Professional Documents
Culture Documents
Datasheet Valve Proving System Vps 504
Datasheet Valve Proving System Vps 504
VPS 504
for multiple actuators
8.10
LED Approvals
- External fault display possible for series EC type test approval as per EC Gas Ap-
02, series 04 and S05 pliance Directive:
- Group fault alarm optional for S01 VPS 504… CE-0085 AP 0168
(SSM) EC type test approval as per EC Pressure
- Suitable for TRD systems Equipment Directive:
- Electrical connection possible by plug con- VPS 504… CE0036
nection S01, 02, 03. No rewiring is required for Approvals in other important gas consum-
contact allocation as per DIN 4791. ing countries. Special design for the North
- S04 and S05: electrical connection at American market with UL, FM and CSA
screw terminals via PG 13.5 cable entry registration.
1 … 12
VPS 504 Valve proving system for automatic shutoff valves as per EN 161, Class A and Class B
The VPS 504 may be used with any other valve whose tightness in counter-flow direction
excludes by construction a leakage in flow direction.
The VPS 504 is suitable for all DUNGS valves according to EN 161 Classes A and B.
Specifications
Fuse installed in housing cover, Microfuse 6.3 slow-blow L 250 V; IEC-127-2/III (DIN 41 662)
replaceable
Switching current Operating output VPS 504 S01, 02, 03, 04, 05: max. 4 A
Refer to motor startup current!
Interference output VPS 504 S02, 04, 05: max.1A
Max. number of test cycles 20/h. Wait for at least 2 minutes after carrying out more than 3 consecutive
test cycles.
Media
• Standard model Gas families 1, 2, 3, sewage gas, landfill gas and biogas (dry, H2S < 0.1% by
volume) and other gaseous media
Not for gases having a butane content of > 60%
• Liquefied gas model Gas family 3 and gases having a butane content of > 60%, gases having a
density of > 1 kg/m3
2 … 12
VPS 504 sectional diagram
DMV… Series
V1 V2
11 4 3 2 1 2 1
p1
10
p1 + 20 mbar
9 7 1
8
8
VPS 504
19
18
17
16
7
6 15
5 14
13
p2
4 12
3
2
1
p1
5
3 … 12
Functional description Function principle
The VPS 504 operates depending on
pressure build-up.
The program module starts to function
when heat is requested.
Test is performed depending on the pmax. = 500 mbar
burner functional procedure:
VPS 504
p1 p2
pe pa
Release period tF
Period which a VPS requires to per- p
e
form a complete operation procedure. Release period
The release period of the VPS 504 t F [s] 30
depends on test volume and input 28 p
max.
= 500 mbar
V1 V2
pressure: 26
Field of application
VTest < 1.5 l
} t ≈ 10 s
24
p1 p2
pe > 20 – 500 mbar F 22 pe Program modul pa
r
ba
20 0 0 m bar
5 m
=
p e 300
VTest > 1.5 l 18
pe > 20 mbar
} tF > 10 s 16
=
p e VPS 504
p1 ar p2
14 mb
tF max. ≈ 26 s pe
= 100
ar
pa
12 pe
20
mb
p e=
p 10 p
Test period ttest e
8
e p + 20 mbar
e
Program sequence p1
pe
p2
pa
p1
pe
p2
pa
p p p + 20 mbar p p p
e e e e e
e
V1 V2 V1 V2 V1 V2
p1
Program modul
p2 Idle state p1
Program modul
p2 Pressure p1 p2 Operation
pe pe pa Program modul
build-up
pa pe pa
p p + 20 mbar p p p
e e e e
e
Idle state: Valves 1 and 2 are closed. test volume (max. 4.0 l) and input pres- If there is a short power failure during
pmax. = 500 mbar
Pressure build-up: The internal mo- pmax. = 500 mbar
sure (max. 500 mbar). If the test section the test or burner operation, the test
tor pump increasesV1 the gasV2pressure is tight, the contact V1 is released
V2 to the is started again automatically.
in the test section by approx. 20 mbar automatic burner control after max. 26 If the pumping time < approx. 10s,
compared
p1
pe
to the
Program input-side
modul
p2
pa
pressure s - thepp1e yellow signal
Program modul lamp pa lights up.
p2 the pressure difference between the
applied to valve V1. If the test section is leaky or if the pres- testing system and the inlet pressure is
During the test period, the installed sure increase by + 20 mbar is not attained balanced after pumping is finished.
differential pressure switch monitors
VPS 504
during the test period (max. 26 s), the
VPS 504
the testp1
pe
section for leakage.
p2
pa
If the test VPS 504 pe switches to fault.
p1 p2
pa The red signal Operation: The internal valve of the
pressure is attained, the motor pump lamp lights as long as the contact release VPS 504 is closed.
is switched
p
off (end ofp test period).pThe by the regulator or thermostat is present
release time (10-26 s) depends on the
e e e
(heat requirement).
