Gambar Kerja Hunian - BLK - Gereja
Gambar Kerja Hunian - BLK - Gereja
00
Datum: 10.00
Datum: 10.00
Datum: 10.00
Datum: 10.00
JARAK EKSISTING
JARAK EKSISTING
JARAK EKSISTING
ELEVASI EXISTING
ELEVASI EXISTING
ELEVASI EXISTING
JARAK EKSISTING
JARAK EKSISTING
ELEVASI EXISTING
ELEVASI EXISTING
DISTANCE EXISTING
DISTANCE EXISTING
DISTANCE EXISTING
DISTANCE EXISTING
DISTANCE EXISTING
10
15
20
EXISTING GROUND LEVEL
12
13
14
1516
17
18
2019
22
23
24
2526
27
28
3029
1011
21
1011
10
10
1514
2524
1514
12
13
16
17
18
2019
22
23
26
27
28
3029
12
13
16
17
18
2019
11
21
11
144.206 14.000 27.977
100.000 26.698 100.000 19.065 147.918
147.166
97.373 23.560 97.199 16.873 139.837 15.062 27.981 180.062 26.491
176.469 26.702
92.070 21.112 91.671 16.034 134.226 14.756 139.818 28.000
86.941 22.013 134.809 27.127 170.389 27.607
86.429 13.658 128.631 14.002
129.479 28.000 165.278 28.277
80.906 18.794 80.648 11.999
121.821 13.755
75.851 17.000 124.423 27.000 157.924 28.036
74.688 12.003
70.496 16.685 119.163 22.598
69.113 12.001 112.415 13.094 151.491 26.000
65.141 18.000 113.310 25.632 146.456 23.000
63.480 11.999
107.710 25.373 141.367 21.876
58.240 17.239 101.163 12.226
102.450 25.049
52.503 18.068 52.412 11.994 95.757 12.035 134.767 21.282
97.175 17.988
47.159 23.000 129.157 20.000
45.305 11.992
86.348 12.000 91.113 15.000
123.949 17.843
39.496 22.347 38.748 11.991 80.528 12.000 84.355 13.876 118.431 14.000
33.752 21.000
32.297 11.992
73.369 12.003
28.272 19.989
25.869 11.992 68.019 12.002
22.908 20.028 71.076 13.163 104.224 12.838
62.941 12.002
17.629 20.000 17.919 11.992 99.022 12.202
63.026 13.000
11.989 19.004 11.545 11.993 55.789 11.998
56.887 13.000 92.207 12.000
5.879 19.013 6.116 11.993
50.754 12.980 84.668 12.000
0.000 16.477 0.000 11.991
41.141 11.980
5.082 11.849 76.326 13.555
41.161 12.184
57.235 12.001
26.848 12.000
66.421 12.001 32.497 12.000
SKALA
NO. GAMBAR
NARKOTK IAKELABR
JSAKONSULTANKSIONSTRUKSI
320A
2N
G
A
TH
R
U
A
N
PERENCANAANPEMBANGUNANLANU
ISUMBAI
JTAN
PADALEMBAGAPEMASYARAKATAN
PEKANBARURA
IU
Direktur
NO. LEMBAR
Direktur Utama
MULYADI
PEKERJAAN
SATUAN KERJA
NRP. 67090332
MENYETUJUI
MENYETUJUI
MENYETUJUI
MENGETAHUI
MENGETAHUI
PEMBERI TUGAS
MISTIAH HERMAWATI
NIP. 1968110199031002
NIP. 1964100819931001
MHD JABARI SITEPU
MANAJEMEN KONSTRUKSI
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
LEMBAGA PEMASYARAKATAN
NAMA GAMBAR
KANTOR WILAYAH KEMENTERIAN
KEPALA DIVISI PEMASYARAKATAN
2023
KUASA PENGGUNA ANGGARAN (KPA)
TAHUN
KEMENTERIAN HUKUM DAN HAM RIAU
LEMBAGA PEMASYARAKATAN
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
2023
PEMBERI TUGAS
GWT
16,64
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
2
1,13
KANTOR WILAYAH RIAU
24 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
6,00
SATUAN KERJA
6,04
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 2,97 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
C PEKERJAAN
19
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
1,22
PERENCANAANPEMBANGUNANLANU JTAN
1,50
1,50
PADALEMBAGAPEMASYARAKATAN
0,70
I
1,40
1,85
I NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
1,85
KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
7,00
7,00
R. KUMPUL
KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR MANDI BERSAMAKAMAR MANDI KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN
5,15
5,15
KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG BERSAMA P±0.00 BERSAMA KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG
P±0.00 P±0.00 P±0.00 P-0.05 P-0.05 P±0.00 P±0.00 P±0.00
H H
2,00
2,00
SELASAR SELASAR
P±0.00 P±0.00 MISTIAH HERMAWATI
Direktur
G D
13,55 13,55 G DIPERIKSA OLEH
20
RABAT BETON
RABAT BETON
MANAJEMEN KONSTRUKSI
B PT. PRISMA KARYA UTAMA
20
P-0.20
P-0.20
SELASAR
SELASAR
24,00
10,00
10,00
24,00
6,00
6,00
P±0.00
P±0.00
-0.10 -0.10
ZULI PRIYANTO, S.Kom
2.00
2.50
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
F
2.00
F
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
F
/ WC
2,00
2,00
P-0.05
SELASAR SELASAR
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
P±0.00 P±0.00
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
E
KAPAS R BLOK
/ WC
E
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
R. JAGA
1,50 1,50
BENNY AFMAN, ST. M.M
70
P-0.05
175 400
150
KM
150
150
400
1
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
P±0.00
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
3,00
SELAS
KM
10 ORAN N
25
/ WC
P±0.00G
HUNIA
10 ORAN N
R. PANEL
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
P±0.00
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KM/WC KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
5,15
5,15
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG
P-0.05
SITAS
KM
KAMA
7,00
KELAS IIB RUMBAI
NN
N
N
4,00
4,00
D D
1,00
1,00
SUGIHARTO, Bc. IP.S.SOS
1,90
KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05
NIP. 196603111987031002
0,85
0,85
MENGETAHUI
C C
1,50 1,50
1,50 1,50
RABAT BETON RABAT BETON KEPALA DIVISI PEMASYARAKATAN
P-0.20 P-0.20
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
B RABAT BETON
ENTRANCE
P±0.00 RABAT BETON B
P-0.20 P-0.20
A A MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 2,97 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 KEMENTERIAN HUKUM DAN HAM RIAU
2,15 1,10 2,15
10,27
U
42,00
MHD JABARI SITEPU
1 2 3 4 5 6 7 8 9 10 NIP. 1964100819931001
MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
A
19
43,68
Dr. REYNHARD SILITONGA
2 NRP. 67090332
24
SKALA NAMA GAMBAR
SKALA1:200 -
2023
PEMBERI TUGAS
2
KEMENTERIAN HUKUM DAN HAM
24 REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
5,40 5,40 5,40 9,60 5,40 5,40 5,40
SATUAN KERJA
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 LEMBAGA PEMASYARAKATAN
C
19 KELAS IIB RIAU
1,22
PEKERJAAN
1,50
1,50
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
0,70
I
1,40
1,85
I PERENCANAANPEMBANGUNANLANU JTAN
1,85
PADALEMBAGAPEMASYARAKATAN
KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
7,00
7,00
KAMAR MANDI KAMAR MANDI
BERSAMA R. KUMPUL BERSAMA
P+4.15 BERSAMA P+4.15
5,15
5,15
KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN
KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG P+4.00 KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG
P+4.00 P+4.00 P+4.00 P+4.00 P+4.00 P+4.00
2,00
SELASAR SELASAR
P+4.00 P+4.00
G D G MISTIAH HERMAWATI
20 Direktur
B
20 DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
24,00
10,00
10,00
24,00
6,00
6,00
R.BERSAMA R.BERSAMA PT. PRISMA KARYA UTAMA
P+4.00 VOID VOID P+4.00
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
F F MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
2,00
2,00
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
SELASAR SELASAR
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
P+4.00 P+4.00
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
E
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
1,50 1,50
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
R. JAGA
123
KM
P-0.20
AR
1
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
P+4.00
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
25
P-0.05
ITAS
BERS UL
125
AMA
3,00
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
R. PANEL
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
P+4.00
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KM/WC KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN NIP. 198204082009121004
70
5,15
ITAS
5,15
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG P+4.15 KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
7,00
7,00
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
T T LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
4,00
4,00
D D
1,00
1,00
+3.90 CM +3.95CM +3.90 CM
KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
0,85
0,85
P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15 P+4.15
SUGIHARTO, Bc. IP.S.SOS
C C NIP. 196603111987031002
1,50 1,50
1,50 1,50
RABAT BETON
P-0.20
MENGETAHUI
B B KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
A A
MULYADI
NIP. 1968110199031002
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 MENGETAHUI
5,40 5,40 5,40 5,40 5,40 KEPALA KANTOR WILAYAH
5,40 9,60 KEMENTERIAN HUKUM DAN HAM RIAU
42,00
1 2 3 4 5 6 7 8 9 10
MHD JABARI SITEPU
NIP. 1964100819931001
U
A MENYETUJUI
19 DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
2
24 Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
2023
PEMBERI TUGAS
SATUAN KERJA
5,40 5,40 5,40 9,60 5,40 5,40 5,40
LEMBAGA PEMASYARAKATAN
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KELAS IIB RIAU
C
19 PEKERJAAN
