You are on page 1of 1

REFER TO PART NO.

2
REFER TO PART NO.1
SD78 G TD25 G SD77 G
2" 2.91 1.5" 0.23 2" 2.91
PART -1

REFER TO PART NO.3


REFER TO PART NO.2
REFER TO PART NO.2
REFER TO PART NO.1

PART -2
REFER TO PART NO.3
REFER TO PART NO.2

REFER TO PART NO.4


REFER TO PART NO.3
SD76 G TD24 G
2" 3.43 1.5" 0.38
PART -3

REFER TO PART NO.5


REFER TO PART NO.4
REFER TO PART NO.4
REFER TO PART NO.3

SD74 G
SD75 G 2" 3.43
2" 3.43
PART -4

CLIENT: CONSULTANT: CONTRACTOR: PROJECT: SCALE: 1:250@A1 DATUM: NEW ABU DHABI DATUM
Rehabilitation Of Landscape Works in
Mainland's Cities - Contract 2 (SOFT LANDSCAPE) PREPARED BY: AZ SHOP DRAWING
REVIEW BY: AB DATE
DRAWING TITLE: Beautification of Sheikh Zayed Road E10 DRAWING No. REV.
(From Sheikh Zayed Bridge to Midfield Terminal ) CHECKED BY: AB 20 - 09 - 2023
IRRIGATION MAIN LINE ( SHEET 1 OF 17) APPROVED BY: AB
ARC-C2-E10-WO-00-IR-ML-00002 00

You might also like