Does the Manufacturer perform weekly test in pH value of mixing water? 7.2
Batch Plant is producing for Saudi Aramco project during the visit?
If yes, which project: (BI/JO/Proj. Name): 10-08643-0008
If no, state the last supply to S. Aramco
BP & CTU Pre-approved mix designs are available at the control room?
Findings: Compliant?
Saudi Aramco projects supplied this month (BI/JO, Project Title and Location):
Type 1
Type V
White- Type I
Quantities of rejected concrete: 2000 psi m³ 5000 psi: m³ 6090 psi: 0_m³
Reason/s for rejection:
2000 psi: 955 m3
6090psi: 550 m3
Volume of concrete produced for Saudi Aramco projects this month:
5000psi: 1165 m3
4640psi: 613 m3
$
Total : _3283 m³
ReadyMix , Precast and Pre-stressed Manufacturing Facilities as applicable.
PID SECTION BP&CT Inspector Monitoring on Precast & Pre-stressed Batch Plants: SAES-Q-012
CHECKED ITEMS Recommendation (Comply, CAR, OFI)
Number of Structural Engineers Approved? Yes No N\A
Number of Structural Engineer Accredited by Saudi Council Yes No N\A
Mill certificates of Wire strands are maintained? Yes No N\A
Mill certificates of steel reinforcement are maintained? Yes No N\A
Hollow Core Slab Beds are identified and maintained? Yes No N\A
Precast mold, table and vibrators are identified & maintained? Yes No N\A
Precast Concrete Inspector is approved and available? Yes No N\A
Pre-stressed Concrete inspector is approved & available? Yes No N\A
Pre-stressing machine are calibrated and maintained? Yes No N\A
Pre-stressing hard wares are controlled and maintained? Yes No N\A
Findings: Compliance? Yes No N\A
PID SECTION BP&CT Inspector Monitoring on Batch Plants Quality Management Systems:
CHECKED ITEMS Recommendation (Comply, CAR, OFI)
Does the Manufacturer have a Quality manual? Yes No
ISO Certification? 12102101 Yes No
Have QMS Procedure, Control of Documents? Yes No
Have QMS Procedure, Control of Records? Yes No
Have QMS Proc., Control of Internal NCR? Yes No
Have QMS Proc., Control of Internal Q-Audits? Yes No
Have QMS Proc., Control of Corrective Actions? Yes No
Have QMS Proc., Control of Preventive Action? Yes No
5| May 24, 2018 - Saudi Aramco: Company General Use
Have documented organization chart? Yes No
Have documented Internal Audit Plan? Yes No
Have documented QC Procedure? Yes No
Have documented Quality policy? Yes No
Have documented QMS Exclusion? Yes No
Have QMR? Name: Rajan Al Rokban Yes No
Quality Training is implemented? Yes No
Number of Quality Objectives? 3
Quality Objectives are updated? Yes No
Management Review is performed? Yes No
No. of QA Personnel?
1 No. of QC Personnel 1
Number of ACI Certified?
1 No of ISO 9001 certified 1
Domenstrate evidences that QMS is implemented? Yes No
CONTROL ON QC RECORDS(09-SAMSS-097)
PID SECTION BP&CT Inspector Monitoring on Batch Plants YES NO Remarks
Quality Control Records:
SA qualified QC personnel, Name: Archie Chua (1737)
Yes No
Division/Section Position
================================================================
Evaluated By: ___________________________ Date: _________________________
Name: ______________________ Position:__________________________
Division: ID.ITSD. BP & CTU