MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PARCIAL TOTAL
UNITARIO ( S/. ) 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
OBRAS PROVICIONALES
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 464.00 464.00 1.00 464.00 464.00 - - 464.00
01.02 ALQUILER DE ALMACEN mes 2.50 250.00 625.00 0.50 250.00 125.00 1.00 250.00 250.00 1.00 250.00 250.00 625.00
02 FLETES - - - -
02.01 FLETE TERRESTRE GLB 1.00 12,280.64 12,280.64 0.70 12,280.64 8,596.45 0.30 12,280.64 3,684.19 - 12,280.64
02.02 FLETE RURAL GLB 1.00 9,234.40 9,234.40 0.50 9,234.40 4,617.20 0.50 9,234.40 4,617.20 - 9,234.40
- - - -
TOTAL COSTO DIRECTO S/. 22,604.04 S/. 13,802.65 S/. 8,551.39 S/. 250.00 S/. 22,604.04
PORCENTAJE PARCIAL % 61.06% 37.83% 1.11% 100.00%
GASTO GENERALES (10.98%) 2,481.92 1,515.53 938.94 27.45 2,481.92
UTILIDAD (8.00%) 1,808.32 1,104.21 684.11 20.00 1,808.32
SUB TOTAL PRESUPUESTO 26,894.28 16,423.00 10,174.82 297.46 26,895.28
IGV 18% 4,840.97 2,956.14 1,831.47 53.54 4,841.15
TOTAL PRESUPUESTO REFERENCIAL 31,735.25 19,379.14 12,006.29 351.00 31,736.43
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 31,735.25 19,379.14 12,006.29 351.00 31,736.43
PORCENTAJE ACUMULADO % 61.06% 98.89% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PRECIO PARCIAL
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO UNITARIO ( S/. ) TOTAL
17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
01 OBRAS PRELIMINARES - - - -
01.01 LIMPIEZA DE TERRENO MANUAL m2 16.00 1.32 21.12 16.00 1.32 21.12 - - 21.12
01.02 TRAZO Y REPLANTEO m2 16.00 2.57 41.12 16.00 2.57 41.12 - - 41.12
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION MANUAL m3 11.10 16.48 182.93 11.10 16.48 182.93 - - 182.93
02.02 RELLENO CON MATERIAL PROPIO m3 2.00 21.60 43.20 2.00 21.60 43.20 - - 43.20
03 CONCRETO SIMPLE - - - -
03.01 CONCRETO 1:10 PARA SOLADOS Y/O SUB BASES m3 0.30 338.48 101.54 0.30 338.48 101.54 - - 101.54
03.02 CONCRETO SIMPLE FC=100 KG/CM2 m3 1.05 343.45 360.62 1.05 343.45 360.62 - - 360.62
04 CONCRETO ARMADO - - - -
04.01 CONCRETO F'C= 175 KG/CM2 m3 2.72 400.57 1,089.55 - 2.72 400.57 1,089.55 - 1,089.55
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 19.97 31.58 630.65 - 19.97 31.58 630.65 - 630.65
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 101.76 3.70 376.51 - 101.76 3.70 376.51 - 376.51
05 TUBERIAS - - - -
05.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 2.00 5.14 10.28 - 2.00 5.14 10.28 - 10.28
05.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 2" PARA DREN m 2.00 7.62 15.24 - 2.00 7.62 15.24 - 15.24
06 ACCESORIOS PARA TUBERIAS - - - -
06.01 SUM. Y COLOC. DE CODO P.V.C. SAP 2" * 90º und 2.00 13.39 26.78 - 2.00 13.39 26.78 - 26.78
06.02 SUM. Y COLOC. DE TEE P.V.C. SAP 2" und 1.00 18.30 18.30 - 1.00 18.30 18.30 - 18.30
06.03 SUM. Y COLOC. DE CONO DE REBOSE 4"-2" und 1.00 36.29 36.29 - 1.00 36.29 36.29 - 36.29
06.04 SUM. Y COLOC. DE CANASTILLA BRONCE1 1/ 2" und 1.00 71.79 71.79 - 1.00 71.79 71.79 - 71.79
06.05 SUM. Y COLOC. DE VALVULA BRONCE 1 1/2"+ACCESORIOS und 1.00 135.44 135.44 - 1.00 135.44 135.44 - 135.44
07 REVESTIMIENTOS - - - -
07.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN RESERVORIO APOYAD m2 3.91 37.55 146.82 - 3.91 37.55 146.82 - 146.82
07.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 15.83 23.84 377.39 - 15.83 23.84 377.39 - 377.39
08 OTROS - - - -
08.01 TAPA METALICA DE E=3/8"+PINTURA ANTICORROSIVA und 2.00 314.00 628.00 - 2.00 314.00 628.00 - 628.00
08.02 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 11.92 6.33 75.45 - 11.92 6.33 75.45 - 75.45
08.03 SUM. Y COLOC. DE PIEDRA 21/2" m3 0.85 174.84 148.61 - 0.85 174.84 148.61 - 148.61
08.04 SUM. Y COLOC. DE ARENA GRUESA m3 0.85 171.22 145.54 - 0.85 171.22 145.54 - 145.54
09 CERCO PERIMETRICO DE PROTECCION - - - -
09.01 CERCO PERIMETRICO-ALAMBRE PUAS+POSTES MADERA m 25.00 9.06 226.50 - 25.00 9.06 226.50 - 226.50
TOTAL COSTO DIRECTO S/. 4,909.67 S/. 750.53 S/. 4,159.14 S/. 0.00 S/. 4,909.67
PORCENTAJE PARCIAL % 15.29% 84.71% 0.00% 100.00%
GASTO GENERALES (10.98%) 539.08 82.41 456.67 0.00 539.08
UTILIDAD (8.00%) 392.77 60.04 332.73 0.00 392.77
SUB TOTAL PRESUPUESTO 5,841.52 893.13 4,949.39 0.00 5,842.52
IGV 18% 1,051.47 160.76 890.89 0.00 1,051.65
TOTAL PRESUPUESTO REFERENCIAL 6,892.99 1,053.89 5,840.28 0.00 6,894.17
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 6,892.99 1,053.89 5,840.28 0.00 6,894.17
PORCENTAJE ACUMULADO % 15.29% 100.00% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PARCIAL TOTAL
UNITARIO ( S/. ) 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
01 OBRAS PRELIMINARES - - - -
01.01 TRAZO Y REPLANTEO PRELIMINAR m 160.50 1.21 194.21 160.50 1.21 194.21 - - 194.21
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION DE ZANJA, TERRENO COMPACTO, H<1.0 MT m 160.50 5.49 881.15 160.50 5.49 881.15 - - 881.15
02.02 RELLENO COMP.ZANJA TERR.NORMAL HASTA 1.00 M m 160.50 1.77 284.09 160.50 1.77 284.09 - - 284.09
02.03 REFINE Y NIVELACION ZANJA TERR.NORMAL m 160.50 1.63 261.62 160.50 1.63 261.62 - - 261.62
02.04 CAMA DE APOYO PARA TUBERIAS m 160.50 2.11 338.66 160.50 2.11 338.66 - - 338.66
03 TUBERIAS - - - -
03.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 160.50 5.14 824.97 160.50 5.14 824.97 - - 824.97
03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.2" A ZANJA TAPADA m 160.50 1.89 303.35 160.50 1.89 303.35 - - 303.35
04 ACCESORIOS PARA TUBERIAS - - - -
04.01 SUM. Y COLOC. DE CODO P.V.C. SAP 11/2" *22.5º und 3.00 10.59 31.77 3.00 10.59 31.77 - - 31.77
04.02 SUM. Y COLOC. DE CODO P.V.C. SAP 1 1/2" *45º und 2.00 10.79 21.58 2.00 10.79 21.58 - - 21.58
04.03 SUM. Y COLOC. DE CODO P.V.C. SAP 1 1/2" *90º und 1.00 10.79 10.79 1.00 10.79 10.79 - - 10.79
TOTAL COSTO DIRECTO S/. 3,152.19 S/. 3,152.19 S/. 0.00 S/. 0.00 S/. 3,152.19
