Kapasitas pile (kg) Jumlah pile di butuhkan

No Nama Conveyor pilling number Axial load (kg)


SP D50-15m SP D350-12m MP 25x25cm-6m SP D50-15m SP D350-12m MP 25x25cm-6m
1 CV 115 C1-A 268,39 3.267,19 1,00
C1-B 227,59 3.267,19 1,00
C2-A 908,00 3.267,19 1,00
C2-B 888,82 3.267,19 1,00
C3-A 799,02 3.267,19 1,00
C3-B 361,00 3.267,19 1,00
C4-A 799,02 3.267,19 1,00
C4-B 762,29 3.267,19 1,00
C5-A 389,92 3.267,19 1,00
C5-B 343,31 3.267,19 1,00
C6-A 2.655,66 3.267,19 1,00
C6-B 3.138,40 3.267,19 1,00
C7-A 5.617,44 24.265,86 1,00
C7-B 6.008,40 24.265,86 1,00
C8-A 24.380,62 24.265,86 1,00
C8-B 243,92 24.265,86 1,00
C8-C 20.902,65 24.265,86 1,00
C8-D 118,36 24.265,86 1,00
C9-A 83.682,75 24.265,86 4,00
15.102,75
29.700,00
17.280,00
21.600,00
C9-B 83.623,40 24.265,86 4,00
15.043,40
29.700,00
17.280,00
21.600,00
14,00 12,00
2 CV 114 B1-A 2999,015 3.267,19 1,00
B1-B 3069,702 3.267,19 1,00
B2-A 3343,716 3.267,19 1,00
B2-B 3402,111 3.267,19 1,00
B3-A 233,046 3.267,19 1,00
B3-B 254,556 3.267,19 1,00
B4-A 12,08 3.267,19 1,00
B4-B 91,291 3.267,19 1,00
B5-A 5314,408 24.265,86 1,00
B5-B 6384,126 24.265,86 1,00
B6-A 13475,669 24.265,86 1,00
B6-B 7528,089 24.265,86 1,00
B6-C 12933,413 24.265,86 1,00
B6-D 7646,304 24.265,86 1,00
B7-A 12281,584 24.265,86 1,00
B7-B 10650,809 24.265,86 1,00
B7-C 7123,386 24.265,86 1,00
B7-D 12539,104 24.265,86 1,00
B7-E 6450,105 24.265,86 1,00
B7-F 8335,061 24.265,86 1,00
B7-G 7072,476 24.265,86 1,00
B7-H 5429,761 24.265,86 1,00
14,00 8,00
3 HOPPER A1 72216,032 75957,82 1,00
A2 57840,388 75957,82 1,00
A3 57433,598 75957,82 1,00
A4 73204,885 75957,82 1,00
A5 71282,006 75957,82 1,00
A6 59187,392 75957,82 1,00
A7 59438,872 75957,82 1,00
A8 72521,454 75957,82 1,00
8,00