10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Toggle the table of contents

Early history of the IRT subway


Route map:

The first regularly operated subway in New York City was opened
on October 27, 1904, and was operated by the Interborough Rapid
Transit Company (IRT). The early IRT system consisted of a single
trunk line running south from 96th Street in Manhattan (running
under Broadway, 42nd Street, Park Avenue, and Lafayette Street),
with a southern branch to Brooklyn. North of 96th Street, the line
had three northern branches in Upper Manhattan and the Bronx.
The system had four tracks between Brooklyn Bridge–City Hall
and 96th Street, allowing for local and express service. The original
line and early extensions consisted of:

The IRT Eastern Parkway Line from Atlantic Avenue–Barclays


Center to Borough Hall
The IRT Lexington Avenue Line from Borough Hall to Grand
Central–42nd Street
The original IRT subway as it
The IRT 42nd Street Shuttle from Grand Central–42nd Street
existed following the completion of
to Times Square
Contracts 1 and 2
The IRT Broadway–Seventh Avenue Line from Times Square
to Van Cortlandt Park–242nd Street
The IRT Lenox Avenue Line from 96th Street to 145th Street
The IRT White Plains Road Line from 142nd Street Junction to 180th Street–Bronx Park

Planning for a rapid transit line in New York City started in 1894 with the enactment of the Rapid
Transit Act. The plans were drawn up by a team of engineers led by William Barclay Parsons, chief
engineer of the Rapid Transit Commission. The city government started construction on the first IRT
subway in 1900, leasing it to the IRT for operation under Contracts 1 and 2. After the initial line was
opened, several modifications and extensions were made in the 1900s and 1910s.

The designs of the underground stations are inspired by those of the Paris Métro; with few exceptions,
Parsons's team designed two types of stations for Contracts 1 and 2. Many stations were built just
below or above street level, as Parsons wished to avoid using escalators and elevators as the primary
means of access to the station. Heins & LaFarge designed elaborate decorative elements for the early
system, which varied considerably between each station, and they were also responsible for each
station's exits and entrances. Most tunnels used cut-and-cover construction, although deep-level tubes
were used in parts of the system; elevated structures were used in Upper Manhattan and the Bronx.
The lines used third rail power supplied by the IRT Powerhouse, as well as rolling stock made of steel
or of steel–wood composite.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 1/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

The city could only afford one subway line in 1900 and had hoped that the IRT would serve mainly to
relieve overcrowding on the existing transit system, but the line was extremely popular,
accommodating 1.2 million riders a day by 1914. Although the subway had little impact on retail in
Lower and Midtown Manhattan, the completion of the IRT subway helped encourage other
development, including residential growth in outlying areas and the relocation of Manhattan's Theater
District. The Dual Contracts, signed in 1913, provided for the expansion of the subway system; as part
of the Dual Contracts, a new "H"-shaped system was placed in service in 1918, splitting the original
line into several segments. Most of the original IRT continues to operate as part of the New York City
Subway, but several stations have been closed.

History

Earlier plans

The New York State Legislature granted a charter to the New York
City Central Underground Company to give it power to construct a
subway line in 1868. However, the charter made it impossible for
the company to raise adequate money to fund the line's
construction. Cornelius Vanderbilt and some associates had the
New York City Rapid Transit Company chartered in 1872 to build
an underground line from Grand Central station to City Hall as an
Political cartoon critical of the
extension of the Park Avenue main line.[1]: 104 The line would have
service of the IRT in 1905. The IRT
run from Broadway's east side at City Hall Park east to Chatham or
is labeled as the "Interborough
Centre Street, then to Park Street, Mott Street, the Bowery, Third
Rattled Transit". Diedrich
Avenue, and Fourth Avenue to connect with the existing line
Knickerbocker, personification of
between 48th Street and 59th Street. The line was estimated to
New York City, stands on the
cost $9.1 million.[2] platform.

While Cornelius Vanderbilt had indicated his intent to continue


the underground line to City Hall, there was speculation that he
did not intend to build the section south of 42nd Street. William Henry Vanderbilt stated the line
would not be as dark as the Metropolitan Railway (now part of the London Underground), and that
there would be stations every eight blocks, or every .5 miles (0.80 km). In January 1873, he expected
the cost of the work to City Hall to be $8 to $10 million, and that the whole project would be
completed by January 1, 1875.[3] The line was expected to have 400,000 daily passengers, and trains
would have traversed the line from City Hall to Grand Central in twelve minutes, and from there to the
Harlem River in ten minutes.[4] Although plans and surveys for the line were completed by January
1873, and proposals for the project were being received,[5] Vanderbilt elected not to follow through on
the project due to public criticism for the grant, opposition to the project[1]: 104 from business people
and homeowners in the Bowery and due to the Panic of 1873.[6]: 82 [7]

The State Legislature granted other applications for the incorporation of companies to construct a
subway in New York, including the Arcade Railroad, which would have been built by the Beach
Pneumatic Railroad Company. Since none of these companies could obtain enough capital to fund
construction, proposals to construct a subway line died by 1875. That year, the Rapid Transit Act of
1875 was passed, allowing for the construction of multiple elevated rail lines in the city, which reduced
demand for a subway line until 1884.[6]: 82 In 1874, the New York State Legislature passed a bill
allowing for the creation of a rapid transit commission in New York City, which was formed in
1875.[8][9]
https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 2/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

In April 1877, the New York City Board of Alderman passed a resolution requesting that
Commissioner Campbell assess the feasibility of constructing an underground line from City Hall to
the existing line by private enterprise. The Commissioner was strongly in support of such a plan, and
predicted that such a line would have a daily ridership of 100,000, would make $1.8 million annually
and would cost $9 to $10 million to build–in his mind, a financial success.[10] William Vanderbilt was
criticized for not following through on the plans of his father to extend the line to City Hall.[11]

In 1880, the New York Tunnel Railway was incorporated to construct a railroad from Washington
Square Park under Wooster Street and University Street to 13th Street, and then under Fourth Avenue
and 42nd Street to connect to the Fourth Avenue Improvement.[12] On October 2, 1895, the Central
Tunnel Company, the New-York and New-Jersey Tunnel Railroad Company, and the Terminal
Underground Railroad Company of New York were consolidated into the Underground Railroad
Company of the City of New York. Together, they planned to build a line running from City Hall Park
to the Fourth Avenue Improvement. The line would have run north under Chambers Street and Reade
Street, before going up Elm Street to Spring Street, Marion Street and Mulberry Streets, before
continuing through blocks and Great Jones Street, Lafayette Place, Astor Place and Eighth Street, and
then under Ninth Street to Fourth Avenue, before heading under 42nd Street to Grand Central Depot
to connect with the Fourth Avenue Improvement. The line would have had three connecting
branches.[13]

In January 1888, Mayor Abram Hewitt, in his message to the New York City Common Council,
conveyed his belief that a subway line could not be built in New York City without the use of credit
from the city government, and that if city funding were used, the city should own the subway line. He
stated that a private company would likely be needed to undertake the construction of the line, and
would have to provide a sufficient bond to complete the work to protect the city against loss. Hewitt
said that the company would be able to operate the line, but would need to do so under rent, which
would pay off the interest on the city bonds used to finance the construction of the line, and a sinking
fund to pay off the payment of the bonds. Furthermore, the company should fund the real estate
needed for buildings, such as power houses, the rolling stock to operate subway service, and a fund to
protect the city against losses if the company failed to build and operate the subway line. Though the
Mayor in the message also suggested encouraging the New York Central Railroad to construct and
operate a subway line, the company was unwilling to start such a venture. Legislation was drafted and
submitted to the State Legislature in 1888 to allow for competition among companies and people
willing to start work on a subway line. However, due to opposition from the Common Council, and
Tammany Hall, it was hard to find any legislator to sponsor the bill. The bill failed after the
Committee of the Legislature elected not to report the bill back to the New York State Senate.[6]: 82–83