PORCENTAJE PARCIAL % 100.00% 0.00% 0.00% 100.00%
GASTO GENERALES (10.98%) 346.11 346.11 0.00 0.00 346.11
UTILIDAD (8.00%) 252.18 252.18 0.00 0.00 252.18
SUB TOTAL PRESUPUESTO 3,750.48 3,751.48 0.00 0.00 3,751.48
IGV 18% 675.09 675.27 0.00 0.00 675.27
TOTAL PRESUPUESTO REFERENCIAL 4,425.57 4,426.75 0.00 0.00 4,426.75
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 4,425.57 4,426.75 0.00 0.00 4,426.75
PORCENTAJE ACUMULADO % 100.00% 100.00% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PARCIAL TOTAL
UNITARIO ( S/. ) 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 LIMPIEZA DE TERRENO MANUAL m2 25.00 1.68 42.00 25.00 1.68 42.00 - - 42.00
01.02 TRAZO Y REPLANTEO m2 25.00 2.81 70.25 25.00 2.81 70.25 - - 70.25
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION MANUAL m3 14.25 16.48 234.84 14.25 16.48 234.84 - - 234.84
02.02 RELLENO CON MATERIAL PROPIO m3 17.81 19.60 349.08 17.81 19.60 349.08 - - 349.08
03 CONCRETO SIMPLE - - - -
03.01 CONCRETO 1:10 PARA SOLADOS Y/O SUB BASES m3 1.20 338.48 406.18 1.20 338.48 406.18 - - 406.18
04 CONCRETO ARMADO - - - -
04.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 m3 9.01 425.02 3,829.43 9.01 425.02 3,829.43 - - 3,829.43
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 49.75 32.55 1,619.36 49.75 32.55 1,619.36 - - 1,619.36
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 459.24 3.70 1,699.19 459.24 3.70 1,699.19 - - 1,699.19
05 TUBERIAS - - - -
05.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 5.00 4.82 24.10 5.00 4.82 24.10 - - 24.10
05.02 TUBERIA PVC CLASE 7.5 /AGUA POTABLE DE 3" m 5.00 21.27 106.35 5.00 21.27 106.35 - - 106.35
06 ACCESORIOS PARA TUBERIAS - - - -
06.01 SUM. Y COLOC. DE CODO P.V.C. SAP 1 1/2" *90º und 3.00 10.60 31.80 - 3.00 10.60 31.80 - 31.80
06.02 SUM. Y COLOC. DE TEE P.V.C. SAP 1 1/2" und 2.00 14.00 28.00 - 2.00 14.00 28.00 - 28.00
06.03 SUM. Y COLOC. DE CONO DE REBOSE 4"-3" und 1.00 46.10 46.10 - 1.00 46.10 46.10 - 46.10
06.04 SUM. Y COLOC. DE CANASTILLA BRONCE1 1/ 2" und 1.00 71.60 71.60 - 1.00 71.60 71.60 - 71.60
06.05 SUM. Y COLOC. DE VALVULA BRONCE 1 1/2"+ACCESORIOS und 3.00 135.44 406.32 - 3.00 135.44 406.32 - 406.32
06.06 SUM. Y COLOC. DE VALVULA BRONCE 3"+ACCESORIOS und 1.00 335.36 335.36 - 1.00 335.36 335.36 - 335.36
06.07 SUM. Y COLOC. DE CODO P.V.C. SAP 3" * 90º und 2.00 19.10 38.20 - 2.00 19.10 38.20 - 38.20
06.08 SUM. Y COLOC. DE TUB. VENTILACION FO GO 2" und 1.00 94.30 94.30 - 1.00 94.30 94.30 - 94.30
06.09 SUM. Y COLOC. DE ESCALERA TIPO GATO 3/4" FO GO und 1.00 226.40 226.40 - 1.00 226.40 226.40 - 226.40
07 REVESTIMIENTOS - - - -
07.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN RESERVORIO APOYAD m2 19.00 37.55 713.45 - 19.00 37.55 713.45 - 713.45
07.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 35.34 26.93 951.71 - 35.34 26.93 951.71 - 951.71
08 OTROS - - - -
08.01 TAPA METALICA DE E=3/8"+PINTURA ANTICORROSIVA und 2.00 204.00 408.00 - 2.00 204.00 408.00 - 408.00
08.02 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 23.78 6.33 150.53 - 23.78 6.33 150.53 - 150.53
08.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 10.00 54.00 540.00 - 5.00 54.00 270.00 5.00 54.00 270.00 540.00
08.04 DESINFECCION DEL RESERVORIO und 1.00 24.65 24.65 - - 1.00 24.65 24.65 24.65
08.05 HIPOCLORADOR und 1.00 135.00 135.00 - - 1.00 135.00 135.00 135.00
09 CERCO PERIMETRICO DE PROTECCION - - - -
09.01 CERCO PERIMETRICO-ALAMBRE PUAS+POSTES MADERA m 32.00 20.92 669.44 - - 32.00 20.92 669.44 669.44
TOTAL COSTO DIRECTO S/. 13,251.64 S/. 8,380.78 S/. 3,771.77 S/. 1,099.09 S/. 13,251.64
PORCENTAJE PARCIAL % 63.24% 28.46% 8.29% 100.00%
GASTO GENERALES (10.98%) 1,455.03 920.21 414.14 120.68 1,455.03
UTILIDAD (8.00%) 1,060.13 670.46 301.74 87.93 1,060.13
SUB TOTAL PRESUPUESTO 15,766.80 9,972.08 4,487.93 1,307.78 15,767.80
IGV 18% 2,838.02 1,794.97 807.83 235.40 2,838.20
TOTAL PRESUPUESTO REFERENCIAL 18,604.82 11,767.05 5,295.76 1,543.18 18,606.00
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 18,604.82 11,767.05 5,295.76 1,543.18 18,606.00
PORCENTAJE ACUMULADO % 63.24% 91.71% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PRECIO PARCIAL
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO UNITARIO ( S/. ) TOTAL
17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 TRAZO Y REPLANTEO PRELIMINAR m 2,424.55 1.21 2,933.71 450.00 1.21 544.50 1,950.00 1.21 2,359.50 24.55 1.21 29.71 2,933.71
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION DE ZANJA, TERRENO COMPACTO, H<1.0 MT m 2,424.55 5.49 13,310.78 450.00 5.49 2,470.50 1,950.00 5.49 10,705.50 24.55 5.49 134.78 13,310.78
02.02 RELLENO COMP.ZANJA TERR.NORMAL HASTA 1.00 M m 2,424.55 1.77 4,291.45 450.00 1.77 796.50 1,950.00 1.77 3,451.50 24.55 1.77 43.45 4,291.45
02.03 REFINE Y NIVELACION ZANJA TERR.NORMAL m 2,424.55 1.63 3,952.02 450.00 1.63 733.50 1,950.00 1.63 3,178.50 24.55 1.63 40.02 3,952.02
02.04 CAMA DE APOYO PARA TUBERIAS m 2,424.55 2.11 5,115.80 450.00 2.11 949.50 1,950.00 2.11 4,114.50 24.55 2.11 51.80 5,115.80
03 TUBERIAS - - - -
03.01 TUBERIA PVC CLASE 7.5 /AGUA POTABLE DE 1 1/2" m 5.11 8.29 42.36 5.11 8.29 42.36 - - 42.36
03.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1" m 695.80 7.15 4,974.97 395.80 7.15 2,829.97 300.00 7.15 2,145.00 - 4,974.97
03.03 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 3/4" m 1,723.35 6.49 11,184.54 49.09 6.49 318.59 1,650.00 6.49 10,708.50 24.26 6.49 157.45 11,184.54
03.04 PRUEBA HIDRAULICA+DESINFECCION TUB.<2" A ZANJA TAPADA m 2,424.55 1.89 4,582.41 450.00 1.89 850.50 1,950.00 1.89 3,685.50 24.56 1.89 46.41 4,582.41
04 ACCESORIOS PARA TUBERIAS - - - -
04.01 SUM. Y COLOC. DE CODO P.V.C. SAP 11/2" *22.5º und 4.00 10.59 42.36 4.00 10.59 42.36 - - 42.36
