You are on page 1of 29

RUKO SUWUNG

GAMBAR STRUKTUR
September, 2 0 2 3
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING
SPECIFICATION
b. Pool and Pond, STP, Ground Tank :
LOKASI :

A. CONCRETE Strength at 28 days ( cube ) C250 or fc'k = 250 kg/cm2


1. GRADE OF REINFORCEMENT Minimum cement content 310 kg/m3 PENANGGUNG JAWAB PARAF

1.1 GENERAL REINFORCEMENT Maximum aggregate size 20 mm


Maximum water/cement ratio 0.66
Diameter > 13 mm (U42) Grade fy = 4200 kg/cm2 ( Deform )
Maximum slump 125 mm
Diameter < 13 mm (U28 B) Grade fy = 2800 kg/cm2 ( Plain )
PEMILIK :

1.2 SPIRAL STIRRUP (U28) Grade fy = 2800 kg/cm2


B STRUCTURAL TIMBER
2. COVER 1. MATERIAL REQUIREMENTS
- All structural timber shall be free of knots. NAMA GAMBAR
Unless otherwise shown on the drawings the following minimum
covers shall apply. - Timber strength shall be to class II - I.
-
- Timber shall have a minimum durability of class II.
Location Internal Face Exterior Face - Definition of quality, strength and durability classes shall be in NAMA PERUSAHAAN

Suspended slabs 25 mm 25 mm accordance with Tata Cara Perencanaan Konstruksi


Kayu Indonesia (PKKI NI - 5).
Top of ground floor slabs 30 mm 40 mm
Bottom of ground floor slabs 50 mm 50 mm 2. QUALITY CONTROL
- All timber size designated in the drawing shall be finished sizes
Columns and walls 25 mm 25 mm and shall be straigth unless noted otherwise
Beams 25 mm 25 mm - All timber shall be machine cut and planed prior to delivery to
Footings 40 mm 40 mm site unless noted otherwise.

3. BAR TOLERANCE
C STRUCTURAL STEEL
Variant in weight Diameter 1. SCOPE OF WORK
Diameter
that allowed toleration a. Supply, fabrication, erection, testing and inspection.
b. Shop preparation and prime painting.
< 10 mm ±7% ± 0.4 mm
c. Field painting, touching up, second prime coat painting
10 mm < Ø < 16 mm ±5% ± 0.4 mm for all steel members, and preparation for finish painting.
16 mm < Ø < 28 mm ±4% ± 0.5 mm 2. MATERIAL REQUIREMENT
a. Structural steel shapes and plates shall have a minimum yield
4. SITE MIXED CONCRETE SHALL BE AS FOLLOW : strength of 240 Mpa and shall comform to SNI 03 - 1729 - 2002
a. Footings & Ground Slabs, Tie Beam, Suspended Slab, b. High tensile strength bolt shall be :
Column , Beam & Ringbeam for all buildings: - Friction grip and tension tipe
- Heat treated carbon stell bolts
Strength at 28 days ( cube ) C250 or fc'= 250 kg/cm2 - Have a minimum yield strength of 3000 kg/cm2
Minimum cement content 320 kg/m3 - Type A 325
DIP DIK DIS
20 mm c. Shop prime material
Maximum aggregate size
Shop prime paint shall be based on phenolic alkyd paint
Maximum water/cement ratio 0.66
material. Which consist of lead and zinc chromate.
Maximum slump 125 mm
SKALA NO GAMBAR JLH GAMBAR

- - 25
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING
DISTANCE OF BAR SPLICES DETAIL OF STEEL BAR OF BEAM IN SETTING DOWN LOKASI :

BEAM
PENANGGUNG JAWAB PARAF

DISTANCE (L) (Min)


QUALITY db
QUALITY OF CONCRETE (fc')
OF STEEL mm
22.5 25 27.5 30 35 PEMILIK :
8 360
U24 10 400
12 480
10 570
13 650
U40 16 800 NAMA GAMBAR
22
25
1400
1575
COLUMN
REINFORCEMENT DETAIL OF BEAM SUPPORTING COLUMN -

NAMA PERUSAHAAN

MINIMUM ANCHOR IN CONCRETE


2D13 2D13

Ldh Ldh

Critical
section

JOINT OF MAIN STEEL BAR IN COLUMN ARRANGEMENT STIRRUPS IN COLUMN

Ldh Ldh
> 2/3 W > 2/3 W
Beam

Beam

end
end
LENGTH Ldh (Min)
QUALITY

middle
db
QUALITY OF CONCRETE (fc')
OF STEEL
Location of steel bar joint
mm
middle

22.5 25 27.5 30 35
10 300

end
U24 12 300 Beam
end

10 200

end
Beam

U40 13 260
end

DIP DIK DIS

middle
16 320
19 380 Location of steel bar joint
middle

22 440

end
25 500

SKALA NO GAMBAR JLH GAMBAR

- - 25
PERUNTUKAN BANGUNAN :

