You are on page 1of 1

TARLAC STATE UNIVERSITY

College of Engineering
Department of Civil Engineering
1st Semester, A.Y. 2023-2024

PROJECT NAME

LOCATION

SUBJECT

DATE

TOTAL COST ₱ -

ITEM NO. MATERIALS QUANTITY UNITS UNIT COST TOTAL PART COST

I. Installation of Covered Arch Roofing Stage

1.0 ₱ -

2.0 ₱ -

3.0 ₱ -

4.0 ₱ -

5.0 ₱ -

6.0 ₱ -

II. Concrete Works

A. For Column Footing

1.0 ₱ -

2.0 ₱ -

3.0 ₱ -

B. For Pedestal

1.0 ₱ -

2.0 ₱ -

3.0 ₱ -

TOTAL ₱ -

Prepared by:

SURNAME, First Name M.I.


Student Number

SURNAME, First Name M.I.


Student Number

SURNAME, First Name M.I.


Student Number

Reviewed by:

SURNAME, First Name M.I.


CEPE1S Instructor

You might also like