4 … 12
pmax. = 500 mbar
V1 V2
Program flowchart
ttest 0 5 10 15 20 25 30 [s]
connection.
VPS 504
Series 01,
internal
V3
The burner female connector is con-
P
Operation
exchangeable
nected with the cable-to-cable male fuse: Female connector
6.3 slow-blow
connector of VPS 504 S01.
6 5 4 3 2 1 (fixed)
L 250 V as per B4 S3 T2 T1 N L VPS 504
IEC 127-2/III (X 1 B)
The female connector VPS 504 S01 (DIN 41662)
D5 x 20
is connected with the cable-to-cable
male connector of the heat genera- B4 S3 T2 T1 N L
F1 Fuse
F2 Switch or limiter
F3 Regulator h
H1 Fault signal P1 H2 H1
S P S P
H2 Operation signal
F3 F2
Additional switching characteristic Operation
V3 internal
of VPS 504 S01 SSM VPS 504
P
S04
If the test path is „untight“, the VPS
V3
S03 is interrupted.
Pump
internal
Operation
6 … 12
Electrical connection
VPS 504 S04
PG 13.5 cable duct and connection
to screw terminals below cover in
Series 04
VPS 504
V3
internal
housing (see Dimensions VPS 504
leaky
P
S04, S05). tight
exchangeable fuse:
6.3 slow-blow
Floating control room signal L 250 V
as per
NC COM NO B L1 N
may only be used for signal- IEC 127-2/III
(DIN 41662) D5 x 20
}
ling, never for burner release.
conductor
Operating
Release
voltage
signal
Zero
Groung
Floating fault signal
(control room signal)
Operating voltage 230 V AC 50 Hz
Electrical connection
VPS 504 S05 VPS 504
series 05
PG 13.5 cable duct and connection internal V3
to screw terminals below cover in leaky
Release
signal
tor startup current!
signal
Falut
Test volume of DUNGS multiple actuators MB-D..., MB-ZR..., MB-VEF..., DMV-..., MBC-...
7 … 12
Using the VPS 504 at DUNGS indi-
vidual solenoid valves .../5 Valve volume Volume of
For mounting the VPS 504 to valves Rp
1 1/2 to Rp 2, the adapter kit, Order
VTest = V1 output-side+
V2 input-side
+ tube line
Rp / DN Valve - Volume [l] Test volume [l] = Volume V1 outlet + V2 inlet + Pipeline length
V1 outlet + Pipeline lengths between individual valves L [m]
V2 inlet 0,5 m 1,0 m 1,5 m 2,0 m
Rp DN Rp DN Rp DN Rp DN Rp DN
Rp 1 1/2 / DN 40 0,50 l 0,70 l 1,10 l 1,35 l 1,70 l 2,00 l 2,20 l 2,65 l 2,80 l 3,30
Rp 2 / DN 50 0,90 l 1,20 l 1,90 l 2,20 l 2,90 l 3,20 l 3,90 l 4,20 l 4,90 l 5,50 l
8 … 12
Startup The motor pump switches off, the red
1. Check test section for leaks after fault lamp lights up. Switch-through to If an exhaust gas valve is
assembly. the automatic burner control does not installed in the boiler, it must
2. Start test by using temperature regu- take place. be open at the beginning of the
lator and/or restart or by pressing the test.
reset button of VPS 504. Functional check
3. If the test section is tight By opening a screw plug in test nipple In order to prevent functional
Depending on the length of the test p2 (pa) during test period (pumping and leakage problems, we
section and the residual pressure time), leakage can be simulated and a recommend the use of solenoid
applied, the pumping time is between function check can take place. valves as per EN 161 Class A and
3 s and 26 s. Class B.