RUKO

DETAIL OF REINFORCEMENT CROSS SECTION OF BEAM AND COLUMN STIRRUP LOKASI :


SHOP DRAWING

IN CANTILEVER BEAM COLUMN


BEAM COLUMN STIRRUP
PENANGGUNG JAWAB PARAF
Concrete Concrete Concrete
cover cover cover

NORMALLY STIRRUP DOUBLE STIRRUP


IF NECESSARY DOUBLE STIRRUP (TYPE A) (TYPE B) (TYPE C)
CAN BE USED IN ONE SECTION CLEAR DISTANCE BETWEEN STEEL BARS :
b1 > 25mm
Concrete cover > 25mm
PEMILIK :

Concrete
CLEAR DISTANCE BETWEEN STEEL BARS : cover
135°0'0"
NAMA GAMBAR
b1 > 25mm
Concrete cover > 25mm
b2 = 25 mm
DOUBLE STIRRUP -
IF NECESSARY DOUBLE STIRRUP
NORMALLY STIRRUP CAN BE USED IN ONE SECTION

NAMA PERUSAHAAN

DETAIL OF REINFORCEMENT IN BEAM TYPICAL DETAIL OF GROUNDSLAB SECTION

GROUNDSALAB

PLASTIC MEMBRANE (0.2 mm THICK)


LEAN CONCRETE (GRADE K : 125 kg/cm2)

COMPACTED SOIL
end middle end

TYPICAL DETAIL OF TYPICAL DETAIL OF


ROOF SLAB PROTECTION SETDOWN AT BATH ROOM
Inertial beam

Leveling sreeding 1 ps : 3 sd
( Min. 50 mm thick )
KM/WC AREA
Waterproofing
Sika waterproofing
end middle end DIP DIK DIS

SKALA NO GAMBAR JLH GAMBAR

- - 25
PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

Tob -0.050
5 SF1
Tob -0.050 Tob -0.050

4 SF1 SF1
PEMILIK :
Tob -0.050

Tob -0.050

Tob -0.050

Tob -0.050
SLAB : THK. 100 mm SLAB : THK. 100 mm SLAB : THK. 100 mm
SF1

SF1

SF1

SF1
FFL : ±0.000 FFL : ±0.000 FFL : ±0.000
FSL : -0.050 FSL : -0.050 FSL : -0.050
NAMA GAMBAR

DENAH RENCANA SLOOF


Tob -0.050 Tob -0.050 Tob -0.050
3 SF1 SF1 SF1 NAMA PERUSAHAAN
Tob -0.050

Tob -0.050

Tob -0.050

Tob -0.050
SLAB : THK. 100 mm SLAB : THK. 100 mm SLAB : THK. 100 mm
SF1

SF1

SF1

SF1
FFL : ±0.000 FFL : ±0.000 FFL : ±0.000
FSL : -0.050 FSL : -0.050 FSL : -0.050

SLOOF
SF1 : 250X400
Tob -0.050 Tob -0.050 Tob -0.050
2 SF1 SF1 SF1 BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
Tob -0.050

Tob -0.050

Tob -0.050

Tob -0.050
SLAB : THK. 100 mm SLAB : THK. 100 mm SLAB : THK. 100 mm B4 : 200X300
SF1

SF1

SF1

SF1
FFL : ±0.000 FFL : ±0.000 FFL : ±0.000
FSL : -0.050 FSL : -0.050 FSL : -0.050 RB1 : 150X250

KOLOM
K1 : 300X500
Tob -0.050 Tob -0.050 Tob -0.050 K2 : 300X400 DIP DIK DIS

1 SF1 SF1 SF1 K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA SLOOF


1:75 STR-01 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 PEMILIK :

NAMA GAMBAR

DENAH RENCANA PONDASI MENERUS

3 NAMA PERUSAHAAN

A B B
SLOOF
SF1 : 250X400

BALOK

2 B1
B2
: 250X450
: 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
K2 : 300X400
K3 : 200X200 DIP DIK DIS

1
SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA PONDASI MENERUS 1:75 STR-02 25


PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 K1 K1 K1 K1
PEMILIK :

NAMA GAMBAR

DENAH RENCANA KOLOM LT DASAR

3 K1 K1 K1 K1 NAMA PERUSAHAAN

SLOOF
SF1 : 250X400

2 K1 K1 K1 K1
BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
K2 : 300X400 DIP DIK DIS

1 K1 K1 K1 K1
K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA KOLOM LT DASAR


1:75 STR-03 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

5 1 1

4 1

BP1 BP1
1

BP1 BP1 PEMILIK :

