8 Got) Onda CoeaiGm) cimBae} em
Gomomat Gung uwsiuTGsst Qn ep
PUBLIC UTILITIES COMMISSION OF SRI LANKA
28 asm ed 09 20
Sroram } tee } 3}
Yourno Ouro Date
Puc/e/Tariff/o1 Oct 19, 2023
br. N.De Silva
‘Actg. General Manager,
Ceylon Electricity Board,
Electricity Tariff R
Reference is made to your proposal for Electricity Tariff Revision, submitted to the Commission (Ref
DGM(CS&RAY/TRF/Tef. 2023), dated Sep 26, 2023, subsequent communication and Section 30 of Sri Lanka
Electricity Act No. 20 of 2009,
Approved tariff effective from Oct 20, 2023 to June 30, 2024 and the conditions therein are attached (as
Annexure 1 and 2) herewith. You are hereby required to implement same and publish the approved tariff in
Sinhala, Tamil and English in National Newspapers and website.
Ge
Prof. Manjula Fernando
Chairman
copy:
Secretary, Ministry of Finance, Economic Stabilization & National Policies
Authorized Officer, Distribution License 1 (AGM, DD1)
‘Authorized Officer, Distribution License 2 (AGM, DD2)
‘Authorized Officer, Distribution License 3 (AGM, DD3)
Authorized Officer, Distribution License 4 (AGM, DD4)
06. Onc, crm Bay 20ER BOE, 6 ayo) ony, Bovbana ont aikant Gani, | Level O6, BOC Merchant Tower,
2k, orien Gad End, SEVER 03, 28, Gast anshae ap, Gamagiy 0. 26, St Michaels Road, Colombo 03, Si Lanka
Tel: 694 11 2392607/8 Fax:498 17 2392681 E-mallinfo@pucsl.gov.hc ‘Web: wwaw.pucslgov:lk
a) edule soe
jos \ 994112392606 cata ome 194 112392605
Eamon rector GeneralAnnex 1
ASTIN TAR APPROVED TARR
Ire FRO
fercah 30" cy ig pv — oe
poms
Eereychree(s/hwh) | Fad Charge oth) | EoereyGarge(s/hwh) | __ fv Chare(s mah)
carmnono-comm pron
iT 0-1OEW 7a Ta Tas 0
oce?=n1- ea wm 35 3000 30 00
[esonptn wbore aE ma
nooo coer 2a WA 2 Wk
[noc e120 Kn 350 005 a0 8
fnocc¥-81= sao Ku S07 8.0 0 T8007
[Becca sar= 10 a0 150990 m0 17000
[oc en nd ae 0} Zom200 a0 1
[Optima ne of Uso) WESTER Ta DC
fsytes20- 180%) 7a aa
eat G30 27:30Ra 300 200000 106.07 2asooo
forest 730 = oso 300 cca
eGIOUs 8 rAITTAGLE NSTTUTORS
[cnumpon0-1208W per month
ea t-0 30x Tom Tw a 2100
oc 31 2O Ra 2000 009 30 30000
secs 95— 120 3500 00 0 7000
oss 1a1= a0 5 m0 5500 17600
ok 1 a ane abo O00 ano sa 73800
omen consumen caTecones ‘eda oe] SRT nr we pollare
waa] waae| waa | waa [orrov sforrevsa] wa | wi2 | wor | wae [orvovia|cravie
Volume aiterentate monty ccosmpcon | 300" | 300" | 5-300 | ane | 1190 | Gao | ts200 | osm | toaoo | paw | sie | om
wey rh tt wah th ry hh a mW RA)
aT
snot fener charge sh ssa | 2s | 1200 | 2seo | soo | seo | 2000 | 2e00 | 2000 | 2800 | sooo | sooo
ora
Jeena
Jcmand_ HG charge mn) ona | 120000 a000> | xp0000} sxn00 | s00co} 24000 | 12000} s00 | 112000] 75000 | s26000
kcaziva alles
fst? leerey [ar 590~ 18300) m0 m0 om 20 2a S200
lize nore eco 220 20 2709 5.00 11.0 1109 e200
09220 ¥les x07 [opreac 20-05: al] 2900 2300 20 2209 2200 1800
| emand Gee VA 7000 am 2.0000
lcwon sed choge ny 02000 00 620200
ney [osri0s30—2830 me aa 20) 60 Er} a0 S700
fees fre ean) 3500 3500, 500 00 000 6709
Sst rasa [onpeae 2230—05300e9] 2800 2800 2209 3100 2100 2709
aan foemane Gace tay 750000 00 en
Fea cage 1 0000 2000 20000
[ETTenNG
veep ART BH S55
levcnanaic oF cea cuansmestavions | OCFauharana(@e/Awn) | Lewl2ACCu(Re/avny | OCFantchrgng(a/hwh) | tel 7ACCH (E/AWH)
[syreso=sesomay TS 7
feseresn=s20mr za 3000 13950 33300
[ores 730 oso 5500 00 50 S000
IKeRCULTURE-Optorel ine oTURe TG. —| eed cag
hee nreychrge (a /Awn) | —_Frachare ord | Ener Chae (ts/A) hag (8)
fate pty at —OSO= TTA 7am 3550
corso contract feat (18.30- 20h B00 120000 A100 12200
lemansccaziva_[ptreae 220-0520 00 300
gSan
re
10
ll
12
13
Conditions
To conduct a comprehensive independent audit for fourth quarter 2023
and report to the Commission
To establish fully functional Bulk Supply Transaction Account (BSTA)
To settle all outstanding dues in the year 2023 to Renewable Energy
Generation Licensees
To recognize the delay interest due under Standardized Power Purchase
Agreements in the financial statements
‘To negotiate and enter into Fuel Supply Agreements with fuel suppliers
To liberalize Solar roof top schemes by allowing unhindered transfer to
and from different schemes
To remove location restrictions for Renewable energy and allow
aggregation of consumer accounts (under same prosumer) for Net
Metering and Net Accounting contracts
‘To negotiate, restructure and reduce finance cost (interest rates)
To complete and commission the Kothmale - New Polpitiya 220kV
‘Transmission Line
‘To submit a plan to reduce Transmission and Distribution losses over next
five years
‘To submit a plan to encourage energy conservation and efficiency
To reduce employee costs —
1, No bonus or other incentive payments for employees for the year
2023
2. To ensure succession plannin;
reduce employee turnover.
3. Optimal utilization of existing human resource and minimize new
recruitments
To eliminate the waste and nonproductive expenditure in order to
‘minimize/ eliminate such expenditure in the electricity supply cost
in the years ahead to eliminate/
Annex 2
Deadline
31/01/2024
31/12/2023,
31/03/2024
31/03/2024
31/12/2023
31/03/2024
31/03/2024
31/12/2023
31/08/2024
31/03/2024
31/03/2024
Further, CEB is instructed to comply with all the conditions provided for in the tariff approvals granted on
14® Feb 2023 and 30" June 2023 that have not yet been complied
ith.
&