This Standard replaces and cancels its previous revision.
Recommended Practice: Prescription that can be used under the conditions set
out in this Standard, but which admits (and warns about) the possibility of an
alternative (not written in this Standard) more suitable for the specific application.
The adopted alternative must be approved and registered by the PETROBRAS Unit
using this Standard. It is characterized by non-imposing verbs. It is indicated by the
expression: [Recommended Practice].
Presentation
PETROBRAS Technical Standards are prepared by Working Groups - GT
(formed by specialist Technical Collaborators from the Company and its Subsidiaries), are commented
on by the Company's Units and its Subsidiaries, are approved by Author Subcommittees - SC (formed
by technicians from a same specialty, representing the Company's Units and Subsidiaries) and approved
by the Executive Nucleus (formed by representatives of the Company's Units and Subsidiaries). A
PETROBRAS Technical Standard is subject to review at any time by its Authoring Subcommittee and
must be re-analyzed every 5 years to be revalidated, revised or canceled. PETROBRAS Technical
Standards are prepared in accordance with PETROBRAS Technical Standard N-1. For complete
information on PETROBRAS Technical Standards, see PETROBRAS Technical Standards Catalog.
-PUBLIC
1 Scope
1.1 This Standard establishes the conditions required for the preparation of technical documentation to be used in
the planning, execution, control, registration and certification of welding.
1.2 This Standard applies to welding in the manufacturing, construction, assembly and maintenance of equipment,
pipes, ducts and metallic structures.
1.3 This Standard applies to metallic materials and welding processes provided for in PETROBRAS
N-133.
1.4 This Standard applies to the preparation of technical welding documentation, from the date of its edition.
2 Normative References
The documents listed below are essential for the application of this document. For dated references, only the cited
editions apply. For undated references, the most recent editions of the aforementioned documents apply.
PETROBRAS N-2163 - Welding and trepanning of equipment, industrial pipes and pipelines in operation;
ABNT NBR 14842 - Welding - Criteria for the Qualification and Certification of Inspectors for the Oil and
Gas, Petrochemical, Fertilizers, Naval and Thermogeneration Sectors (Except
Nuclear);
FBTS N-007 - Criteria for the Qualification and Certification of Technological Engineer
Welding Specialists;
AWS A2.4 - Standard Symbols for Welding, Brazing and Non-destructive Examination;
AWS A3.0 - Standard Welding Terms and Definitions Including Terms for Adhesive Bonding, Brazing,
Soldering, Thermal Cutting, and Thermal Spraying;
BSI BS EN ISO/IEC 17024 - Conformity Assessment - General Requirements for Bodies Operating
Certification of Persons.
For the purposes of this document, the terms and definitions of PETROBRAS N-1438, N-1738 apply and AWS A3.0.
two
Machine Translated by Google
-PUBLIC
4 General Conditions
4.1 This Standard must be used in conjunction with the design, manufacturing, assembly and maintenance
standards for equipment, piping, ducts and metallic structures, with design standards prevailing in the case
of conflicting requirements.
4.2 Each document specified in this Standard must be prepared when required by PETROBRAS N-133 or
in the design, manufacturing, assembly and maintenance standards of equipment, pipes, ducts and
metallic structures, or in other contractual documents.
4.3 It is recommended that technical documents and drawings be prepared in accordance with
PETROBRAS N-381. [Recommended Practice]
4.4 Metrological units must be in accordance with the International System of Units (SI).
When the nature of the subject indicates the convenience of another system of units, it must be written, in
parentheses, after the unit provided for by the SI.
4.5 All documents mentioned in Section 5 must be approved by the welding inspector certified by a Person
Certification Body (OPC) accredited by INMETRO in accordance with ABNT NBR 14842, respecting the
duties of each level of certification, or by the engineer specializing in welding or welding technologist
certified according to FBTS N-007.
NOTE 1 As an alternative, the Welding Execution and Inspection Instruction (IEIS) can be approved by
the technician responsible for welding at the PETROBRAS operational unit in the case of carrying
out repairs detected during in-service inspection and maintenance welds, where knowledge
about the condition of deterioration and the integrity of the equipment in service are necessary.
NOTE 2 All level 2 welding inspectors, who work on contracts signed by PETROBRAS, must have training
as a technician, or engineer, in the metal-mechanical area and registered with the Regional
Engineering and Agronomy Council (CREA).
4.6 For welding services performed abroad, documents must be approved by welding professionals
certified in the applicable main standard, by international entities that meet the requirements of BSI BS EN
ISO/IEC 17024, in which case prior approval by PETROBRAS is required. .