BORE PILE TYPE 1 NAMA GAMBAR

DENAH RENCANA BORE PILE

3 1

BP1
1

BP1
1

BP1 BP1
1

NAMA PERUSAHAAN

SLOOF
BORE PILE TYPE 2
SF1 : 250X400

2 1

BP1
1
BP2
1

BP1 BP1
1

BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
1 BP1 1 BP1 1 1 K1 : 300X500
BP1 BP1
1 K2
K3
: 300X400
: 200X200
DIP DIK DIS

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA BORE PILE


1:75 STR-04 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

5
4 PEMILIK :

SLAB : THK. 100 mm SLAB : THK. 100 mm SLAB : THK. 100 mm


FFL : ±0.000 FFL : ±0.000 FFL : ±0.000
FSL : -0.050 FSL : -0.050 FSL : -0.050

NAMA GAMBAR

DENAH RENCANA PLAT LT DASAR

3 NAMA PERUSAHAAN

SLAB : THK. 100 mm SLAB : THK. 100 mm SLAB : THK. 100 mm


FFL : ±0.000 FFL : ±0.000 FFL : ±0.000
FSL : -0.050 FSL : -0.050 FSL : -0.050

SLOOF
SF1 : 250X400

2 BALOK
B1 : 250X450
B2 : 250X400
SLAB : THK. 100 mm
B3 : 200X350
SLAB : THK. 100 mm SLAB : THK. 100 mm
FFL : ±0.000
FSL : -0.050
FFL : ±0.000
FSL : -0.050
FFL : ±0.000
FSL : -0.050
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
1 K2 : 300X400 DIP DIK DIS

K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA PLAT LANTAI DASAR 1:75 STR-05 24


PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5 Tob +3.350 Tob +3.350 Tob +3.350

Tob +3.350

Tob +3.350
4 B1

Tob +3.350 Tob +3.350


B1 B1
SLAB : THK. 120 mm PEMILIK :

B1

B1
FFL : +3.400 SLAB : THK. 120 mm

B1
FSL : +3.350 FFL : +3.400
FSL : +3.350

Tob +3.350
Tob +3.350 Tob +3.350 Tob +3.350

B1
Tob +3.350

Tob +3.350
B3 B3 B3

Tob +3.350
NAMA GAMBAR
SLAB : THK. 120 mm SLAB : THK. 120 mm
B1

B1
FFL : +3.400

B1
FFL : +3.400
FSL : +3.350 FSL : +3.350

B3
SLAB : THK. 120 mm
DENAH RENCANA BALOK LT 2
FFL : +3.400
Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350
3
FSL : +3.350

NAMA PERUSAHAAN
B1 B1 B1 B1 Tob +3.350 Tob +3.350
Tob +3.350

Tob +3.350
Tob +3.350

Tob +3.350

Tob +3.350
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
B3 B3
B3

B3
FFL : +3.400 FFL : +3.400 FFL : +3.400 FFL : +3.400
B1

B1
FSL : +3.350 FSL : +3.350 FSL : +3.350 FSL : +3.350

B1
SLAB : THK. 120 mm
FFL : +3.400
FSL : +3.350

Tob +3.350

Tob +3.350
Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350
SLAB : THK. 120 mm
FFL : +3.400

B3
B3 B3 B3 B3

B1
FSL : +3.350

SLOOF
Tob +3.350

Tob +3.350

Tob +3.350
Tob +3.350

Tob +3.350
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
SLAB : THK. 120 mm SF1 : 250X400
B1

FFL : +3.400
B3

B3
FFL : +3.400
B1

B1
FFL : +3.400 FFL : +3.400
FSL : +3.350 FSL : +3.350 FSL : +3.350
FSL : +3.350

Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350
BALOK
2 B1 B1 B1 B1 B1 B1
B1 : 250X450
B2 : 250X400
Tob +3.350

Tob +3.350
Tob +3.350

Tob +3.350

Tob +3.350

SLAB : THK. 120 mm


SLAB : THK. 120 mm
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
B3 : 200X350

B1
B1

FFL : +3.400
B3

B3
B1

FFL : +3.400 FFL : +3.400 FFL : +3.400 FFL : +3.400


FSL : +3.350 FSL : +3.350
FSL : +3.350 FSL : +3.350 FSL : +3.350

B4 : 200X300

Tob +3.350

Tob +3.350
Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 SLAB : THK. 120 mm
RB1 : 150X250

B3

B1
FFL : +3.400
FSL : +3.350
B3 B3 B3 B3
KOLOM
Tob +3.350
Tob +3.350

Tob +3.350
Tob +3.350

Tob +3.350

SLAB : THK. 120 mm SLAB : THK. 120 mm


SLAB : THK. 120 mm
K1 : 300X500
B1

SLAB : THK. 120 mm


B3

B3

FFL : +3.400
B1

B1

FFL : +3.400 FFL : +3.400


FSL : +3.350 FFL : +3.400
FSL : +3.350 FSL : +3.350 FSL : +3.350
K2 : 300X400
Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 K3 : 200X200 DIP DIK DIS