New mayor Hugh J. Grant appointed a five-member Board of Rapid Transit Commissioners in April
1889 to lay out planned subway lines across the city.[8] The Board held its first meeting on April 23,
1890, and elected August Belmont as its President. The Board sent a letter to Mayor Grant on June 20,
telling him that state law made it illegal to construct a rail line on many streets in the city, making it
impossible to provide routes for a subway line that would benefit the public. The Board later adopted a
route that would avoid these restrictions, with the section of the route between 42nd Street and City
Hall being identical to the route of the first subway line that would be built.[6]: 83

As a result of the worsening transportation situation in the city, and requests for action by the public,
the State Legislature passed the Rapid Transit Act of 1891, allowing all cities with a population of over
one million, of which New York City was the only one, to create a board of "rapid transit railroad
commissioners." This Board would determine whether it was necessary to build a rapid transit system,
and if this were the case, would adopt a route for the construction of a railroad and obtain permission
for its construction from local authorities, and local property owners, or from the General Term of the
https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 3/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

New York Supreme Court. The Board would then approve detailed plans for the operation and
construction of the railroad and sell the right to operate and construct the rail line. The government
could issue bonds in order to fund rapid transit for the city.[14][15][16] The year, a five-member rapid
transit board for the city, called the Board of Rapid Transit Commissioners, was appointed. After a
series of hearings, it unanimously concluded that a rapid transit system was needed in New York City
and that it should be completed through an underground system. The board released a plan for a
mostly underground rapid transit line on October 20, 1891, and obtained consent from local
authorities and the General Term of the New York Supreme Court. The Board adopted detailed plans
for the railroad, and opened bidding for the contract on December 29, 1892. While it received bids for
the municipal rail line, no bids were selected as no responsible bidder was willing to take on the
project.[8] Following this failed attempt, the plan was essentially scrapped, and the Board lacked the
power to act further.[6]: 83–84

As a result of this failure, a proposition was made requesting that the Chamber of Commerce of the
State of New York construct a subway system if New York City loaned it money to undertake the work.
A committee of the most influential members of the Chamber came out in support of the proposition,
but former Mayor Hewitt stated it was not wise to present the public with a proposal in which public
money would be used by the private sector. Hewitt's opinion was unanimously approved by the
Chamber of Commerce, and a new committee was created to write a bill, based in part on the
legislation Hewitt proposed in 1888, to submit to the State Legislature.[6]: 83

Planning

The new bill, known as the Rapid Transit Act of 1894, was signed into law on May 22, 1894, creating a
new Board of Rapid Transit Railroad Commissioners, which included the Mayor of New York City.
Planning for the system that was built began with this law.[8] The act provided that the commission
would lay out routes with the consent of property owners and local authorities, either build the system
or sell a franchise for its construction, and lease it to a private operating company for fifty
years.[17]: 139–161 The law made it possible for the city to own the rapid transit system, and therefore
borrow money to fund its construction. It also expected the new Board to continue the work of the
Board of Rapid Transit Commissioners from the 1891 law.[6]: 83

The subway plans were drawn up by a team of engineers led by William Barclay Parsons, chief
engineer of the Rapid Transit Commission. It called for a subway line from New York City Hall in
lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[18]: 3
As part of the project, Parsons investigated other cities' transit systems to determine features that
could be used in the new subway.[19] Later in 1894, voters approved by referendum a city policy that
future rapid transit lines should be operated by the city instead of franchised to private operators.[14]: 1

A line through Lafayette Street (then Elm Street) to Union Square was considered, but at first, a more
costly route under lower Broadway was adopted. A legal battle with property owners along the route
led to the courts denying permission to build through Broadway in 1896. The Elm Street route was
chosen later that year, cutting west to Broadway via 42nd Street. This new plan, formally adopted on
January 14, 1897, consisted of a line from City Hall north to Kingsbridge and a branch under Lenox
Avenue and to Bronx Park, to have four tracks from City Hall to the junction at 103rd Street. The
"awkward alignment...along Forty-Second Street", as the commission put it, was necessitated by

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 4/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

objections to using Broadway south of 34th Street. Legal challenges were finally taken care of near the
end of 1899.[17]: 139–161 Elm Street would be widened and cut through from Centre Street and Duane
Street to Lafayette Place to provide a continuous thoroughfare for the subway to run under.[20]: 227

Construction

Contract awards

On November 15, 1899, contract for the construction of the subway and for its operation were
advertised. It called for a line beginning with a loop at Broadway and Park Row around the General
Post Office, before continuing as a four-track line via Park Row, Centre Street, Elm Street, Lafayette
Place, Fourth Avenue, 42nd Street and Broadway to 103rd Street. Then the line would diverge, with a
western branch running under Broadway to Fort George before continuing via a viaduct over Ellwood
Street and Kingsbridge Road to Bailey Avenue.[21] The intermediate section would be largely
underground, except for the Manhattan Valley Viaduct between 122nd Street and 135th Street, which
would cross a deep valley there.[22] The eastern branch was to run under private property to 104th
Street, under that street, Central Park, Lenox Avenue, the Harlem River and 149th Street. At Third
Avenue, the line would emerge onto a viaduct, continuing over Westchester Avenue, Southern
Boulevard and Boston Road to Bronx Park. Both branches were to be two-track lines. Bids were
opened on January 15, 1900, and the contract, later known as Contract 1, was executed on February
21, 1900,[21] between the commission and the Rapid Transit Construction Company, organized
by John B. McDonald and funded by August Belmont Jr., for the construction of the subway and a 50-
year operating lease from the opening of the line.[17]: 162–191 As part of the agreement, $35 million
would be provided for the total cost of the line, and the Rapid Transit Construction Company would
provide the cost of necessary equipment, including signals, rolling stock, and power plants. A formal
groundbreaking ceremony was done City Hall on March 24, pursuant to the contract's
requirements.[17]: 162–191 [21]

