Material Request

Request No. : KINE PROJECT JO/WP2/CIVIL/HJU/CONC/2022-120 Requested Date : 01/May/2023


Sub Contractor : PT.HANS JAYA UTAMA
Q'ty
Required
No. Description Spec / fck Unit Design Accumulation Request Remark
Date
(Estimations) (Until previously) (This)

1 Con'c 15 MPa Lean Con'c m3 - 937.0 0.0 02/May/2023 ON SITE 08.00

2 Con'c 24 MPa Structural Con'c m3 - 9496.0 61.5 " "

LOCATION :
1) PP-PROCESS
2) PP-EXTRUSION

Total - 10433.0 61.5

Project Name INDONESIA KINE PROJECT JO I hereby request for materials as above.

Requested By : Kim Youngfeel (Sign)


Site Name KINE PROJECT JO
LOCATION DETAIL

Request No. : KINE PROJECT JO/WP2/CIVIL/HJU/CONC/2022-084

579
5847.5

SUB S.T PP-EXTRUSION


AWH

PAVING
PP-PROCESS WP 2
1) LOCATION AND CON'C VOLUME
[LEAN CON'C] [STRUCTURAL CON'C]
A) volume : 0 m3(15Mpa) B) volume : 61.5 m3(24Mpa)

2) PP/PROCESS,EXTRUSION

Drainage Bottom 4 m3
PAVING #6 42 m3

LS Bottom Slab 5 m3
- AWH PAVING
LOCATION DETAIL

9 1
0

AWH PAVING until 10 feb 23

1 2 3 4 5 6 7 8

C √ √ √ √

B √ √ √ √ √ √ √ √ √

A
11
1 1 1 15
2 3 4

√ 16 1
7