA 1 1.00 1.00
ENTRADA 8 8.00 8.00
30 MASCARILLA KN 95 UND 0.00 6.00
SALIDA 2 2.00 2.00
ENTRADA 6 6.00 6.00
31 MASCARILLAS COMUNITARIAS CAJA 0.00 5.00
SALIDA 1 1.00 1.00
ENTRADA 12 12.00 12.00
32 PAPEL TOALLA DESECHABLE UND 0.00 11.00
SALIDA 1 1.00 1.00
ENTRADA 1 1.00 1.00
33 MICRO ASPERSOR DE 2 LT UND 0.00 0.00
SALIDA 1 1.00 1.00
ENTRADA 1 1.00 1.00
34 TERMOMETRO DIGITAL TIPO PISTOLA DE TEMPERATUR UND 0.00 0.00
SALIDA 1 1.00 1.00
ENTRADA 1 1.00 1.00
35 TACHO DE BASURA UND 0.00 0.00
SALIDA 1 1.00 1.00
ENTRADA 1 1.00 1.00
36 BOTIQUIN UND 0.00 0.00
SALIDA 1 1.00 1.00
COMBUSTIBLES Y LUBRICANTES
ENTRADA 10 10.00 10.00
1 GASOLONA DE 84 OCTANOS GLN 0.00 10.00
SALIDA 0.00 0.00
ENTRADA 0.5 0.50 0.50
2 ACEITE DE MOTOR GLN 0.00 0.50
SALIDA 0.00 0.00
ENTRADA 120 120.00 120.00
3 PETROLEO DIESEL D-5 GLN 0.00 120.00
SALIDA 0.00 0.00

4
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE ENERO DEL 2021
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE ENERO DEL 2021
V S D L M M J V S D L M M J V S D L M M J V TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
MATERIALES DE FERRETERIA
24 ENTRADA 0.00 24.00
1 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/4 VAR 24.00 0.00
0 SALIDA 24 24.00 24.00
130 ENTRADA 0.00 130.00
2 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 3/8 VAR 130.00 0.00
0 SALIDA 98 32 130.00 130.00
24 ENTRADA 0.00 24.00
3 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/2 VAR 24.00 0.00
0 SALIDA 24 24.00 24.00
50 ENTRADA 0.00 50.00
4 ALAMBRE NEGRO Nº 16 KG 50.00 0.00
0 SALIDA 5 8 5 12 5 5 5 5 50.00 50.00
90 ENTRADA 0.00 90.00
5 ALAMBRE Nº 8 KG 90.00 0.00
0 SALIDA 15 15 15 15 15 15 90.00 90.00
20 ENTRADA 0.00 20.00
6 CLAVO FO N° C/C 2" KG 20.00 0.00
0 SALIDA 8 4 3 2 2 1 20.00 20.00
15 ENTRADA 0.00 15.00
7 CLAVO FO N° C/C 3" KG 15.00 0.00
0 SALIDA 4 2 2 2 4 1 15.00 15.00
25 ENTRADA 0.00 25.00
8 CLAVO FO N° C/C 4" KG 25.00 0.00
0 SALIDA 5 5 5 5 3 2 25.00 25.00
300 ENTRADA 0.00 300.00
9 CEMENTO PORTLAND TIPO I BLS 300.00 0.00
0 SALIDA 40 100 8 8 8 8 8 18 20 10 10 10 10 36 6 300.00 300.00
2 ENTRADA 0.00 2.00
10 LACA DESMOLDANTE GLN 2.00 0.00
0 SALIDA 1 1 2.00 2.00
2500 ENTRADA 0.00 2500.00
11 LADRILLO K.K . 9 X 12 X12 X 24 CM UND 2500.00 0.00
0 SALIDA 400 500 500 400 400 300 2500.00 2500.00
40 ENTRADA 0.00 40.00
12 OCRE KG 40.00 0.00
0 SALIDA 12 28 40.00 40.00
6 ENTRADA 0.00 6.00
13 PINTURA LATEX GLN 6.00 0.00
0 SALIDA 3 3 6.00 6.00
12 ENTRADA 0.00 12.00
14 IMPRIMANTE GLN 12.00 0.00
0 SALIDA 6 6 12.00 12.00
1 ENTRADA 0.00 1.00
15 PINTURA ESMALTE SINTETICO GLN 1.00 0.00
0 SALIDA 1 1.00 1.00
8 ENTRADA 0.00 8.00
16 YESO DE 25 KG UND 8.00 0.00
0 SALIDA 2 2 2 2 8.00 8.00
1 ENTRADA 0.00 1.00
17 CAJA RECTANGULAR DE CONCRETO PARA AGUA BLS 1.00 0.00
0 SALIDA 1 1.00 1.00
1 ENTRADA 0.00 1.00
18 TAPA CON MARCO DE F° G° PARA CAJA DE AGUA UND 1.00 0.00
0 SALIDA 1 1.00 1.00
1 ENTRADA 0.00 1.00
19 CAJA DE REGISTRO DE CONCRETO 12" X 24" CON FON UND 1.00 1.00
0 SALIDA 0.00 0.00
3 ENTRADA 0.00 3.00
20 CAJA DE REGISTRO DE CONCRETO 12" X 24" SIN FOND UND 3.00 3.00
0 SALIDA 0.00 0.00
1 ENTRADA 0.00 1.00
21 SUMIDERO DE BRONCE CON TAPA DE 4" UND 1.00 0.00
0 SALIDA 1 1.00 1.00
1 ENTRADA 0.00 1.00
22 SOMBRERO DE VENTILACION DE PVC 2" UND 1.00 0.00
0 SALIDA 1 1.00 1.00