04.02 SUM. Y COLOC. DE CODO P.V.C. SAP 1" *22.5º und 14.00 8.94 125.16 10.00 8.94 89.40 4.00 8.94 35.76 - 125.16
04.03 SUM. Y COLOC. DE CODO P.V.C. SAP 3/4" *22.5º und 3.00 2.10 6.30 - 3.00 2.10 6.30 - 6.30
04.04 SUM. Y COLOC. DE TEE P.V.C. SAP 1 1/2" und 1.00 14.19 14.19 1.00 14.19 14.19 - - 14.19
04.05 SUM. Y COLOC. DE CODO P.V.C. SAP 3/4" *45º und 4.00 8.50 34.00 - 4.00 8.50 34.00 - 34.00
04.06 REDUCCIONES PVC-SAP 1" A 3/4" und 5.00 16.42 82.10 5.00 16.42 82.10 - - 82.10
04.07 SUM. Y COLOC. DE TAPON P.V.C. SAP 3/4" und 1.00 13.50 13.50 1.00 13.50 13.50 - - 13.50
04.08 SUM. Y COLOC. DE TAPON P.V.C. SAP 1" und 2.00 8.40 16.80 2.00 8.40 16.80 - - 16.80
05 CONCRETO SIMPLE - - - -
05.01 CONCRETOPARA COLOCAR EN LA UNION DE LOS ACCESORIOS MEZCLA 1:8 C:H m3 0.92 338.48 311.40 0.50 338.48 169.24 0.42 338.48 142.16 - 311.40
- - - -
TOTAL COSTO DIRECTO S/. 51,033.85 S/. 9,963.51 S/. 40,566.72 S/. 503.62 S/. 51,033.85
PORCENTAJE PARCIAL % 19.52% 79.49% 0.99% 100.00%
GASTO GENERALES (10.98%) 5,603.52 1,093.99 4,454.23 55.30 5,603.52
UTILIDAD (8.00%) 4,082.71 797.08 3,245.34 40.29 4,082.71
SUB TOTAL PRESUPUESTO 60,720.08 11,854.78 48,267.08 599.22 60,721.08
IGV 18% 10,929.61 2,133.86 8,688.08 107.86 10,929.79
TOTAL PRESUPUESTO REFERENCIAL 71,649.69 13,988.64 56,955.16 707.08 71,650.87
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 71,649.69 13,988.64 56,955.16 707.08 71,650.87
PORCENTAJE ACUMULADO % 19.52% 99.01% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PARCIAL ( S/. ) TOTAL
UNITARIO 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 LIMPIEZA DE TERRENO MANUAL m2 24.00 1.32 31.68 - 24.00 1.32 31.68 - 31.68
01.02 TRAZO Y REPLANTEO m2 24.00 2.57 61.68 - 24.00 2.57 61.68 - 61.68
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION MANUAL m3 6.00 37.08 222.48 - 6.00 37.08 222.48 - 222.48
02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 7.50 10.99 82.43 - 7.50 10.99 82.43 - 82.43
03 CONCRETO SIMPLE - - - -
03.01 CONCRETO SIMPLE FC=100 KG/CM2 m3 2.14 343.45 734.98 - 2.14 343.45 734.98 - 734.98
03.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 1.44 31.58 45.48 - 1.44 31.58 45.48 - 45.48
04 ACCESORIOS PARA TUBERIAS - - - -
04.01 SUM. Y COLOC. DE VALVULA BRONCE 1"+ACCESORIOS und 3.00 84.19 252.57 - 3.00 84.19 252.57 - 252.57
04.02 SUM. Y COLOC. DE VALVULA BRONCE 3/4"+ACCESORIOS und 3.00 42.52 127.56 - 3.00 42.52 127.56 - 127.56
05 OTROS - - - -
05.01 TAPA METALICA DE 0.70X0.70X1/8" und 6.00 204.00 1,224.00 - 6.00 204.00 1,224.00 - 1,224.00
TOTAL COSTO DIRECTO S/. 2,782.86 S/. 0.00 S/. 2,782.86 S/. 0.00 S/. 2,782.86
PORCENTAJE PARCIAL % 0.00% 100.00% 0.00% 100.00%
GASTO GENERALES (10.98%) 305.56 0.00 305.56 0.00 305.56
UTILIDAD (8.00%) 222.63 0.00 222.63 0.00 222.63
SUB TOTAL PRESUPUESTO 3,311.05 0.00 3,312.05 0.00 3,312.05
IGV 18% 595.99 0.00 596.17 0.00 596.17
TOTAL PRESUPUESTO REFERENCIAL 3,907.04 0.00 3,908.22 0.00 3,908.22
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 3,907.04 0.00 3,908.22 0.00 3,908.22
PORCENTAJE ACUMULADO % 0.00% 100.00% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PARCIAL TOTAL
UNITARIO ( S/. ) 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 TRAZO Y REPLANTEO PRELIMINAR m 150.00 1.25 187.50 - 70.00 1.25 87.50 80.00 1.25 100.00 187.50
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION DE ZANJA, TERRENO COMPACTO, H<1.0 MT m 150.00 5.49 823.50 - 70.00 5.49 384.30 80.00 5.49 439.20 823.50
02.02 RELLENO COMP.ZANJA TERR.NORMAL HASTA 1.00 M m 150.00 1.77 265.50 - 70.00 1.77 123.90 80.00 1.77 141.60 265.50
02.03 REFINE Y NIVELACION ZANJA TERR.NORMAL m 150.00 1.63 244.50 - 70.00 1.63 114.10 80.00 1.63 130.40 244.50
02.04 CAMA DE APOYO PARA TUBERIAS m 150.00 2.11 316.50 - 70.00 2.11 147.70 80.00 2.11 168.80 316.50
03 CONEXIONES DOMICILIARIAS - - - -
03.01 INSTALACIONES DE CONEXIONES DOMICILIARIAS DE AGUA Inn. aCC. DE PVC 15mm. DESDE MATRIZ Inn. und 30.00 167.35 5,020.50 - 10.00 167.35 1,673.50 20.00 167.35 3,347.00 5,020.50
04 PRUEBAS HIDRAULICAS - - - -
04.01 PRUEBA HIDRAULICA+DESINFECCION TUB.<2" A ZANJA TAPADA m 150.00 0.76 114.00 - 70.00 0.76 53.20 80.00 0.76 60.80 114.00
TOTAL COSTO DIRECTO S/. 6,972.00 S/. 0.00 S/. 2,584.20 S/. 4,387.80 S/. 6,972.00
PORCENTAJE PARCIAL % 0.00% 37.07% 62.93% 100.00%
GASTO GENERALES (10.98%) 765.53 0.00 283.75 481.78 765.53
UTILIDAD (8.00%) 557.76 0.00 206.74 351.02 557.76
SUB TOTAL PRESUPUESTO 8,295.29 0.00 3,075.06 5,221.23 8,296.29
IGV 18% 1,493.15 0.00 553.51 939.82 1,493.33
TOTAL PRESUPUESTO REFERENCIAL 9,788.44 0.00 3,628.57 6,161.05 9,789.62
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 9,788.44 0.00 3,628.57 6,161.05 9,789.62
PORCENTAJE ACUMULADO % 0.00% 37.07% 100.00%
CRONOGRAMA DE INICIO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO UNITARIO PARCIAL TOTAL
( S/. ) 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 LIMPIEZA DE TERRENO MANUAL m2 4.51 1.32 5.95 - 4.51 1.32 5.95 - 5.95
01.02 TRAZO Y REPLANTEO m2 11.28 2.57 28.99 - 11.28 2.57 28.99 - 28.99
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION MANUAL m3 5.64 94.76 534.45 - 5.64 94.76 534.45 - 534.45
02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 7.05 52.18 367.87 - 7.05 52.18 367.87 - 367.87
03 CONCRETO SIMPLE - - - -
03.01 SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 4.51 41.64 187.80 - 4.51 41.64 187.80 - 187.80
04 CONCRETO ARMADO - - - -
05 CONCRETO F'C= 175 KG/CM2 m3 1.86 400.57 745.06 - 1.86 400.57 745.06 - 745.06
06 ENCOFRADO Y DESENCOFRADO DE MUROS m2 19.92 31.58 629.07 - 19.92 31.58 629.07 - 629.07
07 ACERO EN MUROS REFORZADOS GRADO 60 kg 66.00 3.70 244.20 - 66.00 3.70 244.20 - 244.20
08 TARRAJEO - - - -
08.01 TARRAJEO CON IMPERMEABILIZANTE m2 8.94 35.86 320.59 - 4.00 35.86 143.44 4.94 35.86 177.15 320.59