1,22
1,23 1,22 1,22 1,23 1,25 1,25 1,22 1,23 1,23 1,23 PENGADAAN AJSAKONSULTANKSIONSTRUKSI
1,50
1,50
PERENCANAANPEMBANGUNANLANU JTAN
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
I 1,40
1,40
I PADALEMBAGAPEMASYARAKATAN
1,40
NARKOTK IAKELABR
ISUMBAI
1,85
1,85
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
7,00
7,00
PLAT DAK PLAT DAK PLAT DAK
P+8.00 P+8.00 P+8.00
5,15
5,15
PT.PRIMEGA SANIYYA LESTARI
H H
2,00
2,00
MISTIAH HERMAWATI
G D G Direktur
20 DIPERIKSA OLEH
B
MANAJEMEN KONSTRUKSI
20 PT. PRISMA KARYA UTAMA
24,00
10,00
10,00
24,00
6,00
6,00
VOID PLAT DAK VOID
P+8.00
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
F PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
F
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
2,00
2,00
RANGKA BAJA RINGAN
P±0.00
P-0.20 N
T BETO
AS
RANGKA BAJA RINGAN
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
E
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
E
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
1 1
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
P2
150
175
/ WC
175 400
150
KM
150
150
400
25 25
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
T1
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
5,15
5,15
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
7,00
7,00
PLAT DAK PLAT DAK LEMBAGA PEMASYARAKATAN
P+8.00 AREA TORN P+8.00
KELAS IIB RUMBAI
P+8.00
D D
1,00
1,00
SUGIHARTO, Bc. IP.S.SOS
0,85
0,85
NIP. 196603111987031002
C C
1,40
1,40
MENGETAHUI
0,70
0,70
0,70
0,70
0,70
0,70
1,50 1,50
1,50 1,50
1,63
1,63
KEPALA DIVISI PEMASYARAKATAN
1,23 1,23 1,23 1,23 1,22 1,23
B DAK BETON
J8
P+8.00 J8 B
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
0,61 0,61
A A MULYADI
NIP. 1968110199031002
MENGETAHUI
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
5,40 5,40 5,40 5,40 5,40
5,40 9,60
U
MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
A KEMENTERIAN HUKUM DAN HAM RI
19
2023
PEMBERI TUGAS
SATUAN KERJA
5,40 5,40 5,40 9,60 5,40 5,40 5,40 LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
C PEKERJAAN
19
1,22
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
1,50
1,50
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
0,70
I
1,40
I NARKOTK IAKELABR
ISUMBAI
1,85
1,85
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
7,00
7,00
5,15
5,15
PT.PRIMEGA SANIYYA LESTARI
H H
2,00
2,00
MISTIAH HERMAWATI
Direktur
G D G DIPERIKSA OLEH
20
B MANAJEMEN KONSTRUKSI
20 PT. PRISMA KARYA UTAMA
24,00
10,00
10,00
24,00
6,00
6,00
PLAT DAK
VOID VOID
P+8.00
ZULI PRIYANTO, S.Kom
2.00
2.50
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
F
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
F
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
2,00
2,00
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
E
KM
10 ORAN N
P±0.00G
HUNIA
E
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
1
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
25
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
5,15
5,15
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
7,00
7,00
KELAS IIB RUMBAI
D D
1,00
1,00
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
0,85
0,85
C ROOF DRAIN ROOF DRAIN ROOF DRAIN C MENGETAHUI
1,50 1,50
1,50 1,50
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
A A MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KEMENTERIAN HUKUM DAN HAM RIAU
2023
PEMBERI TUGAS
1,50
PERENCANAANPEMBANGUNANLANU JTAN
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
I I
1,40
1,40
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
1,75
1,75
1,85
1,85
P4 P4 P4 P4 P4 P4 P4 P4 PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
1,75
1,75
7,00
7,00
1,75
1,75
5,15
5,15
J7 J7 J7 J7 J7 J7 J7 J7 J7 J7 J7 J7
1,75
1,75
P3 P3 P3 P3 P3 P3
PT.PRIMEGA SANIYYA LESTARI
H H
1,50 1,50 1,50 1,50
2,00
2,00
BV3 PJ4 PJ4 BV3
G
MISTIAH HERMAWATI
D
20
G Direktur
B DIPERIKSA OLEH
BV3 BV3 20 MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
24,00
10,00
10,00
24,00
-0.10
6,00
6,00
-0.10 J2 J2
3.00
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
F
A
F PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
F
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
2,00
2,00
123
KM
SELAS
P±0.00
BV3 PJ4 PJ4 BV3
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
E
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
E
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
1 1
KAMA
1,50
P±0.00L
70
N
I
R. PANE
BERSAMAND
P3 P3 P3 P5 J6 P3 P3 P3
175
123
P2
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
25 J7 J7 J7 J7 J7 J7 PJ1 J7 J7 J7 J7 J7 J7 25
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
3,00
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
1,50
/ WC
5
PJ3
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
5,15
5,15
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
7,00
7,00
1,50
KELAS IIB RUMBAI
N N
N
N
4,00
D
4,00
D PJ2 PJ2
1,00
1,00
P4 P4 P4 P4 P4 P4 P4 P4 SUGIHARTO, Bc. IP.S.SOS
0,85
0,85
NIP. 196603111987031002
C
1,40
1,40
C
0,70
0,70
0,70
0,70
0,70
0,70
MENGETAHUI
1,50
1,50
1,63
1,63
KEPALA DIVISI PEMASYARAKATAN
1,23 1,22 1,22 1,22 1,22 1,23
B P1
B KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
1,50
1,50
BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 0,61 0,61 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4
A A
BV2 BV2 MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
1,50 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 1,50
U
5,40 5,40 5,40 9,60 5,40 5,40 5,40
42,00
2023
PEMBERI TUGAS
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 LEMBAGA PEMASYARAKATAN
C KELAS IIB RIAU
BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV2 BV1 19 BV2 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4
1,22
PEKERJAAN
1,50
1,50
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
0,70
PERENCANAANPEMBANGUNANLANU JTAN
I
1,40
1,85
I PADALEMBAGAPEMASYARAKATAN
1,85
NARKOTK IAKELABR
ISUMBAI
P4 P4 P4 P4 P4 P4 P4 P4
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
7,00
7,00
5,15
5,15
J7 J7 J7 J7 J7 J7 J7 J7 J7 J7 J7 J7
P3 P3 P3 P3 P3 P3
PT.PRIMEGA SANIYYA LESTARI
H H
2,00
2,00
BV3 PJ4 PJ4 BV3
J3 J3 J5 J5 J3 J3
G D G MISTIAH HERMAWATI
Direktur
20
B DIPERIKSA OLEH
BV3 BV3 20 MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
24,00
10,00
10,00
24,00
6,00
6,00
J1 J2 J2 J1
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
F
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
C
F
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
2,00
2,00
J3 J3 J5 J5 J3 J3
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
E
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
E
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
1,50 1,50
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
1
KM
10 ORAN N
P±0.00G
HUNIA
150
P3 P3 P3 P5 J6 P3 P3 P3
KAPAS R BLOK
/ WC
P2
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
25 PJ1
123
J7 J7 J7 J7 J7 J7 J7 J7 J7 J7 J7 J7
KAMA
175 300
150
3,00
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
5,15
5,15
KM
123
PJ3
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
7,00
KM
7,00
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
T T KELAS IIB RUMBAI
4,00
4,00
D D
1,00
1,00
PJ2 PJ2 +3.90 CM +3.95CM +3.90 CM
P4 P4 P4 P4 P4 P4 P4 P4
0,85
0,85
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
C C
1,50 1,50
1,50 1,50
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
B J8 J8 B KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4 BV4
A BV2 BV2
A
MULYADI
NIP. 1968110199031002
MENGETAHUI
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
KEPALA KANTOR WILAYAH
5,40 5,40 5,40 5,40 5,40 KEMENTERIAN HUKUM DAN HAM RIAU
5,40 9,60
42,00
2
24 Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
2
24
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
5,40 5,40 5,40 9,60 5,40 5,40 5,40 KELAS IIB RUMBAI
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 SATUAN KERJA
C
19 LEMBAGA PEMASYARAKATAN
1,22 KELAS IIB RIAU
1,23 1,22 1,22 1,23 1,25 1,25 1,22 1,23 1,23 1,23
1,50
1,50
PEKERJAAN
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
0,70
I
1,40
I
1,40
1,40
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
1,85
1,85
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
7,00
7,00
PLAT DAK PLAT DAK PLAT DAK
P+8.00 P+8.00 P+8.00 KONSULTAN PERENCANA
5,15
5,15
H H
2,00
2,00
PT.PRIMEGA SANIYYA LESTARI
G D G
20
B MISTIAH HERMAWATI
Direktur
20
DIPERIKSA OLEH
24,00
10,00
10,00
24,00
6,00
6,00
VOID PLAT DAK VOID MANAJEMEN KONSTRUKSI
P+8.00
PT. PRISMA KARYA UTAMA
F 2.00
2.50
2.50 15.00
3.00
F Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
