You are on page 1of 1

Key Plan:

B1 A10

90
00

00
90
B-1 A11

90
00

00
90
B-2 A12
Q

90
00

00
90
B-3 A13

DETAIL - 1

90
00

00
90
B-4 A14 GENERAL NOTES

1. ALL DIMENSION ARE IN MILLIMETERS

90
00

00
90
B-5 A15 AND LEVELS IN METERS UNLESS NOTED
OTHERWISE.
90
00
2. DO NOT SCALE FROM THE DRAWINGS.

00
90
900 B-6 A16

LEGEND :
D4

90
00
410

0
90

0
POF B-7 A17

-1 90
00
PARKING GATE BARRIER

00
(L-345xW-300xH-1117mm)

450

90
B-8 E2 A18
E1

200
E3 LOOP VEHICLE DETECTION LOOP

90
00

00
90
B-9 E16 A19

2H
2H
R
FIR
200

E
R
AT
ENTRY & EXIT MACHINE (TICKET

ED

0
R
O
LL
ER
SH
U
TT
ER
90
00 READER L486xW373xH1188mm)
B-10 A20
C50 INSIDE DATA OUTLET REQUIRED
E15
(LAN).

90
00

00
LIMIT OF CONTRACTOR SCOPE OF WORK

90
B-11 A21

2H
LIMIT OF CONTRACT ZONE D

R
FIR
E
LIMIT OF CONTRACT ZONE E1 - RETAIL

R
AT
POWER : 230V AC 50 Hz SINGLE

ED
R
O
LL
ER
SH
U
TT
ER
E4 90
00
PHASE POWER SUPPLY
A22
2x25mm PVC CONDUIT FOR
POWER & DATA CABLES

VE FF
E14

O
H (G
IC ra

90
LE die

00
S nt
R 1
AM : 1
A23

P 0,
C49

2H

U L
R

P =
FIR
CIVIL FOUNDATION

TO 36
R
AT
ED
R

M 500
O
LL
1 WAY VEHICLES RAMP DOWN TO BASEMENT

AI )
ER
SH

N
U
TT
(Gradient 1: 8, L = 29600)

D
ER
(L-500xW-500xH-500mm)

R
O
P
E5 90
00

A24
B-9 POF PAY ON FOOT MACHINE

90
AUTOMATIC SLIDING GLAZED DOOR

E13

00
RETAIL

2H
STORE

49

R
FIR
LIMIT OF CONTRACTOR SCOPE OF WORK
RS-05
####

E
R
AT
23.4 Sq. M.

ED
R
0

O
LL
ER
SH
U
TT
ER
RETAIL
STORE
RS-06
####

LIM
26.5 Sq. M.

= 1200)

IT
up

LIM
ramp
/L

OF
ient trians
12
E6

1:
Pedes

IT
(Grad

CO
OF

NT
CO

RA CT
NT

CT ZON
RA

ZO
NE E1
RETAIL

C
E
STORE
RS-04
####

-R
ET
27.9 Sq. M.

AIL
E12

-2 RETAIL
900

2H
STORE

410

R
POF

FIR
RS-07
####

E
AU

-1

R
POF - 1

AT
0

26.4 Sq. M.

450
F

ED
R
O
DETAIL - 2
50

LL
TO

ER
200

SH
U
200

TT
ER
M

O
AT
20

E7
I

See DETAIL-1
C

P
SL
0

ID
IN
0

G
90

45
LA
ZE

)
00
= up

49
0
12
/L p
D

2 am
POF - 2
UP
D

:1 sr

AU
0
t 1 ian
O

F-

50

TO
MA
PO

TIC
20
0

SL
O

en tr

ID
IN
di es

G
90

GL

2H
45

AZ
R

R
0)
= up
ED

120
ra ed

/L p
: 12 ram

FIR
DO

t 1 ians
estr
OR

E
(Gra Ped
dien

R
(G P

AT
E8

ED
R
O
LL
See DETAIL-2

ER
SH
U
TT
Ram

ER
pU
p

E8 E11

AU
E9

TO
MA
TIC
SL
ID
IN
G
GL
AZ
E10

ED
DO
OR
0)
= up
120
/L p
: 12 ram
t 1 ians
dien estr
(Gra Ped

OR
DO
ED
AZ
GL
G
B-10

IN
ID
SL
TIC
MA
TO
AU
(Gra Ped
dien estr
t 1 ians
: 12 ram
/L p

A20
= up
120
0)

RETAIL
STORE
RS-01
####
46.9 Sq. M.