5
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE ENERO DEL 2021
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE ENERO DEL 2021
V S D L M M J V S D L M M J V S D L M M J V TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1 ENTRADA 0.00 1.00
23 POZO PERCOLADOR CON TAPA DE CONCRETO DE D=1M UND 1.00 0.00
0 SALIDA 1 1.00 1.00
0.5 ENTRADA 0.00 0.50
24 PEGAMENTO PARA PVC GLN 0.50 0.00
0 SALIDA 0.5 0.50 0.50
1 ENTRADA 0.00 1.00
25 TAPA CON MARCO DE F° G° PARA CAJA DESAGUE 12" X PZA 1.00 0.00
0 SALIDA 1 1.00 1.00
1 ENTRADA 0.00 1.00
26 TUBERIA PVC SAL 2" X 5 M UND 1.00 0.00
0 SALIDA 1 1.00 1.00
3 ENTRADA 0.00 3.00
27 TUBERIA PVC SAP CALSE 10 DE 1" UND 3.00 2.00
0 SALIDA 1 1.00 1.00
5 ENTRADA 0.00 5.00
28 TUBERIA PVC SAL DE 4" X 5 M UND 5.00 0.00
0 SALIDA 5 5.00 5.00
1 ENTRADA 0.00 1.00
29 VALVULA DE COMPUERTA PVC DE 1" UND 1.00 0.00
0 SALIDA 1 1.00 1.00
1 ENTRADA 0.00 1.00
30 UNIDAD ABRAZADERA TERMOPLASTICA DE 2" A 1" UND 1.00 0.00
0 SALIDA 1 1.00 1.00
2 ENTRADA 0.00 2.00
31 NIPLE DE PVC D=1 ROSCADO UND 2.00 0.00
0 SALIDA 2 2.00 2.00
2 ENTRADA 0.00 2.00
32 UNION SP PVC SAP P/AGUA 1" UND 2.00 0.00
0 SALIDA 2 2.00 2.00
2 ENTRADA 0.00 2.00
33 CODO 45° PARA AGUA DE 1" UND 2.00 0.00
0 SALIDA 2 2.00 2.00
5 ENTRADA 0.00 5.00
34 CODO 90° PARA DESAGUE 4" UND 5.00 0.00
0 SALIDA 5 5.00 5.00
MADERA
50 ENTRADA 0.00 50.00
1 MADERA 2" X 2" X 12 FT UND 50.00 0.00
0 SALIDA 50 50.00 50.00
12 ENTRADA 0.00 12.00
2 MADERA 2" X 3" X 12 FT UND 12.00 0.00
0 SALIDA 12 12.00 12.00
8 ENTRADA 0.00 8.00
3 TABLAS DE 8" X 1" X 12 FT UND 8.00 0.00
0 SALIDA 8 8.00 8.00
10 ENTRADA 0.00 10.00
4 ROLLIZOS DE 3M UND 10.00 0.00
0 SALIDA 10 10.00 10.00
40 ENTRADA 0.00 40.00
5 ROLLIZOS DE 4M UND 40.00 0.00
0 SALIDA 40 40.00 40.00
2 ENTRADA 0.00 2.00
6 ROLLIZOS DE 5M UND 2.00 0.00
0 SALIDA 2 2.00 2.00
24 ENTRADA 0.00 24.00
7 TRIPLAY DE 1.20 X 2.40 X 6MM UND 24.00 0.00
0 SALIDA 24 24.00 24.00
AGREGADOS
0 ENTRADA 15 15.00 15.00
1 ARENA GRUESA M3 0.00 0.00
0 SALIDA 15 15.00 15.00
0 ENTRADA 8 8.00 8.00
2 ARENA FINA M3 0.00 0.00
0 SALIDA 8 8.00 8.00
0 ENTRADA 30 30.00 30.00
3 HORMIGON M3 0.00 0.00

6
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE ENERO DEL 2021
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE ENERO DEL 2021
V S D L M M J V S D L M M J V S D L M M J V TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
3 HORMIGON M3 0.00 0.00
0 SALIDA 30 30.00 30.00
HERRAMIENTAS
2 ENTRADA 0.00 2.00
1 CARRETILLAS BUGGIE UND 0.00 0.00
2 SALIDA 0.00 2.00
5 ENTRADA 0.00 5.00
2 PICO UND 0.00 0.00
5 SALIDA 0.00 5.00
5 ENTRADA 0.00 5.00
3 PALA UND 0.00 0.00
5 SALIDA 0.00 5.00
100 ENTRADA 0.00 100.00
4 CORDEL M 0.00 0.00
100 SALIDA 0.00 100.00
2 ENTRADA 0.00 2.00
5 REGLA DE ALUMINIO X 9M UND 0.00 0.00
2 SALIDA 0.00 2.00
2 ENTRADA 0.00 2.00
6 FLEXOMETRO UND 0.00 0.00
2 SALIDA 0.00 2.00
4 ENTRADA 0.00 4.00
7 HOJA DE SIERRA UND 4.00 0.00
0 SALIDA 1 1 1 1 4.00 4.00
4 ENTRADA 0.00 4.00
8 BROCHA UND 4.00 0.00
0 SALIDA 4 4.00 4.00
2 ENTRADA 0.00 2.00
9 ESCOBA UND 0.00 0.00
2 SALIDA 0.00 2.00
5 ENTRADA 0.00 5.00
10 LIJAR UND 5.00 0.00
0 SALIDA 5 5.00 5.00
1 ENTRADA 0.00 1.00
11 WINCHA DE 30 M UND 0.00 0.00
1 SALIDA 0.00 1.00
20 ENTRADA 0.00 20.00
12 MANGUERA DE NIVEL M 0.00 0.00
20 SALIDA 0.00 20.00
4 ENTRADA 0.00 4.00
13 ZARANDA M 4.00 0.00
0 SALIDA 4 4.00 4.00
5 ENTRADA 0.00 5.00
14 PLASTICO DOBLE DE 1.2 M KG 5.00 0.00
0 SALIDA 2 3 5.00 5.00
10 ENTRADA 0.00 10.00
15 BOTAS DE JEBE COM PUNTA DE ACERO PAR 0.00 0.00
10 SALIDA 0.00 10.00
10 ENTRADA 0.00 10.00
16 CASCOS DE PROTECCION CON TAPASOL UND 0.00 0.00
10 SALIDA 0.00 10.00
10 ENTRADA 0.00 10.00
17 MAMELUCO DE 2 PIEZAS UND 0.00 0.00
10 SALIDA 0.00 10.00
20 ENTRADA 0.00 20.00
18 GUANTES DE CUERO PAR 10.00 0.00
10 SALIDA 10 10.00 20.00
20 ENTRADA 0.00 20.00
19 GUANTES DE JEBE PAR 20.00 0.00
0 SALIDA 10 10 20.00 20.00
10 ENTRADA 0.00 10.00
20 LENTES DE SEGURIDAD TRANSPARENTE UND 0.00 0.00
10 SALIDA 0.00 10.00
3 ENTRADA 0.00 3.00
21 CHALECO PERSONAL TECNICO UND 0.00 0.00
3 SALIDA 0.00 3.00
3 ENTRADA 0.00 3.00
22 CASCO DE PROTECCIÓN PERSONAL TECNICO UND 0.00 0.00