2,00
2,00
MENYETUJUI
8.00
A
RANGKA BAJA RINGAN
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
E
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
P2
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
25
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
T1
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
5,15
5,15
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
7,00
SELAS
7,00
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
P+8.00 P+8.00
5
AREA TORN
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
P+8.00
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
D D KELAS IIB RUMBAI
1,00
1,00
0,85
0,85
C C
1,40
1,40
0,70
0,70
0,70
0,70
0,70
0,70
1,50 1,50
1,50 1,50
SUGIHARTO, Bc. IP.S.SOS
1,63
1,63
NIP. 196603111987031002
1,23 1,23 1,23 1,23 1,22 1,23
B DAK BETON
J8
P+8.00 J8 B MENGETAHUI
0,61 0,61 KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
A A HUKUM DAN HAM RIAU
MULYADI
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 NIP. 1968110199031002
5,40 5,40 5,40 5,40 5,40 MENGETAHUI
5,40 9,60
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
1 2 3 4 5 6 7 8 9 10
MHD JABARI SITEPU
NIP. 1964100819931001
A
19 MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
2
24
Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
2023
PEMBERI TUGAS
+16,50
4 LANTAI 05 11,20
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
2,75
3,16
KELAS IIB RUMBAI
+13,00
SATUAN KERJA
3 LANTAI 04
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
3,00
PEKERJAAN
4,00
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
1,00
PERENCANAANPEMBANGUNANLANU JTAN
+8,00 PADALEMBAGAPEMASYARAKATAN
14,75
2 LANTAI 03 NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
+4,00
1 LANTAI 02
4,00
±0,00
0 LANTAI 01 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 MISTIAH HERMAWATI
Direktur
1
2.50 15.00
3.00
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
-
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
SKALA1:200
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
+16,50
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
4 LANTAI 05
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
2,75
+13,00
3 LANTAI 04 SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
MENGETAHUI
3,00
4,00
+8,00
14,75
2 LANTAI 03 MULYADI
NIP. 1968110199031002
4,00
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
+4,00
1 LANTAI 02
MHD JABARI SITEPU
4,00
NIP. 1964100819931001
2,93
MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
±0,00 KEMENTERIAN HUKUM DAN HAM RI
0 LANTAI 01
5,40 5,40 5,40 3,00 3,60 3,00 5,40 5,40 5,40
Dr. REYNHARD SILITONGA
NRP. 67090332
2023
+16,50 PEMBERI TUGAS
4 LANTAI 05
6
5,8
2,75
+13,00 KEMENTERIAN HUKUM DAN HAM
3 LANTAI 04 REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
4,00
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
+8,00
PEKERJAAN
2 LANTAI 03
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
4,00
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
+4,00 320A
2N
G
A
TH
U
R
A
N
4,00
±0,00
0 LANTAI 01 PT.PRIMEGA SANIYYA LESTARI
0,85
1,50 1,85 5,15 2,00 6,00 2,00 5,15 1,00 1,50 1,50
MISTIAH HERMAWATI
Direktur
6,00 7,00 10,00 7,00
DIPERIKSA OLEH
24,00 MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
I H G F E D C B A
-7,00
-1 - ZULI PRIYANTO, S.Kom
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
C
-
MIMBAR
+0.40
A
SKALA1:200 PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
+16,50
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
4 LANTAI 05
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
6
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
5,8
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
2,75
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
+13,00
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
3 LANTAI 04
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
3,00
4,00
NIP. 196603111987031002
+8,00
MENGETAHUI
14,75
+4,00 MULYADI
NIP. 1968110199031002
1 LANTAI 02
MENGETAHUI
KEPALA KANTOR WILAYAH
4,00
±0,00
0 LANTAI 01 MHD JABARI SITEPU
NIP. 1964100819931001
MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
2023
PEMBERI TUGAS
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
D-04
D-03 27
26
+16,50 RANGKA ATAP BAJA RINGAN PT.PRIMEGA SANIYYA LESTARI
4 LANTAI 05 PENUTUP ATAP SPANDEX
2.50 15.00
PELAT LANTAI BETON BERTULANG T12M Direktur Utama
FIN. WATERPROOFING
3.00
A
2.50 2.50
2.00
R. operator
±0.00
1,00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
BALOK INDUK 30/60
±0.00
2.50
MIMBAR
+0.40
A
+8,00 PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
3.00
140
15.00
LEMBAGA PEMASYARAKATAN
123
2.50
2 LANTAI 03
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
+7,42
/ WC
AR
P-0.05
P±0.00
SELAS
TANGGUL WC 15CM
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
4,00
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
R. PANE
BERSAMAND
175
4.60
123
R
KAMA
175 300
150
175
+4.60
/ WC
175 400
150
KM
150
150
400
/ WC
4.15
10 ORAN N
5
P±0.00G
R. JAGA
HUNIA
P-0.0
0
P±0.0
123
KM/WC
KM
+4,00
P-0.05
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
+4,00
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
1 LANTAI 02
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
KM
KAMA
POTONGAN A-A 2
SKALA1:200 - Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
2023
PEMBERI TUGAS
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
D-02
28
+16,50
4 LANTAI 05
PENUTUP ATAP SPANDEK
RANGKA ATAP BAJA RINGAN
PT.PRIMEGA SANIYYA LESTARI
2,75
+13,00
3 LANTAI 04 PAS. DINDING 1 BATA
RANGKA ATAP BAJA RINGAN MISTIAH HERMAWATI
PENUTUP ATAP SPANDEK Direktur
DINDING PARAPET +9.00
3,00
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PLAT BETON BERTULANG T12CM FIN WATERPROOFING PT. PRISMA KARYA UTAMA
1,00
2 LANTAI 03 TEMPAT TIDUR BETON FIN EPOXY/ CAIRAN ANTI KIMIA ZULI PRIYANTO, S.Kom
2.00
2.50
2.50 15.00
3.00
Direktur Utama
PAS DINDING BETON 1 BATA
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
4,00
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
BALOK INDUK 30/60
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
+4,00
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
1 LANTAI 02
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
4,00
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
RABAT BETON
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
DRAINASE
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
PONDASI SQUARE PILE KEDALAMAN 7-12M PONDASI SQUARE PILE KEDALAMAN 7-12M MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
5,40 5,40 5,40 3,00 3,60 3,00 5,40 5,40 5,40 HUKUM DAN HAM RIAU
16,18 9,61 16,21
42,00
-7,00
MULYADI
-1 -
1 2 3 4 5 6 7 8 9 10 NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
2023
D-04
27
CAT PUTIH EXTERIOR
KOLOM STRUKTUR
123
140
70
123
KM
70
/ WC
P-0.05
KM 123
/ WC
P-0.05 KM
70
/ WC
KAMA P-0.05
KAPAS R BLOK KM 123
/ WC
ITAS HUNIA P-0.05 KM
70
10 ORAN N / WC 125
KAMA P-0.0
P±0.00G 5 KM
70
KAPA R BLOK / WC
SITAS HUNIA P-0.05 125
175
10 ORAN N
G KAMA 123
P±0.00 KAPAS R BLOK
70
ITAS HUNIA
KAMA
175
10 ORAN N
70
G R 123
P±0.00 BERSAMAND
175
I KM
P-0.05MAR. KUMP / WC
P-0.05
175
BERS UL
70
AMA KAMAR KM
SELAS / WC 123
P±0.00
175
BERSAMANDI P-0.05 KM
AR / WC
P±0.00
BETON
P-0.05MA P-0.05
175
KAMA
70
KM
SELAS
KAPA R BLOK 123
P±0.00 AR
/ WC
P-0.20
175
SITAS HUNIA P-0.05 KM
70
RABAT
150 10 ORAN N / WC
KAMA P-0.05
150 P±0.00G KM
KAPAS R BLOK / WC
140
175
ITAS HUNIA P-0.05
10 ORAN N
150 KAMA
P±0.00G KAPAS R BLOK
150
ITAS HUNIA
10 ORAN N
SELAS P±0.00G
AR
P±0.00
KAMA SELAS
KAPA R BLOK AR
SITAS HUNIA P±0.00
10 ORAN N
KAMA
P±0.00G KAPAS R BLOK
ITAS HUNIA
10 ORAN N
G KAMA
P±0.00 KAPA R BLOK
SITAS R. JAGA
KM HUNIA
/ WC P±0.0
P-0.05 10 ORAN N
0
KM P±0.00G
/ WC KM/WC
150
N
P-0.05 KM
/ WC P-0.05
SELAS
P-0.05 SELAS
P±0.00 AR
KM AR
300
R. PANE
150
150 P±0.00
T BETO
/ WC
P-0.0 KM P±0.00L
P-0.20
RABAT 5 / WC N
BETON P-0.05 KAMA
RABA
P-0.20
KAPAS R BLOK
70
KM
/ WC ITAS HUNIA
P-0.05 10 ORAN N
400
KAMA
P±0.00G
N KAPAS R BLOK
PENUTUP ATAP SPANDEX
400
ITAS HUNIA
10 ORAN N
G KAMA
P±0.00 KAPA R BLOK
KM SITAS HUNIA
/ WC
P-0.05 10 ORAN N
KM G
P±0.00
/ WC
P-0.05 KM
/ WC
P-0.0
5 KM
/ WC
P-0.05 KM
RABAT / WC
BETON P-0.05
P-0.20
70
KM
/ WC
P-0.05
140
RANGKA ATAP BAJA RINGAN
DAN
8.00
G ALAT
3.00
GUDAN
C
2.50
2.00
P±0.00 A
BOGA
R. TATA
-0.05
P±0.00
TERAS
2.50
HOP
WORKS TANGGUL WC 15CM
2.00
P±0.00 ±0.00
2.50
TEMPE R. operator
ATAN
R. PEMBU
15.00
2.50
A ±0.00
R. IBADAH
3.00
P±0.00Y
R. BAKER
2.50
2.50
A
15.00
+0.40
3.00
2.00
MIMBAR
+0.40
R.PERTOBATAN
+0.40
R.PENDETA
2.50
+0.40
