Full-Underground Brochure
Deposition columns
Ground lids
Quick system
Deposition head
Signaletic panel
Ground lid
Extraction system
Platform lift
Safety platform
(optional)
Safety Barrier
(optional)
Ground ring
Well
Leachate
Integrated system for drainage
leachate removal (optional)
Components Description
All the available deposition columns guarantee a vertical waste disposal axis up to 5% slope. They can incorpo-
rate a battery box and bag dispenser for canine waste and are compatible with an access control system.
blue bee: incorporates handle, pedal and lid with non-impact closure (by shock absorber), in carbon steel with
Deposition head anti-corrosion treatment and powder paint finish in light or dark gray.
green bee: in stainless steel it can optionally incorporate pedal.
red bee: in stainless steel, incorporating a big producers door and with deposition opening of the rotating
drum type or front flap door. Optionally the rotating drum can be double, forming a volumetric unit (used in
PAYT systems).
Quick-system By single ring, double ring, or kinshoffer system, incorporated in the deposition head.
Monoblock well in C40/50 concrete, designed to resist thrust forces. It has an innovative integrated system for
Well
leachate removal.
The concrete tank is equipped with a conical bottom that directs the leachates to a deposit drain that, being
Integrated system for
connected to a tube embedded in the wall of the pit, allows the suction of the leachates, making the cleaning
leachate removal
operation extremely fast and efficient.
The signaletic panel, front and top, are available in thermolacquered aluminum with silkscreen printing or
Signaletic panel
high-strength vinyl with UV lamination and digital printing.
Optionnals Description
Battery box Integrated in the deposition column.
Safety barrier Only for flexible extraction system. Vertical anti-fall and signaling barrier.
Safety platform Only for rigid extraction system. Horizontal safety platform.
Pedal Designed for easy waste disposal.
Only for container with flexible bag, prevents the lifting bags from touching possible
Leachate drainage
leachates.
Dimensions
01. Dig a trench with a depth of 2,0m (3m³) or 2,74m 03. Place the well + ground lid assembled into 06. Perform the connection of
(5m³), and a width of 2,45m. the trench ensuring its vertical positioning and the ground rim to a rainwater
02. Form a well compacted base and stabilize the proper height level. box as well as the finishes of
bottom. 04. Connect the leachate suction pipe to the the surrounding area.
floor box. 07. Place the set deposition
05. Backfill the empty spaces around the head and extraction system in
container. the installed well.
Maintenance
The lasso™ underground containers are characterized by their high strength and low maintenance, having been designed for intensive
use under extreme environments for an extended period of useful life.