1 B1 B1 B1 B1 B1 B1

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA BALOK LANTAI 2


1:75 STR-06 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 K1 K1 K1 K1 PEMILIK :

NAMA GAMBAR

DENAH RENCANA KOLOM LT 2

3 K1 K1 K1 K1
NAMA PERUSAHAAN

SLOOF
SF1 : 250X400

2 K1 K1 K1 K1
BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
DIP DIK DIS
K2 : 300X400
1 K1 K1 K1 K1
K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA KOLOM LANTAI 2 1:75 STR-07 24


PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 SLAB : THK. 120 mm
FFL : +3.400
FSL : +3.350
SLAB : THK. 120 mm
FFL : +3.400
FSL : +3.350
PEMILIK :

SLAB : THK. 120 mm SLAB : THK. 120 mm


NAMA GAMBAR
FFL : +3.400 FFL : +3.400
FSL : +3.350 FSL : +3.350
SLAB : THK. 120 mm
FFL : +3.400 DENAH RENCANA PLAT LT 2
FSL : +3.350

3 NAMA PERUSAHAAN

SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm


FFL : +3.400 FFL : +3.400 FFL : +3.400
FSL : +3.350 SLAB : THK. 120 mm
FSL : +3.350 FSL : +3.350
FFL : +3.400
FSL : +3.350 SLAB : THK. 120 mm SLAB : THK. 120 mm
FFL : +3.400 FFL : +3.400
FSL : +3.350 FSL : +3.350

SLOOF
SLAB : THK. 120 mm
FFL : +3.400
SLAB : THK. 120 mm
FFL : +3.400
SLAB : THK. 120 mm
FFL : +3.400 SF1 : 250X400
FSL : +3.350 FSL : +3.350 FSL : +3.350

2 BALOK
B1 : 250X450
B2 : 250X400
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
SLAB : THK. 120 mm
SLAB : THK. 120 mm
FFL : +3.400
B3 : 200X350
SLAB : THK. 120 mm FFL : +3.400 FFL : +3.400
FFL : +3.400
B4 : 200X300
FFL : +3.400 FFL : +3.400 FSL : +3.350
FSL : +3.350 FSL : +3.350
FSL : +3.350 FSL : +3.350 FSL : +3.350

RB1 : 150X250

KOLOM
SLAB : THK. 120 mm
FFL : +3.400
FSL : +3.350
SLAB : THK. 120 mm
FFL : +3.400
FSL : +3.350
SLAB : THK. 120 mm
FFL : +3.400
FSL : +3.350
K1 : 300X500
DIP DIK DIS
K2 : 300X400
1 K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR


DENAH RENCANA PLAT LANTAI 2
1:75 STR-08 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5 Tob +3.350

B1
Tob +3.350 Tob +3.350

Tob +3.350
Tob +3.350
B1 B1

Tob +3.350
PEMILIK :
SLAB : THK. 120 mm SLAB : THK. 120 mm

Tob +3.350
Tob +3.350
B1

B1
FFL : +6.800 FFL : +6.800

B1
FSL : +6.750 FSL : +6.750

B3
B3

Tob +3.350
Tob +3.350 Tob +3.350

B1
B3 B3 SLAB : THK. 120 mm
NAMA GAMBAR
Tob +3.350

Tob +3.350
FFL : +6.800
SLAB : THK. 120 mm FSL : +6.750
SLAB : THK. 120 mm
B1

B1
FFL : +6.800 FFL : +6.800
FSL : +6.750 DENAH RENCANA BALOK LT 3

Tob +3.350
FSL : +6.750

Tob +3.350
Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350

B3

B3
NAMA PERUSAHAAN
B1 B1 B1 B1 Tob +3.350
Tob +3.350

Tob +3.350
Tob +3.350

Tob +3.350
B3

Tob +3.350
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
B3

B3
B1

B1
FFL : +6.800 FFL : +6.800 FFL : +6.800 FFL : +6.800

B1
FSL : +6.750 FSL : +6.750 FSL : +6.750 FSL : +6.750
SLAB : THK. 120 mm SLAB : THK. 120 mm
FFL : +6.800 FFL : +6.800
FSL : +6.750 FSL : +6.750
Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350

Tob +6.750

Tob +6.750
B3 B3 B3 B3

B3

B1
SLOOF
Tob +3.350

Tob +3.350

Tob +3.350
Tob +3.350

Tob +3.350
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
SLAB : THK. 120 mm
SF1 : 250X400
B1