C
R.KITAB
2.00
F E D C B A
SKALA
NO. GAMBAR
NARKOTK IAKELABR
JSAKONSULTANKSIONSTRUKSI
320A
2N
G
A
TH
R
U
A
N
PERENCANAANPEMBANGUNANLANU
ISUMBAI
JTAN
PADALEMBAGAPEMASYARAKATAN
PEKANBARURA
IU
Direktur
NO. LEMBAR
Direktur Utama
MULYADI
PEKERJAAN
SATUAN KERJA
NRP. 67090332
MENYETUJUI
MENYETUJUI
MENYETUJUI
MENGETAHUI
MENGETAHUI
PEMBERI TUGAS
MISTIAH HERMAWATI
NIP. 1968110199031002
NIP. 1964100819931001
MHD JABARI SITEPU
MANAJEMEN KONSTRUKSI
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
LEMBAGA PEMASYARAKATAN
NAMA GAMBAR
KANTOR WILAYAH KEMENTERIAN
KEPALA DIVISI PEMASYARAKATAN
2023
KUASA PENGGUNA ANGGARAN (KPA)
TAHUN
KEMENTERIAN HUKUM DAN HAM RIAU
LEMBAGA PEMASYARAKATAN
SATUAN KERJA
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
3.00
A
2.50 2.50
2.00
R. operator
±0.00
1
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
SKALA1:50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
ROOF DRAIN
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
SKALA1:70 - 2023
PEMBERI TUGAS
+13,00
0,90 0,90 KELAS IIB RIAU
3 LANTAI 04
+9,65
PAS. DINDING 1 BATA
RANGKA ATAP BAJA RINGAN
PENUTUP ATAP SPANDEK PLAT BETON BERTULANG T12CM
+9.00
DINDING PARAPET +9.00
PEKERJAAN
3,00
±0,00
KONSULTAN PERENCANA
0 LANTAI 01 -0.50
-1.45
SLOOF 30/60 SLOOF 30/60
PILE CAP TEBAL 50-60CM
+8,00 TEMPAT TIDUR BETON FIN EPOXY/ CAIRAN ANTI KIMIA
PILE CAP TEBAL 50-60CM
PONDASI SQUARE PILE KEDALAMAN 7-12M PONDASI SQUARE PILE KEDALAMAN 7-12M
+7,42
5,40 5,40
16,18
5,40 3,00 3,60
9,61
3,00 5,40 5,40
16,21
5,40 PAS DINDING BETON 1 BATA
42,00
-7,00
-1 -
1 2 3 4 5 6 7 8 9 10
BALOK INDUK 30/60
PT.PRIMEGA SANIYYA LESTARI
1,00 +3,40
PAS DINDING BETON 1 BATA
223,68
4,00
ZULI PRIYANTO, S.Kom
3,55
Direktur Utama
PLAT LANTAI BETON BERTULANG FIN. EPOXY
2.00
2.50
2.50 15.00
1,20
3.00
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
RABAT BETON
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
2.50
+0,60
2.00
/ WC
70
P-0.05
R. PENGAW
KM
GWT
P±0.00
P-0.20 N
T BETO
AS
16,64
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
2
KAPAS R BLOK
1,13
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
24
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
6,00
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
6,04
/ WC
175 400
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 2,97 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
150
KM
150
150
400
C
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
19
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
1,22
10 ORAN N
P-0.05
G
HUNIA
P±0.00
1,50
1,50
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
0,70
/ WC
5
P-0.0
I
KM
10 ORAN N
70
1,40
I
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
1,85
1,85
ITAS
140
KM
KAMA
KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
SLOOF 30/60
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
7,00
7,00
-1,10
R. KUMPUL
KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR MANDI BERSAMAKAMAR MANDI KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN
KELAS IIB RUMBAI
5,15
5,15
H H
2,00
2,00
SELASAR SELASAR
P±0.00 P±0.00
G D
13,55 13,55 G SUGIHARTO, Bc. IP.S.SOS
20
RABAT BETON
RABAT BETON
B
20 NIP. 196603111987031002
P-0.20
P-0.20
SELASAR
SELASAR
24,00
10,00
10,00
24,00
6,00
6,00
P±0.00
P±0.00
-0.10 -0.10
MENGETAHUI
-7.00 - 12.00 PONDASI SQUARE PILE KEDALAMAN 7-12M KEPALA DIVISI PEMASYARAKATAN
F F KANTOR WILAYAH KEMENTERIAN
2,00
2,00
F
SELASAR SELASAR
P±0.00 P±0.00
HUKUM DAN HAM RIAU
E R. JAGA E
1,50 1,50
1 P±0.00 1
3,00
25 R. PANEL 25
P±0.00
KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KM/WC KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN KAMAR BLOK HUNIAN
5,15
5,15
KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG P-0.05 KAPASITAS 10 ORANG KAPASITAS 10 ORANG KAPASITAS 10 ORANG
P±0.00 P±0.00 P±0.00 P±0.00 P±0.00 P±0.00
7,00
7,00
NN
N
N
MULYADI
5,40
4,00
4,00
D D
1,00
1,00
NIP. 1968110199031002
1,90
KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC KM / WC
P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05 P-0.05
0,85
0,85
C C
1,50 1,50
1,50 1,50
RABAT BETON
P-0.20
RABAT BETON
P-0.20
MENGETAHUI
B RABAT BETON
ENTRANCE
P±0.00 RABAT BETON B
P-0.20 P-0.20 KEPALA KANTOR WILAYAH
A A KEMENTERIAN HUKUM DAN HAM RIAU
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 2,97 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
10,27
42,00
1 2 3 4 5 6 7 8 9 10
MHD JABARI SITEPU
A
9 10 NIP. 1964100819931001
19
43,68
MENYETUJUI
2 DIREKTUR JENDERAL PEMASYARAKATAN
24
KEMENTERIAN HUKUM DAN HAM RI
2023
PEMBERI TUGAS
KONSULTAN PERENCANA
B ANGKUR ∅ 12mm
PT.PRIMEGA SANIYYA LESTARI
FFL + 2.45
B ANGKUR ∅ 12mm BL1 15 x 20 MISTIAH HERMAWATI
Direktur
5
ANGKUR ∅ 12mm
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
FFL + 2.10 PT. PRISMA KARYA UTAMA
5
ZULI PRIYANTO, S.Kom
Direktur Utama
MENYETUJUI
68
44 PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
A A
24
245
240
MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
210
205
68
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
120
MENGETAHUI
100
100
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
68
90 48
KK4 15 x 20 5 37 5 KP2 15 x 15 KEMENTERIAN HUKUM DAN HAM
5 80 5 REPUBLIK INDONESIA
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KANTOR WILAYAH RIAU
DALAM DALAM LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
KK5 15 x 15
SATUAN KERJA
ANGKUR ∅ 12mm
10 10 10 10 DALAM
LEMBAGA PEMASYARAKATAN
LUAR KELAS IIB RIAU
LUAR
KUSEN DILUBANGI PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
LUAR PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
KUSEN DILUBANGI NARKOTK IAKELABR
ISUMBAI
5 70 5 PEKANBARURA
IU
80 320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
DIPERIKSA OLEH
FFL + 2.15 FFL + 2.45 MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
5
5
BL2 15 x 15
ANGKUR ∅ 12mm
B ANGKUR ∅ 12mm
ZULI PRIYANTO, S.Kom
Direktur Utama
53
5
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
A
A
A BENNY AFMAN, ST. M.M
53
NIP. 198204082009121004
80
MENYETUJUI
215
215
KUASA PENGGUNA ANGGARAN (KPA)
210
210
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
170
5
53
120
ANGKUR ∅ 12mm MENGETAHUI
100
100
BL2 15 x 15 KEPALA DIVISI PEMASYARAKATAN
80
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
53
K1 50 x 50 310 K1 50 x 50
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
5 150 5 145 5
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
10 10 10 10 10 KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
10 10 10 10 10 10 10 10 10 KELAS IIB RUMBAI
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
160
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
POTONGAN -A PERENCANAANPEMBANGUNANLANU JTAN
Skala 1 : 25
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
BL1 15 x 20 BL1 15 x 20 320A
2N
G
A
TH
U
R
A
N
ANGKUR ∅ 12mm
B C ANGKUR ∅ 12mm KONSULTAN PERENCANA
FFL + 3.70
5
5
PT.PRIMEGA SANIYYA LESTARI
37
37
MISTIAH HERMAWATI
Direktur
110
110
37
37
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
37
37
ZULI PRIYANTO, S.Kom
FFL + 2.55 Direktur Utama
MENYETUJUI
5
5
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
41
41
330
330
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
A MENYETUJUI
41
41
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
41
41
210
210
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
41
41
100
MULYADI
NIP. 1968110199031002
MENGETAHUI
46
46
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL + 0.40
TOTAL UNIT 2 Bh
ARS-14 14 2023
LOKASI LANTAI 1 DAN 2
PEMBERI TUGAS
K1 50 x 50
KEMENTERIAN HUKUM DAN HAM
ANGKUR ∅ 12mm DALAM KK4 15 x 20 REPUBLIK INDONESIA
ANGKUR ∅ 12mm KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
10 10 10 10 10 10 10 10 10 10 10 10 10
10 10 10 10 SATUAN KERJA
LEMBAGA PEMASYARAKATAN
LUAR KELAS IIB RIAU
5 270 5 80 5 PEKERJAAN
KUSEN DILUBANGI
275 90 PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
POTONGAN -A PADALEMBAGAPEMASYARAKATAN
Skala 1 : 25 NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
BL1 15 x 20 BL1 15 x 20 320A
2N
G
A
TH
U
R
A
N
ANGKUR ∅ 12mm
C B ANGKUR ∅ 12mm KONSULTAN PERENCANA
FFL + 3.30
5
5
PT.PRIMEGA SANIYYA LESTARI
37
37
MISTIAH HERMAWATI
Direktur
110
37
37
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
37
42
MENYETUJUI
5
250
240
53
52
330
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
A MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
53
53
KELAS IIB RUMBAI
210
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
20
53
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
120
100
MULYADI
80
53
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL ± 0.00