The release for the automatic burner Setting
control is then given after approx. 10 The VPS 504 must not be adjusted Insufficiently shielded fre-
s at the earliest (at small test volumes on site. quency converters could
and small input pressures) and after cause faults in the VPS due to
approx. 26 s at the latest (at large test Assembly network disturbances.
volumes and large input pressures) Directly flange the VPS 504 laterally to Make provisions for sufficient
- the yellow signal lamp lights up. the DUNGS multiple actuators (mount- electrical shielding.
If the test section is leaky ing is possible on left-hand or right-hand
The test pressure is not attained. side) using two 10.5 x 2.25 O rings and
four M4 x 16 self-tapping screws.
9 … 12
Dimensions [mm]
VPS 504 S01, S03
126,5
Fuse 126,5
Typ/Type/Type/Tipo
T 6,3 L 250 V
Betriebsanleitung beachten!
Please comply with the operating instructions!
Suivre les instructions de la notice d'utilisation!
Seguire le istruzioni!
100
Female connector
147
X1B as per DIN 4791 Female connector
X1B as per DIN 4791
150
pa
pa
22
pe
Ø9
pa pe
Ø9
pe
13
4,3
53,7
72
Fonctionamento
Dérangement
Funziamento
Störung
Betrieb
pe test nipple
Blocco
Run
Fonctionamento
Dérangement
X1S as per
Funziamento
Störung
Betrieb
Male connector Suction connection (gas input)
Lockout
Blocco
Run
pa test nipple DIN 4791 X1S as per Pressure connection (to test section)
DIN 4791 Pressure connection (to test section)
Serie 01
Typ VPS 504
Spare fuse
Serie 01
Typ VPS 504
Spare fuse
Dimensions [mm]
VPS 504 S02
126,5
126,5
Fuse
Sicherung eingebaut, auswechselbar
Fuse built into housing, exchangeable
Fusibile integré dans la couvercle du boîtier
interchangeable
Typ/Type/Type/Tipo
T 6,3 L 250 V
Betriebsanleitung beachten!
Please comply with the operating instructions!
Suivre les instructions de la notice d'utilisation!
Seguire le istruzioni!
100
147
150
Ø9
pa
22
pe
pa pe
Ø9
13
Fonctionamento
pa
4,3
Dérangement
Funziamento
Störung
Betrieb
Lockout
Blocco
Run
53,7
72
pe
Spare fuse
Serie 02
Typ VPS 504
Funziamento
Störung
Betrieb
Lockout
Blocco
Run
Spare fuse
Serie 02
Typ VPS 504
Dimensions [mm]
VPS 504 S04, 05
Fuse
Cover, electrical connection
126,5
Cover, electrical connection
126,5
5 6 7 8
Additionally, PG 11
100
150
Standard:
PG 13.5
pa
cable duct
pa
22
Spare fuse pe
pe pa pe
Spare fuse
Ø9
13
4,3
Ø9
53,7
72
Vor dem Öffnen ist das Gerät stromlos zu schalten
Betrieb
schalten
Lockout
Blocco
Run
Betrieb
Run
uniquement
OuvertureTyp:
10 … 12
VPS 504 type overview / accessories / order data
Version
VPS 504 Series …
Accessories/spare parts
Adapter kit VPS 504 for solenoid valves up to Rp 2 205 360
Adapter kit VPS 504 for solenoid valves from DN 40 to DN 80 222 740
Adapter kit VPS / VDK 223 470
7-pole male connector, 2 cable inputs with strain relief (S02) 231 807
7-pole male connector, 4 cable inputs with PG 11 (S02) 231 808
7-pole male connector, 4 cable inputs with strain relief (S02) 231 809
Mounting kit (4 x M4 x 16,2, 2 x O-Ring, 2 x filter insert) 221 503
Appliance fuse link (5 pieces) 231 780
Spare parts set VPS filter 243 801
11 … 12
Valve testing system VPS 504
for multiple actuators
We reserve the right to make any changes in the interest of technical progress.
Head Offices and Factory Postal address
Karl Dungs GmbH & Co. KG Karl Dungs GmbH & Co. KG
Siemensstraße 6-10 Postfach 12 29
D-73660 Urbach, Germany D-73602 Schorndorf, Germany
Telephone +49 (0)7181-804-0 e-mail info@dungs.com
Fax +49 (0)7181-804-166 Internet www.dungs.com 12 … 12