You are on page 1of 1

FINAL EIA/EMP - MODIFICATION IN EXISTING DESHALED COAL CRUSHING UNIT TO 2.

0 MTPA WET COAL WASHERY


Village: Muthara, Tehsil: Rajura, District: Chandrapur (MS), Project Area = 5.57 Ha
M/s. N.N. Global Mercantile Private Limited

DRAFT EIA/EMP - PROPOSED URTAN COAL UNDERGROUND MINE


Villages: Thodha, Baskhali, Nawatola & Mauhari, Tahsil – Kotma,
District – Anuppur, Madhya Pradesh, Project Area 379 Ha, Normative Capacity =
0.650 MTPA, Peak Production Capacity of Coal = 0.975 MTPA
(Project Category ‘B’)
JMS Mining Pvt. Ltd.
Kolkata - 700163, West Bengal

FINAL EIA/EMP – TARA (EAST) & TARA (WEST) COAL MINING PROJECT
Villages: Churulia, Chinchurbill, Deshermohan, Jaynagar, Birkulti,
Manpur and Joyantipur, Block – Jamuria, District – Paschim Bardhaman, West Bengal,
Project Area 937.44 Ha, Peak Production Capacity of Coal: 4 MTPA, (Project Category ‘A’)
The West Bengal Power Development Corp. Ltd. Mining Pvt. Ltd.
Kolkata - 700098, West Bengal

You might also like