TOTAL UNIT 4 Bh
ARS-15 15 2023
LOKASI LANTAI 1 DAN 2
PEMBERI TUGAS
ANGKUR ∅ 12mm
C B ANGKUR ∅ 12mm KONSULTAN PERENCANA
FFL + 3.30
5
PT.PRIMEGA SANIYYA LESTARI
37
37
MISTIAH HERMAWATI
Direktur
110
37
37
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
37
42
MENYETUJUI
5
250
240
53
52
330
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
A MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
53
53
KELAS IIB RUMBAI
210
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
20
53
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
120
100
MULYADI
80
53
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL ± 0.00
TOTAL UNIT 2 Bh
ARS-16 16 2023
LOKASI LANTAI 1 DAN 2
PEMBERI TUGAS
LEMBAGA PEMASYARAKATAN
KUSEN DILUBANGI LUAR KELAS IIB RIAU
5 55 5 80 5 PEKERJAAN
60 90 PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
POTONGAN -A PADALEMBAGAPEMASYARAKATAN
Skala 1 : 25 NARKOTK IAKELABR
ISUMBAI
BL1 15 x 20 BL1 15 x 20 PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
ANGKUR ∅ 12mm
C B ANGKUR ∅ 12mm
KONSULTAN PERENCANA
FFL + 3.40
5
5
PT.PRIMEGA SANIYYA LESTARI
60
60
MISTIAH HERMAWATI
Direktur
120
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
60
65
230
MENYETUJUI
5
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
52
52
340
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
A MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
53
53
FFL + 1.00 SUGIHARTO, Bc. IP.S.SOS
210
NIP. 196603111987031002
5
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
53
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
120
100
100
MULYADI
ANGKUR ∅ 12mm NIP. 1968110199031002
BL1 15 x 20 MENGETAHUI
53
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL ± 0.00
TOTAL UNIT 8 Bh
ARS-17 17 2023
LOKASI LANTAI 1 DAN 2
PEMBERI TUGAS
K2 30 x 30 K2 30 x 30
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KEMENTERIAN HUKUM DAN HAM
LUAR REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
SATUAN KERJA
KONSULTAN PERENCANA
FFL + 7.30
5
15
PT.PRIMEGA SANIYYA LESTARI
50
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
50
ZULI PRIYANTO, S.Kom
230
240
Direktur Utama
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
50
KELAS IIB RUMBAI
50
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
15
FFL + 5.00
SUGIHARTO, Bc. IP.S.SOS
5
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
ANGKUR ∅ 12mm
100
BL1 15 x 20
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL + 4.00
TYPE J1 ( JENDELA 1 )
KUSEN UNP 100 x 50 x 5 Dr. REYNHARD SILITONGA
NRP. 67090332
DAUN PINTU -
SKALA NAMA GAMBAR
RANGKA DAUN PINTU/JENDELA PLAT BAJA STRIP 50 x 10 + BESI SOLID Ø 22 mm + MESH ( BAGIAN LUAR )
DAUN JENDELA / BOUVENLIGHT -
1 : 25 DETAIL KUSEN
AKSESORIS -
SKALA 1 : 25 NO. GAMBAR NO. LEMBAR TAHUN
TOTAL UNIT 2 Bh
ARS-18 18 2023
LOKASI LANTAI 2
PEMBERI TUGAS
K1 50 x 50 K1 50 x 50
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KEMENTERIAN HUKUM DAN HAM
LUAR REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
10 10 10 10 10 10 10 10 10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
SATUAN KERJA
KONSULTAN PERENCANA
FFL + 7.30
5
15
PT.PRIMEGA SANIYYA LESTARI
50
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
50
ZULI PRIYANTO, S.Kom
230
240
Direktur Utama
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
50
KELAS IIB RUMBAI
50
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
15
FFL + 5.00
SUGIHARTO, Bc. IP.S.SOS
5
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
ANGKUR ∅ 12mm
100
BL1 15 x 20
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL + 4.00
TYPE J2 ( JENDELA 2 )
KUSEN UNP 100 x 50 x 5 Dr. REYNHARD SILITONGA
NRP. 67090332
DAUN PINTU -
SKALA NAMA GAMBAR
RANGKA DAUN PINTU/JENDELA PLAT BAJA STRIP 50 x 10 + BESI SOLID Ø 22 mm + MESH ( BAGIAN LUAR )
DAUN JENDELA / BOUVENLIGHT -
1 : 25 DETAIL KUSEN
AKSESORIS -
SKALA 1 : 25 NO. GAMBAR NO. LEMBAR TAHUN
TOTAL UNIT 4 Bh
ARS-19 19 2023
LOKASI LANTAI 1 DAN 2
PEMBERI TUGAS
K2 30 x 30 K2 30 x 30
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KEMENTERIAN HUKUM DAN HAM
LUAR REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
10 10 10 10 10 10 10 10 10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
SATUAN KERJA
KONSULTAN PERENCANA
FFL + 7.30
5
15
PT.PRIMEGA SANIYYA LESTARI
50
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
50
ZULI PRIYANTO, S.Kom
230
240
Direktur Utama
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
50
KELAS IIB RUMBAI
50
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
15
FFL + 5.00
SUGIHARTO, Bc. IP.S.SOS
5
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
ANGKUR ∅ 12mm
100
BL1 15 x 20
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL + 4.00
TYPE J3 ( JENDELA 3 )
KUSEN UNP 100 x 50 x 5 Dr. REYNHARD SILITONGA
NRP. 67090332
DAUN PINTU -
SKALA NAMA GAMBAR
RANGKA DAUN PINTU/JENDELA PLAT BAJA STRIP 50 x 10 + BESI SOLID Ø 22 mm + MESH ( BAGIAN LUAR )
DAUN JENDELA / BOUVENLIGHT -
1 : 25 DETAIL KUSEN
AKSESORIS -
SKALA 1 : 25 NO. GAMBAR NO. LEMBAR TAHUN
TOTAL UNIT 8 Bh
ARS-20 20 2023
LOKASI LANTAI 2
PEMBERI TUGAS
K2 30 x 30 K2 30 x 30
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KEMENTERIAN HUKUM DAN HAM
LUAR REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
10 10 10 10 10 10 10 10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
SATUAN KERJA
KONSULTAN PERENCANA
FFL + 7.30
5
15
PT.PRIMEGA SANIYYA LESTARI
50
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
50
ZULI PRIYANTO, S.Kom
230
240
Direktur Utama
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
50
KELAS IIB RUMBAI
50
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
15
FFL + 5.00
SUGIHARTO, Bc. IP.S.SOS
5
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
ANGKUR ∅ 12mm
100
BL1 15 x 20
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL + 4.00
TYPE J4 ( JENDELA 4 )
KUSEN UNP 100 x 50 x 5 Dr. REYNHARD SILITONGA
NRP. 67090332
DAUN PINTU -
SKALA NAMA GAMBAR
RANGKA DAUN PINTU/JENDELA PLAT BAJA STRIP 50 x 10 + BESI SOLID Ø 22 mm + MESH ( BAGIAN LUAR )
DAUN JENDELA / BOUVENLIGHT -
1 : 25 DETAIL KUSEN
AKSESORIS -
SKALA 1 : 25 NO. GAMBAR NO. LEMBAR TAHUN
TOTAL UNIT 4 Bh
ARS-21 21 2023
LOKASI LANTAI 2
PEMBERI TUGAS
K2 30 x 30 K1 50 x 50
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KEMENTERIAN HUKUM DAN HAM
LUAR REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
10 10 10 10 10 10 10 10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
SATUAN KERJA
KONSULTAN PERENCANA
FFL + 7.30
5
PT.PRIMEGA SANIYYA LESTARI
60
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
55
ZULI PRIYANTO, S.Kom
230
240
Direktur Utama
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
55
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
MENYETUJUI
A KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
60
KELAS IIB RUMBAI
FFL + 5.00
SUGIHARTO, Bc. IP.S.SOS
5
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
100
MULYADI
ANGKUR ∅ 12mm NIP. 1968110199031002
BL1 15 x 20
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL + 4.00
TYPE J5 ( JENDELA 5 )
KUSEN UNP 100 x 50 x 5 Dr. REYNHARD SILITONGA
NRP. 67090332
DAUN PINTU -
SKALA NAMA GAMBAR
RANGKA DAUN PINTU/JENDELA PLAT BAJA STRIP 50 x 10 + BESI SOLID Ø 22 mm + MESH ( BAGIAN DALAM )
DAUN JENDELA / BOUVENLIGHT -
1 : 25 DETAIL KUSEN
AKSESORIS -
SKALA 1 : 25 NO. GAMBAR NO. LEMBAR TAHUN
TOTAL UNIT 4 Bh
ARS-22 22 2023
LOKASI LANTAI 2
PEMBERI TUGAS
K1 50 x 50 K1 50 x 50
ANGKUR ∅ 12mm ANGKUR ∅ 12mm
KEMENTERIAN HUKUM DAN HAM
LUAR REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
10 10 10 10 10 10 10 10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
SATUAN KERJA
B ANGKUR ∅ 12mm
100 KONSULTAN PERENCANA
FFL + 3.30
POTONGAN -A
5
Skala 1 : 25
20
PT.PRIMEGA SANIYYA LESTARI
MISTIAH HERMAWATI
50
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
BL2 15 x 15 PT. PRISMA KARYA UTAMA
B ANGKUR ∅ 12mm
50
ZULI PRIYANTO, S.Kom
FFL + 2.15 Direktur Utama
MENYETUJUI
5
240
250
PEJABAT PEMBUAT KOMITMEN (PPK)
13
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
33
50
BENNY AFMAN, ST. M.M
A NIP. 198204082009121004
110
120
MENYETUJUI
33
A KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
50
33
FFL + 0.95 SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
5
20
5
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
ANGKUR ∅ 12mm
BL2 15 x 15
95
80 MULYADI
NIP. 1968110199031002
ANGKUR ∅ 12mm MENGETAHUI
BL1 15 x 20 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
FFL ± 0.00 FFL ± 0.00
LUAR
LUAR KEMENTERIAN HUKUM DAN HAM
5 50 5 5 50 5 5 50 5
