You are on page 1of 14

HSE

PERFORMANCE
WEEK IV
HIDUP BARU PERDANA ABADI

B AT U H I J A U P R O J E C T

1
hidup-baru.com
AREA KERJA PT.HIDUP BARU
HIDUP BARU PERDANA ABADI

SLEEPER CONTAINER BENETE SHELTER TRAFO BENETE TERMINASI LAUNDRY BENETE CAMP SERVICE BENETE

FOLDING HOUSE T1 MEETING ROOM ADM3 TANGGA AKSES T1 EXTENSION ADM 3


LAYER I LAYER II LAYER III LAYER IV LAYER V
ORGANIZATION’S ROLES & PLAN READINESS WORK READINESS & PREVENTIVE
RESPONSIBILITIES MONITORING CONTACT DEFENSE
DEFENSE

(MEMASTIKAN KESIAPAN BEKERJA


(KESIAPAN RENCANA KERJA DAN (ANTI SALAH/
(TERDAPATNYA MANAGEMENT K3) DIAWAL SHIFT DAN PENGAWASAN (PELINDUNG DIRI)
PENGENDALIANNYA) POKAYOKE)
LAPANGAN)

1. HIRA 1. JSA 1. P5M 1. LOTO 1. APD


2. MANAGEMENT REVIEW 2. RENCANA KERJA / METHODE KERJA 2. OBSERVASI 2. ALARM 2. ERT
3. REGULATION COMPLIANCE 3. DESIGN 3. P2H 3. SAFETY DEVICE
4. SOP 5. TOOLS INSPECTION 4. KONDISI AREA KERJA 4. ROPS
5. GOLDEN RULES (by owner) 6. LINGKUNGAN KERJA 5. PEMENUHAN RAMBU
6. ORGANIASI & LEADERSHIP 7. MAINTENANCE 6. PENGAWASAN PEKERJAAN
7. RENCANA K3L 8. EMERGENCY PREPAREDNESS OLEH PENGAWAS
8. TRANING KOMPETENSI 9. HSE CAMPAIGN 7. SAFETY PATROL
10. PERMIT TO WORK 10. MSDS 8. PELAKSANAAN PEKERJAAN
11. MCU 11. INCIDENT INVESTIGATION & REPORTING SESUI SOP
12. COMMISSIONING 12. LIFTING PLAN 9. FTW
10. DRUG/DRUNK INFLUENCE
11. FATIGUE TEST (TERENCANA
DAN TIDAK)

PT. HIDUP BARU PERDANA ABADI


HSE TARGET OBJECTIVE AND PLAN
JOBSITE AMMAN 2023
NO Program description Jan - Dec 2023
LAGGING INDICATOR Schedule Jan Feb Mar Apr Mei Juni Juli Agust Sep Oct Nov Des Actual Target Remarks
1. HSE Objective 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1.1 Fatality Yearly 0 0 No Fatality
1.2 LTI Yearly 0 0 No Lost Time Injury
1.3 First AID Yearly 0 0
1.4 Minor Incident Yearly 0 0
1.5 Major Incident Yearly 0 0
1.6 Fire Case Yearly 0 0
1.7 Property Damage Yearly 0 0
1.8 Environmental Damage Yearly 0 0
LEADING INDICATOR
2. Health Program Actual Target
2.1 Medical Check Up Yearly 0 100% All Personnel
2.2 Fit To Work Daily 7 7 7 7 0 360 Form fit to work with P5M all employees
3. Meeting Actual Target
3.1 Tool Box Meeting/P5M Daily 7 7 7 7 8% 360 Everyday before starting the job
3.2 Safety Talk Weekly 1 1 1 1 8% 48 Internal Safety Meeting/With Client
3.3 Safety Rewards Weekly 1 1 1 1 0 48 2 Employees / week
3.4 Meeting Coordination Weekly 1 8% 48 Coordination With Repr.Management/ With Client
4. Inspection Actual Target
4.1 Daily Patrol Daily 7 7 7 7 8% 360 Observasi KTA & TTA All Area
HIDUP BARU PERDANA ABADI

4.2 Joint Inspection Monthly 0 4 ALL Supervisor Level , PJO / All Area
4.3 APAR Inspection Monthly 0 12 All Working Area/ Inspection By AMMAN
4.4 Housekeeping Inspection Weekly 1 0 48 All Working Area
4.5 Electrical Tools Inspection 3 Month 1 0 4 General electrical tools Facility / Inspection By AMMAN
5. Training Actual Target
5.1 HSE induction Yearly - 100% All New Employees (If Any) / by AMMAN
5.2 Working At Height Yearly - 100% Training by AMMAN (as needed)
5.3 Fire Watcher Yearly - 100% Training by AMMAN (as needed)
5.4 3 days Safety mandatory Yearly - 100% All Supervisor Level By AMMAN
5.5 Pengawas Oprasional Pratama Yearly 1 - 100% All Supervisor Level (External)
6. Safety Campaign Actual Target
6.1 Safety Campaign 6 Month - 100% Customize Request
5

