Professional Documents
Culture Documents
RRFC 8
RRFC 8
CARTON
WAITING SHED/ BIOMETRIC
GUARD HOUSE
CANTEEN
SMOKING
LOCKER AREA
AREA
KITCHEN FABRICATION METAL STOCKFILE AREA
AREA
BLASTING AREA
AIR BLASTING
COMPRESSOR
CARPENTRY
SHOP
SAFETY
OFFICE
PORT OFFICE
3
P-2
EMPLOYEE'S
GUARD ENTRANCE
LOCKER'S AREA
FISH RECEIVING AREA
COLD STORAGE 3 ADMIN ENTRANCE WHARF
3
SKINNING AREA
8
CS
CS INFORMATION HOLDING TANK 1
2 1
IP OFFICE ROOM
LED LED LED LED LED LED LED LED
BRINE FREEZING
C O N C R E T E R O A D FILTER TANK
STOCK ROOM
GUARD HOUSE
AERATION RBC 2
DN
CR 10
CONTROL ROOM
CS
OFFICE LED
CR
LED LED LED LED LED
LED
LED
LED
LED
FIRE ESCAPE
ICE STORAGE 2
UP
CS
7
CPF
LED
IP
LED
LED
LED
LED
COLD STORAGE 2
PIER AREA
MAIN CONTROL CENTER
M A C H I N E S H O P
2
VACUUM
LED LED LED
ANTE ROOM
CS
MACHINE
ANTE ICE PREPARATION
ANTE ROOM
2
CS
ROOM
HALLWAY
MNGR
LOADING AREA
1
IP3
LED LED LED LED LED
1
EMPLOYEE'S
IP
3 (440V) DISTRIBUTOR
ENTRANCE
IP
MACHINE ROOM @ MACHINESHOP
LOINING AREA
LV-LV TRANSFORMER
225KVA, 480-240V,
3Ø, 60HZ, DRY TYPE
MACHINING AREA MECHANICAL AREA C O N C R E T E R O A D
LED LED LED LED LED
5 1 4
CS CS CS
3
220V DISTRIBUTOR
@ POWER HOUSE
BRINE TANK AREA 1
IP3
ICE HARVESTER'S
ICE STORAGE 1 VALVE SETTING AREA
ROOM
DEPOT ICE CRUSHER
LED
IP3 IP3
9
5 CS
P-2
15
LED
LED
MACHINE ROOM
CS
LED
WINCH
PUMP ROOM
AISLE
STOCK ROOM
LANDING WAREHOUSE
MALE/ FEMALE CR OFFICE
TOWER BASE CONFERENCE
MAIN STAIR ROOM 2
BOOTS AREA MANAGER'S OFFICES
10 TOILER & BATH 1-2 LP1
CS UTILITY
MALE DRESSING
ROOM H A L L W A Y
BEDROOM 1
MALE DRESSING ROOM MAIN LOBBY
FOYER
3
RRFC OPERATION RECEIVING/ RELEASING
LANDING
PP2
BEDROOM 2 LOBBY
STAIR OFFICE AREA
UP GUEST ROOM RECORDS GARDEN
LIVING ROOM STOCK ROOM
OPEN
STAIR/LOBBY ROOF DECK
STAIR/LOBBY
7
DN
PP2
OPEN OVERLOOKING
TO DRY STORAGE
ADMIN ROOF DECK PLAN ADMIN MEZZANINE FLOOR PLAN LOWER GROUND 1 LOWER GROUND 2
2ND FLR. 3RD FLR.
LEGEND:
LED
FLOURESCENT ASSY. 1X40 WATTS
LIGHTING LAYOUT
CIRCULAR TYPE 20 WATTS
LIGHTING PANEL
DATE DRAWN : M.PORRAS PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.
RELL & RENN FISHING CORP. PROFESSIONAL ELECTRICAL ENGINEER
CAD BY :
REG NO. : DATE : CHECKED BY : I.LUCAS
AS BUILT PLAN - POWER CENTER NATHANIEL CABALLERO
BANISIL TAMBLER GENERAL SANTOS CITY SINGLE LINE DIAGRAM
PTR NO. : DATE : (480 V) OWNER
TIN NO. : LOCATION: BANISIL TAMBLER GENERAL SANTOS CITY ADDRESS: BANISIL TAMBLER GENERAL SANTOS CITY