You are on page 1of 1

KEY PLAN LOCATION PLAN NOTA :

N
NOT TO SCALE NOT TO SCALE
1. REKABENTUK PELAN KAWALAN TRAFIK ADALAH BERPANDUKAN GARIS PANDUAN ATJ 2C/85 (PINDAAN 2017).
2. PERMUKAAN PAPAN TANDA AMARAN SEMENTARA MESTI MENGGUNAKAN FLUORESCENT ORANGE PRISMATIC RETRO-REFLECTIVE SHEETING
2W, HDD
250 METER
PROP
MH03
EXT TDC
MH
(LATAR BELAKANG) DAN HIGH INTENSITY PRISMATIC SHEETING (SELAIN LATAR BELAKANG)
3. PLASTIC BARRIER PERLU DISUSUN SECARA BERTERUSAN (INTERLOCK) DI SEPANJANG KAWASAN KERJA
PROP
MH04

EKO CHERAS 2W, HDD


180 METER
2W, HDD
180 METER MALL

4. BLINKERS HENDAKLAH DIPASANG PADA SELANG JARAK 10.0m (TAPER) DAN 30.0m (BUFFER/LURUS)
2W, HDD 2W, HDD
265 METER 213 METER

PROP
MH01
PROP
MH02

5. STRING DELINEATOR HENDAKLAH HENDAKLAH DIPASANG DI SEPANJANG KAWASAN KERJA


6. PENGAWAL BENDERA HENDAKLAH DITEMPATKAN DI LALUAN KELUAR/MASUK KAWASAN KERJA
PROP
MH05

2W, HDD
200 METER
7. KERJA-KERJA YANG DITETAPKAN PADA WAKTU MALAM, KONTRAKTOR HENDAKLAH MEMASANG ANTI-GLARE FLOOD LIGHT DI KAWASAN KERJA
PROP
MH06

2W, HDD
160 METER

PROP
MH07

2W, HDD
250 METER

DETECTION
AREA KATEGORI TRAFIK : BANDAR HALAJU RENDAH
PROP
PROP MH09
MH08

TEMPOH : JANGKA MASA PENDEK


2W, HDD
125 METER

HAD LAJU TEMPATAN : 60km/j


FLAT SERI SRI CENDEKIA
CENDEKIA CONDOMINIUM

PROP BUILD
MH15 MH

2W, HDD
130 METER 2W, HDD
250 METER

2W, HDD
180 METER

PENGECILAN LORONG
PROP
MH10

PUSAT
KUMBAHAN
2W, HDD
2W, HDD 250 METER 2W, HDD
250 METER 100 METER
2W, HDD
250 METER

PROP PROP PROP PROP


PROP MH13 MH12 MH10 MH11
MH14

PAPAN TANDA AMARAN AWAL (BANDAR HAD LAJU RENDAH) FOR REVIEW
A B C D E F G H
25m 25m 25m 25m 25m 25m 25m

PROJEK MENAIKTARAF
PEMBINAAN
FIBER OPTIK 40 30 TAMAT
HOTLINE :

125m km/j 75m km/j


ELAK KESESAKAN
LALULINTAS
GUNAKAN LALUAN ALTERNATIF

HOTLINE :
H/P :

CADANGAN KOREKAN KERJA-KERJA PEMASANGAN KABEL


OPTIK, SESALUR DAN LURANG TT DotCom Sdn Bhd SECARA 2W'
HORIZONTAL DIRECTIONAL DRILLING' (HDD) SEPANJANG
3618m DI JALAN CHERAS, JALAN MUTIARA 4, JALAN MUTIARA
BARAT 2, JALAN MUTIARA BARAT, JALAN MUTIARA 7, JALAN
MUTIARA BARAT 6, JALAN NADCHATIRAM, JALAN BEE ENG 3,
JALAN MAHADEVI, JALAN BEE ENG 1, JALAN WARAS, JALAN
SARJANA, JALAN 3/124, TAMAN COUNNAUGHT, CHERAS, KUALA
LUMPUR UNTUK LINK SERI CENDEKIA MAN.

- KEY PLAN
- LOCATION PLAN
- SITE PLAN (TRAFFIC MANAGEMENT PLAN)
- LEGEND
2W, HDD
125 METER

UCSI COLLEGE

PROP
PROP MH09
MH08

CCS COMSERVICE (Malaysia)SDND BHD.

2W, HDD
FLAT SERI
130 METER SRI CENDEKIA
CENDEKIA CONDOMINIUM

I MAP ENTERPRISE
PROP BUILD
MH15 MH
2W, HDD
250 METER

SJK(C)
TAMAN CONNAUGHT
2W, HDD
180 METER
PROP
MH10

2W, HDD 2W, HDD


PUSAT LOJI 2W, HDD 250 METER 100 METER TMP GLOBAL RESOURCES SDN BHD
2W, HDD
KUMBAHAN 250 METER
250 METER
BHP
PROP PETROL
MH13 PROP
PROP MH12 PROP
MH14 MH11

You might also like