09 TUBERIAS - - - -
09.01 TUBERIA DE VENTILACION DE Fº Gº DE 2" GLB 2.00 35.36 70.72 - 2.00 35.36 70.72 - 70.72
09.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1" m 2.00 7.15 14.30 - 2.00 7.15 14.30 - 14.30
09.03 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 3/4" m 2.00 6.49 12.98 - 2.00 6.49 12.98 - 12.98
10 ACCESORIOS PARA TUBERIAS - - - -
10.01 ACCESORIOS DE ENTRADA Y SALIDA DE 1" und 1.00 182.96 182.96 - 1.00 182.96 182.96 - 182.96
10.02 ACCESORIOS DE ENTRADA Y SALIDA DE 3/4" und 1.00 136.00 136.00 - 1.00 136.00 136.00 - 136.00
11 OTROS - - - -
11.01 TAPA METALICA DE 0.75X0.75X1/8" und 2.00 224.72 449.44 - - 2.00 224.72 449.44 449.44
11.02 TAPA METALICA DE 0.50X0.60 und 2.00 174.00 348.00 - - 2.00 174.00 348.00 348.00
TOTAL COSTO DIRECTO S/. 4,278.38 S/. 0.00 S/. 3,303.79 S/. 974.59 S/. 4,278.38
PORCENTAJE PARCIAL % 0.00% 77.22% 22.78% 100.00%
GASTO GENERALES (10.98%) 469.77 0.00 362.76 107.01 469.77
UTILIDAD (8.00%) 342.27 0.00 264.30 77.97 342.27
SUB TOTAL PRESUPUESTO 5,090.42 0.00 3,931.62 1,159.80 5,091.42
IGV 18% 916.28 0.00 707.69 208.76 916.46
TOTAL PRESUPUESTO REFERENCIAL 6,006.70 0.00 4,639.31 1,368.56 6,007.88
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 6,006.70 0.00 4,639.31 1,368.56 6,007.88
PORCENTAJE ACUMULADO % 0.00% 77.22% 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PRECIO PARCIAL 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO UNITARIO ( S/. ) TOTAL
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 TRAZO Y REPLANTEO m2 120.00 2.57 308.40 - 100.00 2.57 257.00 20.00 2.57 51.40 308.40
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION MANUAL m3 71.07 53.56 3,806.51 - 61.07 53.56 3,270.91 10.00 53.56 535.60 3,806.51
02.02 ELIMINACION MATERIAL EXCEDENTE m3 85.28 13.18 1,123.99 - 70.00 13.18 922.60 15.28 13.18 201.39 1,123.99
02.03 NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO m2 30.00 1.11 33.30 - 24.00 1.11 26.64 6.00 1.11 6.66 33.30
03 CONCRETO SIMPLE - - - -
03.01 CONCRETO F'C= 175 KG/CM2 m3 3.60 400.57 1,442.05 - 3.00 400.57 1,201.71 0.60 400.57 240.34 1,442.05
04 CONCRETO ARMADO - - - -
04.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 m3 7.78 425.02 3,306.66 - 7.00 425.02 2,975.14 0.78 425.02 331.52 3,306.66
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 30.00 32.55 976.50 - 22.00 32.55 716.10 8.00 32.55 260.40 976.50
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 544.32 3.70 2,013.98 - 400.00 3.70 1,480.00 144.32 3.70 533.98 2,013.98
05 ESTRUCTURA DE MADERA Y COBERTURA - - - -
05.01 COLUMNAS DE MADERA TORNILLO DE 3"X3" p2 570.00 5.50 3,135.00 - 470.00 5.50 2,585.00 100.00 5.50 550.00 3,135.00
05.02 ARRIOSTRES DE MADERA TORNILLO DE 2"X2" p2 440.00 5.50 2,420.00 - 380.00 5.50 2,090.00 60.00 5.50 330.00 2,420.00
05.03 TABIQUERIA DE MADERA MACHIEMBRADO QUINILLA p2 295.20 44.94 13,266.29 - 205.20 44.94 9,221.69 90.00 44.94 4,044.60 13,266.29
05.04 VIGAS DE MADERA TORNILLO DE 2"X3" p2 180.00 5.45 981.00 - 120.00 5.45 654.00 60.00 5.45 327.00 981.00
05.05 COBERTURA DE CALAMINA m2 91.88 32.04 2,943.84 - 71.88 32.04 2,303.04 20.00 32.04 640.80 2,943.84
06 CARPINTERIA DE MADERA - - - -
06.01 PUERTA DE MADERA TABLERO PLANCHA CALAMINA m2 43.20 63.70 2,751.84 - 35.20 63.70 2,242.24 8.00 63.70 509.60 2,751.84
07 CARPINTERIA METALICA - - - -
07.01 VENTANA METALICA INCLUIDO MALLA MOSQUITERO m2 11.03 62.04 684.30 - 7.03 62.04 436.14 4.00 62.04 248.16 684.30
08 ACCESORIOS - - - -
08.01 TUBERIA DE PVC SAL 2" PARA VENTILACION m 30.00 11.05 331.50 - 25.00 11.05 276.25 5.00 11.05 55.25 331.50
08.02 SOMBRERO PARA VENTILACION DE P.V.C. DE 4" und 30.00 7.90 237.00 - 25.00 7.90 197.50 5.00 7.90 39.50 237.00
TOTAL COSTO DIRECTO S/. 39,762.16 S/. 0.00 S/. 30,855.96 S/. 8,906.20 S/. 39,762.16
PORCENTAJE PARCIAL % 0.00% 77.60% 22.40% 100.00%
GASTO GENERALES (10.98%) 4,365.89 0.00 3,387.98 977.90 4,365.89
UTILIDAD (8.00%) 3,180.97 0.00 2,468.48 712.50 3,180.97
SUB TOTAL PRESUPUESTO 47,309.02 0.00 36,713.20 10,596.82 47,310.02
IGV 18% 8,515.62 0.00 6,608.38 1,907.43 8,515.80
TOTAL PRESUPUESTO REFERENCIAL 55,824.64 0.00 43,321.58 12,504.25 55,825.82
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 55,824.64 0.00 43,321.58 12,504.25 55,825.82
PORCENTAJE ACUMULADO % 0.00% 77.60% 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PARCIAL TOTAL
UNITARIO ( S/. ) 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. ) METRADO PRECIO UNITARIO PARCIAL ( S/. )
( S/. ) ( S/. ) ( S/. )
- - - -
01 OBRAS PRELIMINARES - - - -
01.01 LIMPIEZA DE TERRENO MANUAL m2 480.00 1.32 633.60 - 480.00 1.32 633.60 - 633.60
01.02 TRAZO Y REPLANTEO m2 480.00 2.57 1,233.60 - 480.00 2.57 1,233.60 - 1,233.60
02 MOVIMIENTO DE TIERRAS - - - -
02.01 EXCAVACION MANUAL m3 9.00 53.56 482.04 - 7.00 53.56 374.92 2.00 53.56 107.12 482.04
02.02 ELIMINACION MATERIAL EXCEDENTE m3 4.50 5.27 23.72 - 3.50 5.27 18.45 1.00 5.27 5.27 23.72
03 CONCRETO SIMPLE - - - -
03.01 CONCRETO SIMPLE FC=100 KG/CM2 m3 4.50 343.45 1,545.53 - 3.50 343.45 1,202.08 1.00 343.45 343.45 1,545.53
04 CONCRETO ARMADO - - - -
04.01 CONCRETO F'C= 175 KG/CM2 m3 13.46 400.57 5,391.67 - 10.46 400.57 4,189.96 3.00 400.57 1,201.71 5,391.67
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 197.10 31.58 6,224.42 - 157.10 31.58 4,961.22 40.00 31.58 1,263.20 6,224.42
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 661.20 3.70 2,446.44 - 581.20 3.70 2,150.44 80.00 3.70 296.00 2,446.44
05 TUBERIAS - - - -
05.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 2" PARA DREN m 60.00 7.62 457.20 - 50.00 7.62 381.00 10.00 7.62 76.20 457.20
05.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 60.00 5.14 308.40 - 50.00 5.14 257.00 10.00 5.14 51.40 308.40
06 ACCESORIOS PARA TUBERIAS - - - -