7
CUADRO DE INGRESO Y SALIDA DE MATERIALES
CORRESPONDIENTE AL MES DE ENERO DEL 2021
OBRA : "CREACION DE BAÑADERO MIXTO PARA GANADO EN LA COMUNIDAD DE ALTA GRACIA, DEL DISTRITO DE SAN JOSÉ - AZÁNGARO - PUNO."
ENTIDAD EJECUTOR : MUNICIPALIDAD DISTRITAL DE SAN JOSE
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
SUPERVISOR DE OBRA : Ing. Jose Luis Linares Mendoza
RESIDENTE DE OBRA : Ing. Edwin Ricardo Pariccahua Huanca
DESCRIPCION MES DE ENERO DEL 2021
V S D L M M J V S D L M M J V S D L M M J V TOTAL E/S TOTAL TOTAL E/S
TOTAL I/S SALDO ENTRADA MENSUAL SALDO ACUM.
Nº MATERIALES Y/O HERRAMIENTAS UND
ANTERIOR ANTERIOR SALIDA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
22 CASCO DE PROTECCIÓN PERSONAL TECNICO UND 0.00 0.00
3 SALIDA 0.00 3.00
3 ENTRADA 0.00 3.00
23 LENTES DE SEGURIDAD OSCURO UND 0.00 0.00
3 SALIDA 0.00 3.00
2 ENTRADA 0.00 2.00
24 ALCOHOL EN GEL LT 1.00 0.00
1 SALIDA 1 1.00 2.00
2 ENTRADA 0.00 2.00
25 ALCOHOL ETILICO AL 70º LT 1.00 0.00
1 SALIDA 1 1.00 2.00
2 ENTRADA 0.00 2.00
26 DETERGENTE X 5 KG UND 1.00 0.00
1 SALIDA 1 1.00 2.00
4 ENTRADA 0.00 4.00
27 JABON LIQUIDO UND 3.00 0.00
1 SALIDA 1 1 1 3.00 4.00
1 ENTRADA 0.00 1.00
28 LAVADERO PORTATILES DE MANO UND 0.00 0.00
1 SALIDA 0.00 1.00
2 ENTRADA 0.00 2.00
29 LEJIA (HIPOCLORITO DE SODIO) AL 5% UND 1.00 0.00
1 SALIDA 1 1.00 2.00
8 ENTRADA 0.00 8.00
30 MASCARILLA KN 95 UND 6.00 0.00
2 SALIDA 1 1 1 1 1 1 6.00 8.00
6 ENTRADA 0.00 6.00
31 MASCARILLAS COMUNITARIAS CAJA 5.00 0.00
1 SALIDA 1 1 1 1 1 5.00 6.00
12 ENTRADA 0.00 12.00
32 PAPEL TOALLA DESECHABLE UND 11.00 0.00
1 SALIDA 1 1 1 1 1 1 1 1 1 2 11.00 12.00
1 ENTRADA 0.00 1.00
33 MICRO ASPERSOR DE 2 LT UND 0.00 0.00
1 SALIDA 0.00 1.00
1 ENTRADA 0.00 1.00
34 TERMOMETRO DIGITAL TIPO PISTOLA DE TEMPERATUR UND 0.00 0.00
1 SALIDA 0.00 1.00
1 ENTRADA 0.00 1.00
35 TACHO DE BASURA UND 0.00 0.00
1 SALIDA 0.00 1.00
1 ENTRADA 0.00 1.00
36 BOTIQUIN UND 0.00 0.00
1 SALIDA 0.00 1.00
COMBUSTIBLES Y LUBRICANTES
10 ENTRADA 0.00 10.00
1 GASOLINA DE 84 OCTANOS GLN 10.00 0.00
0 SALIDA 2.5 2.5 2.5 2.5 10.00 10.00
0.5 ENTRADA 0.00 0.50
2 ACEITE DE MOTOR GLN 0.50 0.00
0 SALIDA 0.5 0.50 0.50
120 ENTRADA 0.00 120.00
3 PETROLEO DIESEL D-5 GLN 120.00 0.00
0 SALIDA 40 40 10 5 12 8 5 120.00 120.00

8
EXISTENCIAS VALORADAS DE ALMACEN
MOVIMIENTO DE ALMACEN A CULMINACION DE OBRA
MUNICIPALIDAD DISTRITAL DE
SAN JOSE

2 3 6
DOCUMENTO CANTIDADES 4 5 IMPORTES
1
PRECIO COSTO
N° a b a b c a b c
UNITARIO PROMEDIO
CLASE Nº ENTRADA SALIDA SALDO ENTRADA SALIDA SALDO
ARTICULO

MATERIALES DE FERRETERIA

1 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/4 24.00 24.00 0.00 13.00 312.00 312.00 0.00

2 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 3/8 130.00 130.00 0.00 20.10 2,613.00 2,613.00 0.00

3 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/2 24.00 24.00 0.00 33.50 804.00 804.00 0.00

