You are on page 1of 5

Spec. No.

: 3201
OFFSHORE FUNCTIONAL
Rev. No.: 0
DESIGN SPECIFICATION FOR
SECTION Discipline: Instrumentation
FLOW TOTALIZER
Page: 1 of 5

FUNCTIONAL SPECIFICATION
FOR
FLOW TOTALIZER

TOTAL
PREPARED / REVIEWED
APPROVED BY No. OF DATE REV. No.
REVISED BY BY
PAGES
ET MC AC 2 25.08.2003 0

FORMAT No. Ref. PROCEDURE No. ISSUE No. REV. No. REV. DATE:
ODS/SOF/004A / B ODS/SOP/008 TO 015 01 01 15/210/2003
Spec. No.: 3201
OFFSHORE FUNCTIONAL
Rev. No.: 0
DESIGN SPECIFICATION FOR
SECTION Discipline: Instrumentation
FLOW TOTALIZER
Page: 2 of 5

CONTENTS

Clause No. ITEM Page No.


1.0 Scope Of This Document 3
2.0 Standards And Specifications 3
2.1 Reference specifications 3
2.2 Other specifications to be followed 3
3.0 Scope Of Supply 3
4.0 Flow totalizer 3
4.1 General 3
4.2 Material 4
4.3 Accuracy 4
4.4 Reading scales 4
4.5 Enclosure class 4
5.0 Equipment Protection 4
6.0 Installation Requirement 4
7.0 Calibration, Inspection And Testing 4
8.0 Documentation 5
9.0 Tagging & Nameplates 5
10.0 Review And Approval 5
11.0 Vendor Pre-Qualification Requirements 5
12.0 Preparation For Shipment 5
13.0 Receipt And Storage 5

FORMAT No. Ref. PROCEDURE No. ISSUE No. REV. No. REV. DATE:
ODS/SOF/004A / B ODS/SOP/008 TO 015 01 01 15/210/2003
Spec. No.: 3201
OFFSHORE FUNCTIONAL
Rev. No.: 0
DESIGN SPECIFICATION FOR
SECTION Discipline: Instrumentation
FLOW TOTALIZER
Page: 3 of 5

1.0 SCOPE OF THIS DOCUMENT:

1.1 This specification describes the essential considerations in the selection, installation,
calibration, testing and commissioning of Flow totalizer.

1.2 The Contractor shall be responsible for the selection of the Flow totalizer suitable for its
intended application, its procurement, packing, calibration, testing, and shipment to site,
installation and commissioning at site.

2.0 CODES & STANDARDS:

2.1 Project Specifications:


a) Specification No. 3.6: Instrumentation Design Criteria
b) Basic Bid Work

2.2 Other Specifications to be followed:


NIL

3.0 SCOPE OF SUPPLY:

3.1 The number of Flow totalizer to be supplied and installed shall be as per the
requirements indicated in the Basic Bid Work and the P & IDs.

3.2 The scope of supply shall also include commissioning spares and two years’ spares as
required by clause 3.6.4.8 of Instrumentation Design Criteria, and as suggested by the
Manufacturer.

4.0 FLOW TOTALIZER:

4.1 General:

4.1.1 The Flow totalizer shall be microprocessor based.

4.1.2 The Flow totalizer shall display both flow rate and totalized value. LCD type display
shall be provided in the Flow totalizer.

4.1.3 Flow totalizer shall provide an output of 4-20 mA sq.root signal (for flow rate).The
input power supply to the Flow totalizer shall be 24vdc.

FORMAT No. Ref. PROCEDURE No. ISSUE No. REV. No. REV. DATE:
ODS/SOF/004A / B ODS/SOP/008 TO 015 01 01 15/210/2003
Spec. No.: 3201
OFFSHORE FUNCTIONAL
Rev. No.: 0
DESIGN SPECIFICATION FOR
SECTION Discipline: Instrumentation
FLOW TOTALIZER
Page: 4 of 5

4.1.4 All programming and total values are stored in non-volatile memory and can be
retrieved even if the power is removed from the unit.

