LAPORAN HASIL TEST KUAT TEKAN BETON READYMIX,
Kontraktor PT. ABIPRAYA BUMI KARSA. CPA. KSO-
Proyek : PEMBANGUNAN JALAN BEBAS HAMBATAN SFKSI 6B,
Sampel ler 1530
Beton Mutu :FC30SCC
Slump 102,
Tas ‘at eka ca) 28 Fiat
No] TanggtPenbustn | Tanggetpegsesan | Beats) | sentnang | Uwe lar [Max Load ON] pay Sub) [omens um] “ea
T aOR Tone Tap3S, 176.025 z aw 21.26 70.86% r
2 eo Too 1870 176.5 7 AS. Bai B08
a DeORO 13102035, 3030 Tas z Tas 239 7s 0 310 TRIAL MGCEC SCC,
a DeOROS, Taos 12,790 T7625 a HO Bai TSO 7G 3G
Ratacrata 2344 7B13%. 3397 _| 113,23%
Pemaluan, 13 Oktober 2023,
Konsultan Supers
PT, Anugerah Kridapradana-Virama Karya-Hanata, KSO_
eq Tis,
fad,
¥a.T8sna. Suynsn
oe
Sunysea..LPT. KARYA SEJATI READYMIX :
Pesan Seemann
LAPORAN HASIL TEST KUAT TEKAN BETON READYMIX
:PT, ABIPRAYA BUMIKARSA. CPA. KSO
Kontrakior
Proyek NGUNAN JALAN BEBAS HAMBATAN SEKSI 6B
Sampel finder 15%30
Beton Mutu F020
Slump 0:2
Nees] ae eae nea aN Tas Rant ekan 28 Ha
Tanggal Per 1 pengetesan simu (Hari) ] Max Lead angan
NO gol Pembustan ‘Tangaal penget penceang_ | Uour (ae) [Mac Lend 40] Mipay oe Keterangar
T a0 oR, 176.71 z Bee 2438 35.35
2 ‘p10 Boo, Tem z ao 22.89 i _| 16585
‘TRIAL MIX FC 20
z TaN BORO, Po 167 7 aia 28 ow Shia _| 185,70
Real, I 2430
Pemaluan, 09 Oktober 2023,
Disetujul Konsultan Supervisi Kontraktor Dibuat oleh,
PT, Anugerah Kridapradana-Virama Karya-Hanata, KSO
SL,
Beg: RNING: Sud. ve
PT. Abipraya Bumi Karsa - CPA, KSOAce 14 avs
CONTRACTOR + ABIPRAYA-BUMI KARSA-CPA KSO-
PROJECT $ Proyok Pembangunan Jalan Bebas Hambatan Sokst 6 B
Rencana Outor Ring Road - Simpang 3 Ct
cope irem 2 TRIAL MIX
COMPRESSIVE STRENGTH : FC 30 Mpa(SCC)
aa SoRME | weeaT row] TE] waxmum [connecTion | ACTUAL | CORRECTION | ESrimaTe
ie amen | same |", | ‘or | 4010 | “racron” | commesave | or | ereve | peu
Ue ae (cm2 } (Ko) (cm) | CEMENT (KN) sean ees (MPa) AGE {tiPa)
T [arses [Cees [Trees [nes] a] Pe 3255 [080 38.80 coca
ceonias | 786 | ites |e ae] x | 2808 8 sia 38%
sons | vva0es | taco [eo 1 mi] 30] 1 48 860 st 1a
cm |W
| D
e
R
I WERE a Bat eae
‘Sopaku, “06 Oktober 2023
stahui, Diperiksa & Menyetujul Kontraktor Tested
Hori [roads GHA TENA, SUY Vi Hh Hondl ka 8
PPE 2 KAL-THM Konsuitan SUPERVISI Laboratorium,
‘ABIPRAYA-BK-CPA-KSOaoe 14 avs
CONTRACTOR + ABIPRAYA-BUMMI KARSA-CPA KSO
PROECT [propa revieptons aus tees Honiton Gear @
Roncene Outor Ring Road -Simpang 317Cl
Cove frre TRIAL Me
COMPRESSIVE STRENGTH _: FC 30 Mpa
“ae asain | Som | acTUAC | CORRECTION] SSE
eeu | arta | onracreris | covsvasienl| bn tor cael |fiepemie | Erase
POUR ‘TEST size | FORM —— a
i) Loo amor | en i nae pa
TT ian esas Be ee ose tao
thee eee es ae et] x | y ee aa [oer | re
eset aca ae | ener gg me ea | | an a
om le
fs
| :
F :
* "AVERAGE. * 31.03. I 35.26 T_103.42%_
‘Sepaku, ‘05 Oktober 2023
Diperiksa & Menyetujui Tested B}
' I ea Telsna Coyugi Paol ond ke
-2KAL-TI ‘Konsultan SUPERVI FSIPRAVABKCPARSO Taboratoria
#AGE : 7 Days
CONTRACTOR : ABIPRAYA-BUMI KARSA-CPA KSO
PROJECT + Proyek Pembangunan Jalan Bobas Hambatan Sols! 6 B