4 ALAMBRE NEGRO Nº 16 50.00 50.00 0.00 7.60 380.00 380.00 0.00

5 ALAMBRE Nº 8 90.00 90.00 0.00 7.60 684.00 684.00 0.00

6 CLAVO FO N° C/C 2" 20.00 20.00 0.00 7.60 152.00 152.00 0.00

7 CLAVO FO N° C/C 3" 15.00 15.00 0.00 7.60 114.00 114.00 0.00

8 CLAVO FO N° C/C 4" 25.00 25.00 0.00 7.60 190.00 190.00 0.00

9 CEMENTO PORTLAND TIPO I 300.00 300.00 0.00 24.60 7,380.00 7,380.00 0.00

10 LACA DESMOLDANTE 2.00 2.00 0.00 160.00 320.00 320.00 0.00

11 LADRILLO K.K . 9 X 12 X12 X 24 CM 2,500.00 2,500.00 0.00 1.50 3,750.00 3,750.00 0.00

12 OCRE 40.00 40.00 0.00 7.50 300.00 300.00 0.00

13 PINTURA LATEX 6.00 6.00 0.00 32.20 193.20 193.20 0.00

14 IMPRIMANTE 12.00 12.00 0.00 21.30 255.60 255.60 0.00

15 PINTURA ESMALTE SINTETICO 1.00 1.00 0.00 49.00 49.00 49.00 0.00

16 YESO DE 25 KG 8.00 8.00 0.00 9.00 72.00 72.00 0.00

17 CAJA RECTANGULAR DE CONCRETO PARA AGUA 1.00 1.00 0.00 23.00 23.00 23.00 0.00

18 TAPA CON MARCO DE F° G° PARA CAJA DE AGUA 1.00 1.00 0.00 38.00 38.00 38.00 0.00

19 CAJA DE REGISTRO DE CONCRETO 12" X 24" CON FONDO 1.00 0.00 1.00 18.00 18.00 0.00 18.00

20 CAJA DE REGISTRO DE CONCRETO 12" X 24" SIN FONDO 3.00 0.00 3.00 18.00 54.00 0.00 54.00
21 SUMIDERO DE BRONCE CON TAPA DE 4" 1.00 1.00 0.00 15.00 15.00 15.00 0.00