4.7 For welding and trepanning of equipment, pipes and ducts in operation, in addition to the technical
documentation required by this Standard, the requirements of PETROBRAS N-2163 must also be met.
5 Specific Conditions
The documents mentioned in Section 5 must be submitted for approval by PETROBRAS inspection, before
welding is carried out.
3
Machine Translated by Google
-PUBLIC
N-2301 REV. AND 11/2016
h) map (sketches) indicating the location of the joints to be simulated in said test.
The documents mentioned in 5.2.1 to 5.2.5, when required in accordance with 4.2 of this Standard, must
be prepared and approved to be used in the execution and control of welding and must be available to
welders, operators, supervisors and welding inspectors.
5.2.1 The IEIS must be prepared in accordance with Annex E of this Standard.
NOTE In manufacturing, the IEIS and the Welding Plan can constitute a single document, as long as
that the minimum contents of these are met.
4
Machine Translated by Google
-PUBLIC
N-2301 REV. AND 11/2016
5.2.2 The List of qualified Welders and Welding Operators must be drawn up in accordance with Annex F
of this Standard.
5.2.3 The Performance Control of Welders and Welding Operators must be prepared in accordance with
Annex G of this Standard.
5.2.4 The Qualification Register of Welders and Welding Operators must be prepared in accordance with
Annex D of this Standard.
5.2.5 The Work Repair Index Control must be prepared in accordance with Annex J of this Standard.
The documents mentioned in 5.3.1 to 5.3.3, when required in accordance with 4.2 of this Standard, must
be prepared to be used as a record of the welding execution.
5.3.1 The Welding Record Report must be prepared in accordance with Annex H of this Standard.
5.3.2 The Heat Treatment Record Report must be prepared in accordance with Annex I of this Standard
and portray the information contained in the Heat Treatment Procedure.
NOTE The Heat Treatment Procedure must be prepared by a specialist welding engineer or welding
technologist certified in accordance with FBTS N-007 or a level 2 welding inspector in
accordance with the applicable standard.
5.3.3 The Production Test Execution Record must be prepared in accordance with Annex C of this
Standard.
5
Machine Translated by Google
-PUBLIC
A.1.1 An LJS must be prepared that allows the identification (traceability) of all joints to the manufacturing and/
or construction and assembly drawings.
A.1.2 In the same drawing, joints that have the same characteristics defined in Section A.2 must be listed only
once.
6
Machine Translated by Google
-PUBLIC
The EPS must be prepared based on the codes, standards and specifications for design, manufacturing,
assembly and maintenance, observing the requirements of PETROBRAS N-133. After welding and approval
of the RQPS, the welding parameter ranges must be reviewed to make the values actually used compatible
with the tolerances allowed in the qualification standards applicable for issuing the EPS for performing
production welds.
The EPS must contain, at a minimum, all the information provided for in the respective applicable
qualification standards, in addition to:
7
Machine Translated by Google
-PUBLIC
Annex C - Instructions for Preparing the Welding Procedure Qualification Record (RQPS)
and the Production Test Execution Record
(RETP)
The following documents, when applicable, must be attached to the RQPS or RETP:
a) welding record report prepared in accordance with Annex H of this Standard, in the case of
RQPS;
b) heat treatment record report prepared in accordance with Annex I of this Standard; c)
reports recording the results of non-destructive tests prepared in accordance with applicable
standards; d)
reports recording the results of all tests required by applicable codes, standards and project
specifications in accordance with C.2.2 to C.2.8 of this Annex; e) quality
certificate for welding consumables and base metals, in the case of
RQPS;
f) reports of mechanical tests, micro and macrostructural analyses, phase measurements,
hardness and microhardness measurements and other analyzes necessary for the
qualification of welding or production test procedures. These reports must be issued and
signed by technical professionals with responsibilities recognized by the CREA system or
Regional Chemistry Council (CRQ).
C.2.1 The RQPS and RETP must contain, at a minimum, in addition to all the information provided for in
the respective applicable qualification standards, the following data:
a) identification of the welding procedure (preliminary EPS in the case of RQPS or EPS issued
for production in the case of RETP); b)
identification of the welder or welding operator; c)
identification of the production test, in the case of RETP;
d) list of documents that are attached and their identification; e) identification
of the applicable qualification standards and design, manufacturing or assembly standards of
the equipment and identification of the edition;
f) temperature at which the RQPS or REPT is
performed; g) date
of issue; h) full name, signature and OPC certification number of the level 2 welding inspector
or certified welding specialist engineer or certified welding technologist.