LIMIT OF CONTRACTOR SCOPE OF WORK


RETAIL
STORE
RS-02
####
32.6 Sq. M.

(Gra
Peddien
estrit 1
ans
: 12
ramp
/L
=
up
1200
)
RETAIL 2HR FIRE RATED ROLLER SHUTTER
4.50° STORE
4.50° RS-03
####
32.7 Sq. M.
4.50°

C54 C53
4.50°

C52 4.50 ian /


str : 12
up
mp = 12
s ra L
00
)

C51
de 1
° Pe nt
die

RAMP
ra
(G

C50 4.50
°
UP
C49 4.5

C48
4.5

C47
6
4.5 5

0° 7
4
3
RAMP
C46 8
9
2
1

UP
p
10

)
11

p u 600
12

r a m 2 C45
4.5

s L =
ian /
str : 12
Pedestr dient

d e 1 C44
4.5
Pe ient

KTC International Co.
1 : 12 /

rad (HO) PO BOX : 28427, DUBAI, UAE


(G
(Gra

C43
4.5
ians ram


TEL : +97142286373
L = 360

FAX :+97142271837
D5 C42
4.5
0° info@ktcco.net, www.ktcco.net
p up

Pedestrians ramp up
(Grad

(Gradient 1 : 12 / L = 4800)
0)

C41
Pede 1 : 12 / L

4.5

ient
strian

up 00)
mp 26

C40
PARAGON BAY MALL
s ra L =
ian 12 /
str
de 1 :

Pedestrians nt
Pe nt

LIMIT OF CONTRACT ZONE E1 - RETAIL


1 : 12 / L
radie
(G

(Gradie
4.50

= 3600)

ramp up
(Gradien
°

Pede

LIMIT OF CONTRACT ZONE B


strian / L = 3000
C37

t
s ram 3000)

1 : 12
s ramp
up
)
C39

(Gradient
Pedestrians
4.50

900

1 : 12 / L
p up

500
=

ramp up
°

450

= 4000)
3
POF-

200
C38
Basement + 1 Ground Floor + 2 Floors
DOOR ramp up
GLAZED Pedestrians L = 1200)
TIC SLIDING 1 : 12 /
AUTOMA
(Gradient
4.50°

C37 Shopping Mall + Roof Floor


4.50°

C36
(Gradie

POF - 3 SHOP DRAWING


Pedestr 12 / L = 4000)

4.50°

See DETAIL-3
nt 1 :

C35
900
ians ram

4.50°

500
DETAIL - 3 C34
CAR PARK MANAGEMENT SYSTEM
450

DETAIL LAYOUT BASEMENT LEVEL


4.50°
p up

3
POF-
ENTRY - 1 & POF - 1, 2, 3

LIMIT OF CONTRACTOR SCOPE OF WORK


C33
MACHINE
4.50°
200

LIMIT OF
C32 LIMIT OF
CONTRA
CT ZONE
CONTRA
CT ZONE
E1 - RET
E2 - HOT
AIL
EL ZDT
2.50°

C31 LIMIT OF
CONTRA
CTO R SCOPE
OF WORK

26.APR.18
5.20°

C30 1 WAY VEHICLES RAMP UP TO URBAN PLAZA


(Gradient 1: 10, L = 37000)

729/PBM/SD/ELE/00/02
LIMIT OF CONTRACT ZONE E1 - RETAIL
LIMIT OF CONTRACT ZONE E2 - HOTEL
R
D DOO
GLAZE
LIDING LIMIT OF CONTRACTOR SCOPE OF WORK

ATIC S 900
AUTOM
0 9000 9000 1020
0 7800
01 REVISION
9000 9000 9000 9000

D10 D9 D8 D7 D6 D5 D4 D3 D2 D1
D4 9000 9000 9000 9000 9000 9000 9000 9000

J9 J8 J7 J6 J5 J4 J3 J2 J1 01 00
C36

You might also like