Professional Documents
Culture Documents
DEPOT 1 20 20
WC(MAN-WOMAN-DISABLED) 3 25 75
TOTAL 295
DIRECTOR 1 30 30
ADMINISTRATION
DIRECTOR SUPERVISOR 1 24 24
DIR. ASSIST. 2 20 40
TEACHERS ROOM 1 60 60
ADMINISTRATOR ROOM 1 16 16
ARCHIVE 1 20 20
parent-teacher association (pta) 1 12 12
school counselling service 1 20 20
Nursery 1 12 12
WC(MAN-WOMAN-DISABLED) 6 25 150
TOTAL 384
CLASSROOM 10 40 70 700
EDUCATIONAL
EQUİPMENT ROOM 1 12 12
LABS. 2 40 70 140
COMPUTER LAB 2 40 70 140
SPACES
SPECIALIST ROOM 1 1 12 12
IT ROOM 1 20 20
EQUİPMENT ROOM 1 20 20
PAINTING STUDIO 1 80 80
CERAMIC WORKSHOP-STUDIO 1 80 80
PHOTOGRAPH STUDIO 1 80 80
MODEL STUDIO 1 80 80
ART STUDIOS
STUDIOS(GRAPHIC,TRAD.ARTS,PA
1 80 80
TTERN DESIGN ETC..)
ADMINISTRATOR ROOM FOR ART
1 20 20
DEPT.
*ALL STUDIOS MUST INCLUDE TEACHERS SPACE,DEPOT, ETC..
WC(MAN-WOMAN-DISABLED) 3 25 75
TOTAL 1539
LIBRARY 1 80 80
CAFETERIA 1 40 40
FACILITIES
DINING HALL 1 60 90 90
KITCHEN FOR DINING HALL 1 120 120
GYM HALL(INCLUDE LOCKER
1 120 120
ROOMS,DEPOT ETC.)
DEPOT 1 20 20
PRAYER ROOM 1 12 12
TOTAL 482
CENTRAL HEATING ROOMS 1 40 40
TECHINACAL
RESERVOIR 1 40 40
SERVICES
IT SERVICE ROOM 1 12 12
main distribution board 1 12 12
HVAC 1 40 40
DEPOT 1 20 20
SHELTER 1 120 120
TOTAL 284
FINAL TOTAL 2984
CIRCULATION AREA (%70) 2684
TOTAL AREA OF BUILDING 5668