Shortly afterwards, the Rapid Transit Construction Company began preparing for the actual
construction of the line, divided the route up into fifteen sections, and invited bids from
subcontractors for each of these segments.[21][23]: 235 Degnon-McLean Contracting Company was
awarded the contract for Section 1, from Post Office Loop to Chambers Street, and the contract for
section 2, from Chambers Street to Great Jones Street. Work began on Section 1 on March 24, 1900,
and work began on Section 2 on July 10, 1900. On May 14, 1900, L. B. McCabe & Brother commenced
work on Section 13, the segment between 133rd Street and a point 100 feet (30 m) north of 182nd
Street. Construction began on the section from 104th Street to 125th Street on June 18, 1900. Work on
this section, Section 11 was awarded to John Shields. Work began on Section 6A, from 60th Street to
82nd Street, and for Section 6B, from 82nd Street to 104th Street, on August 22, 1900. These sections
had been awarded to William Bradley. Construction on the portion from 110th Street to a point 100
feet (30 m) north of 135th Street, Section 8, was begun on August 30, 1900, by Farrell & Hopper. On
September 12, 1900, work began on the line from Great Jones Street and 41st Street. The first section,
from Great Jones Street to a point 100 feet (30 m) north of 33rd Street, Section 3, had been awarded
to Holbrook, Cabot & Daly Contracting Company, while the remaining section to 41st Street, Section 4
was to be done by Ira A. Shaler. A week later, on September 19, Naughton & Company began work on
Section 5-B, which stretched from 47th Street to 60th Street. On October 2, 1900, Farrell & Hopper
started work on Section 7, from 103rd Street to 110th Street and Lenox Avenue.[21]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 5/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Degnon-McLean began work on the section along Park Avenue from 41st Street and 42nd Street,
along 42nd Street, and then Broadway to 47th Street, Contract 5-A, on February 25, 1901.
Construction was begun on Section 14, the portion for a point 100 feet (30 m) north of 182nd Street to
Hillside Avenue, by L. B. McCabe & Brother on March 27, 1901. On June 1, 1901, work began on the
viaduct over Manhattan Valley from 125th Street to 133rd Street, Section 12. Work on the stone piers
and foundations for the viaduct was done by E. P. Roberts, while other work was done by Terry &
Tench Construction Company. Work on Section 9-B, between Gerard Avenue on 149th Street and a
point past Third Avenue where the viaduct begins, was started on June 13, 1901, by J.C. Rogers. Work
on Section 11, from 104th Street to 135th Street, which had been awarded to John Shields, began on
June 18, 1901. On August 19, 1901, E. P. Roberts and Terry & Tench Construction Company began
work on Section 10, from Brook Avenue to Bronx Park and 182nd Street. McMullan & McBean began
work on the section from 135th Street and Lenox Avenue to Gerard Avenue and 149th Street, Section
9-A, on September 10, 1901. Work began on the final section, the West Side Viaduct from Hillside
Avenue to Bailey Avenue, Section 15 on January 19, 1903. E. P. Roberts and Terry & Tench
Construction Company completed this work.[21] In addition, contracts for 74,326 tons of structural
steel and 4,000 tons of rail were awarded to the Carnegie Steel Company. United Building Materials
Company was to supply 1.5 million barrels of cement, which would be used to make 400,000 cubic
yards of concrete. These were said to be "the largest ever undertaken by an individual firm for
supplying cement and steel for a single engineering work".[23]: 236

On February 26, the Board instructed the Chief Engineer to evaluate the feasibility of extending the
subway south to South Ferry, and then to Brooklyn. To ensure that the RTC was legally permitted to
construct the subway into areas of the city that were added as part of Consolidation in 1898, which
occurred after the Act of 1894 was passed, a bill was passed and became law on April 23, 1900. In May
1900, two routes were examined for the Brooklyn extension. One route would have run under
Broadway to Whitehall Street, under the East River, Joralemon Street, Fulton Street, and Flatbush
Avenue to Atlantic Avenue. The second route would have followed the first route but would have gone
to Hamilton Avenue before going towards Bay Ridge and South Brooklyn. On January 24, 1901, the
Board adopted the first route, which would extend the subway 3.1 miles (5.0 km) from City Hall to the
Long Island Rail Road (LIRR)'s Flatbush Avenue terminal station (now known as Atlantic Terminal)
in Brooklyn. The line's cost was expected to be no greater than $8 million, and added 8 miles (13 km)
of trackage.[20]: 83–84 Two contracts were received to construct the line and its terminals. John L.
Wells of the Brooklyn Rapid Railroad Company submitted a bid of $1 million for terminals, and $7
million for construction, while the Rapid Transit Subway Construction Company, which completed
Contract 1, bid $1 million for terminals, and $2 million for construction. As such,Contract 2, giving a
lease of only 35 years, was executed between the commission and the Rapid Transit Subway
Construction Company on September 11, with construction beginning at State Street in Manhattan on
November 8, 1902.[4] Belmont incorporated the Interborough Rapid Transit Company (IRT) in April
1902 as the operating company for both contracts; the IRT leased the Manhattan Railway Company,
operator of the four elevated railway lines in Manhattan and the Bronx, on April 1, 1903.[17]: 162–191

Progress

On July 12, 1900, the contract was modified to widen the subway at Spring Street to allow for the
construction of 600 feet (183 m) of a fifth track, and to lengthen express station platforms to 350 feet
(107 m) to accommodate longer trains.[20]: 82, 249 On June 21, 1900, the route of Contract 1 was
modified at Fort George in Upper Manhattan. The route was changed to run over Nagle Avenue and
Amsterdam Avenue instead of over Ellwood Street, between Eleventh Avenue and Kingsbridge
Avenue or Broadway. The route of the terminal loop at City Hall was shortened to only be constructed
between City Hall and the Post Office instead of passing completely around the Post Office as a result
https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 6/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

of a change issued on January 10, 1901.[24]: 189–190


In addition, the loop was changed from being
double-tracked to single tracked. The loop was designed to allow local trains to be turned around, and
to pass under the express tracks under Park Row without an at-grade crossing, and to allow for a
possible future extension south under Broadway. To allow for the switching back of express trains, a
relay track was constructed under Park Row, allowing for a future southern extension under
Broadway.[20]: 226, 249

On December 20, 1900, the contractor requested that the plans for the Manhattan Valley Viaduct be
modified to allow for a three-track structure and for the construction of a third track at the 145th
Street, 116th Street, and 110th Street stations. The Board adopted the request on January 24, 1901.
Some time after, the contractor requested permission to construct a third track for storage. The Board
authorized the construction of a third track from 103rd Street to 116th Street on March 7, 1901. The
contractor petitioned the board once more for the permission to build a third track continuously from
137th Street to 103rd Street, some of which was already authorized, and to build a storage yard
between 137th Street and 145th Street, with three tracks on either side of the main line to allow for the
storage of 150 cars. The Board authorized the request on May 2, 1901, and rescinded the March 7
resolution. The new resolution specified that the third track would be for express
trains.[20]: 93 [24]: 189–190 However, construction on the section between 104th Street and 125th Street
had already begun prior to the design change, requiring that a portion of the work be
undone.[20]: 240–241 As part of the modifications for a third track, a third track was to be added to both
the upper and lower levels of the subway directly north of 96th Street, immediately to the east of the
originally planned two tracks.[25]: 14

In 1902, the contractor requested permission to build an additional third track from Fort George to
Kingsbridge. The Board authorized the construction of the track on January 15, 1903,[26]: 35 and it was
formally approved on March 24, 1904.[24]: 191

The contractor for the subway purchased a large area of land on the Harlem River near 150th Street
for the construction of a terminal for the East Side Line. On October 24, 1901, the Board voted to
extend the line from 143rd Street to the terminal. As part of the plan, a station would be built at 145th
Street instead of at 141st Street and Lenox Avenue.[27]: 781 Some trains would originate at 145th Street
instead of Bronx Park. This change was expected to promote the benefits of using the subway for
travel to Harlem.[20]: 94 On April 28, 1902, Mayor Low signed the ordinance providing for the
extension.[28] On January 16, 1903, a modification to Contract 1 was made to allow for the extension
of the Lenox Avenue Line from 142nd Street to 148th Street with a stop between 142nd Street and
Exterior Street. The stop was placed at 145th Street along tracks that were only intended to lead to
Lenox Yard.[29][30]: 387–415