Reneana Outer Ring Road - Simpang 3 TCI
CODE / ITEM 3 TRIAL MIX
COMPRESSIVE STRENGTH : FC 30 Mpa
re SoRFACE | west’ [uum] Twee | WaxMuN | CORRECTION | ACTUAL] CORRECTION | —ESTmnTe
fo aren | sawete oF toa |__factor _| compressive or smrenoTt | pearee
| STRENGTH appavs
PN ee (m2) (Kg) CEMENT. (KN) oe | Fora aa) AGE (ua)
4] 21-Sep-23 | 28-Sep-23 476.625, 12.542 1 [aaa 15 c 27.40 0.650 81.34%
3 | ar-sep-35 | 26-9025 | 179625 | 12009 1 aa] x | y 272 2660 wan
a | 2tsep23 | 2eSep23 [vee | v2rti fae sir] cm] + 7827 0660 48.08 aTh
N
°
&
R
AVERAGE 27.80 4277 92.66%
Sepaka, 28 September 2025
ngotahui, Diporiksa & Monyotujul
fo Geo TASh a Susu
Paz Kar Konaultan SUPERVISTCONTRACTOR + ABIPRAYA-BUMI KARSA-CPA KSO-
PROJECT 1 Proyek Pombangunan Jalan Bobo Hambatan Soke 6 B
Rencana Outer Ring Road - Simpang 3 TCI
cope / rem = TRIAL ax
COMPRESSIVE STRENGTH _:_FC 30 Mpa( SCG)
ae SuRFAGE | Wear [FLOW] —1WPE” | maximum | connecrion | acTuat | CORRECTION | ESTMATE
ie area | sameus | ge, | oF | ton | tacror | commmessve | oF | STRENGTH | pewanye
POUR: ‘TEST ‘SIZE | FORM ey eo
Cm. CEMENT (KN) (MPa) AGE (Pay
7 aen eee = a Pe Pe 783 wean 579 wom
Z| aisen2s | s08ep2 st sea] x | y zi 0 sit carom
[sc [etsenzs_[assepze ale a] om | zat a0 ua Tae
N
3
e
®
AVERAGE,
Sepak, 58 September S00
Diperiksa & Monyotajul Kontraktor : Tested
Gea TH sna SUgUd Galilean Ese Hone
Konsultan SUPERVIST aapearearccssc Taboratora i PT. GARTON MANDIRI INDONESIA sis raat
arton ee g
LAPORAN HASIL UJI KUAT TEKAN
Proyek PEMBANGUNAN JALAN BEBAS HAMBATAN SEKS| 68
Kontraktor PT.ABIPRAYA.BUMI KARSA.CPA.KSO
sampel 1 Sllinder 15 x30
Beton Mutu FC20
stump 1222
Tanggat | Tangeal ] Berat | Luas | Umur ] Mon oad | Kuat Tekan] Konversi] 2B HART] —¥% eee,
Pembuatan | Pengetesan| (Kg) _| Penampang | (Hari) | (KN) | (Mpa) | Umur_} (Mpa) | (Mpa ee
1_| 19/09/2023 | 26/09/2023 | 12,62 176,625, 7 217 12,29 0,651. 18,87 61% TRIAL MIX,
2_[ 19/09/2023 | 26/09/2023| 12,81_| 176,625 | 7 200 o6s1_|_17,39 | 57% FC 20512
3 | 19/09/2023 | 26/09/2023 | 12,43 | 176,625 7 191 0651 | 1661 | 54%
4 | 19/09/2023 | 26/09/2023 | 13,12 176,625, 7 186 0,651. 16,18 53%
Rata-Rata Taz T7z6_| 36%
Sepaku, 26 September 2023
bi Konsultan supervisi Kontraktor Dibuat oleh,
KEMENTRIAN PUPR PT. ANUGRAH.K dieser ata mrpsecan oor
bya ter vyudi i ae \ /ANDA WAHYUDIN
r QC LAB. GARTON2 Distributor Semen Tonasa sis
papan.gmig@ gmail.com "
[| x a
1_| 19/09/2023 | 26/09/2023 | 12,96 176,625 2 175. 991 0,651. 15,22 99% TRIAL MK,
2_| 19/09/2023 | 26/09/2023 | _13,12 176,625 7 252 14,27 0,651 21,92 143%. FC10S12
3 | 19/09/2023 | 26/09/2023] 12,86. 176,625, 2 240 13,59 0,651 20,87 136%
4 | 19/09/2023 | 26/09/2023 | 12,64 176,625. 7 197 11,15 0,651 17,13 112%
Konsultan supervis!
PT. ANUGRAH,K
fad:
ea Cuyud
Kontraktor
PT.ABIPRAYA.BUMI KARSA.CPA,KSO
)
Mt
|
Pr
Sepaku,
26 September 2023
bin oleh,CONTRACTOR
OWNER
LOCATION
‘coNcRETE ‘DIMENSIONS
Locanion oe
TAD WIKA BETON Few SCC
TAB WIA BETON, FOX ee [7
7
T
TAD WIE BETON Fem Tee | 7
7
z
TAB WIKABETON, Feo z Exo
7 Ts
z 1X30
Ra 2 Bat
TE CORTLTINT es
ATO Micnde ‘Bere