B3

B3
FFL : +6.800 FFL : +6.800
B1

B1
FFL : +6.800 FFL : +6.800
FSL : +6.750 FSL : +6.750 FSL : +6.750
FSL : +6.750

Tob +3.350 Tob +3.350


Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350
BALOK
2 B1 B1 B1 B1 B1 B1
B1 : 250X450
Tob +3.350

Tob +3.350
B2 : 250X400
Tob +3.350

Tob +3.350

Tob +3.350

SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm

B1
B1

B3

B3

B3 : 200X350
B1

FFL : +6.800 FFL : +6.800 FFL : +6.800 FFL : +6.800


FSL : +6.750 FSL : +6.750 FSL : +6.750 FSL : +6.750

B4 : 200X300

Tob +3.350

Tob +3.350
Tob +3.350 Tob +3.350
Tob +3.350 Tob +3.350
RB1 : 150X250

B3

B1
B3 B3 B3 B3
SLAB : THK. 120 mm SLAB : THK. 120 mm
Tob +3.350
Tob +3.350

Tob +3.350

KOLOM
Tob +3.350

Tob +3.350

FFL : +6.800 FFL : +6.800


FSL : +6.750 FSL : +6.750
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
B1
B3

B3
B1

B1

FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750
K1 : 300X500
K2 : 300X400 DIP DIK DIS

Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350 Tob +3.350
K3 : 200X200
1 B1 B1 B1 B1 B1 B1

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA BALOK LANTAI 3


1:75 STR-09 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 K2 K2 K2 K2 PEMILIK :

NAMA GAMBAR

DENAH RENCANA KOLOM LT 3

3 K2 K2 K2 K2 NAMA PERUSAHAAN

SLOOF
SF1 : 250X400

2 K2 K2 K2 K2 BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
DIP DIK DIS
K2 : 300X400
1 K2 K2 K2 K2 K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA KOLOM LANTAI 3


1:75 STR-10 24
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

A B C D LOKASI :

PENANGGUNG JAWAB PARAF

5
4 SLAB : THK. 120 mm
FFL : +6.800
FSL : +6.750
PEMILIK :

NAMA GAMBAR

SLAB : THK. 120 mm SLAB : THK. 120 mm


FFL : +6.800 FFL : +6.800 DENAH RENCANA PLAT LT 3
FSL : +6.750 FSL : +6.750

3 NAMA PERUSAHAAN

SLAB : THK. 120 mm


SLAB : THK. 120 mm FFL : +6.800
FFL : +6.800 FSL : +6.750
FSL : +6.750

SLAB : THK. 120 mm


SLOOF
SLAB : THK. 120 mm SLAB : THK. 120 mm
SLAB : THK. 120 mm
FFL : +6.800
FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750 SF1 : 250X400
FSL : +6.750

2 BALOK
SLAB : THK. 120 mm
SLAB : THK. 120 mm
FFL : +6.800
B1 : 250X450
FFL : +6.800
FSL : +6.750
FSL : +6.750
B2 : 250X400
SLAB : THK. 120 mm
B3 : 200X350
SLAB : THK. 120 mm
FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750 B4 : 200X300
RB1 : 150X250

SLAB : THK. 120 mm


KOLOM
SLAB : THK. 120 mm
FFL : +6.800
FSL : +6.750
FFL : +6.800
FSL : +6.750 K1 : 300X500 DIP DIK DIS

K2 : 300X400
1 K3 : 200X200
SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA PLAT LANTAI 3 1:75 STR-11 24


PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

A B C D LOKASI :

PENANGGUNG JAWAB PARAF

5 Tob +10.150

B2
Tob +10.150 Tob +10.150

Tob +10.150
Tob +10.150
B2 B2 PEMILIK :

Tob +10.150

Tob +10.150
SLAB : THK. 120 mm SLAB : THK. 120 mm

B2

B2
FFL : +10.200 FFL : +10.200 SLAB : THK. 120 mm

B2
FSL : +10.150 FSL : +10.150 FFL : +10.200

B2
FSL : +10.150
Tob +10.150 Tob +10.150
NAMA GAMBAR
B4 B4

Tob +10.150
Tob +10.150
Tob +10.150

Tob +10.150
Tob +10.150
SLAB : THK. 120 mm SLAB : THK. 120 mm
B4 B4 DENAH RENCANA BALOK ROOFTOP

B2
B2

B2
FFL : +10.200 FFL : +10.200
FSL : +10.150 FSL : +10.150

Tob +10.150
Tob +10.150 Tob +10.150 Tob +10.150 Tob +3.350

3
NAMA PERUSAHAAN

B4
SLAB : THK. 120 mm
B2 B2 B2 B2 FFL : +10.200

Tob +10.150
FSL : +10.150
Tob +10.150

Tob +10.150
Tob +10.150

Tob +10.150

B2
SLAB : THK. 120 mm SLAB : THK. 120 mm
SLAB : THK. 120 mm SLAB : THK. 120 mm
Tob +10.150 Tob +10.150
B4