Also in 1903, residents in the vicinity of 104th Street and Central Park West urged the board to build a
station at this location. They cited the long distance between the two nearest subway stations, and the
need to serve Central Park West. The Board declined to construct the station after serious
consideration. They found that the station's construction would have delayed the opening of the line,
and would have slowed service for passengers using the Lenox Avenue Line coming from the
Bronx.[26]: 43 Residents of the area requested the construction of a station at this location again in
1921.[31]

The soil excavated during construction went to various places.[32] In particular, Ellis Island in New
York Harbor was expanded from 2.74 acres (1.11 ha) to 27.5 acres (11.1 ha), partially with soil from the
excavation of the IRT line,[33] while nearby Governors Island was expanded from 69 acres (28 ha) to

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 7/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

172 acres (70 ha).[34]


The excavated Manhattan schist was also used to construct buildings for the City
College of New York.[32]

Opening

On New Year's Day 1904, mayor George B. McClellan Jr. and a


group of wealthy New Yorkers gathered at the City Hall station
and traveled 6 miles (9.7 km) to 125th Street using
handcars.[35][36] The IRT conducted several more handcar
trips afterward. The first train to run on its own power
traveled from 125th Street to City Hall in April 1904.[37]

Operation of the subway began on October 27, 1904,[38] with


the opening of all stations from City Hall to 145th Street on the The Simpson Street station in the Bronx
West Side Branch.[17]: 162–191 [24]: 189 Express trains originally opened on November 26, 1904.
[4]
were eight-cars long. Service was extended to 157th Street
for a football game on November 12, 1904, before the station
had fully opened. The 157th Street station officially opened on December 4.[24]: 191 On November 23,
1904, the East Side Branch, or Lenox Avenue Line, opened to 145th Street.[24]: 191 The line was
extended to Fulton Street on January 16, 1905,[39] to Wall Street on June 12, 1905,[40] and to Bowling
Green and South Ferry on July 10, 1905.[41]

The initial segment of the IRT White Plains Road Line opened on November 26, 1904, between Bronx
Park/180th Street and Jackson Avenue. Initially, trains on the line were served by elevated trains from
the IRT Second Avenue Line and the IRT Third Avenue Line, with a connection running from the
Third Avenue local tracks at Third Avenue and 149th Street to Westchester Avenue and Eagle Avenue.
Once the connection to the IRT Lenox Avenue Line opened on July 10, 1905, trains from the newly
opened IRT subway ran via the line.[42] Elevated service on the White Plains Road Line via the Third
Avenue elevated connection was resumed on October 1, 1907, when Second Avenue locals were
extended to Freeman Street during rush hours.[43]

The West Side Branch was extended northward to a temporary terminus of 221st Street and Broadway
on March 12, 1906.[24]: 191 [44] This extension was served by shuttle trains operating between 157th
Street and 221st Street.[45] On April 14, 1906, the shuttle trains started stopping at 168th Street. On
May 30, 1906, the 181st Street station opened, and the shuttle operation ended.[46]: 71, 73 Through
service began north of 157th Street, with express trains terminating at 168th Street or 221st
Street.[46]: 175–176 The original system as included in Contract 1 was completed on January 14, 1907,
when trains started running across the Harlem Ship Canal on the Broadway Bridge to 225th Street,[44]
meaning that 221st Street could be closed.[24]: 191 Once the line was extended to 225th Street, the
structure of the 221st Street station was dismantled and was moved to 230th Street for a new
temporary terminus. Service was extended to the temporary terminus at 230th Street on January 27,
1907.[24]: 191 The 207th Street station was completed, but did not open until April 1, 1907, because the
bridge over the Harlem River was not yet completed.[40]

The original plan for the West Side Branch had called for it to turn east on 230th Street, running to
the New York Central Railroad's Kings Bridge station at a point just west of Bailey Avenue.[47] An
extension of Contract 1, officially Route 14, north to 242nd Street at Van Cortlandt Park was approved
on November 1, 1906.[17]: 204 This change also called for the abandonment of the route along 230th
Street.[24]: 191 This extension opened on August 1, 1908.[24]: 191 [48] When the line was extended to
https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 8/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

242nd Street the temporary platforms at 230th Street were dismantled, and were rumored to be
brought to 242nd Street to serve as the station's side platforms. There were two stations on the line
that opened later; 191st Street and 207th Street. The 191st Street station did not open until January 14,
1911, because the elevators and other work had not yet been completed.[40]

To complete Contract 2, the subway had to be extended under the East River to reach Brooklyn. The
tunnel was named the Joralemon Street Tunnel, which was the first underwater subway tunnel
connecting Manhattan and Brooklyn, and it opened on January 9, 1908, extending the subway from
Bowling Green to Borough Hall.[49] On May 1, 1908, the construction of Contract 2 was completed
when the line was extended from Borough Hall to Atlantic Avenue near the Flatbush Avenue LIRR
station.[50] With the opening of the IRT to Brooklyn, ridership fell off on the BRT's elevated and
trolley lines over the Brooklyn Bridge as Brooklyn riders chose to use the new subway.[51]

Proposed expansion

In 1903, the New York Rapid Transit Board ordered Chief Engineer Parsons to create a plan for a
comprehensive subway system to serve all of New York City. Parsons presented his plan to the Board
on February 19, 1904, for his proposals in Manhattan and the Bronx, and released his proposals for
Brooklyn and Queens on March 12.[4]

Modifications

On June 27, 1907, a modification called the 96th Street Improvement was made to Contract 1, which
would add tracks at 96th Street in order to remove the at-grade junction north of the 96th Street
station. Here, trains from Lenox Avenue and Broadway would switch to get to the express or local
tracks and would delay service.[52] The tracks would have been constructed with the necessary fly-
under tracks and switches.[25]: 14 The work was partially completed in 1908, but was stopped because
the introduction of speed-control signals made the remainder of the project unnecessary. Provisions
were left to allow the work to be completed later on. The signals were put into place at 96th Street on
April 23, 1909. The new signals allowed trains approaching a station to run more closely to the
stopped train, eliminating the need to be separated by hundreds of feet. The new signals were also
installed at Grand Central, 14th Street, Brooklyn Bridge, and 72nd Street by November 1909, allowing
the IRT to run two or three more trains during peak hours.[24]: 85–87, 191 [53]: 166–167

On June 18, 1908, a modification to Contract 2 was made to add shuttle service between Bowling
Green and South Ferry. At the time, of the trains that continued south of City Hall, some trains ran
through to Brooklyn, with the rest running to South Ferry before returning to uptown service. It was
determined that the operation of trains via the South Ferry Loop impeded service to Brooklyn,
prohibiting a doubling of Brooklyn service. In order to increase Brooklyn service, it was decided to
continue serving South Ferry via shuttle service. An additional island platform and track were
constructed on the west side of the Bowling Green station to allow for the shuttle's operation. The cost
was estimated to be $100,000. While the change inconvenienced South Ferry riders, it stood to
benefit the greater number of Brooklyn riders.[54] Though work on the project was not fully
completed, shuttle service began on February 23, 1909, allowing all Broadway express trains to run to
Brooklyn, instead of having some of them terminate at South Ferry, increasing express service to
Brooklyn by about 100 percent.[55][56]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 9/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