06.01 ACCESORIO PARA LAVADERO und 30.00 59.85 1,795.50 - 25.00 59.85 1,496.25 5.00 59.85 299.25 1,795.50
07 REVESTIMIENTOS - - 5.00 0.00 - -
07.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 116.40 26.93 3,134.65 - 86.40 26.93 2,326.75 30.00 26.93 807.90 3,134.65
TOTAL COSTO DIRECTO S/. 23,676.77 S/. 0.00 S/. 19,225.27 S/. 4,451.50 S/. 23,676.77
PORCENTAJE PARCIAL % 0.00% 81.20% 18.80% 100.00%
GASTO GENERALES (10.98%) 2,599.71 0.00 2,110.93 488.77 2,599.71
UTILIDAD (8.00%) 1,894.14 0.00 1,538.02 356.12 1,894.14
SUB TOTAL PRESUPUESTO 28,170.62 0.00 22,875.03 5,296.58 28,171.62
IGV 18% 5,070.71 0.00 4,117.51 953.38 5,070.89
TOTAL PRESUPUESTO REFERENCIAL 33,241.33 0.00 26,992.54 6,249.96 33,242.51
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 33,241.33 0.00 26,992.54 6,249.96 33,242.51
PORCENTAJE ACUMULADO % 0.00% 81.20% 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
MES DE PROGRAMACION
MAYO DEL 2013 JUNIO DEL 2013 JULIO DEL 2013
PRECIO PARCIAL 17/05/2013 al 31-05-2013 01/06/2013 al 30-06-2013 01/07/2013 al 31-07-2013
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO UNITARIO ( S/. ) TOTAL
- - - -
01 IMPACTO AMBIENTAL - - - -
01.01 MITIGACION EN IMPACTO AMBIENTAL GLB 1.00 3,850.00 3,850.00 0.30 3,850.00 1,155.00 0.30 3,850.00 1,155.00 0.40 3,850.00 1,540.00 3,850.00
TOTAL COSTO DIRECTO S/. 3,850.00 S/. 1,155.00 S/. 1,155.00 S/. 1,540.00 S/. 3,850.00
PORCENTAJE PARCIAL % 30.00% 30.00% 40.00% 100.00%
GASTO GENERALES (10.98%) 422.73 126.82 126.82 169.09 422.73
UTILIDAD (8.00%) 308.00 92.40 92.40 123.20 308.00
SUB TOTAL PRESUPUESTO 4,580.73 1,374.52 1,374.52 1,832.69 4,581.73
IGV 18% 824.53 247.41 247.41 329.88 824.71
TOTAL PRESUPUESTO REFERENCIAL 5,405.26 1,621.93 1,621.93 2,162.57 5,406.44
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 5,405.26 1,621.93 1,621.93 2,162.57 5,406.44
PORCENTAJE ACUMULADO % 30.00% 60.00% 100.00%
RESUMEN DE CRONOGRAMA DE VALORIZADO DE EJECUCION DE OBRA
►INSPECTOR : ING. EDWARD INOCENTE CARLOS MONTO CONTRATADO S/. 299,535.83 S/. 299,535.83
►MODALIDA DE EJECUCION : PRECIOS UNITARIOS PLAZO DE EJECUCION : 75 : 75
FECHA DE INICIO : 17/05/13 : 17/05/13
FORMULA Nº 001 : OBRAS PROVISIONALES FECHA DE TERMINO : 31/07/2013 : 31/07/2013
MES DE PROGRAMACION
AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
PARTIDAS COMPONENTES Y/O METAS UNIDAD METRADO PRECIO PRESUPUESTO
UNITARIO ( S/. ) MAYO DEL 17/05/2013 al 31-05-2013
METRADO MONTO ( S/. ) PORCENTAJE ( %) METRADO MONTO ( S/. ) PORCENTAJE ( %) METRADO MONTO ( S/. ) PORCENTAJE ( %) METRADO MONTO ( S/. )
OBRAS PROVICIONALES
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 464.00 464.00 - - 1.00 464.00 100.00% 1.00 464.00 100.00% 0.00 0.00
01.02 ALQUILER DE ALMACEN mes 2.50 250.00 625.00 - - 0.50 125.00 20.00% 0.50 125.00 20.00% 2.00 500.00
02 FLETES - - 0.00% 0.00%
02.01 FLETE TERRESTRE GLB 1.00 12,280.64 12,280.64 - - 0.80 9,824.51 80.00% 0.80 9,824.51 80.00% 0.20 2,456.13
02.02 FLETE RURAL GLB 1.00 9,234.40 9,234.40 - - 0.50 4,617.20 50.00% 0.50 4,617.20 50.00% 0.50 4,617.20
02 CAPTACION - -
01 OBRAS PRELIMINARES - -
01.01 LIMPIEZA DE TERRENO MANUAL m2 16.00 1.32 21.12 - - 16.00 21.12 100.00% 16.00 21.12 100.00% 0.00 0.00
01.02 TRAZO Y REPLANTEO m2 16.00 2.57 41.12 - - 16.00 41.12 100.00% 16.00 41.12 100.00% 0.00 0.00
02 MOVIMIENTO DE TIERRAS - -
02.01 EXCAVACION MANUAL m3 11.10 16.48 182.93 - - 11.10 182.93 100.00% 11.10 182.93 100.00% 0.00 0.00
02.02 RELLENO CON MATERIAL PROPIO m3 2.00 21.60 43.20 - - 2.00 43.20 100.00% 2.00 43.20 100.00% 0.00 0.00
03 CONCRETO SIMPLE - -
03.01 CONCRETO 1:10 PARA SOLADOS Y/O SUB BASES m3 0.30 338.48 101.54 - - 0.00% - 0.00 0.00% 0.30 101.54
03.02 CONCRETO SIMPLE FC=100 KG/CM2 m3 1.05 343.45 360.62 - - 0.00% - 0.00 0.00% 1.05 360.62
04 CONCRETO ARMADO - -
04.01 CONCRETO F'C= 175 KG/CM2 m3 2.72 400.57 1,089.55 - - 0.00% - 0.00 0.00% 2.72 1,089.55
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 19.97 31.58 630.65 - - 0.00% - 0.00 0.00% 19.97 630.65
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 101.76 3.70 376.51 - - 0.00% - 0.00 0.00% 101.76 376.51
05 TUBERIAS - -
05.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 2.00 5.14 10.28 - - 0.00% - 0.00 0.00% 2.00 10.28
05.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 2" PARA DREN m 2.00 7.62 15.24 - - 0.00% - 0.00 0.00% 2.00 15.24
06 ACCESORIOS PARA TUBERIAS - - 0.00%
06.01 SUM. Y COLOC. DE CODO P.V.C. SAP 2" * 90º und 2.00 13.39 26.78 - - 0.00% - 0.00 0.00% 2.00 26.78
06.02 SUM. Y COLOC. DE TEE P.V.C. SAP 2" und 1.00 18.30 18.30 - - 0.00% - 0.00 0.00% 1.00 18.30
06.03 SUM. Y COLOC. DE CONO DE REBOSE 4"-2" und 1.00 36.29 36.29 - - 0.00% - 0.00 0.00% 1.00 36.29
06.04 SUM. Y COLOC. DE CANASTILLA BRONCE1 1/ 2" und 1.00 71.79 71.79 - - 0.00% - 0.00 0.00% 1.00 71.79
06.05 SUM. Y COLOC. DE VALVULA BRONCE 1 1/2"+ACCESORIOS und 1.00 135.44 135.44 - - 0.00% - 0.00 0.00% 1.00 135.44
07 REVESTIMIENTOS - - 0.00% -
07.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN RESERVORIO AP m2 3.91 37.55 146.82 - - 0.00% - 0.00 0.00% 3.91 146.82
07.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 15.83 23.84 377.39 - - 0.00% - 0.00 0.00% 15.83 377.39
08 OTROS - - 0.00% -
08.01 TAPA METALICA DE E=3/8"+PINTURA ANTICORROSIVA und 2.00 314.00 628.00 - - 0.00% - 0.00 0.00% 2.00 628.00
08.02 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 11.92 6.33 75.45 - - 0.00% - 0.00 0.00% 11.92 75.45
08.03 SUM. Y COLOC. DE PIEDRA 21/2" m3 0.85 174.84 148.61 - - 0.00% - 0.00 0.00% 0.85 148.61
08.04 SUM. Y COLOC. DE ARENA GRUESA m3 0.85 171.22 145.54 - - 0.00% - 0.00 0.00% 0.85 145.54
09 CERCO PERIMETRICO DE PROTECCION - - 0.00% -
09.01 CERCO PERIMETRICO-ALAMBRE PUAS+POSTES MADERA m 25.00 9.06 226.50 - - 0.00% - 0.00 0.00% 25.00 226.50
