Professional Documents
Culture Documents
Second Floor Framing Plan 2 Roof Beam Plan 3: AB C DE F GH I AB C DE F GH I
Second Floor Framing Plan 2 Roof Beam Plan 3: AB C DE F GH I AB C DE F GH I
9.78 9.78
1.00 1.81 1.12 0.86 1.79 1.29 0.99 0.93 1.00 1.81 1.12 0.86 1.79 1.29 0.99 0.93
10 10
1.46
1.46
A B C D E F G H I
9 2B-4 25 x 40 2B-1 25 x 50
9
5.54
RB-1 20 x 35 RB-3 20 x 35
9.78
2.02 1.00 1.81 1.12 0.86 1.79 1.29 0.99 0.93 2.70
Line of Roof Fascia
2B-1 25 x 50
1
RB-1 20 x 35
RB-3 20 x 35
4.68
RB-3 20 x 35
4.68
2B-1 25 x 50
2B-2 25 x 50
A7 F3 800 x 800 x 250 F3 800 x 800 x 250 S3 S1
10 LB - 150 x 200
WF-1
LB - 150 x 200
LB - 150 x 200
1.46
Truss - 1
Truss - 2
LB 100 x 300
Truss - 1
9 FTB 250 x 350 FTB 250 x 350
F2 1100 x 1100 x 250
8 2B-5 30 x 55
8 RB-2 20 x 35
2B-7 25 x 45 RB-2 20 x 35
C1 - 23 x 35 C1 - 23 x 35 C1 - 23 x 35
DN
RB-1 20 x 35
2B-4 25 x 40
2.38
2.38
RB-1 20 x 35
15.92
RB-1 20 x 35
WF-1
15.92
FTB 250 x 350
2B-3 25 x 40
2B-3 25 x 40
WF-1 WF-1
S2
4.68
LB 100 x 300
ST - 125 x 300 ST - 125 x 300
7 7
1.41
1.41
WF-1
RB-1 20 x 35
RB-1 20 x 35
Open
6
RB-1 20 x 35
RCB 20 x 40
to 2B-6 30 x 50
LB 100 x 300
F2 1100 x 1100 x 250 F1 1600 x 1600 x 300 F1 1600 x 1600 x 300
Below
8
2B-4 25 x 40
WF-1 FTB 250 x 350 FTB 250 x 350
RB-2 20 x 35
LB 100 x 300
2.25
2.25
S4 RB-1 20 x 35
FTB 250 x 350
1 C1 - 23 x 35 C2 - 30 x 30 C2 - 30 x 30
LB 100 x 300
A8 LB 100 x 300
2.38
5 5
15.92
2B-9 25 x 50
EB 15 x 20
S3
7 F1 1600 x 1600 x 300
4 4
C3 - 23 x 35
3 3
1.41
EB 15 x 20
F2 1100 x 1100 x 250 FTB 250 x 350
A
FTB 250 x 350
6 C1 - 23 x 35
C4 - 23 x 35 2 2
FTB 250 x 350
C1 - 23 x 35
1.25
1.25
B
FTB 250 x 350
EB 15 x 20
F4 600 x 900 x 250 2B-10 25 x 50
1 1 6.49
5
FTB 250 x 350
1.15 0.31 1.04
C3 - 23 x 35 C3 - 23 x 35
4
3
F2 1100 x 1100 x 250
2 1 : 100 1 : 100
1.25
Setback Line C6 - 49 x 20
1 C5 - 30 x 30
F3 800 x 800 x 250
Top Chord : 2 < 2 x 2 x 41
C4 - 23 x 35
F3 800 x 800 x 250
Bot Chord : 2 < 2 x 2 x 41
2.04
0.55 0.55
Web Member : 2 < 1 21 x 1 21 x 41
0.40
2.00
0.15
1.68
EB
0.20
2B-6
+-2.10
Edge of C-6 10 mm diam. @ 0.20 B.W.
1.00 6 @ 0.967 = +-5.80 5 @ 0.924 = +-4.62 1.00
4 1Architectural-
: 25
Overhang Detail (Section A)
6 1Truss
: 100
-1
10 mm diam. Top bars @ 0.15 O.C.
1 Foundation Plan
0.55 0.55
1.827
0.40
1 : 100
0.15
0.20
EB
2B-6
+-0.50 +-1.60 1.00 6 @ 0.80 = +-4.80 5 @ 0.924 = +-4.62 1.00
Edge of C-6 10 mm diam. @ 0.20 B.W.
5 1Architectural-
: 25
Overhang Detail (Section B)
7 1Truss
: 100
-2