On August 9, 1909, a modification to Contract 1 was made, allowing for the construction of an infill
station on the West Farms Branch at Intervale Avenue. The station would have an escalator to the
mezzanine, where the ticket office would be located.[56] Construction of the station began in
December 1909. The station opened on April 30, 1910, even though work on the station was not
completed until July. In February 1910, work began on the construction of a permanent terminal for
the West Farms Branch at Zoological Park at 181st Street and Boston Road, replacing the temporary
station at this location. The new station cost $30,000[24]: 10 and opened on October 28,
1910.[57]: 105–106

To address overcrowding, the New York State Public Service Commission proposed to lengthen
platforms to accommodate ten-car express and six-car local trains.[53]: 168 On January 18, 1910, a
modification was made to Contracts 1 and 2 to lengthen station platforms to increase the length of
express trains to eight cars from six cars, and to lengthen local trains from five cars to six cars. In
addition to $1.5 million spent on platform lengthening, $500,000 was spent on building additional
entrances and exits. It was anticipated that these improvements would increase capacity by 25
percent.[57]: 15 In September 1910, it was estimated that work to lengthen express platforms to fit ten-
car trains would be sufficiently complete to allow for ten-car expresses by February 1, 1911, and that
work to lengthen local platforms to fit six-car trains would be sufficiently complete to allow for six-car
locals by November 1, 1910.[58] On January 23, 1911, ten-car express trains began running on the
Lenox Avenue Line, and on the following day, ten-car express trains were inaugurated on the
Broadway Line. The platforms at all but three express stations were extended to accommodate ten-car
trains. The platforms at 168th Street and 181st Street, and the northbound platform at Grand Central,
were not extended. Until the platform extensions were completed, the first two cars of trains overshot
the platform, and the doors did not open in these cars. All southbound stations on the Broadway Line
north of 96th Street and on the White Plains Road Line north of 149th Street, as well as at Mott
Avenue, Hoyt Street, and Nevins Street, were only eight cars long.[53]: 168 [59]

Service pattern
Initially, express service ran every two minutes, running at an average speed of 30 miles per hour
(48 km/h), with service alternating between the east and west branches. Express trains were eight
cars long, with three trailer cars, and five motor cars. Local trains ran at an average speed of 16 miles
per hour (26 km/h), and also alternated between the east and west branches. Service was provided
with five-car trains, of which two cars were trailers, and three were motors.[4]

Express trains began at South Ferry in Manhattan or Atlantic Avenue in Brooklyn, while local trains
typically began at South Ferry or City Hall, both in Manhattan. Local trains to the West Side Branch
(242nd Street) ran from City Hall during rush hours and continued south at other times. East Side
local trains ran from City Hall to Lenox Avenue (145th Street). All three branches were initially served
by express trains; no local trains used the East Side Branch to West Farms (180th Street).[60]

Beginning on June 18, 1906, Lenox Avenue express trains no longer ran to 145th Street; all Lenox
Avenue express trains ran to the West Farms Line.[46]: 78 When the Brooklyn branch opened, all West
Farms express trains and rush-hour Broadway express trains operated through to Brooklyn.[61]
Essentially each branch had a local and an express, with express service to Broadway (242nd Street)
and West Farms, and local service to Broadway and Lenox Avenue (145th Street).[62] In November
1906, some southbound express trains on the West Side branch began skipping the four stations
between 137th and 96th Streets during rush hours;[63] however, Upper Manhattan residents reported
that these express services did not save time and operated inconsistently.[64]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 10/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

When the "H" system opened in 1918, all trains from the old system were sent south from Times
Square–42nd Street along the new IRT Broadway–Seventh Avenue Line. Local trains (Broadway and
Lenox Avenue) were sent to South Ferry, while express trains (Broadway and West Farms) used the
new Clark Street Tunnel to Brooklyn.[65] These services became 1 (Broadway express and local), 2
(West Farms express), and 3 (Lenox Avenue local) in 1948. The only major change to these patterns
was made in 1959, when all 1 trains became local and all 2 and 3 trains became express.[66][67][68] The
portion south of Grand Central–42nd Street became part of the IRT Lexington Avenue Line, and now
carries 4 (express), 5 (express), 6 (local), and ⟨6⟩ (local) trains; the short piece under 42nd Street is
now the 42nd Street Shuttle.[65]

Design

Underground stations

Platform layouts

The designs of the underground stations are inspired by those of


the Paris Métro,[18]: 5 whose design had impressed
Parsons.[19]: 46–47 With few exceptions, Parsons's team designed
two types of stations for Contracts 1 and 2. Local stations, which
serve only local trains, have side platforms on the outside of the
tracks.[18]: 4 [69]: 8 Local stations were spaced .25 miles (0.40 km)
apart on average.[4][70]: 3 Express stations, which serve both local
and express trains, have island platforms between each direction's
pair of local and express tracks. There were five express stations:
Brooklyn Bridge, 14th Street, Grand Central, 72nd Street, and 96th The Bowling Green station, built as
part of Contract 2
Street,[18]: 4 [69]: 8 which were spaced 1.5 miles (2.4 km) apart on
average.[4][70][71]: 3 The Brooklyn Bridge, 14th Street, and 96th
Street stations also had shorter side platforms for local trains,
though these platforms have since been abandoned at all three stations.[69]: 8 [72]: 4 There was not
enough space for side platforms at the Grand Central and 72nd Street stations.[71]: 3 Stations north of
96th Street and south of Brooklyn Bridge, which served both local and express trains, typically had
two side platforms and two or three tracks.[18]: 4 [69]: 8

Some exceptions were made to the standard platform design. The now-closed City Hall station
contains one balloon loop and was designed in a much more ornate style than all of the other
stations.[18]: 4–5 [69]: 8 The City Hall station originally only served passengers entering the system;
passengers had to disembark at the Brooklyn Bridge station.[71]: 4 The Bowling Green station, opened
as part of Contract 2, was built with one island platform and two tracks, although a third track and a
second island platform was built in 1908 for the Bowling Green–South Ferry shuttle.[73] The South
Ferry loops, also part of Contract 2, had two balloon loops with a platform on the outer loop.[74] The
Central Park North–110th Street station, north of 96th Street, had a single island platform.[72]: 4 Other
nonstandard platform layouts included a Spanish solution (two side platforms, one island platform,
and two tracks), used at the terminal stations at Van Cortlandt Park–242nd Street[75] and 180th
Street–Bronx Park.[76]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 11/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Generally, local platforms south of 96th Street were originally 200 feet (61 m) long and between 10
and 20 feet (3.0 and 6.1 m) wide. Express platforms, all platforms north of 96th Street, and all
Contract 2 platforms were originally 350 feet (110 m) long and between 15.5 and 30 feet (4.7 and
9.1 m) wide.[18]: 4–5 [69]: 8 The 200-foot local platforms could fit five cars of the IRT's original rolling
stock, while the 350-foot platforms could fit eight original cars.[71]: 2 [77] Both the local and express
trains were slightly longer than the platforms, as each car was about 51 feet (16 m) long; thus, the
frontmost and rearmost doors of each train did not open.[77]