5 50 5 5 50 5 5 50 5 POTONGAN -A REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
60 60 60 Skala 1 : 25
LEMBAGA PEMASYARAKATAN
60 60 60
POTONGAN -A KELAS IIB RUMBAI
Skala 1 : 25 SATUAN KERJA
B
B B2 30 x 50
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
B2 30 x 50 ANGKUR ∅ 12mm
PEKERJAAN
ANGKUR ∅ 12mm
FFL + 11.60 PENGADAAN AJSAKONSULTANKSIONSTRUKSI
FFL + 7.50 PERENCANAANPEMBANGUNANLANU JTAN
5
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
25
PEKANBARURA
IU
20
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
50
50
PT.PRIMEGA SANIYYA LESTARI
50
50
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
50
50
ZULI PRIYANTO, S.Kom
Direktur Utama
350
360
340
350
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
50
50
50
KUASA PENGGUNA ANGGARAN (KPA)
50
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
50
50
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
25
20
5
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
LEMBAGA PEMASYARAKATAN
POTONGAN -A POTONGAN -A KELAS IIB RIAU
Skala 1 : 25 Skala 1 : 25
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
B BL2 15 x 15
BESI ∅ 22mm
B BL2 15 x 15
BESI ∅ 22mm
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
FFL + 3.35 FFL + 3.35
A A
50
50
PT.PRIMEGA SANIYYA LESTARI
FFL + 2.85 FFL + 2.85
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
BESI ∅ 22mm BESI ∅ 22mm
MANAJEMEN KONSTRUKSI
BL2 15 x 15 BL2 15 x 15 PT. PRISMA KARYA UTAMA
360 300
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
285
285
MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
MULYADI
NIP. 1968110199031002
MENGETAHUI
FFL ± 0.00 FFL ± 0.00 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
10 10 10 10 10 10 10
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
LUAR LUAR KELAS IIB RUMBAI
LEMBAGA PEMASYARAKATAN
POTONGAN -A POTONGAN -A KELAS IIB RIAU
Skala 1 : 25 Skala 1 : 25
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
B BL2 15 x 15
BESI ∅ 22mm
B BL2 15 x 15
BESI ∅ 22mm
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
FFL + 3.35 FFL + 3.35
A A
50
50
PT.PRIMEGA SANIYYA LESTARI
FFL + 2.85 FFL + 2.85
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
BESI ∅ 22mm BESI ∅ 22mm
MANAJEMEN KONSTRUKSI
BL2 15 x 15 BL2 15 x 15 PT. PRISMA KARYA UTAMA
600 / 200
540
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
285
MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
MULYADI
NIP. 1968110199031002
MENGETAHUI
FFL ± 0.00 FFL ± 0.00 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
POTONGAN -A PENGADAAN AJSAKONSULTANKSIONSTRUKSI
Skala 1 : 25
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
144
PLAT LANTAI BETON T = 15 cm
133
15
POTONGAN -B
Skala 1 : 25 MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
50
50
50
50
50
FFL + 11.10
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
30 20 30 20 30 20 30 20 30
MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
143
133
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
A
TAMPAK DEPAN SUGIHARTO, Bc. IP.S.SOS
Skala 1 : 25 NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
125
MULYADI
NIP. 1968110199031002
135
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
TAMPAK ATAS
Skala 1 : 25
5,40
6,04
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
1,22 KANTOR WILAYAH RIAU
1,50
1,50
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
0,70
I
1,40
I SATUAN KERJA
1,85
1,85
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
7,00
7,00
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
5,15
5,15
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
H H KONSULTAN PERENCANA
2,00
2,00
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
G P2 P3 P3 P3 P3 P3 P3 13,55 P3 P3 P2
G
10,00
24,00
6,00
6,00
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
F P2 P3 P3 P3 P3 P3 P3 P3 P3 F MANAJEMEN KONSTRUKSI
2,00
2,00
P2 PT. PRISMA KARYA UTAMA
E E
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 ZULI PRIYANTO, S.Kom
2.00
2.50
2.50 15.00
3.00
Direktur Utama
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
5,15
5,15
A
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
P4 P4 P4 P4
A
7,00
2.50
7,00
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
D
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
D
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
1,00
1,00
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
P1 P1 P1 P1
KM
150
150
400
/ WC
10 ORAN N
5
G
0,85
R. JAGA
0,85
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
C
SITAS
/ WC
70
P-0.05
SITAS
KM
C
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
1,50 1,50
1,50 1,50
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
P2 P2 P2
10 ORAN N
P2
P±0.00G
HUNIA
P2 P2
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
LEMBAGA PEMASYARAKATAN
B B KELAS IIB RUMBAI
A A
P4 P4 SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
MENGETAHUI
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
5,40 HUKUM DAN HAM RIAU
42,22
1 2 3 4 5 6 7 8 9 10 MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
DENAH PONDASI 1
KEMENTERIAN HUKUM DAN HAM RIAU
SKALA1:200 -
MHD JABARI SITEPU
NIP. 1964100819931001
P1 P2 P3 P4 MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
1,80 1,80
0,25
0,25 0,25
0,55
0,90
0,33 0,32
1,80
0,25
0,90
NRP. 67090332
0,90
RENCANA PONDASI
2,70
2,70
1,20
1,80 1,80
NO. GAMBAR NO. LEMBAR TAHUN
2023
PEMBERI TUGAS
5,40
6,04
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
1,22 LEMBAGA PEMASYARAKATAN
1,50
1,50
KELAS IIB RUMBAI
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60
0,70
SATUAN KERJA
I
1,40
I
1,85
1,85
LEMBAGA PEMASYARAKATAN
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
KELAS IIB RIAU
PEKERJAAN
7,00
7,00
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
5,15
5,15
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 KONSULTAN PERENCANA
H H
2,00
2,00
S2 S2 S2 S2 S2 S2 S2 S2 S2 S2
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60
G G
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
13,55
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
PT.PRIMEGA SANIYYA LESTARI
24,00
10,00
10,00
24,00
6,00
6,00
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60
F F MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
2,00
2,00
S2 S2 S2 S2 S2 S2 S2 S2 S2 S2
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60
E E ZULI PRIYANTO, S.Kom
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
Direktur Utama
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
SLOOF 1 30/60
2.00
2.50
2.50 15.00
3.00
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
5,15
5,15
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
7,00
7,00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
KAMAR
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
D
KAPAS R BLOK
/ WC
P-0.05
ITAS
D
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
1,00
1,00
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
0,85
0,85
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
SLOOF 1 30/60
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
C
KAPAS R BLOK
P-0.05
ITAS
C
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
1,50 1,50
P-0.05
SITAS
KM
KAMA
LEMBAGA PEMASYARAKATAN
SLOOF 1 30/60 SLOOF 1 30/60 SLOOF 1 30/60 KELAS IIB RUMBAI
B B
SLOOF 1 30/60
A A SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
5,40
42,22
1 2 3 4 5 6 7 8 9 10 MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
20
40
BBB-10 BERTULANG, 20,00
BERTULANG, 20,00
40
40
SKALA NAMA GAMBAR
cm x 40,00 cm
SLOOF BETON
20
cm x 40,00 cm
S1 S1 20
S2 20
5D16 1:200, 1:1 DENAH SLOOF LANTAI 1
7D16
TUMPUAN LAPANGAN 5D16 TUMPUAN LAPANGAN NO. GAMBAR NO. LEMBAR TAHUN
2023
PEMBERI TUGAS
6,04
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,05 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
1,50
1,50
B2 30/55 B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55
B2 30/55 B2 30/55 PENGADAAN AJSAKONSULTANKSIONSTRUKSI
I I PERENCANAANPEMBANGUNANLANU JTAN
1,85
1,85
PADALEMBAGAPEMASYARAKATAN
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
NARKOTK IAKELABR
ISUMBAI
B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
7,00
7,00
KONSULTAN PERENCANA
B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40
5,15
5,15
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B2 30/55 B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55
B2 30/55 B2 30/55
H H PT.PRIMEGA SANIYYA LESTARI
2,00
2,00
B2 30/55 B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55
B2 30/55 B2 30/55
G G MISTIAH HERMAWATI
B4 20/40
B4 20/40
Direktur
DIPERIKSA OLEH
B1 35/65
B4 20/40
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
24,00
10,00
10,00
24,00
MANAJEMEN KONSTRUKSI
6,00
6,00
B4 20/40 B4 20/40 B4 20/40 B4 20/40 PT. PRISMA KARYA UTAMA
B4 20/40
B4 20/40
ZULI PRIYANTO, S.Kom
2.00
2.50 15.00
B2 30/55 B2 30/55
F
3.00
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
2,00
+0.40
2,00
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
R.PERTOBATAN
2.00
C
+0.40
2.50
A
2.50
140
15.00 3.00
LEMBAGA PEMASYARAKATAN
123
2.50
2.00
/ WC
70
P-0.05
B2 30/55
R. PENGAW
KM
P±0.00
P-0.20 N
B2 30/55
T BETO
AS
RABA
/ WC
70
B2 30/55 B2 30/55
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
E
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
P±0.00G
/ WC
HUNIA
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
/ WC
SELAS
KAPA R BLOK
5
ITAS
P-0.0
BERSAMANDI
175
SITAS
KM
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
B2 30/55
B2 30/55
B2 30/55
KAMAR
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
P-0.05
175
150
KM
10 ORAN N
P±0.00G
HUNIA
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
5,15
5,15
10 ORAN N
5
P±0.00G
R. JAGA
HUNIA
P-0.0
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
P±0.00
KM
123
B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
B1 35/65
B1 35/65
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
7,00
7,00
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
B4 20/40 B4 20/40
LEMBAGA PEMASYARAKATAN
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
KELAS IIB RUMBAI
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
D B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35
D
1,00
1,00
0,85
0,85
TANGGA TANGGA
B2 30/55 B2 30/55 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55
C C SUGIHARTO, Bc. IP.S.SOS
B2 30/55
1,50 1,50
1,50 1,50
NIP. 196603111987031002
B4 20/40 B4 20/40 B4 20/40 MENGETAHUI
B B KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
B4 20/40 HUKUM DAN HAM RIAU
A A
MULYADI
NIP. 1968110199031002
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,05 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
MENGETAHUI
5,40 KEPALA KANTOR WILAYAH
42,22 KEMENTERIAN HUKUM DAN HAM RIAU
1 2 3 4 5 6 7 8 9 10
MHD JABARI SITEPU
NIP. 1964100819931001
MENYETUJUI
DENAH PEMBALOKAN LANTAI 2 2 DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
SKALA1:200 -
Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
2023
PEMBERI TUGAS
SATUAN KERJA
5,40 LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
6,04
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,05 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
1,50
1,50
PERENCANAANPEMBANGUNANLANU JTAN
B2 30/55 B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55 PADALEMBAGAPEMASYARAKATAN
B2 30/55 B2 30/55
I I NARKOTK IAKELABR
ISUMBAI
1,85
1,85
PEKANBARURA
IU
B4 20/40
B4 20/40
B4 20/40
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40
7,00
7,00
B4 20/40 B4 20/40
B4 20/40
5,15
5,15
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
PT.PRIMEGA SANIYYA LESTARI
B2 30/55 B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55
B2 30/55 B2 30/55
H H
2,00
2,00
MISTIAH HERMAWATI
B2 30/55 B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55 B2 30/55 Direktur
B2 30/55 B2 30/55
G G DIPERIKSA OLEH
B4 20/40
B4 20/40
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
B1 35/65
B4 20/40
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
24,00
10,00
10,00
24,00
6,00
6,00
B4 20/40 B4 20/40 B4 20/40 B4 20/40
B4 20/40
2.00
2.50
2.50 15.00
3.00
A
2.50 2.50
2.00
R. operator
±0.00
MENYETUJUI
8.00
3.00
TERAS
-0.05
R. IBADAH
R.KITAB
+0.40
±0.00
2.50
MIMBAR
+0.40
A
PEJABAT PEMBUAT KOMITMEN (PPK)
R.PENDETA
+0.40
B2 30/55
R.PERTOBATAN
2.00
C
+0.40
B4 20/40 B2 30/55 B4 20/40 B2 30/55 B2 30/55
2.50
B2 30/55
A
2.50
B2 30/55 B2 30/55
140 3.00
F
15.00
LEMBAGA PEMASYARAKATAN
123
2.50
F
2.00
/ WC
70
P-0.05
R. PENGAW
KM
P±0.00
P-0.20 N
T BETO
AS
RABA
/ WC
70
10 ORAN N
P-0.05
P±0.00G
HUNIA
P±0.00 AR
WORKS
123
KM
SELAS
P±0.00
HOP
KAPAS R BLOK
/ WC
R. BAKER
GUDAN
ITAS
P-0.05
140
2,00
2,00
P±0.00Y
KM
KAMA
G ALAT
/ WC
P-0.05
DAN
KM
10 ORAN N
/ WC
G
HUNIA
P±0.00
R. TATA
70
10 ORAN N
P-0.05
P±0.00
BAHAN
P±0.00G
HUNIA
R. PEMBU
KM
123
P±0.00
BOGA
KAPA R BLOK
/ WC
KAPAS R BLOK
P-0.05
SITAS
/ WC
ATAN
P-0.05
ITAS
KM
KAMA
KM
TEMPE
P±0.00
KAMA
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
70
G
/ WC
HUNIA
P±0.00
70
BETON
10 ORAN N
P-0.05
P±0.00G
HUNIA
123
KM
P-0.20
AR
KAPAS R BLOK
RABAT
P±0.00
B2 30/55
/ WC
SELAS
KAPA R BLOK
5
ITAS
B2 30/55
P-0.0
175
SITAS
KM
B2 30/55
KAMA
70
MA
175
KAMA
P-0.05
175
/ WC
125
B2 30/55 B2 30/55
KAMAR
P-0.05
175
150
KM
E
10 ORAN N
P±0.00G
HUNIA
E
150
KAPAS R BLOK
/ WC
P-0.05
ITAS
BERS UL
125
AMA
P±0.00
KM
P-0.05MAR. KUMP
KAMA
P±0.00L
70
N
I
R. PANE
BERSAMAND
175
123
R
KAMA
175 300
150
175
/ WC
175 400
150
KM
150
150
400
/ WC
10 ORAN N
5
R. JAGA
HUNIA
P-0.0
P±0.00
0
P±0.0
123
KM/WC
KM
P-0.05
KAPAS R BLOK
150
/ WC
B6 20/35
B6 20/35
B6 20/35
NIP. 198204082009121004
70
ITAS
P-0.05
KM
KAMA
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
/ WC
AR
P-0.05
P±0.00
SELAS
KM
10 ORAN N
/ WC
P±0.00G
HUNIA
10 ORAN N
P-0.05
G
HUNIA
P±0.00
KM
123
AR
KAPA R BLOK
P±0.00
/ WC
KAPA R BLOK
SELAS
P-0.05
SITAS
/ WC
70
P-0.05
SITAS
KM
KAMA
KM
KAMA
/ WC
5
P-0.0
KM
10 ORAN N
70
G
/ WC
MENYETUJUI
HUNIA
P±0.00
70
P-0.05
10 ORAN N
P±0.00G
BETON
HUNIA
123
KM
P-0.20
KAPAS R BLOK
RABAT
/ WC
KAPAS R BLOK
P-0.05
ITAS
ITAS
140
KM
KAMA
KAMA
5,15
5,15
P±0.00 AR
/ WC
P-0.05
SELAS
KM
10 ORAN N
P±0.00G
HUNIA
P-0.20
BETON
RABAT
KAPA R BLOK
KM
KAMA
B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40 B4 20/40
B1 35/65
B1 35/65
LEMBAGA PEMASYARAKATAN
7,00
7,00
KELAS IIB RUMBAI
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B4 20/40
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
B1 35/65
D B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35 B6 20/35
D
1,00
1,00
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
0,85
0,85
B2 30/55 B2 30/55 B2 30/55 B2 30/55 B2 30/55 B2 30/55 MENGETAHUI
C C
1,50 1,50
1,50 1,50
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
B4 20/40 B4 20/40
B B
HUKUM DAN HAM RIAU
A A MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 3,00 3,60 3,00 2,15 1,10 2,15 2,15 1,10 2,15 2,15 1,10 2,15 KEMENTERIAN HUKUM DAN HAM RIAU
5,40
2023
PEMBERI TUGAS
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
+16,50 KELAS IIB RIAU
C 4 LANTAI 05
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
R.PENDETA PADALEMBAGAPEMASYARAKATAN
R.KITAB +0.40 NARKOTK IAKELABR
ISUMBAI
2.00 +0.40 R.PERTOBATAN 2.00 PEKANBARURA
320A
2N
G
A
TH
U
R
A
N
IU
+0.40
KONSULTAN PERENCANA
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
3.00 3.00 PT. PRISMA KARYA UTAMA
2.50 2.50
R. operator SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
±0.00
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
2.00 2.00
TERAS MULYADI
NIP. 1968110199031002
-0.05
MENGETAHUI
KEPALA KANTOR WILAYAH
±0,00
KEMENTERIAN HUKUM DAN HAM RIAU
0 LANTAI 01
A C
MHD JABARI SITEPU
NIP. 1964100819931001
S a a 50
DENAH BANGUNAN GEREJA Dr. REYNHARD SILITONGA
Skala 1 : 200
NRP. 67090332
SKALA NAMA GAMBAR
2023
PEMBERI TUGAS
KACA SALIP RANGKA ALUMUNIUM 4" KACA SALIP RANGKA ALUMUNIUM 4" 0.15
KACA ACRYLIC KACA ACRYLIC
BALOK 15x15cm
(MENERUS HINGGA KOLOM PRAKTIS)
BALOK 15x20cm BALOK 15x20cm
0.20 (MENERUS HINGGA 0.20 (MENERUS HINGGA
KOLOM PRAKTIS) KOLOM PRAKTIS)
KEMENTERIAN HUKUM DAN HAM
0.70 0.70 0.70 0.70 PINTU ALUMUNIUM REPUBLIK INDONESIA
BOUVENLIS ALUMUNIUM BOUVENLIS ALUMUNIUM KACA ACRYLIC KANTOR WILAYAH RIAU
KACA ACRYLIC KACA ACRYLIC LEMBAGA PEMASYARAKATAN
2.20 KELAS IIB RUMBAI
BALOK BALOK
0.20 0.15 0.20 0.15
2.00 15x20cm 1.20 15x20cm SATUAN KERJA
(MENERUS HINGGA (MENERUS HINGGA
KOLOM PRAKTIS) KOLOM PRAKTIS)
PINTU ALUMUNIUM
BOUVENLIS RANGKA ALUMUNIUM 4" BOUVENLIS RANGKA ALUMUNIUM 4" KACA ACRYLIC LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
0.80
KETERANGAN : KETERANGAN : PEKERJAAN
KUSEN ALUMUNIUM 4" BRO N KUSEN ALUMUNIUM 4" BRO N
SEALENT NETRAL SEALENT NETRAL KOLOM PASANGAN KOLOM PENGADAAN AJSAKONSULTANKSIONSTRUKSI
KOLOM KACA ACRYLIC KOLOM KACA ACRYLIC PRATIS 15X15cm DINDING 21 BATA PRATIS 15X15cm PERENCANAANPEMBANGUNANLANU JTAN
PRATIS 15X15cm PRATIS 15X15cm PINTU 2 PADALEMBAGAPEMASYARAKATAN
S 1 : 50 NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
BOUVENLIS 2 BOUVENLIS 1
S 1 : 50 S 1 : 50 KONSULTAN PERENCANA
1.25 1.25
PRATIS 15X15cm DIPERIKSA OLEH
0.20
MANAJEMEN KONSTRUKSI
BALOK PT. PRISMA KARYA UTAMA
15x20cm
MULYADI
NIP. 1968110199031002
2.20 2.20
JENDELA KACA ACRYLIC RANGKA ALUMUNIUM
2.20 2.20
