INSERT CONSTRUCTION/CONTRACTOR COMPANY

PROJECT TITLE: QUALITY ASSURANCE CHECKLIST


PROJECT LOCATION: DOC NO. :
CLIENT: DATE :

CHECKLIST FOR TILING (Wall dadoing/flooring)


YES NO NA
BEFORE TILING
1 Check for any additions & alterations
2 Cleaning slab off loose mortar/ material
3 Check for levels, Button marking, Mortar thickness
4 Availability of Material - Sand, Tiles
5 Proper Stacking of Tiles
6 Quality of Tiles/ Sand
7 Check for any platform, B/w for wardrobe area

DURING TILING
1 Drg. No./ Date as per which pattern given / starting point
2 Line/ Level fixed, checked & Slopes are as per requirement
Check difference in colour shade of tiles and replace with
3 same batch/ lot
4 Proportion of bedding mortar Mixing in A/2 tray
5 Clearing waste tiles/ mortar
6 Clearing for joints/ workmanship
7 Check the skirting for projection, Right angle etc.,

AFTER TILING
1 No material stacked after fixing? (Crack or any damage)
2 Tile surface cleaned properly before starting first coat?
3 Check for any hollow sound
4 Are there any Cracked tiles, should be replaced
5 Check the pointing and grouting materials
6 Curing for four days after grouting I.e. first coat?

REMARKS AND COMMENTS OF QUALITY ASSURANCE ENGINEER :

Signature Date:
Checked By:
Approved By: