Rab - Ruang Meeting Besar

Harga Jual
Pekerjaan Persiapan
no item unit satuan harga satuann total harga
1 Fee Design ( 105.00) m2 ( 125,000) ( 13,125,000)

Pekerjaan Interior
no item unit satuan harga satuann total harga
1 bongkar plafon ( 61.11) m2 ( 55,000) ( 3,361,072)
2 plafon Plywood 9mm finish paint waterbase ( 61.11) m2 ( 1,500,000) ( 91,665,600)
3 cat dropceiling ( 58.50) m2 ( 56,073) ( 3,280,241)
4 karpet tile - Floornine ( 61.11) m2 ( 480,000) ( 29,332,992)
5 Wall Decoratif dinding Belakang ( 20.04) m2 ( 1,590,420) ( 31,865,019)
6 Wall Decoratif Sisi Jendela ( 40.22) m2 ( 1,590,420) ( 63,969,873)
7 Wall Decoratif Sisi Koridor ( 37.10) m2 ( 1,590,420) ( 59,007,763)
8 Build in bench ( 3.50) m1 ( 3,200,000) ( 11,200,000)
9 Build in cabinet ( 3.12) m2 ( 2,500,000) ( 7,800,000)
10 Wall Decoratif Sisi Depan ( 12.52) m2 ( 1,590,420) ( 19,912,536)
11 Build in cabinet ( 7.52) m2 ( 2,500,000) ( 18,788,250)

Pekerjaan MEP
no item unit satuan harga satuann total harga
1 LED Strip - wall area ( 56.00) m1 ( 154,000) ( 8,624,000)
2 Lampu Downlight ( 24.00) titik ( 184,000) ( 4,416,000)
3 instalasi lampu ( 60.00) titik ( 224,000) ( 13,440,000)
4 saklar ( 8.00) titik ( 77,000) ( 616,000)
5 Relokasi Sprinkler titik by client
6 Relokasi Smoke Detector titik
7 Relokasi AC suply titik
8 Relokasi AC return titik
9 Testcomm Smoke detector dan speaker ls
10 Testcomm AC ls
TOTAL ( 380,404,346)

Note:
1. Harga Belum Termasuk segala jenis pajak dan asuransi
2. Harga belum termasuk biasa listrik kerja, air, dan administrasi perijinan (working permit)
3. Harga mangacu pada design yang telah disepakai saat ini, jika ada perubahan maka akan ada perhitungan RAB kembali
4. Harga belum termasuk segala jenis tes com dan koneksi ke instalasi utama gedung.
5. Harga berlaku 1 bulan sejak RAB ini dikeluarkan.
6. Termin Pembayaran DP 60% sebelum pekerjaan dimulai, pelunasan 40% setelelah pekerjaan selesei.

Jakarta 12 Juni 2023