Passenger circulation and structural features

One major consideration was the avoidance of escalators and elevators as the primary means of access
to the station. Many of the local stations are just below ground level and have a fare control (turnstile)
area at the same level as the platform.[69]: 8 [18]: 4 The local stations are generally 17 feet (5.2 m) under
the street. Platform-level control areas generally measured 30 by 45 feet (9.1 by 13.7 m) and contained
an oak ticket booth and two restrooms.[69]: 8–9 Every station, apart from City Hall, had a
restroom.[72]: 5 Local stations from Worth Street to 50th Street were designed symmetrically on either
side of their respective cross street. To provide space for the ticket offices and waiting rooms, an area
of the cross street was excavated. At platform level, separate entrances and exits were installed on
either end of each platform, and short wide stairways were installed on each platform. The entrance
stairway for each platform was placed at the back of the waiting room, while the exit stairway was at
the back of the platform directly to the street. North of 59th Street, Broadway is wide enough that
stations' platforms generally did not extend under the sidewalk; at these stations, access to the
platforms was provided by a single wide staircase. Most stations in which the tracks were not under
the middle of the street, with only a single platform under the sidewalks, were supplied with a pair of
wide staircases due to their location in Harlem's business district.[4]

Among stations with two side platforms, the Times Square and
Astor Place stations had underpasses connecting the platforms,
while the 103rd Street, 116th Street, 168th Street, 181st Street, and
Mott Avenue stations had overpasses linking the
platforms. [71]: 2–3 [6]: 146 Crossovers and crossunders were not
provided at other stations,[6]: 146 although underpasses were
installed at 28th Street and 66th Street after the original IRT
opened.[71]: 3 A slight modification to the standard local station
design was also done at 116th Street–Columbia University,[4]
which was designed with a station house in the median of The 168th Street station has
Broadway. The ticket office for the station was at street level. A overpasses linking its two platforms.
stairway led from the station house to an overpass over the tracks, The station is also built at a deep
which provided access to both platforms.[6]: 146 level and, as a result, is only
reachable via elevator.
Access to express stations was provided by overpasses,
underpasses, and stairways directly leading to the street.[4] The
Brooklyn Bridge, 14th Street, and Grand Central stations were 25 feet (7.6 m) below street
level;[69]: 8–9 all three stations had mezzanines above the platform.[69]: 8–9 [71]: 2–3 The 72nd Street
station was only 14 feet (4.3 m) beneath the street, since its entrance was through a control house
directly above the platform, while the 96th Street station had an underpass because a large trunk
sewer made a mezzanine impractical.[69]: 8–9

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 12/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Three stations, 168th Street, 181st Street, and Mott Avenue, were built at a deep level and contain
arched ceilings; they were only reachable by elevators.[69]: 8 [78][a] The 191st Street station was also
built at a deep level, but contains a passageway in addition to its elevator entrance.[80] Deep stations
had their ticket offices directly under the sidewalk, and had a stairway and elevators that could
accommodate 3,500 riders per hour leading down to the station. These stations were constructed with
large arches extending over the tracks and platforms. The elevators led down to an overpass crossing
the tracks to provide access to both platforms.[4] The 168th Street, 181st Street, 191st Street, and Mott
Avenue stations contained double-deck elevators, all of which have since been removed or replaced.
The lower deck carried passengers from the platform to the mezzanine, while the upper deck carried
passengers from a mezzanine to an overpass above the platforms.[71]: 3

In the majority of underground stations, excluding the deep-level stations, the roofs of the platforms
are supported by round cast iron columns placed every 15 feet (4.6 m). Additional columns between
the tracks, placed every 5 feet (1.5 m), support the jack-arched concrete station roofs. Each platform
consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins.[18]: 5 [69]: 9 Bronze
ventilation grates were placed in the lowest portions of the station walls, as well as in the cornices. At
twenty stations where the platforms were beneath the sidewalk, overhead vault lights were installed to
provide light to stations; incandescent bulbs provided artificial lighting. The ceilings were finished in
plaster, applied to wire lath.[69]: 9–11 [72]: 5 The walls of the station were built with brick, and were
covered by plaster ceilings and enameled tiles.[4] The City Hall station, the only one whose decorative
treatment was explicitly part of its structure, contains vaulted ceilings with Guastavino
tile.[18]: 6 [69]: 14–15

Decorations

Heins & LaFarge were commissioned to design the stations'


decorations;[71]: 2 while some of these original designs remain
intact, others have been modified or removed over the years.[18]: 3, 5
At stations with side platforms, wainscoting and wall surfaces are
generally given a similar treatment. The lowermost 2.5 feet (0.8 m)
of the walls are wainscoted in either Roman brick or marble to
resist heavy wear.[4] The rest of the walls are made of white glass
or glazed tiles measuring 3 by 6 inches (76 mm × 152 mm). The
walls are generally divided at 15-foot (4.6 m) intervals by colorful
tile or mosaic pilasters.[18]: 5 [69]: 10 [81]: 67 Architectural critic
Christopher Gray wrote that "the stations were meant not only to
appear sanitary and healthful but also to constitute a major public Ceramic plaques on station walls
work like the automobile parkways of the 1920s".[82] were associated with something of
local significance. Seen here is a
Under the IRT's contract with the city, the company was faience plaque with beaver at Astor
theoretically allowed to place advertisements on the blank walls Place, representing the beaver pelts
between the pilasters.[83]: 46, 48 Belmont had tried to pare down the that helped make John Jacob Astor
stations' decorations in 1902 so he could increase his advertising wealthy.[18]: 8
revenue, although this did not become widely known until late
1904.[82] In practice, the Rapid Transit Commission had banned
the IRT from displaying advertisements or adding objects such as slot machines to stations.[84] The
public initially opposed advertisements in stations.[83]: 46, 48 [82] The Real Estate Record and Guide
wrote that the advertisements "irretrievably mar the appearance of a very appropriate and admirable
piece of interior decoration",[85] while the New-York Tribune said "it was a scandal to have the

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 13/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

stations of a road owned by the city used in such vulgar and offensive fashion for advertising
purposes".[86] Legal disputes over the advertisements continued until 1907, when a New York
Supreme Court judge ruled that the IRT could display advertising at stations.[82]

Decorative details in each station varied considerably to give each station a distinct identity, to
improve the appearance of the stations, and to make it easier for passengers to recognize a station
through the windows of a subway car.[4] There are friezes atop each station's walls, which are
generally interspersed with plaques signifying the street name or number, as well as plaques with a
symbol that is associated with a local landmark or another object of local significance.[18]: 5 [69]: 10 Such
plaques may have been installed to provide a visual aid to the large immigrant populations who were
expected to ride the subway, many of whom did not read English,[83]: 46 [87]: 5347 although a writer for
The New York Times said in 1957 that "non-English readers would have had to be rich in associative
powers".[88] Heins & LaFarge worked with the ceramic-producing firms Grueby Faience Company of
Boston and Rookwood Pottery of Cincinnati to create the ceramic plaques.[89][90] Mosaic tablets with
the name of the station are put at regular intervals within the stations' walls.[18]: 5 The bright colors
were intended to catch the attention of the casual observer,[69]: 11 [91][92] and each station used a
different color scheme.[92] Other architectural details were made of glazed terracotta or, in more
important stations, of faience. These materials were of high quality but were also expensive, requiring
Heins & LaFarge to limit their use of such materials in the IRT stations.[69]: 11

Entrances and exits

Heins & LaFarge also designed entrance and exit structures for the underground stations.[18]: 3 At
stations with platform-level fare control areas, there were generally four staircases to the street, two
each for entrance and exit.[69]: 8 A station could have between two and eight staircases in total.[72]: 5 At
some stations, such as the 23rd Street station, the IRT made agreements with property owners to
construct entrances into adjacent buildings.[83]: 48 [69]: 8 As part of Contract 2, an underground
passageway was constructed to connect a large building with the Wall Street station.[4]

