Checklist For Tiling Nryikn
Checklist For Tiling Nryikn
DURING TILING
1 Drg. No./ Date as per which pattern given / starting point
2 Line/ Level fixed, checked & Slopes are as per requirement
Check difference in colour shade of tiles and replace with
3 same batch/ lot
4 Proportion of bedding mortar Mixing in A/2 tray
5 Clearing waste tiles/ mortar
6 Clearing for joints/ workmanship
7 Check the skirting for projection, Right angle etc.,
AFTER TILING
1 No material stacked after fixing? (Crack or any damage)
2 Tile surface cleaned properly before starting first coat?
3 Check for any hollow sound
4 Are there any Cracked tiles, should be replaced
5 Check the pointing and grouting materials
6 Curing for four days after grouting I.e. first coat?
Signature Date:
Checked By:
Approved By: