APPENDIX B1 INSPECTION TECHNICAL SUPPORT DIVISION

CONCRETE BATCH PLANT FOR MAT9COMS: 6000000453, 560 & 561


MONTHLY MONITORING REPORT TO SAEP 1150, 7.5.4
For the month of: September 2023

DIVISION/SECTION: _ MIP Project Inspection Section __


The responsible PID Inspection Section BP & CT inspector shall perform the day-to-day monitoring of the batch plants in their area.
Complete this report monthly to insure compliance with Saudi Aramco Standards. If concerns are detected affecting the project, the
responsible SAPMT shall be informed to request contractor/manufacturer to make necessary corrective actions. All inspection findings
shall be entered in the Batch Plant Log book.

Email to: ITSD. Batch Plants and Civil Testing Unit


Al Midra Tower 11th Floor, Dhahran
rajeh.rajeh.3@aramco.com

Al Rokban Readymix BP# 1 Safaneya, Eastern Province


RMC Plant/SN: Location:
10067487
Mfc. No.(VRC) GSID No.

Plant Manager: Meraj Ahmad App. BPI: Tanweer Alam


0532213717
Phone No.: Phone No.: 0570204765
alrokban@alrokbanreadymix.com alrokban@alrokbanreadymix.com
Email: Email:

Inspection Checked Items to ASTM C94M & ACI 311.5R YES NO


Batch Plants are properly identified?
Batch Plant is approved by Vendor Review Committee? When? November 13,2020
Approved for manufacturing on-shore concrete
Approved for offshore, marine and coastal ready mix concrete
Approved for Sulfur Pit and other special concrete mixes to SAES-Q-001, 2016 Ed.
PID Comments in The BP Logbook is attended and corrected by Manufacturer?
Stationary Central Mixers has valid Uniformity test to ASTM C94M, Annex A1.1?
The concrete mix designs are stored in the Batch Recorder? Same mix parameters?
Number of Mix Designs: 2000psi 4000psi ˃ 5000psi Validity: June 2 ,2025
The document batch printout contained batch tolerance % deviation?
Inspection Ladders, walkways, platforms and guardrails are maintained?
The Batch plant and support facilities are properly grounded?
Complete quality tests on concrete raw materials available? (09-SAMSS-088)
Performed by: AYED EID Al Osaimi Engineering Date of latest test results: September 23,
consulting office 2023
Service Provider Civil Testing Laboratory is Approved by Saudi Aramco?
Batch Plant QC Laboratory test results on raw materials are documented?
Batch Plant QC records are properly controlled?
Mill certificate of Cement is provided, Type I V SF FA
Test in Silica Fume is maintained?
Test on Sulfur capping materials is maintained? Unbonded Caps/ Gylson Pad
Capping material on Specimen test cylinders meet ASTM C-617? Unbonded Caps
Are set of sieves available and in good shape?
Set of slump cone are available and maintained?
Reusable Concrete test specimen cylinders are calibrated to ASTM C470, controlled?
The concrete test cylinders are controlled & curing temperature within 23 ± 2ºC?

1| May 24, 2018 - Saudi Aramco: Company General Use


How many concrete truck mixers? __7__. Have operable revolution counter?
How many Generator Sets? ___.
Dust Control is implemented?
Test on Hardened Concrete (Acid Soluble Sulphate ions content) is being performed?
Test on Hardened Concrete (Water soluble Chloride ions content) is being performed?
Evaluation of Mix design 28 days CST performed
Percentage Difference of 7/28/56 days CST of supplied concrete is above 85%
Percentage Difference of 7/28/56 days CST of supplied concrete is below 85%
Findings: Compliant?
Inspection Checked Items to ASTM C94M & ASTM C1077M
Lab. Equipment Calibration Date Next Calibration Date Calibration Agency
Compression Machine 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Schmidt Hammer 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Electronic Balance 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Thermo hygrometer 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Thermo hygrometer 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Digital Thermometer 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Air meter 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Lab. Oven 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
TDS Meter 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
pH Meter 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Cylinder Mold 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Test Sieve 1 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Test Sieve 2 30 September 2023 30 March 2024 AYED EID Al Osaimi Engineering
Consulting Office
Findings: Compliant? Yes No
Inspection Test Items to 09-SAMSS-097 & 088 Inspector’s Test Limits Visual
238
What is the TDS in mixing water (Raw)? 500ppm max. Normal
85
What is the TDS in mixing water (melted ice)? 500ppm max Normal
129
What is the TDS in mixing water (Chilled)? 500ppm max Normal
6.8
What is the pH value of mixing water (Raw)? 6–8 Normal
7.2
What is the pH value of mixing water (Chilled)? 6-8 Normal
7.0
What is the pH value of mixing water (Melted Ice)? 6-8 Normal
None 3500-ppm
What is the TDS in washing water? max None
23
What is the curing water temp. of the Test cylinder? 23 ± 2ºC Normal
YES NO RESULTS

2| May 24, 2018 - Saudi Aramco: Company General Use


Does the Manufacturer perform weekly TDS test in mixing water? 210

Does the Manufacturer perform TDS in wash water? N/A

Does the Manufacturer perform weekly test in pH value of mixing water? 7.2

Does the Manufacturer perform daily moisture adjustment in aggregates?


Monthly test reports of concrete ingredients available and controlled?
Concrete strength tests being performed and records controlled?
Date/s Area Inspection Section Batch Plant/
Civil Inspector visited/ monitored the plant: 2th September 2023

Batch Plant is operating during the visit:

Batch Plant is producing for Saudi Aramco project during the visit?
If yes, which project: (BI/JO/Proj. Name): 10-08643-0008
If no, state the last supply to S. Aramco
BP & CTU Pre-approved mix designs are available at the control room?
Findings: Compliant?

Saudi Aramco projects supplied this month (BI/JO, Project Title and Location):

INSPECTION MONITORING ITEMS to SPECIFIC SCHEDULE Q- 2008 Edition:


BI/JO No. Project Name Location Contractor Volume (m³)
10-08643-0002 EARLY WORKS OF Zuluf ALKHODARI & 571
ZULUF CPF SONS CO

10-09003-0007 Main Gate/ Manhole Marjan Naizak Global 51


Eng’g System
1002454 0002 MIP Package 6-Onshore Tanjib Naizak Global 279
Oil Facilities Eng’g System
10-086463-0007 Mosque Building Zuluf Khonaini 437
International Co.

10-09003-0008 STP MH Base,CSW Tanajib Nesma & Partners 173


Base

10-09003-0014 TCF Extension Marjan Al Rashid 958

10-12201-0002 Gantry Tower Marjan E.P.C. Contractor 51

10-08643-0008 Zuluf Safaniyah Al Yamama Co. 763

TOTAL Manufactured and Supplied for On-shore Concrete 3283

BI/JO No. Project Name Location Contractor Volume (m³)


0

3| May 24, 2018 - Saudi Aramco: Company General Use


TOTAL Manufactured and Supplied for Offshore Concrete 0

For Ready Mix Concrete Batch Plant Only: YES NO


Source of aggregate changed?
If yes, state the new source:
Is aggregate being washed?
What is the method of washing?

Stationary central mixer blades, paddles, drum in good condition?


If no, describe the condition.
Stationary central mixer free of hardened concrete?
If no, describe the condition!
Do trucks have operable revolution counters?
Do trucks have hardened concrete in drums?
Batch plants weighing scales and water flow meters calibrated?

Plant Current Calibration Next Calibration


Calibration Agency
Scales/Dispensers Date Date
28 December 2023 RICI Company Ltd
Cement 29 August 2023
29 August 2023 28 December 2023 RICI Company Ltd
Silica Fume
29 August 2023 28 December 2023 RICI Company Ltd
Fly Ash
29 August 2023 28 December 2023 RICI Company Ltd
Aggregates
29 August 2023 28 December 2023 RICI Company Ltd
Aggregates
29 August 2023 28 December 2023 RICI Company Ltd
Water Meter
29 August 2023 28 December 2023 RICI Company Ltd
Ice Scale
Chemical Dispensers
29 August 2023 28 December 2023 RICI Company Ltd
Super plasticizer
29 August 2023 28 December 2023 RICI Company Ltd
Retarder
CONTROLS OF IDENTIFICATION ON CEMENT & ADMIXTURES:
Chemical Admixtures YES NO Aggregates Stock bays YES NO

Tanks Shaded? 3/4"

Dispensers identified? 1/2"

Separated pumps? 3/8"

Free of leaks? Sand

4| May 24, 2018 - Saudi Aramco: Company General Use


Cement Silos

Type 1

Type V

White- Type I

Delivery tickets are properly controlled?

Any produced concrete has been rejected this month?