JENDELA KACA ACRYLIC RANGKA ALUMUNIUM
MENGETAHUI
1.68 1.68
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
+11.70 RAFTER WF 150.100.6.9 NARKOTK IAKELABR
ISUMBAI
PENUTUP ATAP SPANDEK PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
CNP 100.50.20 KONSULTAN PERENCANA
1.50
+10.20
BALOK
15x20
PT.PRIMEGA SANIYYA LESTARI
3.14
WF 150.100.6.9 / BAJA RINGAN
MISTIAH HERMAWATI
CNP 100.50.20 Direktur
BALOK BAGI
2.56
15x20 ZULI PRIYANTO, S.Kom
Direktur Utama
MENYETUJUI
GEWEL
+4.50 PEJABAT PEMBUAT KOMITMEN (PPK)
+3.50 1.00
7.06
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
BALOK LATEI MENYETUJUI
15x20 KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
3.50
Sk 1 50
Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
1 : 50 POTONGAN B - B
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
+11.70 RAFTER WF 150.100.6.9 NARKOTK IAKELA
BR
ISUMBAI
PENUTUP ATAP SPANDEK PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
CNP 100.50.20 KONSULTAN PERENCANA
1.50
+10.20
BALOK
15x20
PT.PRIMEGA SANIYYA LESTARI
3.14
WF 150.100.6.9 / BAJA RINGAN
MISTIAH HERMAWATI
CNP 100.50.20 Direktur
BALOK BAGI
2.56
15x20 ZULI PRIYANTO, S.Kom
Direktur Utama
MENYETUJUI
GEWEL
+4.50 PEJABAT PEMBUAT KOMITMEN (PPK)
+3.50 1.00
7.06 BENNY AFMAN, ST. M.M
NIP. 198204082009121004
BALOK LATEI MENYETUJUI
15x20 KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
3.50
Sk 1 50
Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
1 : 50 POTONGAN B - B
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAA N
JSA
KONSULTAK
NO
SINSTRUKSI
PERENCANAAN PEMBANGUNAN LANU JTAN
PADALEMBAGA PEMASYARAKATAN
NARKOK TIA
KERBLU
IA
IMSBAI
PEKANBARU
R
AIU
3202N
A
RG
N
AN
U
H
AT
KONSULTAN PERENCANA
MISTIAH HERMAWATI
Direktur
PENUTUP ATAP
SPANDEK
2.56 ZULI PRIYANTO, S.Kom
CNP 100.50.20 Direktur Utama
MENYETUJUI
+4.50 RAFTER WF 150.100.6.9 PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
BALOK
+3.50 1.00 15x25cm
PLAFOND GYPSUM
+3.73 BALOK LATEI BENNY AFMAN, ST. M.M
NIP. 198204082009121004
PLAFOND GYPSUM PLAFOND GYPSUM
0.75 +3.25 +3.25 0.75 15x25cm MENYETUJUI
PAS. DINDING 21 BATA KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
3.50 LANTAI KERAMIK GLOSSY Uk. 40x 40cm KELAS IIB RUMBAI
PINTU GANDA KACA
SUGIHARTO, Bc. IP.S.SOS
R. IBADAH
RANGKA ALUMUNIUM NIP. 196603111987031002
TERAS TERAS
-0.15 ±0.00 0.15 -0.05 ±0.00 -0.05 TANAH URUG MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
SLOOF 15x20 KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
0.30 0.30
PILECAP NIP. 1968110199031002
MENGETAHUI
0.80 0.80 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
Sk 1 50 Sk 1 50
Dr. REYNHARD SILITONGA
NRP. 67090332
SKALA NAMA GAMBAR
2023
PEMBERI TUGAS
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
4 10 71 10 10 71 10 4 4 10 72 10 4 PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
POTONGAN -A POTONGAN -A
Skala 1 : 25 Skala 1 : 25 PT.PRIMEGA SANIYYA LESTARI
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
BL2 15 x 15
MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
B B
FFL + 2.15 FFL + 2.15
ZULI PRIYANTO, S.Kom
Direktur Utama
4 4
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
211
215
215
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
MULYADI
NIP. 1968110199031002
MENGETAHUI
FFL ± 0.00 FFL ± 0.00 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
SATUAN KERJA
POTONGAN -A POTONGAN -A
Skala 1 : 25 Skala 1 : 25
PT.PRIMEGA SANIYYA LESTARI
MISTIAH HERMAWATI
Direktur
BL1 15 x 20 DIPERIKSA OLEH
ANGKUR ∅ 12mm BL1 15 x 20 ANGKUR ∅ 12mm ANGKUR ∅ 12mm MANAJEMEN KONSTRUKSI
B ANGKUR ∅ 12mm B PT. PRISMA KARYA UTAMA
5
Direktur Utama
8
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
53
41
A
8
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
A MENYETUJUI
53
44
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
215
210
215
8
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
44
53
MENGETAHUI
KEPALA DIVISI PEMASYARAKATAN
KANTOR WILAYAH KEMENTERIAN
120
8
100
MULYADI
42
53
NIP. 1968110199031002
MENGETAHUI
FFL + 0.00 FFL ± 0.00 KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
8
MHD JABARI SITEPU
TAMPAK DEPAN POTONGAN -B TAMPAK DEPAN POTONGAN -B NIP. 1964100819931001
Skala 1 : 25 Skala 1 : 25 Skala 1 : 25 Skala 1 : 25
MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
DALAM
KK2 15 x 15
10 10 10 10
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
POTONGAN -A PEKERJAAN
Skala 1 : 25
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
BL2 15 x 15 PERENCANAANPEMBANGUNANLANU JTAN
BESI ∅ 22 mm PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
4 142 4 B PEKANBARURA
320A
2N
G
A
TH
U
R
A
N
IU
150 FFL + 3.50
KONSULTAN PERENCANA
POTONGAN -A
Skala 1 : 25
A
50
FFL + 3.00
PT.PRIMEGA SANIYYA LESTARI
MISTIAH HERMAWATI
Direktur
BESI ∅ 22 mm
DIPERIKSA OLEH
BL2 15 x 15
BL2 15 x 15 MANAJEMEN KONSTRUKSI
B PT. PRISMA KARYA UTAMA
FFL + 2.15
ZULI PRIYANTO, S.Kom
4
Direktur Utama
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
A
112
120
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
300
MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
FFL + 0.95
4
MULYADI
NIP. 1968110199031002
MENGETAHUI
FFL ± 0.00 KEPALA KANTOR WILAYAH
FFL + 0.00 KEMENTERIAN HUKUM DAN HAM RIAU
DALAM DALAM
KK2 15 x 15 KK2 15 x 15
10 10 10 10 10 10 10 10
KEMENTERIAN HUKUM DAN HAM
REPUBLIK INDONESIA
KANTOR WILAYAH RIAU
LEMBAGA PEMASYARAKATAN
LUAR LUAR KELAS IIB RUMBAI
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
POTONGAN -A POTONGAN -A PEKERJAAN
Skala 1 : 25 Skala 1 : 25
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
BL2 15 x 15 BL2 15 x 15 PERENCANAANPEMBANGUNANLANU JTAN
BESI ∅ 22 mm BESI ∅ 22 mm PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
B B PEKANBARURA
320A
2N
G
A
TH
U
R
A
N
IU
FFL + 3.50 FFL + 3.50
KONSULTAN PERENCANA
A A
50
50
FFL + 3.00 FFL + 3.00
PT.PRIMEGA SANIYYA LESTARI
MISTIAH HERMAWATI
Direktur
BESI ∅ 22 mm BESI ∅ 22 mm
DIPERIKSA OLEH
BL2 15 x 15 BL2 15 x 15 MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
300
MENYETUJUI
KUASA PENGGUNA ANGGARAN (KPA)
LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
MULYADI
NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
FFL + 0.00 FFL + 0.00 KEMENTERIAN HUKUM DAN HAM RIAU
10 10 10 10 10 LEMBAGA PEMASYARAKATAN
KK2 15 x 15 KELAS IIB RIAU
ANGKUR ∅ 12mm
PEKERJAAN
DALAM
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
5 90 5 PERENCANAANPEMBANGUNANLANU JTAN
100 PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
5 95 32 32 32 5 PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
200 POTONGAN -A KONSULTAN PERENCANA
Skala 1 : 25
POTONGAN -A
Skala 1 : 25
PT.PRIMEGA SANIYYA LESTARI
BL1 15 x 20 BL2 15 x 15
ANGKUR ∅ 12mm
B ANGKUR ∅ 12mm
B ANGKUR ∅ 12mm
MISTIAH HERMAWATI
Direktur
DIPERIKSA OLEH
MANAJEMEN KONSTRUKSI
FFL + 2.15 FFL + 2.15 PT. PRISMA KARYA UTAMA
5
13
ZULI PRIYANTO, S.Kom
Direktur Utama
MENYETUJUI
33
PEJABAT PEMBUAT KOMITMEN (PPK)
LEMBAGA PEMASYARAKATAN
105
110
120
33
BENNY AFMAN, ST. M.M
NIP. 198204082009121004
MENYETUJUI
33
KUASA PENGGUNA ANGGARAN (KPA)
215
210 FFL + 0.95 LEMBAGA PEMASYARAKATAN
KELAS IIB RUMBAI
5
SUGIHARTO, Bc. IP.S.SOS
NIP. 196603111987031002
120
ANGKUR ∅ 12mm
MENGETAHUI
105
100
95
KANTOR WILAYAH KEMENTERIAN
HUKUM DAN HAM RIAU
MULYADI
FFL ± 0.00 FFL ± 0.00 NIP. 1968110199031002
MENGETAHUI
KEPALA KANTOR WILAYAH
KEMENTERIAN HUKUM DAN HAM RIAU
REL BESI Ø 19 TAMPAK DEPAN POTONGAN -B
Skala 1 : 25 Skala 1 : 25
SATUAN KERJA
LEMBAGA PEMASYARAKATAN
KELAS IIB RIAU
PEKERJAAN
PENGADAAN AJSAKONSULTANKSIONSTRUKSI
PERENCANAANPEMBANGUNANLANU JTAN
PADALEMBAGAPEMASYARAKATAN
NARKOTK IAKELABR
ISUMBAI
PEKANBARURA
IU
320A
2N
G
A
TH
U
R
A
N
KONSULTAN PERENCANA
MISTIAH HERMAWATI
TOP ATAP Direktur
P+8.47 DIPERIKSA OLEH
5 MANAJEMEN KONSTRUKSI
PT. PRISMA KARYA UTAMA
347
ZULI PRIYANTO, S.Kom
LISPLANG SPANDEK Direktur Utama
TOP BALOK
P+5.00 PLAT STRIP + BESI Ø 22 + MESH DALAM MENYETUJUI
PEJABAT PEMBUAT KOMITMEN (PPK)
KOLOM BAJA BY STRUKTUR LEMBAGA PEMASYARAKATAN
R. BAKERY KELAS IIB RUMBAI
300
300
847
P±0.00
BL2 15 x 15
ANGKUR ∅ 12mm
R. PEMBUATAN TEMPE PLAT LANTAI BETON BY STRUKTUR FIN. CAIRAN KIMIA BENNY AFMAN, ST. M.M
P±0.00
500
4 PAS. DINDING 1/2 BATA NIP. 198204082009121004
PEDESTAL MENYETUJUI
P+1.00 KUASA PENGGUNA ANGGARAN (KPA)
300
50
KELAS IIB RUMBAI
P±0.00
95
4 3 DRAINASE
SUGIHARTO, Bc. IP.S.SOS
SLOOF BY STRUKTUR
MT NIP. 196603111987031002
1500
1500
900
300
150
R. PENGAWAS
P±0.00
MHD JABARI SITEPU
NIP. 1964100819931001
150
150
MENYETUJUI
DIREKTUR JENDERAL PEMASYARAKATAN
KEMENTERIAN HUKUM DAN HAM RI
200
1 : 150 POTONGAN
2
NO. GAMBAR NO. LEMBAR TAHUN
ARS-07 07 2023