B4
B2

FFL : +10.200 FFL : +10.200

B2
FFL : +10.200 FFL : +10.200
FSL : +10.150 FSL : +10.150 FSL : +10.150
FSL : +10.150
B4 B4

Tob +10.150

Tob +10.150
SLAB : THK. 120 mm
Tob +10.150 Tob +10.150 Tob +10.350 Tob +10.150

B4
FFL : +10.200

B2
FSL : +10.150
B4 B4 B4 B4
Tob +10.150 Tob +10.150
Tob +10.150

Tob +10.150

Tob +10.150
Tob +10.150

B4 B4 SLOOF

Tob +10.150
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm
B2

B4

B4
B2

FFL : +10.200 FFL : +10.200 FFL : +10.200 FFL : +10.200 SLAB : THK. 120 mm
FSL : +10.150 FSL : +10.150 FSL : +10.150 FSL : +10.150 FFL : +10.200
SF1 : 250X400

B2
FSL : +10.150

Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150

2 B2 B2 B2 B2 B2 B2
BALOK
B1 : 250X450
Tob +10.150

Tob +10.150
Tob +10.150

Tob +10.150

Tob +10.150

SLAB : THK. 120 mm SLAB : THK. 120 mm


FFL : +10.200
SLAB : THK. 120 mm SLAB : THK. 120 mm
B2 : 250X400

B2
FFL : +10.200
B2

B4

B4

FFL : +10.200
B2

FFL : +10.200
FSL : +10.150 FSL : +10.150 FSL : +10.150
FSL : +10.150
B3 : 200X350

Tob +10.150

Tob +10.150
Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150 B4 : 200X300

B4

B2
B4 B4 B4 B4 RB1 : 150X250
SLAB : THK. 120 mm
Tob +10.150
Tob +10.150

Tob +10.150
Tob +10.150

Tob +10.150

FFL : +10.200 SLAB : THK. 120 mm


FSL : +10.150 FFL : +10.200
SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm SLAB : THK. 120 mm FSL : +10.150 KOLOM
B4

B4

FFL : +10.200
B2

B2

FFL : +10.200 FFL : +10.200


B2

FFL : +10.200
FSL : +10.150 FSL : +10.150 FSL : +10.150 FSL : +10.150
K1 : 300X500 DIP DIK DIS

Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150 Tob +10.150 K2 : 300X400
1 B2 B2 B2 B2 B2 B2
K3 : 200X200
SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA BALOK ROOFTOP 1:75 STR-12 24


PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 PEMILIK :

K3 K3 NAMA GAMBAR

DENAH RENCANA KOLOM ROOFTOP

3 NAMA PERUSAHAAN

K3 K3

K3 SLOOF
K3
SF1 : 250X400

2 BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
K2 : 300X400 DIP DIK DIS

1 K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA KOLOM ROOFTOP


1:75 STR-13 24
PERUNTUKAN BANGUNAN :

RUKO

A
SHOP DRAWING

B C D LOKASI :

PENANGGUNG JAWAB PARAF

5
4 SLAB : THK. 120 mm SLAB : THK. 120 mm
SLAB : THK. 120 mm
PEMILIK :

FFL : +10.200
FFL : +10.200 FFL : +10.200
FSL : +10.150
FSL : +10.150 FSL : +10.150

NAMA GAMBAR

DENAH RENCANA PLAT ROOFTOP

3 SLAB : THK. 120 mm


SLAB : THK. 120 mm
FFL : +10.200
FSL : +10.150
NAMA PERUSAHAAN

FFL : +10.200
FSL : +10.150

SLAB : THK. 120 mm


FFL : +10.200
FSL : +10.150 SLAB : THK. 120 mm
FFL : +10.200
FSL : +10.150

SLOOF
SLAB : THK. 120 mm
SLAB : THK. 120 mm
FFL : +10.200
SLAB : THK. 120 mm
FFL : +10.200
FFL : +10.200
FSL : +10.150
SF1 : 250X400
FSL : +10.150 FSL : +10.150

2 BALOK
SLAB : THK. 120 mm
SLAB : THK. 120 mm
FFL : +10.200
SLAB : THK. 120 mm
FFL : +10.200
B1 : 250X450
FFL : +10.200 FSL : +10.150
FSL : +10.150 FSL : +10.150
B2 : 250X400
B3 : 200X350
Tob +10.150 B4 : 200X300
B2 RB1 : 150X250

KOLOM
SLAB : THK. 120 mm
SLAB : THK. 120 mm
FFL : +10.200
FFL : +10.200
FSL : +10.150
K1 : 300X500 DIP DIK DIS
FSL : +10.150
K2 : 300X400
1 K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA PLAT ROOFTOP


1:75 STR-14 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

5
4 PEMILIK :

