You are on page 1of 1

Disetujui : Diperiksa : Diajukan Oleh :

NOMOR PAKET - Pejabat Pelaksanan Teknis Kegiatan


NO. LBR : 03
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PEMERINTAH PROPINSI SULAWESI SELATAN PEKERJAAN : (PPTK) PT. BIOSFERA WIDHY ENGINEERING PT. PUTRA DELAPAN DELAPAN JUDUL GAMBAR
DINAS PEKERJAAN UMUM DAN TATA RUANG
KEGIATAN LAYANAN TEKNIS PERENCANAAN
PEMBANGUNAN JALAN RUAS TAKKALASI -
BAINANGE - LAWO DI KAB. SOPPENG
NAMA RUAS TAKKALASI - BAINANGE - LAWO SHOP JML LBR :
TYPIKAL JALAN
DAN PENGAWASAN JALAN DAN JEMBATAN
JL. A. Pangeran Pettarani No. 90 Mks (0411) 448309
PROPENSI SULAWESI SELATAN NOMOR RUAS - DRAWING
ASMAWATI, ST.MT MUHAMMAD ALWI, ST SUDIRMAN, ST SKALA 1 : 100
LOKASI KABUPATEN SOPPENG Nip. 19810608 200604 2 025 Supervision Engineering General Superintendent

LC
600
100 300 300 100
BETON F'C MPa T = 15 CM
H= VAR BAHU JALAN AC-BC t=6cm BAHU JALAN
AGREGAT KLAS A t= 15cm (CBR MIN. 90) LAYER 2 TIMBUNAN PILIHAN = 25 CM(CBR MIN 10%)
AGREGAT KLAS A t= 15cm (CBR MIN. 90) LAYER 1
TIMBUNAN BIASA T = VAR. (CBR MIN 6%)
MARKA PEMBAGI JALUR
MARKA TEPI
5% 3% 3% 5%

TIMBUNAN PILIHAN t=20 CM (CBR MIN. 10%)


EKSISTING JALAN TANAH L = 3 M

DETAIL B
TYPIKAL JALAN
SKALA 1 : 100 DETAIL A

30
30 Rencana Typical Pek.Jalan
STATION PANJANG (M) KETERANGAN
PAS. BATU TALUD
0+465 s/d 0+850 385.00
PLASTERAN MATA SAPI
20 2+050 s/d 2+121 71.00
PLASTERAN 35 2+180 s/d 2+300 120.00
200 PAS. BATU TALUD
PIPA RESAPAN
2+750 s/d 3+200 450.00
100
PASANGAN BATU MORTAR
3+270 s/d 3+700 430.00
3+750 s/d 4+625 875.00
20 30 4+700 s/d 4+725 25.00

65 8+650 s/d 8+750 100.00


40 10+840 s/d 10+900 60.00

DETAIL KIRI B DETAIL A


SKALA 1 : 75 SKALA 1 : 75

You might also like