03 LINEA DE CONDUCCION - - 0.00% -
01 OBRAS PRELIMINARES - - 0.00% -
01.01 TRAZO Y REPLANTEO PRELIMINAR m 160.50 1.21 194.21 - - 160.50 194.21 100.00% 160.50 194.21 100.00% 0.00 0.00
02 MOVIMIENTO DE TIERRAS - - 0.00% -
02.01 EXCAVACION DE ZANJA, TERRENO COMPACTO, H<1.0 MT m 160.50 5.49 881.15 - - 160.50 881.15 100.00% 160.50 881.15 100.00% 0.00 0.00
02.02 RELLENO COMP.ZANJA TERR.NORMAL HASTA 1.00 M m 160.50 1.77 284.09 - - 160.50 284.09 100.00% 160.50 284.09 100.00% 0.00 0.00
02.03 REFINE Y NIVELACION ZANJA TERR.NORMAL m 160.50 1.63 261.62 - - 160.50 261.62 100.00% 160.50 261.62 100.00% 0.00 0.00
02.04 CAMA DE APOYO PARA TUBERIAS m 160.50 2.11 338.66 - - 160.50 338.66 100.00% 160.50 338.66 100.00% 0.00 0.00
03 TUBERIAS - - 0.00% -
03.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 160.50 5.14 824.97 - - 160.50 824.97 100.00% 160.50 824.97 100.00% 0.00 0.00
03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.2" A ZANJA TAPADA m 160.50 1.89 303.35 - - 0.00 0.00 0.00% - 0.00 0.00% 160.50 303.35
04 ACCESORIOS PARA TUBERIAS - - 0.00% -
04.01 SUM. Y COLOC. DE CODO P.V.C. SAP 11/2" *22.5º und 3.00 10.59 31.77 - - 3.00 31.77 100.00% 3.00 31.77 100.00% 0.00 0.00
04.02 SUM. Y COLOC. DE CODO P.V.C. SAP 1 1/2" *45º und 2.00 10.79 21.58 - - 2.00 21.58 100.00% 2.00 21.58 100.00% 0.00 0.00
04.03 SUM. Y COLOC. DE CODO P.V.C. SAP 1 1/2" *90º und 1.00 10.79 10.79 - - 1.00 10.79 100.00% 1.00 10.79 100.00% 0.00 0.00
04 RESERVORIO - - 0.00% -
01 OBRAS PRELIMINARES - - 0.00% -
01.01 LIMPIEZA DE TERRENO MANUAL m2 25.00 1.68 42.00 - - 25.00 42.00 100.00% 25.00 42.00 100.00% 0.00 0.00
01.02 TRAZO Y REPLANTEO m2 25.00 2.81 70.25 - - 25.00 70.25 100.00% 25.00 70.25 100.00% 0.00 0.00
02 MOVIMIENTO DE TIERRAS - - 0.00%
02.01 EXCAVACION MANUAL m3 14.25 16.48 234.84 - - 14.25 234.84 100.00% 14.25 234.84 100.00% 0.00 0.00
02.02 RELLENO CON MATERIAL PROPIO m3 17.81 19.60 349.08 - - 17.81 349.08 100.00% 17.81 349.08 100.00% 0.00 0.00
03 CONCRETO SIMPLE - - 0.00% -
03.01 CONCRETO 1:10 PARA SOLADOS Y/O SUB BASES m3 1.20 338.48 406.18 - - 1.20 406.18 100.00% 1.20 406.18 100.00% 0.00 0.00
04 CONCRETO ARMADO - - 0.00% -
04.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 m3 9.01 425.02 3,829.43 - - 9.01 3,829.43 100.00% 9.01 3,829.43 100.00% 0.00 0.00
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 49.75 32.55 1,619.36 - - 49.75 1,619.36 100.00% 49.75 1,619.36 100.00% 0.00 0.00
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 459.24 3.70 1,699.19 - - 459.24 1,699.19 100.00% 459.24 1,699.19 100.00% 0.00 0.00
05 TUBERIAS - - 0.00% -
05.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 5.00 4.82 24.10 - - 5.00 24.10 100.00% 5.00 24.10 100.00% 0.00 0.00
05.02 TUBERIA PVC CLASE 7.5 /AGUA POTABLE DE 3" m 5.00 21.27 106.35 - - 5.00 106.35 100.00% 5.00 106.35 100.00% 0.00 0.00
06 ACCESORIOS PARA TUBERIAS - - 0.00% -
06.01 SUM. Y COLOC. DE CODO P.V.C. SAP 1 1/2" *90º und 3.00 10.60 31.80 - - 0.00% - 0.00 0.00% 3.00 31.80
06.02 SUM. Y COLOC. DE TEE P.V.C. SAP 1 1/2" und 2.00 14.00 28.00 - - 0.00% - 0.00 0.00% 2.00 28.00
06.03 SUM. Y COLOC. DE CONO DE REBOSE 4"-3" und 1.00 46.10 46.10 - - 0.00% - 0.00 0.00% 1.00 46.10
06.04 SUM. Y COLOC. DE CANASTILLA BRONCE1 1/ 2" und 1.00 71.60 71.60 - - 0.00% - 0.00 0.00% 1.00 71.60
06.05 SUM. Y COLOC. DE VALVULA BRONCE 1 1/2"+ACCESORIOS und 3.00 135.44 406.32 - - 0.00% - 0.00 0.00% 3.00 406.32
06.06 SUM. Y COLOC. DE VALVULA BRONCE 3"+ACCESORIOS und 1.00 335.36 335.36 - - 0.00% - 0.00 0.00% 1.00 335.36
06.07 SUM. Y COLOC. DE CODO P.V.C. SAP 3" * 90º und 2.00 19.10 38.20 - - 0.00% - 0.00 0.00% 2.00 38.20
06.08 SUM. Y COLOC. DE TUB. VENTILACION FO GO 2" und 1.00 94.30 94.30 - - 0.00% - 0.00 0.00% 1.00 94.30
06.09 SUM. Y COLOC. DE ESCALERA TIPO GATO 3/4" FO GO und 1.00 226.40 226.40 - - 0.00% - 0.00 0.00% 1.00 226.40
07 REVESTIMIENTOS - - 0.00% -
07.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN RESERVORIO AP m2 19.00 37.55 713.45 - - 0.00% - 0.00 0.00% 19.00 713.45
07.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 35.34 26.93 951.71 - - 0.00% - 0.00 0.00% 35.34 951.71
08 OTROS - - 0.00% -
08.01 TAPA METALICA DE E=3/8"+PINTURA ANTICORROSIVA und 2.00 204.00 408.00 - - 0.00% - 0.00 0.00% 2.00 408.00
08.02 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 23.78 6.33 150.53 - - 0.00% - 0.00 0.00% 23.78 150.53
08.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 10.00 54.00 540.00 - - 0.00% - 0.00 0.00% 10.00 540.00
08.04 DESINFECCION DEL RESERVORIO und 1.00 24.65 24.65 - - 0.00% - 0.00 0.00% 1.00 24.65
08.05 HIPOCLORADOR und 1.00 135.00 135.00 - - 0.00% - 0.00 0.00% 1.00 135.00
09 CERCO PERIMETRICO DE PROTECCION - - 0.00% -
09.01 CERCO PERIMETRICO-ALAMBRE PUAS+POSTES MADERA m 32.00 20.92 669.44 - - 0.00% - 0.00 0.00% 32.00 669.44
05 RED DE DISTRIBUCION - - 0.00% -
01 OBRAS PRELIMINARES - - 0.00% -
01.01 TRAZO Y REPLANTEO PRELIMINAR m 2,424.35 1.21 2,933.46 - - 557.25 674.27 23.00% 557.25 674.27 23.00% 1,867.10 2,259.19
02 MOVIMIENTO DE TIERRAS - - 0.00% -
02.01 EXCAVACION DE ZANJA, TERRENO COMPACTO, H<1.0 MT m 2,424.35 5.49 13,309.68 - - 557.25 3,059.30 23.00% 557.25 3,059.30 23.00% 1,867.10 10,250.38
02.02 RELLENO COMP.ZANJA TERR.NORMAL HASTA 1.00 M m 2,424.35 1.77 4,291.10 - - 557.25 986.33 23.00% 557.25 986.33 23.00% 1,867.10 3,304.77
02.03 REFINE Y NIVELACION ZANJA TERR.NORMAL m 2,424.35 1.63 3,951.69 - - 557.25 908.32 23.00% 557.25 908.32 23.00% 1,867.10 3,043.37
02.04 CAMA DE APOYO PARA TUBERIAS m 2,424.35 2.11 5,115.38 - - 557.25 1,175.80 23.00% 557.25 1,175.80 23.00% 1,867.10 3,939.58
03 TUBERIAS - -
03.01 TUBERIA PVC CLASE 7.5 /AGUA POTABLE DE 1 1/2" m 7.25 8.29 60.11 - - 7.25 60.11 100.00% 7.25 60.10 100.00% 0.00 0.00
