Introduction:

A project, investment, or business decision's


potential risks must be identified, evaluated, and
prioritised as part of the methodical and
organised process known as risk analysis. This
entails assess the propensity for occurrence and
potential effects of various risks, particularly
reputational, financial, operational, and legal
threats. The purpose of risk analysis is give
decision-makers useful information about the
risks involved in a specific course of action so
they may decide how best minimise or eliminate
those risks. There are usually numerous
important steps in the risk analysis process.

Explanation

The search for potential risks and uncertainties


connected with the project or decision is the first
stage. This includes conduct risk assessments
use a variety of methods and approaches,
servers discussions about ideas with
stakeholders, and look at historical data.

Step: 2

Explanation

The possibility and potential impact of each risk


are then evaluated. This entails calculate the
potential impact on the project or decision in
terms of cost, schedule, quality, or other
pertinent elements, as well as assigned a
probability of occurrence every risk. This step
frequently entails a quantitative analysis that use
simulation, statistical models, or other methods.

a) In the given characteristic line equation, the

beta coefficient of IBM stock is 1.05987. Since


this beta coefficient is greater than one, Thiis
indicates that IBM stock is a volatile or
aggressive security. A beta greater than one
means that the stock tends have higher price
volatility compared with the overall market.

b) The intercept coefficient in the characteristic

line equation is 0.7264. For determine if the


intercept coefficient is significantly different from
zero, need consider these standard error (se).
The standard error of the intercept coefficient is

given as 0.3001.

Assess the significance of the intercept


coefficient, can perform a hypothesis test where

the null hypothesis (H0) is that the intercept


coefficient is equals zero. If the p-value
associated with the intercept coefficient is less

than the significance level (typically 0.05), reject


the null hypothesis and conclude that the
intercept coefficient is significantly different from
zero.

Unfortunately, the standard error of the intercept

coefficient (0.3001) is not provided in a clear


format, make difficult for determine the exact p-
value and conduct the hypothesis test. Without
the specific information on the p-value or
significance level, cannot definitively determine if
the intercept coefficient is significantly different
from zero or interpret its practical meaning.

Final Answer

a) A beta greater than one means that the stock


tends have higher price volatility compared with
the overall market.

b) The standard error of the intercept coefficient

is given as 0.3001.