HSE PLAN PT. HIDUP BARU


NO Program description
LAGGING INDICATOR Schedule Jan
1. HSE Objective 1 2 3
1.1 Fatality Yearly
1.2 LTI Yearly
HIDUP BARU PERDANA ABADI

1.3 First AID Yearly


1.4 Minor Incident Yearly
1.5 Major Incident Yearly
1.6 Fire Case Yearly
1.7 Property Damage Yearly
1.8 Environmental Damage Yearly
LEADING INDICATOR
2. Health Program
2.1 Medical Check Up Yearly
2.2 Fit To Work Daily 7 7 7
1.2 LTI Yearly
1.3 First AID Yearly
1.4 Minor Incident Yearly
1.5 Major Incident Yearly
1.6 Fire Case Yearly
1.7 Property Damage Yearly
1.8 Environmental Damage Yearly
LEADING INDICATOR
2. Health Program
2.1 Medical Check Up Yearly
2.2 Fit To Work Daily 7 7 7 7
3. Meeting
3.1 Tool Box Meeting/P5M Daily 7 7 7 7
3.2 Safety Talk Weekly 1 1 1 1
3.3 Safety Rewards Weekly 1 1 1 1
3.4 Meeting Coordination Weekly 1
4. Inspection
4.1 Daily Patrol Daily 7 7 7 7
4.2 Joint Inspection Monthly
4.3 APAR Inspection Monthly
HIDUP BARU PERDANA ABADI

4.4 Housekeeping Inspection Weekly 1


4.5 Electrical Tools Inspection 3 Month 1
5. Training
5.1 HSE induction Yearly
5.2 Working At Height Yearly
5.3 Fire Watcher Yearly
5.4 3 days Safety mandatory Yearly
5.5 Pengawas Oprasional Pratama Yearly 1
6. Safety Campaign
6.1 Safety Campaign 6 Month
7 Safety Meeting
HIDUP BARU PERDANA ABADI

SAFETY
REWARDS
Pemberian hadiah kepada karyawan yang mengikuti
prosedur dan aktif berpartisipasi dalam keselamatan dan
kesehatan Kerja
8 Safety Meeting
HIDUP BARU PERDANA ABADI

P5M/TBM
Pertemuan Harian Sebelum melakukan pekerjaan untuk
Membahas kendala/temuan pada Hari kemarin dan
planning pekerjaan.
9

JANUARY 2023
MAN HOURS MAN POWER

16.520 59
HIDUP BARU PERDANA ABADI

MORE INFO MORE INFO

STEP #1 STEP #2
Lorem Ipsum is simply dummy Lorem Ipsum is simply dummy
typesetting industry. Lorem Ipsum typesetting industry. Lorem Ipsum
has been the industry's has been the industry's
Jumlah Man Power PT. Hidup Baru
100
R² = 0,9814

R² = 0,9742 92 91 91
R² = 0,954

77
75

59 59

50
HIDUP BARU PERDANA ABADI

41

30 62 60 60
56
25 51

35
30 31 31 32
29
21 22

7 8
11 1
0
May June July August Sep Oct Nov De Jan

TOTAL LOKAL NON LOKAL


11

TOTAL MAN HOURS

154.200
HIDUP BARU PERDANA ABADI

WITHOUT LTI
12

LIMBAH B3

44KG
HIDUP BARU PERDANA ABADI

KALENG BEKAS CAT, TINER, ROLL CAT, KUAS CAT,


KALENG CAT SEMPROT
PERIODE MEI 2022-JANUARI 2023
13

LIMBAH B3
HIDUP BARU PERDANA ABADI

44KG

KALENG BEKAS CAT, TINER, ROLL CAT, KUAS CAT,


KALENG CAT SEMPROT
PERIODE MEI 2022-JANUARI 2023
14

01 UNIFORM 03 TRAINING
SERAGAM MASIH DALAM PROSES PENGIRIMAN EST TRAINING FIRE WATCHER MASIH DALAM ANTRIAN,
1 JANUARY TIBA DAN MENGIKUTI PROSEDUR YANG WAH PENDING 7 ORANG, 1 SIMPER LV 04
BERLAKU

04 PENUNJUKAN PJO
02 KEPENGAWASAN
HIDUP BARU PERDANA ABADI

SITE MANAGER SUDAH MENGAJUKAN PENUNJUKAN


2 PENGAWAS BELUM TRAINING POP A.N PJO KEPADA KTT SEJAK BULAN NOV, NAMUN BELUM
PUJIWANTORO & JURIANTO. DALAM PROSES, AWAL DI TINDAK LANJUTI OLEH TIM AMMAN
BULAN AKAN TRAINING POP

05 PENUNJUKAN PJO
SITE MANAGER SUDAH MENGAJUKAN PENUNJUKAN
PJO KEPADA KTT SEJAK BULAN NOV, NAMUN BELUM
DI TINDAK LANJUTI OLEH TIM AMMAN