03.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1" m 693.35 7.15 4,957.45 - - 550.00 3,932.50 79.00% 550.00 3,932.50 79.00% 143.35 1,024.95
03.03 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 3/4" m 1,723.75 6.49 11,187.15 - - 550.00 3,569.50 32.00% 550.00 3,569.50 32.00% 1,173.75 7,617.65
03.04 PRUEBA HIDRAULICA+DESINFECCION TUB.<2" A ZANJA TAPADA m 2,424.35 1.89 4,582.02 - - 0.00% - 0.00 0.00% 2,424.35 4,582.02
04 ACCESORIOS PARA TUBERIAS - -
04.01 SUM. Y COLOC. DE CODO P.V.C. SAP 11/2" *22.5º und 4.00 10.59 42.36 - - 0.00% - 0.00 0.00% 4.00 42.36
04.02 SUM. Y COLOC. DE CODO P.V.C. SAP 1" *22.5º und 14.00 8.94 125.16 - - 0.00% - 0.00 0.00% 14.00 125.16
04.03 SUM. Y COLOC. DE CODO P.V.C. SAP 3/4" *22.5º und 3.00 2.10 6.30 - - 0.00% - 0.00 0.00% 3.00 6.30
04.04 SUM. Y COLOC. DE TEE P.V.C. SAP 1 1/2" und 1.00 14.19 14.19 - - 0.00% - 0.00 0.00% 1.00 14.19
04.05 SUM. Y COLOC. DE CODO P.V.C. SAP 3/4" *45º und 4.00 8.50 34.00 - - 0.00% - 0.00 0.00% 4.00 34.00
04.06 REDUCCIONES PVC-SAP 1" A 3/4" und 5.00 16.42 82.10 - - 0.00% - 0.00 0.00% 5.00 82.10
04.07 SUM. Y COLOC. DE TAPON P.V.C. SAP 3/4" und 1.00 13.50 13.50 - - 0.00% - 0.00 0.00% 1.00 13.50
04.08 SUM. Y COLOC. DE TAPON P.V.C. SAP 1" und 2.00 8.40 16.80 - - 0.00% - 0.00 0.00% 2.00 16.80
05 CONCRETO SIMPLE - - 0.00% - 0.00
05.01 CONCRETOPARA COLOCAR EN LA UNION DE LOS ACCESORIOS MEZCLA m3 0.92 338.48 311.40 - - 0.00% - 0.00 0.00% 0.92 311.40
06 CAJA DE VALVULAS - - 0.00% - 0.00
01 OBRAS PRELIMINARES - - 0.00% - 0.00
01.01 LIMPIEZA DE TERRENO MANUAL m2 24.00 1.32 31.68 - - 24.00 31.68 100.00% 24.00 31.68 100.00% 0.00 0.00
01.02 TRAZO Y REPLANTEO m2 24.00 2.57 61.68 - - 24.00 61.68 100.00% 24.00 61.68 100.00% 0.00 0.00
02 MOVIMIENTO DE TIERRAS - - 0.00% - 0.00
02.01 EXCAVACION MANUAL m3 6.00 37.08 222.48 - - 0.00% - 0.00 0.00% 6.00 222.48
02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USAND m3 7.50 10.99 82.43 - - 0.00% - 0.00 0.00% 7.50 82.43
03 CONCRETO SIMPLE - - 0.00% - 0.00
03.01 CONCRETO SIMPLE FC=100 KG/CM2 m3 2.14 343.45 734.98 - - 0.00% - 0.00 0.00% 2.14 734.98
03.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 1.44 31.58 45.48 - - 0.00% - 0.00 0.00% 1.44 45.48
04 ACCESORIOS PARA TUBERIAS - - 0.00% - 0.00
04.01 SUM. Y COLOC. DE VALVULA BRONCE 1"+ACCESORIOS und 3.00 84.19 252.57 - - 0.00% - 0.00 0.00% 3.00 252.57
04.02 SUM. Y COLOC. DE VALVULA BRONCE 3/4"+ACCESORIOS und 3.00 42.52 127.56 - - 0.00% - 0.00 0.00% 3.00 127.56
05 OTROS - - 0.00% - 0.00
05.01 TAPA METALICA DE 0.70X0.70X1/8" und 6.00 204.00 1,224.00 - - 0.00% - 0.00 0.00% 6.00 1,224.00
07 CONEXIONES DOMICILIARIAS - - 0.00% - 0.00
01 OBRAS PRELIMINARES - - 0.00% - 0.00
01.01 TRAZO Y REPLANTEO PRELIMINAR m 150.00 1.25 187.50 - - 0.00% - 0.00 0.00% 150.00 187.50
02 MOVIMIENTO DE TIERRAS - - 0.00% - 0.00
02.01 EXCAVACION DE ZANJA, TERRENO COMPACTO, H<1.0 MT m 150.00 5.49 823.50 - - 0.00% - 0.00 0.00% 150.00 823.50
02.02 RELLENO COMP.ZANJA TERR.NORMAL HASTA 1.00 M m 150.00 1.77 265.50 - - 0.00% - 0.00 0.00% 150.00 265.50
02.03 REFINE Y NIVELACION ZANJA TERR.NORMAL m 150.00 1.63 244.50 - - 0.00% - 0.00 0.00% 150.00 244.50
02.04 CAMA DE APOYO PARA TUBERIAS m 150.00 2.11 316.50 - - 0.00% - 0.00 0.00% 150.00 316.50
03 CONEXIONES DOMICILIARIAS - - 0.00% - 0.00
03.01 INSTALACIONES DE CONEXIONES DOMICILIARIAS DE AGUA Inn. aCC. D und 30.00 167.35 5,020.50 - - 0.00% - 0.00 0.00% 30.00 5,020.50
04 PRUEBAS HIDRAULICAS - - 0.00% - 0.00
04.01 PRUEBA HIDRAULICA+DESINFECCION TUB.<2" A ZANJA TAPADA m 150.00 0.76 114.00 - - 0.00% - 0.00 0.00% 150.00 114.00
08 CAMARA ROMPE PRESION - - 0.00% - 0.00
01 OBRAS PRELIMINARES - - 0.00% - 0.00
01.01 LIMPIEZA DE TERRENO MANUAL m2 4.51 1.32 5.95 - - 4.51 5.95 100.00% 4.51 5.95 100.00% 0.00 0.00
01.02 TRAZO Y REPLANTEO m2 11.28 2.57 28.99 - - 11.28 28.99 100.00% 11.28 28.99 100.00% 0.00 0.00
02 MOVIMIENTO DE TIERRAS - - 0.00% - 0.00
02.01 EXCAVACION MANUAL m3 5.64 94.76 534.45 - - 0.00% - 0.00 0.00% 5.64 534.45
02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USAND m3 7.05 52.18 367.87 - - 0.00% - 0.00 0.00% 7.05 367.87
03 CONCRETO SIMPLE - - 0.00% - 0.00
03.01 SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 4.51 41.64 187.80 - - 0.00% - 0.00 0.00% 4.51 187.80
04 CONCRETO ARMADO - - 0.00% - 0.00
05 CONCRETO F'C= 175 KG/CM2 m3 1.86 400.57 745.06 - - 0.00% - 0.00 0.00% 1.86 745.06
06 ENCOFRADO Y DESENCOFRADO DE MUROS m2 19.92 31.58 629.07 - - 0.00% - 0.00 0.00% 19.92 629.07
07 ACERO EN MUROS REFORZADOS GRADO 60 kg 66.00 3.70 244.20 - - 0.00% - 0.00 0.00% 66.00 244.20
08 TARRAJEO - - 0.00% - 0.00
08.01 TARRAJEO CON IMPERMEABILIZANTE m2 8.94 35.86 320.59 - - 0.00% - 0.00 0.00% 8.94 320.59
09 TUBERIAS - - 0.00% - 0.00
09.01 TUBERIA DE VENTILACION DE Fº Gº DE 2" GLB 2.00 35.36 70.72 - - 0.00% - 0.00 0.00% 2.00 70.72
09.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1" m 2.00 7.15 14.30 - - 0.00% - 0.00 0.00% 2.00 14.30
09.03 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 3/4" m 2.00 6.49 12.98 - - 0.00% - 0.00 0.00% 2.00 12.98
10 ACCESORIOS PARA TUBERIAS - - 0.00% - 0.00
10.01 ACCESORIOS DE ENTRADA Y SALIDA DE 1" und 1.00 182.96 182.96 - - 0.00% - 0.00 0.00% 1.00 182.96
10.02 ACCESORIOS DE ENTRADA Y SALIDA DE 3/4" und 1.00 136.00 136.00 - - 0.00% - 0.00 0.00% 1.00 136.00
11 OTROS - - 0.00% - 0.00
11.01 TAPA METALICA DE 0.75X0.75X1/8" und 2.00 224.72 449.44 - - 0.00% - 0.00 0.00% 2.00 449.44
11.02 TAPA METALICA DE 0.50X0.60 und 2.00 174.00 348.00 - - 0.00% - 0.00 0.00% 2.00 348.00
09 LETRINAS - - 0.00% - 0.00
01 OBRAS PRELIMINARES - - 0.00% - 0.00
01.01 TRAZO Y REPLANTEO m2 120.00 2.57 308.40 - - 102.00 262.14 85.00% 102.00 262.14 85.00% 18.00 46.26
02 MOVIMIENTO DE TIERRAS - - 0.00% - 0.00
02.01 EXCAVACION MANUAL m3 71.07 53.56 3,806.51 - - 47.38 2,537.67 67.00% 47.38 2,537.67 67.00% 23.69 1,268.84
