You are on page 1of 1

NOTES:

1. THIS DRAWING IS THE COPYRIGHT OF AL FAJER CONSULTANT


AND MUST NOT BE RETAINED OR REPRODUCED WITHOUT
N CONSULTANT'S PERMISSION.
2. ALL DRAWINGS TO BE READ IN CONJUNCTION WITH THE
NORTH SPECIFICATIONS, THE BILL OF QUANTITIES AND OTHER
RELEVANT DRAWINGS.
3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS,
UNLESS NOTED OTHERWISE.
4. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS
SHOULD BE FOLLOWED AND VERIFIED WITH THE DETAILS.
5. ANY DISCREPANCIES FOUND IN DRAWINGS ARE TO BE
REPORTED TO THE ENGINEER.
6. CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO THE
CONSULTANT BEFORE COMMENCING ANY WORK ON SITE.

R Q P N M L K J H G 4 F E D C B A ‫ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ‬
2 ‫اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ‬
A-202
A-302 --- NEIGHBOURING PLOT --- ‫ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء‬
‫ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة‬
10200 2100 5399 8850 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 5749
‫ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اžﺑﻴﺾ ﻓﻘﻂ‬
PLOT LIMIT 4
PLOT LIMIT ‫ ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري‬-
A516 ‫اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة‬
1 ‫ وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ‬.‫واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ‬
‫واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ‬
200 200
6650
‫ ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ‬-

300
– ‫اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ‬

7450
1000
200
SER. PH 15 ‫اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ‬
‫ وﺻﺤﺔ ﺟﻤﻴﻊ‬،‫اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد‬

3300
0
70
LIFT

R6

R6
RAMP UP TO ROOF LVL ST-01

7
RAMP UP FROM PODIUM - 5
‫اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اžﻣﺮ‬

00
5500

5500
3350
102 PARKING 91 116 PARKING 126

200
PH 16
SLOPE 1:10
PH 17
SLOPE 1:10 PH 16 ‫ واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت‬٩٢/٢٣ ‫اﻟﻤﺤﻠﻲ رﻗﻢ‬

R3

350
200
1850
A-404 ‫اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت‬

35

1750
S01

R3
2

0
7500 1000 7500 1000 7500 1000 7500 900 5100 ST-02 10800 5300 900 7500 1000 7500 1000 7500 1000 5000
‫اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت‬
ELECTRICAL ROOM
‫واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت‬

3500

500
250 S05 18.15 SQM. PH 14 350 5500 1170
+61.75 M
200 200 S01 127 150 ‫اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ‬
SSL

7350
PH 10 4600 6250

300
6.0 M WIDE DRIVEWAY 6.0 M WIDE DRIVEWAY .‫ﻣﻦ ﻫﺬه اﻻدارة‬
A-401

6000

6000

6000

5000
R3

R3 00
00 0
00

J. RM 0 R3
0

LIFT-1 LIFT-2 LIFT-3


00 0 PH 16 ‫ ﻳﻠﺘﺰم اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ‬-

2050
R3 7.00
PH 11 PH 12 PH 13 PARKING
PH 09
SQM. ‫ﺑﺘﻮﻓﻴﺮ اﻟﺤﻤﺎﻳﺔ اﻟﻼزﻣﺔ ﻟﻠﻤﺸﺮوع وﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ‬

R1

0
00
S06

00
R1

200 ‫واﻟﺨﺪﻣﺎت اﻟﻤﺠﺎورة ﻣﻊ اﻻﺧﺬ ﺑﺎﻻﻋﺘﺒﺎر ﻃﺒﻴﻌﺔ اﻟﺘﺮﺑﺔ‬

00
0

300

R2
R1
00

2200 8450

0
0

.‫واﻟﺘﺄﺛﻴﺮات اﻻﻧﺸﺎﺋﻴﺔ ﻟﻠﺒﻴﺌﺔ اﻟﻤﺤﻴﻄﺔ‬

1000
800

300
3

2500
200 PH 08 300

3300
S08
4.0 M WIDE DRIVEWAY

4.0 M WIDE DRIVEWAY

4.0 M WIDE DRIVEWAY


LIFT LOBBY ‫ ﻓﻲ ﺣﺎﻟﺔ اﻟﻘﻄﻊ اﻟﻘﺮﻳﺒﺔ ﻣﻦ اﻟﺠﺒﺎل أو اžودﻳﺔ ﻓﺈﻧﻪ‬-

2200

150

6.0 M WIDE DRIVEWAY


31 SQM.
‫ﻳﺘﻄﻠﺐ ﻋﻠﻰ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف ﺗﻘﺪﻳﻢ دراﺳﺔ‬
4400

86 90 103 PARKING PARKING 115


8750
1900 1700 PH 16 ‫ﻣﻔﺼﻠﺔ ﻋﻦ ﻛﻴﻔﻴﺔ ﻗﻄﻊ اﻟﺠﺒﺎل او اﻟﺤﻤﺎﻳﺎت اﻟﻼزﻣﺔ ﺟﻬﺔ‬
3

8000
150 150

2700
.‫اﻟﻮادي ﻗﺒﺐ اﻟﺸﺮوع ﺑﺎﻟﻌﻤﻞ‬

5000
AL10
CHILLER
A-202
10600

11000

11000
PUMP ROOM
2200 ‫ ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﺎﺳﺘﺨﺪام اﻟﻠﻮن اžﺑﻴﺾ ﺑﺎﻟﻮاﺟﻬﺎت او‬-
1 300 300
PH 07
‫اﻟﺘﻨﺴﻴﻖ ﻣﻊ اﻟﻤﺪﻳﺮﻳﺎت ﺑﺎﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﺑﺨﻼف‬