Tob +13.600
NAMA GAMBAR
RB1

DENAH RENCANA BALOK ATAP TANGGA

Tob +13.600

Tob +13.600
3

RB1

RB1
NAMA PERUSAHAAN

Tob +13.600
RB1

Tob +13.600

Tob +13.600
RB1

RB1
Tob +13.600
RB1

SLOOF
SF1 : 250X400
2 BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500 DIP DIK DIS

1 K2 : 300X400
K3 : 200X200
SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA BALOK ATAP TANGGA


1:75 STR-15 24
PERUNTUKAN BANGUNAN :

RUKO

A B C D LOKASI :
SHOP DRAWING

PENANGGUNG JAWAB PARAF

5
4 PEMILIK :

NAMA GAMBAR

DENAH RENCANA PLAT ATAP TANGGA

3 SLAB : THK. 120 mm


FFL : +13.600
FSL : +13.550 NAMA PERUSAHAAN

SLAB : THK. 120 mm


FFL : +13.600
FSL : +13.550

SLOOF
SF1 : 250X400

2 BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
K2 : 300X400 DIP DIK DIS

1 K3 : 200X200

SKALA NO GAMBAR JLH GAMBAR

DENAH RENCANA PLAT ATAP TANGGA


1:75 STR-16 24
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

LOKASI :

B2 B2 B2
PENANGGUNG JAWAB PARAF

K2 K2 K2

B1 B1 B1
PEMILIK :

K1 K1 K1 NAMA GAMBAR

PORTAL GRID A
B1 B1 B1
NAMA PERUSAHAAN

K1 K1 K1

SF1 SF1 SF1

SLOOF
SF1 : 250X400

BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
1 2 3 5 K1 : 300X500
K2 : 300X400
K3 : 200X200
DIP DIK DIS

SKALA NO GAMBAR JLH GAMBAR

PORTAL GRID A
1:100 STR-17 25
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

LOKASI :

B2 B2 B2

PENANGGUNG JAWAB PARAF

K2 K2 K2 K2

B1 B1 B1
PEMILIK :

K1 K1 K1 K1

NAMA GAMBAR

B1 B1 B1 PORTAL GRID 1

NAMA PERUSAHAAN

K1 K1 K1 K1

SF1 SF1 SF1

SLOOF
SF1 : 250X400

BALOK
B1 : 250X450
B2 : 250X400
B3 : 200X350
B4 : 200X300
RB1 : 150X250

KOLOM
K1 : 300X500
K2 : 300X400
K3 : 200X200

A B C D
DIP DIK DIS

SKALA NO GAMBAR JLH GAMBAR


PORTAL GRID 1
1:100 STR-18 25
PERUNTUKAN BANGUNAN :

RUKO

1450 SHOP DRAWING


300 850 300
LOKASI :

A A

245 300
D13-150
D19-150

1450
300 850 300 PENANGGUNG JAWAB PARAF

1336
736
491
D13-150

350 350
D19-150

D13-150
D19-150
85
700
A A

D13-150
D19-150

0
300
1450 1450
700 PEMILIK :

700
350

8D13
SPIRAL Ø8-150
NAMA GAMBAR

DETAILB-B DETAIL PONDASI BORE PILE

350
NAMA PERUSAHAAN

8D13
B B B B SPIRAL Ø8-150

DETAILB-B
14 Meter

14 Meter
Tanah Keras Pada Tanah Keras Pada
Kedalaman ±14 Meter Kedalaman ±14 Meter

350 350 350 350

PONDASI BORE PILE TYPE 1 PONDASI BORE PILE TYPE 2


DIP DIK DIS

POTONGAN PONDASI BORE PILE SKALA NO GAMBAR JLH GAMBAR

1:40 STR-19 25
PERUNTUKAN BANGUNAN :

RENCANA SLOOF,BALOK & RING BALOK RUKO

SCHEMATIC SHOP DRAWING


X Y X A B LOKASI :

PENANGGUNG JAWAB PARAF


1/4 Ln 1/2 Ln 1/4 Ln
1/2 Lk
TUMPUAN LAPANGAN TUMPUAN
Ln Lk
L
CATATAN :
MUTU BETON : f'c. 20.75 Mpa
MUTU BAJA TULANGAN : DIAMETER >= 13 : U42 Grade Fy = 420 Mpa (deform)
: DIAMETER < 13 : U28 B Grade Fy = 280 Mpa (Plain)
PEMILIK :

POTONGAN PENGUATAN
TIPE UKURAN TIPE TIPE UKURAN CATATAN
POTONGAN. X POTONGAN. Y TUMPUAN LAPANGAN NAMA GAMBAR
250 250
B1 250x450 3 1 U 3 1 U