C.2.2 The tensile test results recording report must contain, at a minimum, the following information:
8
Machine Translated by Google
-PUBLIC
N-2301 REV. AND 11/2016
C.2.3 The bending test results record report must contain, at a minimum, the following information:
C.2.4 The impact test results recording report must contain, at a minimum, the following information:
C.2.5 The report recording the results of the macrographic test must contain, at least, the following information:
9
Machine Translated by Google
-PUBLIC
N-2301 REV. AND 11/2016
C.2.6 The hardness test results recording report must contain, at least, the following information:
C.2.7 The report recording the results of the fracture test (“nick-break test”) must contain, at a minimum,
the following information:
C.2.8 The corrosion test results record report must contain, at a minimum, the following information:
10
Machine Translated by Google
-PUBLIC
Annex D - Instructions for Preparing the Qualification Register for Welders and
Welding Operators (RQS)
The RQS must be issued for each approved test of each welder or welding operator.
The RQS must contain, in addition to all the information provided for in the respective applicable qualification
standards, at least:
a) name and Individual Taxpayer Registration Number (CPF) of the welder or welding operator;
NOTE For services carried out abroad, the CPF must be replaced by the code or number of the
document that unequivocally identifies welders and operators.
11
Machine Translated by Google
-PUBLIC
E.1.1 Welding parameters in the IEIS must be based on the values specified in the qualified welding
procedure and the tolerances allowed in the applicable qualification standard.
E.1.2 The IEIS must be detailed for each joint to be welded for a given service. When the number of joints
to be welded is high, the grouping of identical joints is permitted, subject to PETROBRAS' prior approval.
In any case, traceability between the individual joint and the applicable welding procedure must be
guaranteed.
E.2.1 Drawing number and identification of equipment, piping, duct or metallic structure
indicating the location of the joints to be welded.
E.2.2 Individual identification of the joint or group of joints to be welded as described in E.1.2 of this Annex.
E.2.3 Specific information for the execution and inspection of welding of the joint or group of joints, that is:
12
Machine Translated by Google
-PUBLIC
N-2301 REV. AND 11/2016
n) reference standards, including the manufacturing standard and standard for acceptance criteria
with the applicable item;
o) process data such as: type of fluid, pressure class and temperature (if applicable); p) date of
preparation and approval; q) full name,
signature and certification number issued by the welding OPC of the level 2 welding inspector or
certified welding specialist engineer or certified welding technologist.
13
Machine Translated by Google
-PUBLIC
Annex F - Instructions for Preparing the List of Welders and Iron Operators
Qualified Welding (RSQ)
F.1.2 Each qualification of a given welder or welding operator must be transcribed separately in the RSQ.
14
Machine Translated by Google
-PUBLIC
G.1.1 The CDS must be issued at intervals according to the criteria of the project standards and other contractual
documents.
G.1.2 Control of the performance of the welder and welding operators must be carried out by the number of failed films or
by the sum of the length of defects detected by the ultrasonic technique.
15
Machine Translated by Google
-PUBLIC
The RRS is applicable to the welding of test pieces for qualification of procedures and welders and for welding
of production tests, as required in C.1 a) of Annex C of this Standard.
16
Machine Translated by Google
-PUBLIC
RRTT is required when heat treatment is performed. The RRTT must comply with the Heat Treatment
Procedure, design standard and applicable technical specification.
17
Machine Translated by Google
-PUBLIC
Annex J - Instructions for Preparing the Construction Repair Index Control (CIRO)
J.1.1 The acceptable repair index for the work must be previously agreed between the manufacturer and
PETROBRAS, including defining how it should be calculated.
J.1.2 The CIRO must be issued at intervals according to the criteria of the design, manufacturing and assembly
standards of the equipment or contractual documents.
J.1.3 Control of the repair rate of the work must be carried out by the number of failed films or by the sum of the
length of the defects by ultrasound.
18
Machine Translated by Google
-PUBLIC
REVISION INDEX
REV. A and B
REV. W
1.2 Reviewed
4.5 Reviewed
B.2 Reviewed
C.1 Reviewed
C.2.1 Reviewed
C.2.4 Reviewed
C.2.6 Reviewed
D.2 Reviewed
E.1.1 Reviewed
E.2.1 Reviewed
E.2.3 Reviewed
F.2 Reviewed
REV. D