You are on page 1of 2
Daffodil International University B.Sc. in Civil F it Final Examination, Spring - 2023 Course Code: CE 414 Course Title: Prestressed Concrete Section: EI & £2 Level-Term: 4-2 ‘Teacher's Initial: AW Full Marks: 40 Date: May 06, 2023 ‘Time: 2.0 Hours There are three (03) questions in total. Assume any reasonable value if not provided in the question. The figures in the right-hand margin indicate full marks. \y two (02) from the following questions (a) to (c) G4 12 in by 25 in pretensioned concrete beam is eccentricaly prestressed with six 0.30 [7] in? each high tensile steel wire located at 5 in below the neutral axis. The tendons are anchored to the bulkheads at a unit prestress of 160 ksi. Assuming n=6, determine the stress in conerete and steel immediately after transfer due to prestress only b)_A35 fi long posttensioned bonded concrete beam has a cross section of 14 in x 30 in.It [7] hhas a presetress of 410 kips in the steel immediately after prestressing, which eventually reduces by 40 kips due to losses. The beam carries a uniformly distributed load of 160 Ibvft in addition to its self-weight of 350 Ib/ft, Compute the extreme fibre stress at midspan after the losses have taken place, and with full live load. Also, check the adequacy of the concrete if compressive strength of concrete is Le ~ $000 pai. GFA 40 4 tong postensioned simple bean has a cross section of 12 in x 30 im where (7) prestressing force 350 kip is applied through a p: int 6 inch (c.g.s.) above the bottom fiber, Compute the total dead and live lord that can be car ed by the beam for cracking, in the bottom fibers at a modulus of rupture of 600 psi. Assume, concrete will take tension up to modulus of rupture. Describe the types of prestressing steel BI 1) What is grout? What are the des irable Properties of grout? BI ©) Differentiate between ereep and shrinkage, 1 3e gi Determine the area of cone d plestressings stecl for prelini y section of a [6] prestressed concrete beau (0 resint a jones moment of 310 Ripelt cial git 85 kip-ft, Assume, total depth of the section is 30 in, effective prestress for steel is 133 ksi, and allowable stress for concrete under working load is -1620 psi. Assume n=6 Page Scanned with CamScanner Design and draw the final section ofa prestressed concrete girder using the following [12] data, Mr= 470 kip-fi, Mg = 74 kip-ft, fe = 2650 psi, f= -1.65 ksi, f= -1.50 ksi, fo ‘The preliminary cross sectional dimension is given below, h 50 ksi, and fe 35 ksi. ) Here, B= 15 in, £ Scanned with CamScanner

You might also like