02.02 ELIMINACION MATERIAL EXCEDENTE m3 85.28 13.18 1,123.99 - - 59.23 780.59 69.00% 59.23 780.59 69.00% 26.06 343.40
02.03 NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO m2 30.00 1.11 33.30 - - 20.00 22.20 67.00% 20.00 22.20 67.00% 10.00 11.10
03 CONCRETO SIMPLE - - 0.00% - 0.00
03.01 CONCRETO F'C= 175 KG/CM2 m3 3.60 400.57 1,442.05 - - 0.00% - 0.00 0.00% 3.60 1,442.05
04 CONCRETO ARMADO - - 0.00% - 0.00
04.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 m3 7.78 425.02 3,306.66 - - 2.60 1,105.05 33.00% 2.60 1,105.05 33.00% 5.18 2,201.61
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 30.00 32.55 976.50 - - 10.00 325.50 33.00% 10.00 325.50 33.00% 20.00 651.00
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 544.32 3.70 2,013.98 - - 0.00% - 0.00 0.00% 544.32 2,013.98
05 ESTRUCTURA DE MADERA Y COBERTURA - - 0.00% - 0.00
05.01 COLUMNAS DE MADERA TORNILLO DE 3"X3" p2 570.00 5.50 3,135.00 - - 0.00% - 0.00 0.00% 570.00 3,135.00
05.02 ARRIOSTRES DE MADERA TORNILLO DE 2"X2" p2 440.00 5.50 2,420.00 - - 0.00% - 0.00 0.00% 440.00 2,420.00
05.03 TABIQUERIA DE MADERA MACHIEMBRADO QUINILLA p2 295.20 44.94 13,266.29 - - 0.00% - 0.00 0.00% 295.20 13,266.29
05.04 VIGAS DE MADERA TORNILLO DE 2"X3" p2 180.00 5.45 981.00 - - 0.00% - 0.00 0.00% 180.00 981.00
05.05 COBERTURA DE CALAMINA m2 91.88 32.04 2,943.84 - - 0.00% - 0.00 0.00% 91.88 2,943.84
06 CARPINTERIA DE MADERA - - 0.00% - 0.00
06.01 PUERTA DE MADERA TABLERO PLANCHA CALAMINA m2 43.20 63.70 2,751.84 - - 0.00% - 0.00 0.00% 43.20 2,751.84
07 CARPINTERIA METALICA - - 0.00% - 0.00
07.01 VENTANA METALICA INCLUIDO MALLA MOSQUITERO m2 11.03 62.04 684.30 - - 0.00% - 0.00 0.00% 11.03 684.30
08 ACCESORIOS - - 0.00% - 0.00
08.01 TUBERIA DE PVC SAL 2" PARA VENTILACION m 30.00 11.05 331.50 - - 0.00% - 0.00 0.00% 30.00 331.50
08.02 SOMBRERO PARA VENTILACION DE P.V.C. DE 4" und 30.00 7.90 237.00 - - 0.00% - 0.00 0.00% 30.00 237.00
10 LAVADERO - - 0.00% - 0.00
01 OBRAS PRELIMINARES - - 0.00% - 0.00
01.01 LIMPIEZA DE TERRENO MANUAL m2 480.00 1.32 633.60 - - 160.00 211.20 33.00% 160.00 211.20 33.00% 320.00 422.40
01.02 TRAZO Y REPLANTEO m2 480.00 2.57 1,233.60 - - 160.00 411.20 33.00% 160.00 411.20 33.00% 320.00 822.40
02 MOVIMIENTO DE TIERRAS - - 0.00% - 0.00
02.01 EXCAVACION MANUAL m3 9.00 53.56 482.04 - - 2.00 107.12 22.00% 2.00 107.12 22.00% 7.00 374.92
02.02 ELIMINACION MATERIAL EXCEDENTE m3 4.50 5.27 23.72 - - 2.50 13.18 56.00% 2.50 13.18 56.00% 2.00 10.54
03 CONCRETO SIMPLE - - 0.00% - 0.00
03.01 CONCRETO SIMPLE FC=100 KG/CM2 m3 4.50 343.45 1,545.53 - - 0.00% - 0.00 0.00% 4.50 1,545.53
04 CONCRETO ARMADO - - 0.00% - 0.00
04.01 CONCRETO F'C= 175 KG/CM2 m3 13.46 400.57 5,391.67 - - 0.00% - 0.00 0.00% 13.46 5,391.67
04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 197.10 31.58 6,224.42 - - 0.00% - 0.00 0.00% 197.10 6,224.42
04.03 ACERO EN MUROS REFORZADOS GRADO 60 kg 661.20 3.70 2,446.44 - - 0.00% - 0.00 0.00% 661.20 2,446.44
05 TUBERIAS - - 0.00% - 0.00
05.01 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 2" PARA DREN m 60.00 7.62 457.20 - - 0.00% - 0.00 0.00% 60.00 457.20
05.02 TUBERIA PVC CLASE 10 /AGUA POTABLE DE 1 1/2" m 60.00 5.14 308.40 - - 0.00% - 0.00 0.00% 60.00 308.40
06 ACCESORIOS PARA TUBERIAS - - 0.00% - 0.00
06.01 ACCESORIO PARA LAVADERO und 30.00 59.85 1,795.50 - - 0.00% - 0.00 0.00% 30.00 1,795.50
07 REVESTIMIENTOS - - 0.00% - 0.00
07.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 116.40 26.93 3,134.65 - - 0.00% - 0.00 0.00% 116.40 3,134.65
11 IMPACTO AMBIENTAL - - 0.00% - 0.00
01 IMPACTO AMBIENTAL - - 0.00% - 0.00
01.01 MITIGACION EN IMPACTO AMBIENTAL GLB 1.00 3,850.00 3,850.00 - - 0.20 770.00 20.00% 0.20 770.00 20.00% 0.80 3,080.00
- - 0.00%
TOTAL COSTO DIRECTO S/. 176,273.56 S/. 0.00 S/. 47,588.98 S/. 47,588.97 S/. 128,684.58
PORCENTAJE PARCIAL %
GASTO GENERALES (10.98%) 17,627.36 0.00 4,758.90 4,758.90 12,868.46
UTILIDAD (8.00%) 17,627.36 0.00 4,758.90 4,758.90 12,868.46
SUB TOTAL PRESUPUESTO 211,528.28 0.00 57,106.78 57,106.77 154,421.50
IGV 18% 38,075.09 0.00 10,279.22 10,279.22 27,795.87
TOTAL PRESUPUESTO REFERENCIAL 249,603.37 0.00 67,386.00 67,385.99 182,217.37
FACTOR 1.00 1.00 1.00 1.00 1.00
TOTAL PRESUPUESTO CONTRACTUAL 249,603.37 0.00 67,386.00 67,385.99 182,217.37
PORCENTAJE ACUMULADO %
SALDO
PORCENTAJE ( %)
0.00%
80.00%
0.00%
20.00%
50.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
77.00%
77.00%
77.00%
77.00%
77.00%
0.00%
21.00%
68.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
15.00%
33.00%
31.00%
33.00%
100.00%
67.00%
67.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
67.00%
67.00%
78.00%
44.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.00%
S/. 1.50
0.00%
0.16
0.12
1.78
0.32
2.10
1.00
2.10
0.00%
VALORIZACION DE OBRA Nº 001 - CORRESPONDIENTE AL MES DE MAYO DEL 17/05/2013 AL 31/05/2013
METRADO MONTO ( S/. ) PORCENTAJE ( %) METRADO MONTO ( S/. ) PORCENTAJE ( %) METRADO MONTO ( S/. ) PORCENTAJE ( %) METRADO MONTO ( S/. ) PORCENTAJE ( %)
VAL. AVANCE PROGAMADO AVANCE EJECUTADO % AVANCE PROGAMADO % AVANCE EJECUTADO DESFASE EN ESTADO DEL
Nº MES PARCIAL ACUMULADO PARCIAL ACUMULADO PARCIAL ACUMULADO PARCIAL ACUMULADO EL AVANCE AVANCE
00 0.00 0.00 0.00 0.00 0.000% 0.000% 0.000% 0.000%
01 INF. 01 268,614.57 268,614.57 269,421.06 269,421.06 60.00% 60.00% 60.18% 60.18% 0.18% ADELANTADA
02 INF. 02 134,307.28 402,921.85 0.00 0.00 30.00% 90.00% 0.00%
03 INF. 03 44,769.10 447,690.95 0.00 0.00 10.00% 100.00% 0.00%
∑ 447,690.95 269,421.07
CURVA S - VALORIZACION N° 01
110%
100.00%
90% 90.00%
70%
PORCENTAJE DE AVANCE
60.18%
60.00%
50%
30%
10%
0 1 2 3
% AVANCE PROGRAMADO 0.000% 60.00% 90.00% 100.00%
-10%
% AVANCE EJECUTADO 0.000% 60.18% #FMT #FMT
% AVANCE PROGRAMADO % AVANCE EJECUTADO