DETAIL SLOOF DAN BALOK


2 1 U 250 250
4 1 U 2 1 U
450

450
10 100 10 150
NAMA PERUSAHAAN

SF1 250x400 10 150 10 150

400

400
3 1 U 4 1 U

4 1 U 2 1 U
250 250
B2 250x400 4 1 U 2 1 U
400

400

10 150 10 200

2 1 U 3 1 U

B3 200x350 200
4 1 U
200
2 1 U
350

350

10 150 10 150

2 1 U 3 1 U

B4 200x300 200
3 13 U
200
2 13 U
300

300

150 150

2 13 U 4 13 U

DIP DIK DIS

RB1 150x250 2 12 2 12

150 200

2 12 2 12
DETAIL PENULANGAN SLOOF & BALOK SKALA NO GAMBAR JLH GAMBAR

1:20 STR-20 24
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

PENGUATAN LOKASI :

TIPE UKURAN CATATAN


TUMPUAN LAPANGAN PENANGGUNG JAWAB PARAF

K1 300x500 300 300

PEMILIK :

500

500
10 1 U 10 1 U

10 100 10 150

NAMA GAMBAR

DETAIL KOLOM

K2 300x400 300 300 NAMA PERUSAHAAN

400

400
10 1 U 10 1 U
10 100 10 150

K3 200 x200
200 200
200

200
13 U 13 U
150 200

DIP DIK DIS

DETAIL PENULANGAN KOLOM SKALA NO GAMBAR JLH GAMBAR

1:20 STR-21 25
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

PEMILIK :

SLOOF 250x400MM SLOOF 250x400MM


PAS. GRANITE TILE PAS. GRANITE TILE

BETON RABAT 80MM BETON RABAT 80MM NAMA GAMBAR

50.0000 50.0000
80.0000 80.0000 DETAIL PONDASI MENERUS
50.0000 URUGAN PASIR 50.0000 URUGAN PASIR
50MM 50MM
NAMA PERUSAHAAN
420.0000 TANAH URUG 420.0000 TANAH URUG
300MM 300MM
MUKA TANAH ASLI
MUKA TANAH ASLI

PAS. BATU KALI PAS. BATU KALI

800.0000 800.0000

PAS. BATU PAS. BATU


150.0000 KOSONG 150MM 150.0000 KOSONG 150MM
50.0000 URUGAN PASIR 50.0000 URUGAN PASIR
50MM 50MM

DETAIL A DETAIL B

DIP DIK DIS

DETAIL PONDASI BATU KALI SKALA NO GAMBAR JLH GAMBAR

1:25 STR-22 24
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

PEMILIK :

A A A
NAMA GAMBAR

DENAH TANGGA
1500

NAMA PERUSAHAAN

1500
1 2 3 4 5 6 18 19 20 21 22 23

1500 1500
300 300 300 300 300 300 300 300 300 300 300

1200 300 300 300 300 7

300 300 300 300 300 300 300 300 300 300 300
1200 300 300 300 300 24

8 25
NAIK

1200
9 NAIK 26
35 36 37 38 39 40
41
10 27
11 28

300 300 300 300 300 300 300


42
12 29
43
Lantai 1 13 Lantai 2 30
44
14 31 45
Lantai 3
15 32 46
16 33
47
17 34 48

49

50

A A 51

TURUN
DENAH TANGGA LT 1-2
DENAH TANGGA LT 2-3 DENAH TANGGA LT 3-4 A
DIP DIK DIS

SKALA NO GAMBAR JLH GAMBAR

1:50 STR-23 25
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

51

50

49
PEMILIK :
48

300
46
47
B4
300

200 45
200 44
NAMA GAMBAR
Ø8-150
43
Ø8
42 D13-150

41 Ø8-150 POTONGAN TANGGA


40

39

38 K2 NAMA PERUSAHAAN

37
36
35

34
B3
33

32

31 PLAT LANTAI 12 CM

30
300
29
300

200 28
200 27
Ø8-150
26
Ø8
25 D13-150

24 Ø8-150

23
22

21
K1
20
19

18
17 B3
16

15

14 PLAT LANTAI 12 CM

13
300
12
300

200 11
200 10
Ø8-150
9
Ø8
8 D13-150

DIP DIK DIS


7 Ø8-150

6
5 K1
4
3
2 SKALA NO GAMBAR JLH GAMBAR
1
POTONGAN TANGGA
1:50 STR-24 25
PERUNTUKAN BANGUNAN :

RUKO

SHOP DRAWING

LOKASI :

PENANGGUNG JAWAB PARAF

150

300 PEMILIK :

NAMA GAMBAR

200 DETAIL TANGGA

NAMA PERUSAHAAN

Ø8-150

Ø8
D13-150

Ø8-150

DIP DIK DIS

SKALA NO GAMBAR JLH GAMBAR

1:25 STR-25 25

You might also like