VESSEL PORT / LOCATION

DATE TIME

Monthly Maintenance

NO DESCRIPTIONS CONDITIONS OPERATING/HOURS REMARKS


Screw adjust Every 50
1 Fixation of crane base hours
2 Slewing rack (slew 360 degrees) Greasing Every 50 hours
Main boom cylinder pivot, Outer boom Greasing Every 50 hours
3
cylinder pivot
Machinery oil Every 50
4 Continuous rotation hours
Screw adjust Every 50
5 Thrust bearing hours
Gear oil (inspection glass- fuel lever Visual check Every 50
6 hours
plunger)
7 Main boom pivot Greasing Every 50 hours
8 Power link pivot Greasing Every 50 hours
9 Outer boom pivot Greasing Every 50 hours
Boom extension rams - guide parts, Greasing Every 50 hours
10
pivot guide
11 Extension booms - guide blocks Greasing Every 50 hours
12 Mechanical extensions Greasing Every 50 hours
13 Turntable (slew 360 degrees) Greasing Every 50 hours
Screw adjust Every 50
14 Thrust turntable hours
15 Rope winch Greasing Every 50 hours
Rope Grease Every 50
16 Rope hours
17 Load hook Greasing Every 50 hours
Screw adjust Every 50
18 Tighten up, fittings, pipes and hoses hours
Visual check Every 50
19 Repairing paint damage hours

Change every 1000 hours /


20 Oil filter, hydraulic oil smallest once a year
Rope winch – hydraulic oil (see data Sae 90 every 1000 hours /
21 smallest once a year
sheet)
Sae 90 every 1000 hours /
22 Slewing system – gear oil smallest once a year

OTHER REMARKS
THIS MONTHLY MAINTENANCE MUST BE CARRIED OUT BY THE ENGINE DEPARTMENT, WITH AN ASSISTANCE OF THE CRANE
OPERATOR, DURING OPERATIONS, IT IS IMPORTANT TO INFORM THE OPERATOR OF THE WORKS TO BE CARRIED OUT

NAME RANK SIGNATURE

Page 1 of 1
Revision: 05 January 2023