22 SOMBRERO DE VENTILACION DE PVC 2" 1.00 1.00 0.00 7.00 7.00 7.00 0.00

23 POZO PERCOLADOR CON TAPA DE CONCRETO DE D=1M 1.00 1.00 0.00 105.00 105.00 105.00 0.00

24 PEGAMENTO PARA PVC 0.50 0.50 0.00 105.00 52.50 52.50 0.00

25 TAPA CON MARCO DE F° G° PARA CAJA DESAGUE 12" X 24" 1.00 1.00 0.00 48.00 48.00 48.00 0.00

26 TUBERIA PVC SAL 2" X 5 M 1.00 1.00 0.00 18.00 18.00 18.00 0.00

27 TUBERIA PVC SAP CALSE 10 DE 1" 3.00 1.00 2.00 30.00 90.00 30.00 60.00

28 TUBERIA PVC SAL DE 4" X 5 M 5.00 5.00 0.00 24.00 120.00 120.00 0.00

29 VALVULA DE COMPUERTA PVC DE 1" 1.00 1.00 0.00 85.00 85.00 85.00 0.00

30 UNIDAD ABRAZADERA TERMOPLASTICA DE 2" A 1" 1.00 1.00 0.00 115.00 115.00 115.00 0.00

31 NIPLE DE PVC D=1 ROSCADO 2.00 2.00 0.00 8.00 16.00 16.00 0.00

32 UNION SP PVC SAP P/AGUA 1" 2.00 2.00 0.00 8.00 16.00 16.00 0.00

33 CODO 45° PARA AGUA DE 1" 2.00 2.00 0.00 8.00 16.00 16.00 0.00

34 CODO 90° PARA DESAGUE 4" 5.00 5.00 0.00 10.00 50.00 50.00 0.00

MADERA

1 MADERA 2" X 2" X 12 FT 50.00 50.00 0.00 25.37 1,268.50 1,268.50 0.00

2 MADERA 2" X 3" X 12 FT 12.00 12.00 0.00 38.00 456.00 456.00 0.00

3 TABLAS DE 8" X 1" X 12 FT 8.00 8.00 0.00 50.74 405.92 405.92 0.00

4 ROLLIZOS DE 3M 10.00 10.00 0.00 20.00 200.00 200.00 0.00

5 ROLLIZOS DE 4M 40.00 40.00 0.00 23.50 940.00 940.00 0.00

6 ROLLIZOS DE 5M 2.00 2.00 0.00 33.50 67.00 67.00 0.00

7 TRIPLAY DE 1.20 X 2.40 X 6MM 24.00 24.00 0.00 73.00 1,752.00 1,752.00 0.00

AGREGADOS

1 ARENA GRUESA 15.00 15.00 0.00 25.00 375.00 375.00 0.00

2 ARENA FINA 8.00 8.00 0.00 25.00 200.00 200.00 0.00

3 HORMIGON 30.00 30.00 0.00 17.50 525.00 525.00 0.00

HERRAMIENTAS

1 CARRETILLAS BUGGIE 2.00 2.00 0.00 178.00 356.00 356.00 0.00

2 PICO 5.00 5.00 0.00 32.00 160.00 160.00 0.00


3 PALA 5.00 5.00 0.00 27.00 135.00 135.00 0.00

4 CORDEL 100.00 100.00 0.00 1.00 100.00 100.00 0.00

5 REGLA DE ALUMINIO X 9M 2.00 2.00 0.00 64.00 128.00 128.00 0.00

6 FLEXOMETRO 2.00 2.00 0.00 17.00 34.00 34.00 0.00

7 HOJA DE SIERRA 4.00 4.00 0.00 7.00 28.00 28.00 0.00

8 BROCHA 4.00 4.00 0.00 27.00 108.00 108.00 0.00

9 ESCOBA 2.00 2.00 0.00 17.00 34.00 34.00 0.00

10 LIJAR 5.00 5.00 0.00 3.00 15.00 15.00 0.00

11 WINCHA DE 30 M 1.00 1.00 0.00 50.00 50.00 50.00 0.00

12 MANGUERA DE NIVEL 20.00 20.00 0.00 2.00 40.00 40.00 0.00

13 ZARANDA 4.00 4.00 0.00 7.00 28.00 28.00 0.00

14 PLASTICO DOBLE DE 1.2 M 5.00 5.00 0.00 4.00 20.00 20.00 0.00

15 BOTAS DE JEBE COM PUNTA DE ACERO 10.00 10.00 0.00 20.00 200.00 200.00 0.00

16 CASCOS DE PROTECCION CON TAPASOL 10.00 10.00 0.00 10.00 100.00 100.00 0.00

17 MAMELUCO DE 2 PIEZAS 10.00 10.00 0.00 37.00 370.00 370.00 0.00

18 GUANTES DE CUERO 20.00 20.00 0.00 8.50 170.00 170.00 0.00

19 GUANTES DE JEBE 20.00 20.00 0.00 8.50 170.00 170.00 0.00

20 LENTES DE SEGURIDAD TRANSPARENTE 10.00 10.00 0.00 5.00 50.00 50.00 0.00

21 CHALECO PERSONAL TECNICO 3.00 3.00 0.00 62.00 186.00 186.00 0.00

22 CASCO DE PROTECCIÓN PERSONAL TECNICO 3.00 3.00 0.00 35.00 105.00 105.00 0.00

23 LENTES DE SEGURIDAD OSCURO 3.00 3.00 0.00 5.00 15.00 15.00 0.00

24 ALCOHOL EN GEL 2.00 2.00 0.00 20.00 40.00 40.00 0.00

25 ALCOHOL ETILICO AL 70º 2.00 2.00 0.00 17.00 34.00 34.00 0.00

26 DETERGENTE X 5 KG 2.00 2.00 0.00 50.00 100.00 100.00 0.00

27 JABON LIQUIDO 4.00 4.00 0.00 7.00 28.00 28.00 0.00

28 LAVADERO PORTATILES DE MANO 1.00 1.00 0.00 162.00 162.00 162.00 0.00

29 LEJIA (HIPOCLORITO DE SODIO) AL 5% 2.00 2.00 0.00 15.00 30.00 30.00 0.00

30 MASCARILLA KN 95 8.00 8.00 0.00 3.00 24.00 24.00 0.00

31 MASCARILLAS COMUNITARIAS 6.00 6.00 0.00 22.00 132.00 132.00 0.00


32 PAPEL TOALLA DESECHABLE 12.00 12.00 0.00 4.00 48.00 48.00 0.00

33 MICRO ASPERSOR DE 2 LT 1.00 1.00 0.00 20.00 20.00 20.00 0.00

34 TERMOMETRO DIGITAL TIPO PISTOLA DE TEMPERATURA INFRAR 1.00 1.00 0.00 100.00 100.00 100.00 0.00

35 TACHO DE BASURA 1.00 1.00 0.00 77.00 77.00 77.00 0.00

36 BOTIQUIN 1.00 1.00 0.00 40.00 40.00 40.00 0.00

COMBUSTIBLES Y LUBRICANTES

1 GASOLINA DE 84 OCTANOS 10.00 10.00 0.00 12.00 120.00 120.00 0.00

2 ACEITE DE MOTOR 0.50 0.50 0.00 100.00 50.00 50.00 0.00

3 PETROLEO DIESEL D-5 120.00 120.00 0.00 12.50 1,500.00 1,500.00 0.00
KARDEX
ARTICULO: ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/4
U/MEDIAD: VAR
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 24 13.00 312.00 - 24 13.00 312.00


24 1 21 24 13.00 312.00 0
TARJETA KARDEX
ARTICULO: ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 3/8
U/MEDIAD: VAR
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 130 20.10 2,613.00 130 20.10 2,613.00


02 01 21 98 20.10 1,969.80 32 20.10 643.20
11 1 21 32 20.10 643.20 0 -
TARJETA KARDEX
ARTICULO: ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 D 1/2
U/MEDIAD: VAR
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 24 33.50 804.00 24 33.50 804.00


24 33.50 804.00 0
TARJETA KARDEX
ARTICULO: ALAMBRE NEGRO Nº 16
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 50 7.60 380.00 50 7.60 380.00


2 1 21 5 7.60 38.00 45 7.60 342.00
4 1 21 - 8 7.60 60.80 37 7.60 281.20
5 1 21 - 5 7.60 38.00 32 7.60 243.20
6 1 21 12 7.60 91.20 20 7.60 152.00
11 1 21 5 7.60 38.00 15 7.60 114.00
12 1 21 5 7.60 38.00 10 7.60 76.00
13 1 21 5 7.60 38.00 5 7.60 38.00
19 1 21 5 7.60 38.00 0
TARJETA KARDEX
ARTICULO: ALAMBRE Nº 8
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 90 7.60 684.00 90 7.60 684.00


4 1 21 15 7.60 114.00 75 7.60 570.00
5 1 21 15 7.60 114.00 60 7.60 456.00
6 1 21 15 7.60 114.00 45 7.60 342.00
7 1 21 15 7.60 114.00 30 7.60 228.00
8 1 21 15 7.60 114.00 15 7.60 114.00
9 1 21 15 7.60 114.00 0
11 1 21
TARJETA KARDEX
ARTICULO: CLAVO FO N° C/C 2"
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 20 7.60 152.00 20 7.60 152.00


2 1 21 8 7.60 60.80 12 7.60 91.20
4 1 21 4 7.60 30.40 8 7.60 60.80
5 1 21 3 7.60 22.80 5 7.60 38.00
6 1 21 2 7.60 15.20 3 7.60 22.80
11 1 21 2 7.60 15.20 1 7.60 7.60
12 1 21 1 7.60 7.60 0
TARJETA KARDEX
ARTICULO: CLAVO FO N° C/C 3"
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 15 7.60 114.00 15 7.60 114.00


2 1 21 4 14.00 28.00 11 7.60 83.60
4 1 21 2 14.00 28.00 9 7.60 68.40
5 1 21 2 14.00 28.00 7 7.60 53.20
6 1 21 2 14.00 28.00 5 7.60 38.00
11 1 21 4 14.00 28.00 1 7.60 7.60
12 1 21 1 14.00 28.00 0 7.60 -
TARJETA KARDEX
ARTICULO: CLAVO FO N° C/C 4"
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 25 7.60 35.00 25 7.60 35.00


5 7.60 38.00 20 7.60 35.00
5 7.60 38.00 15 7.60 35.00
5 7.60 38.00 10 7.60 35.00
5 7.60 38.00 5 7.60 35.00
3 7.60 22.80 2 7.60 35.00
2 7.60 15.20 0 7.60 35.00
TARJETA KARDEX
ARTICULO: CEMENTO PORTLAND TIPO I
U/MEDIAD: BLS
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 300 24.60 7,380.00 300 24.60 7,380.00