Most stations had entrance and exit kiosks, extremely ornate


structures made of cast iron and glass, being inspired by those on
the Budapest Metro, which themselves were inspired by ornate
summer houses called "kushks".[83]: 443 [81]: 66–67 One hundred and
thirty-three kiosks of varying width were made by Brooklyn-based
manufacturer Hecla Iron Works. Exit kiosks were distinguished by
their four-sided pyramidal wire-glass skylights, while entrance
kiosks had domed roofs with cast-iron shingles. The kiosks also
carried ventilation shafts for the stations' restrooms, which were
generally directly underneath each kiosk.[69]: 13 The entrance and Hecla Iron Works manufactured 133
exit kiosks were considered obstructions to traffic, and were entrance and exit kiosks for the IRT;
frequently vandalized and used as advertising boards. As a result, two entrance kiosks are shown
they were all removed by the late 20th century.[69]: 13 [81]: 67 One here.
replica of an entrance kiosk exists at the Astor Place station.[93]

The 72nd Street, 103rd Street, 116th Street–Columbia University, and Mott Avenue stations were
accessed via large brick control houses; those at 103rd and 116th Streets no longer
exist.[69]: 8 [83]: 46 [94]: 2 At these stations, the ticket booths and restrooms were in the surface-level
control houses rather than inside the station.[72]: 5 Control houses of a similar style were also built at
Bowling Green and Atlantic Avenue.[83]: 46 [94]: 2 They were probably inspired by those on the Boston

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 14/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

subway and, rather than using a specific historical style, were generally fanciful in design. The control
houses were decorated with bricks, limestone, and terracotta, and contained details similar to the
buildings at the Bronx Zoo's Astor Court, also designed by Heins & LaFarge.[69]: 11–13

Tunnels

McDonald's contract with the Board of Rapid Transit Commissioners specified the methods of
construction to be used for the subway. The board preferred a shallow tunnel as used on the Boston
subway and on the Budapest Metro's Line 1. Cut-and-cover construction was permitted, although
open excavations were not to exceed 400 feet (120 m) unless there were overpasses for pedestrian and
vehicle traffic. Open excavation was permitted between City Hall and 34th Street; along 42nd Street;
and along Broadway from 42nd to 60th Streets. Open excavation was prohibited between 34th and
40th Streets due to the presence of the Murray Hill Tunnel, as well as on the Lenox Avenue Line from
104th to 110th Streets, which ran under the North Woods of Central Park. North of 60th Street the
contractor could choose "the most expeditious manner possible, having due regard to safety of
persons and property and reasonable consideration for the accommodation of street
traffic."[23]: 235–236 The tunnels had a minimum railway curve radius of 147 feet (45 m), at the City
Hall station, and a maximum gradient of 3 percent, in the Harlem River tunnels.[71]: 2

For the most part, cut-and-cover construction was used. Cut-and-cover tunnels contain concrete
foundations, and have steel beams supporting the ceiling arches, as in the stations.[71]: 2 [72]: 6 [23]: 237
Cut-and-cover tunnels are typically shallow, as the roofs of the tunnels are usually only 30 inches
(760 mm) beneath the surface; this provided room for the underground conduits that were used by
streetcars in New York City at the time. Each trackway measured about 12 feet 4 inches (3.76 m) from
the center of the column to the outer wall of each tunnel, and 12 feet 6 inches (3.81 m) from the top of
the rail to the top of the ceiling. A four-track tunnel typically measured 50 feet (15 m) wide; the outer
walls of the tunnels did not have duct benches.[71]: 2 Flat-roof tunnels were used for short sections of
the route, and about 4.6 miles (7.4 km) of concrete-lined tunnels were also built.[72]: 6 In the Brooklyn
extension to Atlantic Avenue, the concrete floor is designed as a thick slab of unreinforced concrete (as
in the Manhattan tunnels), but the walls and roof are primarily constructed of reinforced concrete and
lack steel columns.[23]: 262–263

The city's topology and preexisting infrastructure precluded the use of the cut-and-cover construction
method in parts of the original line. Concrete-lined tunnels were built in Murray Hill and under
Central Park.[23]: 236, 256–257 In Murray Hill, the four-track line was divided into two double-track
tunnels, providing space between the express tracks for a spur leading directly to the mainline railroad
station at Grand Central Terminal. This spur was never built, and the space was instead used to
extend the IRT Lexington Avenue Line's express tracks northward as part of the Dual
Contracts.[71]: 7–8 On the West Side Line between 151st and 155th Streets, and between 158th Street
and Fort George, a deep bore tunnel was used to cut through high, rocky hills.[23]: 236, 256–257 The
Joralemon Street Tunnel under the East River, between the Bowling Green and Borough Hall stations,
was dug as a pair of cast iron tubes.[23]: 261–262 [95]

Elevated segments

The topology of Manhattan and the Bronx also necessitated the construction of elevated viaducts,
particularly on the West Side Line between 122nd and 135th Streets; on the West Side Line north of
Fort George in Manhattan and the northwest Bronx; and on the East Side Line east of Melrose Avenue
in the central Bronx.[23]: 236 Steel viaducts with open floors were used because they were generally
https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 15/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

cheaper than viaducts with solid floors, which were used in places such as Philadelphia.[71]: 2 On the
original IRT elevated viaducts, the elevated structure is carried on pairs of bents, one on each side of
the road, at locations where the rails are at most 29 feet (8.8 m) above the ground. There is zigzag
lateral bracing at intervals of every four panels. Higher viaducts are carried on sets of four towers:
those on opposite sides of the road (situated transversely) are 29 feet (8.8 m) apart from each other,
while those on the same side (situated longitudinally) are 20 to 25 feet (6.1 to 7.6 m) apart. The tops of
the towers have X-bracing, and the connecting spans have two panels of intermediate vertical sway
bracing between the three pairs of longitudinal girders.[72]: 7 [96]: 60–61 [97]

Elevated stations were designed by Heins & LaFarge in a similar design to those on the existing
elevated railway system. Contracts 1 and 2 only provided for local and terminal elevated stations.
Generally, each elevated platform contains a Victorian style station house at platform level, with wood
siding and a copper hip roof. The stairways from each station house to the street are decorated with
elaborate iron work and are also covered by canopies. The platforms also contain canopies extending
for a short distance in either direction from the station house, while the remaining sections of the
platforms only contain iron guard rails interspersed with lampposts.[69]: 13–14 Elevated stations on a
viaduct had their ticket offices and waiting rooms at street level, with access to the platforms provided
by elevators or stairways.[4]

Two of the original IRT's elevated stations differ significantly in design from the others. The 125th
Street station on the Broadway–Seventh Avenue Line was carried on a steel-arch viaduct high across
the street, with a smaller station house below the tracks, while the Dyckman Street station sat on a
masonry embankment with a control area beneath the platforms.[69]: 13–14 Escalators were added at
the 125th Street station on the Broadway–Seventh Avenue Line, as well as at the 177th Street
station.[71]: 3

Tracks

The tracks themselves were made of 100-pound (45 kg) rails, which rested on wooden cross ties and
were placed on ballasted trackbeds. Originally, the system was supposed to have used 80-pound
(36 kg) rails, which would have been secured to longitudinal wooden ties embedded within concrete
trackbeds. A 0.25-mile (0.40 km) section of track, consisting of 80-pound rails with longitudinal ties,
was installed on the Long Island Rail Road near the Jamaica station, but this was found to be less
effective than 100-pound rails with cross ties.[71]: 2