4.1.5 The totalizer should have provision to save accumulated total flow even if the power is
lost.

4.2 Material: The material requirements for Flow totalizer shall in general be according to
clause 3.6.4.5 of Instrumentation Design Criteria.

4.3 Accuracy: The accuracy shall be ±0.25%. Repeatability shall be ±0.25%

4.4 Reading Scales: Units for Flow totalizer shall be in M3/HR for liquids and NM3 for
gases.

4.5 Enclosure Class: In addition to weatherproof of class IP-66and flame proof to


EExdIIC, T6, the Flow totalizer enclosure shall be explosion-proof to NEMA-7 and
shall be certified by statutory body like UL/FM/BASEEFA or equal for use in
hazardous area.

5.0 EQUIPMENT PROTECTION:

5.1 Flow totalizer protection requirements shall in general be as per clause no. 3.6.4.4 of
Instrumentation Design Criteria.

6.0 INSTALLATION REQUIREMENTS:

6.1 The installation of Flow totalizer shall in general be according to clause 3.6.4.6 of
Instrumentation Design Criteria.

6.2 Mountings accessories required for Flow totalizer shall be 316SS or better. When Flow
totalizer and other devices are grouped and mounted on a gauge board or instrument
stand it should be in such a manner that removal of each instrument shall be possible
without the need to disconnect, dismantle or remove any other instruments or tubing.

7.0 CALIBRATION, INSPECTION & TESTING:

7.1 Calibration, inspection and testing requirements shall in general be as per clause 3.6.4.7
of Instrumentation Design Criteria.

7.2 The manufacturer before shipment shall perform calibration and alignment of all
instruments.

FORMAT No. Ref. PROCEDURE No. ISSUE No. REV. No. REV. DATE:
ODS/SOF/004A / B ODS/SOP/008 TO 015 01 01 15/210/2003
Spec. No.: 3201
OFFSHORE FUNCTIONAL
Rev. No.: 0
DESIGN SPECIFICATION FOR
SECTION Discipline: Instrumentation
FLOW TOTALIZER
Page: 5 of 5

8.0 DOCUMENTATION:

8.1 The documentation requirements shall in general be according to clause 3.6.6.2 of


Instrumentation Design Criteria.

9.0 TAGGING & NAMEPLATES:

9.1 Tagging & Nameplate requirements shall in general be according to clause 3.6.6.1 of
Instrumentation Design Criteria.

9.2 The Flow totalizer shall be provided with SS name plate indicating the following:
• Tag Number
• Manufacturer’s Name and Model Number
• Adjustable range
• Element material
• Enclosure classification.
• Service fluid.

9.3 A warning label which reads (EXPLOSION PROOF INSTRUMENT, ISOLATE


ELSEWHERE BEFORE OPENING”, shall be affixed on Flow totalizer which are
certified as explosion proof.

10.0 REVIEW & APPROVAL:

10.1 Review and approval of purchase specifications and other related documents should in
general be according to clause 3.6.6.3 of Instrumentation Design Criteria.

11.0 VENDOR PRE-QUALIFICATION REQUIREMENTS:

11.1 The Vendor pre-qualification requirements shall in general be according to clause


3.6.6.4 of Instrumentation Design Criteria.

12.0 PREPARATION FOR SHIPMENT:

12.1 The Flow totalizer shall be prepared for shipment in accordance to clause 3.6.6.5 of
Instrumentation Design Criteria.

13.0 RECEIPT & STORAGE:

13.1 Receipt and storage of the Flow totalizer shall be in accordance to clause 3.6.6.6 of
Instrumentation Design Criteria.

FORMAT No. Ref. PROCEDURE No. ISSUE No. REV. No. REV. DATE:
ODS/SOF/004A / B ODS/SOP/008 TO 015 01 01 15/210/2003