2 1 21 40 24.60 984.00 260 24.60 6,396.00
4 1 21 100 24.60 2,460.00 160 24.60 3,936.00
5 1 21 8 24.60 196.80 152 24.60 3,739.20
6 1 21 8 24.60 196.80 144 24.60 3,542.40
7 1 21 8 24.60 196.80 136 24.60 3,345.60
8 1 21 8 24.60 196.80 128 24.60 3,148.80
9 1 21 8 24.60 196.80 120 24.60 2,952.00
11 1 21 18 24.60 442.80 102 24.60 2,509.20
12 1 21 20 24.60 492.00 82 24.60 2,017.20
13 1 21 10 24.60 246.00 72 24.60 1,771.20
14 1 21 10 24.60 246.00 62 24.60 1,525.20
15 1 21 10 24.60 246.00 52 24.60 1,279.20
16 1 21 10 24.60 246.00 42 24.60 1,033.20
18 1 21 36 24.60 885.60 6 24.60 147.60
19 1 21 6 24.60 147.60 0 24.60 -
TARJETA KARDEX
ARTICULO: LACA DESMOLDANTE
U/MEDIAD: GLN
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 2 160.00 320.00 2 160.00 320.00


2 1 21 1 160.00 160.00 1 160.00 160.00
11 1 21 1 160.00 160.00 0 160.00 -
TARJETA KARDEX
ARTICULO: LADRILLO K.K . 9 X 12 X12 X 24 CM
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

12 20 2500 1.50 3,750.00 2500 1.50 3,750.00


4 1 21 400 1.50 600.00 2100 1.50 3,150.00
5 1 21 500 1.50 750.00 1600 1.50 2,400.00
6 1 21 500 1.50 750.00 1100 1.50 1,650.00
7 1 21 400 1.50 600.00 700 1.50 1,050.00
8 1 21 400 1.50 600.00 300 1.50 450.00
9 1 21 300 1.50 450.00 0 1.50 -
11 1 21
TARJETA KARDEX
ARTICULO: OCRE
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 40 7.50 300.00 40 7.50 300.00


4 1 21 12 7.50 90.00 28 5.00 140.00
18 1 21 28 8.50 238.00 0 5.00 -
TARJETA KARDEX
ARTICULO: PINTURA LATEX
U/MEDIAD: GLN
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 6 32.20 193.20 6 32.20 193.20


20 1 21 3 32.20 96.60 3 20.00 60.00
21 1 21 3 32.20 96.60 0 20.00 -
TARJETA KARDEX
ARTICULO: IMPRIMANTE
U/MEDIAD: GLN
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 12 21.30 255.60 12 21.30 255.60


20 1 21 6 21.30 127.80 6 50.00 300.00
21 1 21 6 21.30 127.80 0 50.00 -
-
-
TARJETA KARDEX
ARTICULO: PINTURA ESMALTE SINTETICO
U/MEDIAD: GLN
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 49.00 49.00 1 49.00 49.00


22 1 21 1 49.00 49.00 0 49.00 -
TARJETA KARDEX
ARTICULO: YESO DE 25 KG
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 8 9.00 72.00 8 9.00 72.00


2 1 21 2 9.00 18.00 6 9.00 54.00
4 1 21 2 9.00 18.00 4 9.00 36.00
7 1 21 2 9.00 18.00 2 9.00 18.00
11 1 21 2 9.00 18.00 0 9.00 -
TARJETA KARDEX
ARTICULO: CAJA RECTANGULAR DE CONCRETO PARA AGUA
U/MEDIAD: BLS
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 23.00 23.00 1 23.00 23.00


18 1 21 1 23.00 23.00 0
TARJETA KARDEX
ARTICULO: TAPA CON MARCO DE F° G° PARA CAJA DE AGUA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 38.00 38.00 1 38.00 38.00


18 1 21 1 38.00 38.00 0
TARJETA KARDEX
ARTICULO: CAJA DE REGISTRO DE CONCRETO 12" X 24" CON FONDO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 18.00 18.00 1 18.00 18.00


18 1 21
TARJETA KARDEX
ARTICULO: CAJA DE REGISTRO DE CONCRETO 12" X 24" SIN FONDO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 21 20 3 18.00 54.00 3 18.00 54.00


MUNICIPALIDAD DISTRITAL
DE MACARI
TARJETA KARDEX
ARTICULO: SUMIDERO DE BRONCE CON TAPA DE 4"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 15.00 15.00 1 15.00 15.00


18 1 21 1 15.00 15.00 0
TARJETA KARDEX
ARTICULO: SOMBRERO DE VENTILACION DE PVC 2"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 7.00 7.00 1 7.00 7.00


18 1 21 1 7.00 7.00 0
TARJETA KARDEX
ARTICULO: POZO PERCOLADOR CON TAPA DE CONCRETO DE D=1M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 105.00 105.00 1 105.00 105.00


18 1 21 1 105.00 105.00 0
TARJETA KARDEX
ARTICULO: PEGAMENTO PARA PVC
U/MEDIAD: GLN
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 0.5 105.00 52.50 0.5 105.00 52.50


18 1 21 0.5 105.00 52.50 0
TARJETA KARDEX
ARTICULO: TAPA CON MARCO DE F° G° PARA CAJA DESAGUE 12" X 24"
U/MEDIAD: PZA
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 48.00 48.00 1 48.00 48.00


18 1 21 1 48.00 48.00 0
TARJETA KARDEX
ARTICULO: TUBERIA PVC SAL 2" X 5 M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 18.00 18.00 1 18.00 18.00


18 1 21 1 18.00 18.00 0
TARJETA KARDEX
ARTICULO: TUBERIA PVC SAP CALSE 10 DE 1"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 3 30.00 90.00 3 30.00 90.00


18 1 21 1 30.00 30.00 2 30.00 30.00
TARJETA KARDEX
ARTICULO: TUBERIA PVC SAL DE 4" X 5 M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 5 24.00 120.00 5 24.00 120.00


18 1 21 5 24.00 120.00 0
TARJETA KARDEX
ARTICULO: VALVULA DE COMPUERTA PVC DE 1"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 85.00 85.00 1 85.00 85.00