Quantities of rejected concrete: 2000 psi m³ 5000 psi: m³ 6090 psi: 0_m³
Reason/s for rejection:
2000 psi: 955 m3
6090psi: 550 m3
Volume of concrete produced for Saudi Aramco projects this month:
5000psi: 1165 m3
4640psi: 613 m3
$

Total : _3283 m³
ReadyMix , Precast and Pre-stressed Manufacturing Facilities as applicable.
PID SECTION BP&CT Inspector Monitoring on Precast & Pre-stressed Batch Plants: SAES-Q-012
CHECKED ITEMS Recommendation (Comply, CAR, OFI)
Number of Structural Engineers Approved? Yes No N\A
Number of Structural Engineer Accredited by Saudi Council Yes No N\A
Mill certificates of Wire strands are maintained? Yes No N\A
Mill certificates of steel reinforcement are maintained? Yes No N\A
Hollow Core Slab Beds are identified and maintained? Yes No N\A
Precast mold, table and vibrators are identified & maintained? Yes No N\A
Precast Concrete Inspector is approved and available? Yes No N\A
Pre-stressed Concrete inspector is approved & available? Yes No N\A
Pre-stressing machine are calibrated and maintained? Yes No N\A
Pre-stressing hard wares are controlled and maintained? Yes No N\A
Findings: Compliance? Yes No N\A
PID SECTION BP&CT Inspector Monitoring on Batch Plants Quality Management Systems:
CHECKED ITEMS Recommendation (Comply, CAR, OFI)
Does the Manufacturer have a Quality manual? Yes No
ISO Certification? 12102101 Yes No
Have QMS Procedure, Control of Documents? Yes No
Have QMS Procedure, Control of Records? Yes No
Have QMS Proc., Control of Internal NCR? Yes No
Have QMS Proc., Control of Internal Q-Audits? Yes No
Have QMS Proc., Control of Corrective Actions? Yes No
Have QMS Proc., Control of Preventive Action? Yes No
5| May 24, 2018 - Saudi Aramco: Company General Use
Have documented organization chart? Yes No
Have documented Internal Audit Plan? Yes No
Have documented QC Procedure? Yes No
Have documented Quality policy? Yes No
Have documented QMS Exclusion? Yes No
Have QMR? Name: Rajan Al Rokban Yes No
Quality Training is implemented? Yes No
Number of Quality Objectives? 3
Quality Objectives are updated? Yes No
Management Review is performed? Yes No
No. of QA Personnel?
1 No. of QC Personnel 1
Number of ACI Certified?
1 No of ISO 9001 certified 1
Domenstrate evidences that QMS is implemented? Yes No

CONTROL ON QC RECORDS(09-SAMSS-097)
PID SECTION BP&CT Inspector Monitoring on Batch Plants YES NO Remarks
Quality Control Records:
SA qualified QC personnel, Name: Archie Chua (1737)
Yes No

Plant Log Book Issued? Yes Yes No

Inspection comments are being replied by Manufacturer? Yes No


Monthly quality test reports on concrete raw materials
Yes No
performed and certififed by SA approved independent lab?

Quality control test reports from vendor’s own lab. Yes No

Calibration certificate (plant scales and lab equipment) Yes No

Compressive strength of capping materials? Yes No

Logbook of compressive strength samples? Yes No

Moisture adjustment in coarse and fine aggregates? Yes No

Records for water TDS, Temperature and pH? Yes No

Referenced standards (ACI, ASTM, 09-SAMSS-088, Yes No


097, SAES-Q-001, SAEP-1152) ?

CONTROL ON BASIC HSE (Saudi Aramco Safety HandBook - 2017 Edition)


PID SECTION BP&CT Inspector Monitoring on Batch Plants YES NO Remarks
BASIC HSE
6| May 24, 2018 - Saudi Aramco: Company General Use
1 Safety Management System-Safety Manual? Yes No
2 Copy of Safety Handbook 2017 is available? Yes No
3 Safety Personnel Full Name? Mohammad Irfan Yes No
Mobile Number: 0505396285
Email Address: alrokban@alrokbanreadymix.com
4 Emergency Assembly Point available? Yes No
5 Does Plant personnel wear PPE’s? Yes No
6 Does Machine & Equipment grounded? Yes No
7 Inventory of Fire extinguishers are controlled? Tagged with
current inspection?
Yes No
8. Dust Control is implemented? Yes No
9. HSE Training is being implemented? Yes No
10. HSE internal Audit is being implemented? Yes No
Findings:
Yes No

Name of Inspector: Date Reported:

Division/Section Position

================================================================
Evaluated By: ___________________________ Date: _________________________
Name: ______________________ Position:__________________________
Division: ID.ITSD. BP & CTU