±0.00
A-201 .‫ذﻟﻚ‬

2000
5500
4 ‫ ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري‬-
1000 2500 1000 7600 10500 1100 4000 3500 79 7500 77 1000 4000 1000 2500 1000 7500 1000 7500 1000 7500 1000 7500 2400 500
‫اﻟﻤﺸﺮف اﻟﺮﺟﻮع اﻟﻰ ﻫﺬه اﻻدارة ﻗﺒﻞ ﺗﻨﻔﻴﺬ اﻟﻤﺒﻨﻰ ﻓﻲ‬
‫ﺣﺎﻟﺔ وﺟﻮد ﻣﺸﻜﻠﺔ ﻓﻨﻴﺔ ﺗﺤﻮل دون اﻟﺒﻨﺎء وﺣﺴﺐ‬
200

85 200 80 200 76 PARKING PARKING 64 131


850
R1 R2
00
1 00
1 ‫اﻟﺨﺮاﺋﻂ اﻟﻤﺘﻌﻤﺪة ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم ﺗﻄﺎﺑﻖ اﻟﺨﺮاﺋﻂ ﻣﻊ ﺑﻌﻀﻬﺎ‬
0

0
0

0
00

00
R1

00
R1

R1
+3.00

R1
000

+61.75 M ‫او ﻣﻊ اﻟﻤﻮﻗﻊ ﻓﻲ اﻟﻄﺒﻴﻌﺔ‬


A-301 PH 16 PH 16 A-301

11000
6.0 M WIDE DRIVEWAY SSL 6.0 M WIDE DRIVEWAY

10000
6000

6000

6000
0
00
R3
150
150
1100 4000 1000 2500 1000 7500 1000 7500 1000 7500 1000 7500 1000 7500 1000 4000 1000 2500 8125 1375 4000 1000 2500 1000 7500 1000 7500 2400 6200 5500 1220
R1

R1
0 00 0 R10 00

00
0 0
R10 00 R1

0
000
57
R2 A-402
PARKING
A-405 1000 51 PARKING

6.0 M WIDE DRIVEWAY


31 PARKING 46 47 PARKING 50
4.0 M WIDE DRIVEWAY

PARKING
PH 16
5

2000
4.0 M WIDE DRIVEWAY
5500
4.0 M WIDE DRIVEWAY
11000

11000

8000
5000
2700
AL10 By ABDULLAH AL FARSI at 8:16 am, Dec 07, 2020

150
136
30 PARKING PARKING 15 58 PARKING PARKING 63

2400
1250 150 PH 01 150 700
1000 2500 1000 7500 1000 7500 1000 7500 1000 7500 1000 7500 1000 4000 8750 2700 4000 1900 1900 7500 1000 7500 2400 6200
PLOT LIMIT +37.50 LVL CONSIDERED AS ±0.00M

3300

2000
LIFT LOBBY
6

800
300 31 SQM. 300 R2
00

300

0
8450 0
0

00
00

R6

R1
R1

00

PH 16
21550

+61.75 M LIFT-4 LIFT-5 LIFT-6

2050
SSL PH 02 PH 03 PH 04

300

7350
6.0 M WIDE DRIVEWAY 6.0 M WIDE DRIVEWAY
6000

6000

6000
137
5870 S01
200
200 ST-03

3500
650 10800 5300 900 7500 1400 5000 4500
A-406 1950 5000 6600 2800 7500 1000 7500 1000 7500 1000 7500 900 1893 A-403
0 PH 05
00
200

R4
7

2150
R3
725

200

350
2550 ST-05 S01 1900
RAMP DOWN FROM ROOF LVL RAMP DOWN TO PODIUM-5 142 138

3350
PH 06
3500

5500

5500
MEP ROOM 01
PARKING

2400
200 200 SLOPE 1:10 SLOPE 1:10
1500

PH 16 PH 17

200
1 2020-4-5 AK UPDATED SCHEMATIC DRAWINGS
350

6200
2700

7450
200

R6
R7

700
2000 No. DATE ENG REVISIONS
1000

DESIGN CONSULTANTS:
4000
AL-FAJER
Engineering Consultants
900 8 P.O BOX NO.2021, P.C, 112 RUWI
SULTANATE OF OMAN
PLOT LIMIT 1 PLOT LIMIT
CLIENT:
TEL: +968-24708588

2 2
A515
A-302 --- NEIGHBOURING PLOT ---
DESIGN DEVELOPMENT & PARTNERS L.L.C
A-201
PROJECT TITLE:

PROPOSED SHOPPING CENTER


TOTAL NO OF PARKING = 142 NOS & PARKING BUILDING AT MUSCAT HILLS
DEVELOPMENT, MADINAT AL ERFAAN,
MUSCAT, OMAN
DRAWING TITLE: MAIN BUILDING
PENTHOUSE LEVEL PLAN

AREA : MADINAT AL ERFAAN Plot No. PHASE-01 / PLOT NO. 225


Status Project no

FOR APPROVAL J-840


Designed Developed Drawn Checked
AK VW NV
Date Scale

PENTHOUSE FLOOR PLAN NOV-2020 1:200


1 1:200 Drawing No. Rev
A-108 R2