18 1 21 1 85.00 85.00 0
TARJETA KARDEX
ARTICULO: UNIDAD ABRAZADERA TERMOPLASTICA DE 2" A 1"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 1 115.00 115.00 1 115.00 115.00


18 1 21 1 115.00 115.00 0
TARJETA KARDEX
ARTICULO: NIPLE DE PVC D=1 ROSCADO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 2 8.00 16.00 2 8.00 16.00


18 1 21 2 8.00 16.00 0
TARJETA KARDEX
ARTICULO: UNION SP PVC SAP P/AGUA 1"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 2 8.00 16.00 2 8.00 16.00


18 1 21 2 8.00 16.00 0
TARJETA KARDEX
ARTICULO: CODO 45° PARA AGUA DE 1"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 5 8.00 40.00 5 8.00 40.00


2 8.00 16.00 3.00 8.00 24.00
TARJETA KARDEX
ARTICULO: CODO 90° PARA DESAGUE 4"
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

24 12 20 5 10.00 50.00 5 10.00 50.00


18 1 21 5 10.00 50.00 0 -
TARJETA KARDEX
ARTICULO: MADERA 2" X 2" X 12 FT
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 50 25.37 1,268.50 50 25.37 1,268.50


2 1 21 50 25.37 1,268.50 0
TARJETA KARDEX
ARTICULO: MADERA 2" X 3" X 12 FT
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 12 38.00 456.00 12 38.00 456.00


2 1 21 12 38.00 456.00 0
TARJETA KARDEX
ARTICULO: TABLAS DE 8" X 1" X 12 FT
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 8 50.00 400.00 8 50.00 400.00


2 1 21 8 50.00 400.00 0
TARJETA KARDEX
ARTICULO: ROLLIZOS DE 3M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 10 20.00 200.00 10 20.00 200.00


2 1 21 10 20.00 200.00 0
TARJETA KARDEX
ARTICULO: ROLLIZOS DE 4M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 40 23.50 940.00 40 23.50 940.00


2 1 21 40 23.50 940.00 0
TARJETA KARDEX
ARTICULO: ROLLIZOS DE 5M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 33.50 67.00 2 33.50 67.00


2 1 21 2 33.50 67.00 0
TARJETA KARDEX
ARTICULO: TRIPLAY DE 1.20 X 2.40 X 6MM
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 24 73.00 1,752.00 24 73.00 1,752.00


2 1 21 24 73.00 1,752.00 0
TARJETA KARDEX
ARTICULO: ARENA GRUESA
U/MEDIAD: M3
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

7 1 21 15 25.00 375.00 15 25.00 375.00 0


TARJETA KARDEX
ARTICULO: ARENA FINA
U/MEDIAD: M3
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

7 1 21 8 25.00 200.00 8 25.00 200.00 0


TARJETA KARDEX
ARTICULO: HORMIGON
U/MEDIAD: M3
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

7 1 21 30 17.50 525.00 30 17.50 525.00 0


TARJETA KARDEX
ARTICULO: CARRETILLAS BUGGIE
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 178.00 356.00 2 178.00 356.00 0


TARJETA KARDEX
ARTICULO: PICO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 5 32.00 160.00 5 32.00 160.00 0 6.00 48.00


TARJETA KARDEX
ARTICULO: PALA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 5 27.00 135.00 5 27.00 135.00 0


TARJETA KARDEX
ARTICULO: CORDEL
U/MEDIAD: M
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 100 1.00 100.00 100 1.00 100.00 0


TARJETA KARDEX
ARTICULO: REGLA DE ALUMINIO X 9M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 64.00 128.00 2 64.00 128.00 0


TARJETA KARDEX
ARTICULO: FLEXOMETRO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 17.00 34.00 2 17.00 34.00 0


TARJETA KARDEX
ARTICULO: HOJA DE SIERRA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 4 7.00 28.00 4 7.00 28.00


2 1 21 1 7.00 7.00 3 7.00 21.00
4 1 21 1 8.00 8.00 2 7.00 14.00
8 1 21 1 9.00 9.00 1 7.00 7.00
11 1 21 1 10.00 10.00 0
TARJETA KARDEX
ARTICULO: BROCHA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 4 27.00 108.00 4 27.00 108.00


18 1 21 4 27.00 108.00 0
TARJETA KARDEX
ARTICULO: ESCOBA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 17.00 34.00 2 17.00 34.00 0


TARJETA KARDEX
ARTICULO: LIJAR
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 5 3.00 15.00 5 3.00 15.00


19 1 21 5 3.00 15.00 0
TARJETA KARDEX
ARTICULO: WINCHA DE 30 M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 1 50.00 50.00 1 50.00 50.00 0


TARJETA KARDEX
ARTICULO: WINCHA DE 30 M
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 1 50.00 50.00 1 50.00 50.00 0


TARJETA KARDEX
ARTICULO: MANGUERA DE NIVEL
U/MEDIAD: MTRS
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 20 2.00 40.00 20 2.00 40.00


23 12 20 20 2.00 40.00 0
TARJETA KARDEX
ARTICULO: ZARANDA
U/MEDIAD: M
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 4 7.00 28.00 4 7.00 28.00


5 1 21 4 7.00 28.00 0
TARJETA KARDEX
ARTICULO: PLASTICO DOBLE DE 1.2 M
U/MEDIAD: KG
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 5 4.00 20.00 5 4.00 20.00


2 1 21 2 2.00 40.00 3 4.00 20.00
4 1 21 3 2.00 40.00 0
TARJETA KARDEX
ARTICULO: BOTAS DE JEBE COM PUNTA DE ACERO
U/MEDIAD: PAR
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 10 20.00 200.00 10 20.00 200.00 10 20.00 200.00


0
TARJETA KARDEX
ARTICULO: CASCOS DE PROTECCION CON TAPASOL
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 10 10.00 100.00 10 10.00 100.00 10 10.00 100.00


0
TARJETA KARDEX
ARTICULO: MAMELUCO DE 2 PIEZAS
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 10 37.00 370.00 10 37.00 370.00 10 37.00 370.00


0
TARJETA KARDEX
ARTICULO: GUANTES DE CUERO
U/MEDIAD: PAR
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 20 8.50 170.00 10 8.50 85.00 10 8.50 85.00


