GGT_Concrete

TOKA TINDUNG 5MTPA EXPANSION PROJECT


PROCESS PLANT
PROJ.OBJECT
CONCRETE
PRECAST
DATE : 07.09.2023

Qt Area[m2] Area[m2] Weight[T] Weight[T] Volume[m3]


Name Grade
y each all each all each
SLAB N40 1 6.3 6.3 1.62 1.62 0.68
SLAB N40 1 51.37 51.37 31.014 31.014 12.92
Subtotal 57.67 32.63
WALLBRICK N40 1 7.68 7.68 1.174 1.174 0.49
WALLBRICK N40 1 8.29 8.29 1.395 1.395 0.58
WALLBRICK N40 1 45.48 45.48 9.395 9.395 3.91
WALLBRICK N40 1 51.06 51.06 10.709 10.709 4.46
Subtotal 112.51 22.67
Total 170.18 55.31

Page 1
GGT_Concrete

Page 2
GGT_Concrete

Volume[m3]
all
0.68
12.92
13.6
0.49
0.58
3.91
4.46
9.45
23.05