2 1 21 10 2.00 40.00 0
TARJETA KARDEX
ARTICULO: GUANTES DE JEBE
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 20 8.50 170.00 20 8.50 170.00


6 1 21 10 8.50 85.00 10 8.50 85.00
11 1 21 10 8.50 85.00 0
TARJETA KARDEX
ARTICULO: LENTES DE SEGURIDAD TRANSPARENTE
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 10 5.00 50.00 10 5.00 50.00 10 5.00 50.00


0
TARJETA KARDEX
ARTICULO: CHALECO PERSONAL TECNICO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 3 62.00 186.00 3 62.00 186.00 3 62.00 186.00


0
TARJETA KARDEX
ARTICULO: CASCO DE PROTECCIÓN PERSONAL TECNICO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 3 35.00 105.00 3 35.00 105.00 3 35.00 105.00


0
TARJETA KARDEX
ARTICULO: LENTES DE SEGURIDAD OSCURO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 3 5.00 15.00 3 5.00 15.00 3 5.00 15.00


0
TARJETA KARDEX
ARTICULO: ALCOHOL EN GEL
U/MEDIAD: LT
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 20.00 40.00 1 20.00 20.00 1 20.00 20.00


4 1 21 1 2.00 40.00 0
TARJETA KARDEX
ARTICULO: ALCOHOL ETILICO AL 70º
U/MEDIAD: LT
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 17.00 34.00 1 17.00 17.00 1 17.00 17.00


4 1 21 1 17.00 17.00 0
TARJETA KARDEX
ARTICULO: DETERGENTE X 5 KG
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 50.00 100.00 1 50.00 50.00 1 50.00 50.00


4 1 21 1 50.00 50.00 0
TARJETA KARDEX
ARTICULO: JABON LIQUIDO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 4 7.00 28.00 1 7.00 7.00 3 7.00 21.00


2 1 21 1 7.00 7.00 2 8.00 16.00
11 1 21 1 7.00 7.00 1 9.00 9.00
18 1 21 1 7.00 7.00 0 -
TARJETA KARDEX
ARTICULO: LAVADERO PORTATILES DE MANO
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 1 162.00 162.00 1 162.00 162.00 1 162.00 162.00


0
TARJETA KARDEX
ARTICULO: LEJIA (HIPOCLORITO DE SODIO) AL 5%
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 2 15.00 30.00 1 15.00 15.00 1 15.00 15.00


6 1 21 1 15.00 15.00 0
TARJETA KARDEX
ARTICULO: MASCARILLA KN 95
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 8 3.00 24.00 2 3.00 6.00 6 3.00 18.00


2 1 21 1 2.00 40.00 4 3.00 18.00
6 1 21 1 2.00 40.00 3 3.00 18.00
9 1 21 1 2.00 40.00 2 3.00 18.00
15 1 21 1 2.00 40.00 1 3.00 18.00
18 1 21 1 2.00 40.00 0
TARJETA KARDEX
ARTICULO: MASCARILLAS COMUNITARIAS
U/MEDIAD: CAJA
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 6 22.00 132.00 1 22.00 22.00 5 22.00 110.00


2 1 21 1 2.00 40.00 4 22.00 88.00
5 1 21 1 2.00 40.00 3 22.00 66.00
13 1 21 1 2.00 40.00 2 22.00 44.00
18 1 21 1 2.00 40.00 1 22.00 22.00
22 1 21 1 2.00 40.00 0
TARJETA KARDEX
ARTICULO: PAPEL TOALLA DESECHABLE
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 12 4.00 48.00 1 4.00 4.00 11 4.00 44.00


2 1 21 1 4.00 4.00 10 4.00 40.00
5 1 21 1 4.00 4.00 9 4.00 36.00
7 1 21 1 4.00 4.00 8 4.00 32.00
9 1 21 1 4.00 4.00 7 4.00 28.00
11 1 21 1 4.00 4.00 6 4.00 24.00
13 1 21 1 4.00 4.00 5 4.00 20.00
15 1 21 1 4.00 4.00 4 4.00 16.00
18 1 21 1 4.00 4.00 3 4.00 12.00
20 1 21 1 4.00 4.00 2 4.00 8.00
22 1 21 2 4.00 8.00 0 -
TARJETA KARDEX
ARTICULO: MICRO ASPERSOR DE 2 LT
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 1 20.00 20.00 1 20.00 20.00 -


TARJETA KARDEX
ARTICULO: TERMOMETRO DIGITAL TIPO PISTOLA DE TEMPERATURA INFRAROJA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 1 100.00 100.00 1 100.00 100.00 20 2.00 40.00


TARJETA KARDEX
ARTICULO: TACHO DE BASURA
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

22 12 20 1 77.00 77.00 1 77.00 77.00 -


TARJETA KARDEX
ARTICULO: BOTIQUIN
U/MEDIAD: UND
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

29 12 20 1 40.00 40.00 1 40.00 40.00 -


TARJETA KARDEX
ARTICULO: GASOLINA DE 84 OCTANOS
U/MEDIAD: GLN
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

29 12 20 10 2.00 20.00 10 2.00 20.00


2 1 21 2.5 2.00 5.00 7.5 2.00 20.00
4 1 21 2.5 2.00 5.00 5 2.00 20.00
12 1 21 2.5 2.00 5.00 2.5 2.00 20.00
18 1 21 2.5 2.00 5.00 0
TARJETA KARDEX
ARTICULO: PETROLEO DIESEL D-5
U/MEDIAD: GLS
FECHA ENTRADAS SALIDA SALDO
D M A CANT. P/U P/TOTAL CANT. P/U P/TOTAL CANT. P/U P/TOTAL

29 12 20 120 12.50 1,500.00 120 12.50 1,500.00


2 1 21 40 12.50 500.00 80 12.50 1,000.00
7 1 21 40 12.50 500.00 40 12.50 500.00
9 1 21 10 12.50 125.00 30 12.50 375.00
11 1 21 5 12.50 62.50 25 12.50 312.50
13 1 21 12 12.50 150.00 13 12.50 162.50
15 1 21 8 12.50 100.00 5 12.50 62.50
18 1 21 5 12.50 62.50 0 12.50