Equipment and mechanical features

Electrification

The main powerhouse was the IRT Powerhouse, occupying an entire block bounded by 58th Street,
59th Street, 11th Avenue, and 12th Avenue. The structure was designed by a group of IRT engineers
led by Paul C. Hunter, with a freestanding facade designed by Stanford White. It had an operating
room on the north side and a boiler room on the south side.[69]: 15–16 [98] The powerhouse also served
as an aboveground focal point for the IRT system, similar to Grand Central Terminal or St Pancras
railway station, because the City Hall station was relatively small and not readily visible except from
underground.[69]: 15 The building became unnecessary to the subway system in the 1950s, and since
then, Consolidated Edison has used the space to supply the New York City steam system.[99]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 16/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Eight power substations were also erected, and were designed by


Hunter with the assistance of IRT engineers; six of the substations
were identical in design.[69]: 17 Most substations were up to half a
block from the subway, but substations 17 and 18 are next to the
subway itself, as they were built in neighborhoods that were
sparsely populated at the time of the IRT's opening.[100]: 329 From
the main powerhouse, 11,000 volts of alternating current passed
through high tension feeder cables that ran under 58th Street
eastward to the subway tunnel under Broadway, and were then
carried through ducts to the substations. The ducts ran alongside
the tunnels and underneath the platforms to the Facade of the IRT Powerhouse, the
powerhouse.[100]: 330 The substations converted the alternating original subway's main powerhouse
current to 600 volts of direct current for use by the
trains.[100]: 330, 332

Power for the original IRT subway was provided to the trains via a 600-volt direct current third rail
system.[100]: 341 [87]: 5347 Alternating current traction was comparatively unsuccessful at the IRT's
opening, and existing elevated lines operated by the Manhattan Railway Company, which the IRT
hoped to acquire, had also been electrified with third rail between 1899 and 1900.[100]: 341 The third
rail runs along each of the two running rails. Electrical engineer Lewis B. Stillwell designed a wooden
plank that was hung slightly above the third rail to prevent debris from falling onto it. Power to each
track section was generally supplied by the nearest substation.[100]: 342 Rolling stock would collect
current from the third rail via over-running contact shoes that glided over the top surface of the third
rail.[100]: 344

Rolling stock

John B. McDonald, the contractor in charge of building the first


IRT subway, was also given specifications for the system's rolling
stock, or trains. There were to be enough rolling stock for a three-
car local train to arrive every two minutes and a four-car express
train every five minutes on the trunk lines. The cars had to allow
easy passenger boarding and alighting, be attractive in appearance,
seat at least 48 persons, and contain thorough ventilation.[100]: 341 The Composite was the first IRT
subway car.
The first rolling stock ordered for the IRT was the 500-car
Composite, which arrived from 1903 to 1904, and manufactured by
the Jewett, St. Louis, Wason, and John Stephenson companies. This count excluded two prototype
cars. The Composites were so named because they were made of a wood and steel
composite.[100]: 346–347 [101]: 56–58 In 1904, an order was placed with American Car and Foundry (ACF)
for 300 Gibbs Hi-V cars, the first production all-steel passenger cars in the world. These were named
after their designer, George Gibbs.[101]: 59 [102]: 27 Transit officials were initially reluctant to use the
Composite and steel cars in the same train set because of the risk that could be posed if the mixed
trains were involved in a crash.[101]: 59 The IRT decided to order only steel cars after a collision
between a Composite and steel train in 1906, which led to both cars burning; the steel train was
mostly intact but the Composites were almost completely destroyed.[100]: 348 The Composite fleet was
ultimately transferred to the elevated lines with the arrival of additional steel subway
cars.[100]: 348 [101]: 59 ACF built fifty steel Deck Roof Hi-V cars for the IRT in 1907 and 1908.[101]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 17/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

The original subway cars, designed with two doors at the ends of each side, were inefficient, causing
delays of up to fifty seconds during rush hours. In response, the Public Service Commission started to
order cars with two end doors and a center pair of doors on each side, and converted existing rolling
stock to accommodate center doors. The first center-door fleet, the Hedley Hi-V, was ordered in 1909
and started to arrive the next year.[53]: 167–168

Impact

Ridership

The IRT was instantly popular upon its opening, with the New-York Tribune proclaiming the "birth of
[the] subway crush".[53]: 146 However, within a week of its opening, the first subway line became
overburdened by the sheer number of passengers using it.[83]: 46 The first line, designed to
accommodate up to 600,000 passengers a day, was already accommodating half that amount by
December 1904 and was nearing its capacity by the first anniversary of its opening. With subsequent
expansions, the IRT's average daily traffic increased to 800,000 by 1908, and to 1.2 million by 1914.
Consulting engineer Bion J. Arnold wrote in 1908 that "the number of patrons is increasing yearly and
the maximum carrying capacity is therefore taxed to the utmost limit".[53]: 146–147 Express services
were more popular than IRT planners had expected. At 25 miles per hour (40 km/h), the express
trains were the fastest form of urban transportation in the city when they were not delayed, but they
were frequently delayed because many passengers wished to transfer to and from local services.[53]: 151

The city could only afford one subway line in 1900 and had hoped that the IRT would serve mainly to
relieve overcrowding on the existing transit system. However, crowds on existing transportation
modes did not decrease significantly: elevated ridership in 1907 was one percent less than in 1904,
while streetcar ridership declined four percent from 1904 to 1910.[53]: 146–147 A report in 1906,
published by the New York State Railroad Commission, stated that Greater New York's growth was
exceeding the development of its rapid transit.[103] In general, this could be attributed to huge growth
in the years just prior to the subway's opening, with elevated ridership having increased by fifty
percent from 1901 to 1904.[53]: 148 Between 1904 and 1914, the total number of passengers in New
York City increased by more than 60 percent to 1.753 billion.[53]: 153 The technical modifications made
in the late 1900s and early 1910s, including signaling system upgrades and platform extension,
allowed the IRT to run a train on the express and local tracks once every 108 seconds, or 33 trains per
hour.[53]: 168

City development

South of 42nd Street, the opening of the subway had little impact on retail. While high-end retailers
and middle-class department stores were moving northward at the beginning of the 20th century,
they chose to remain further west on Sixth and Fifth Avenues.[53]: 182 Union Square, and Fourth
Avenue between 14th and 25th Streets (now Park Avenue South), was becoming a major wholesaling
district with several loft and office buildings by 1909.[104][105] The subway had a more visible impact
north of 42nd Street, where it switched from Manhattan's east side to its west side. Just north of 42nd
Street and Broadway was Longacre Square, which saw an increase in development after the IRT
subway was announced, including the new headquarters of The New York Times.[53]: 182 Longacre

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 18/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Square was renamed Times Square in 1904, after the Times, in part because the IRT subway station
there necessitated a unique station name.[106] The subway's opening prompted the relocation of
Manhattan's theater district to the stretch of Broadway surrounding Times Square.[53]: 183–184

In the Upper West Side of Manhattan, the opening of the subway resulted in residential development
along Broadway, which in the late 19th century was unevenly developed with low-rise buildings. The
presence of Central Park had previously limited the extent of development in the Upper West Side,
since not many people from the more densely developed Upper East Side were willing to cross the
park. The subway's opening brought about an increase in land values around it, as apartment
buildings of over 10 stories and smaller business structures were erected on Broadway.[53]: 185–186
Further north, around the West Side Branch in Morningside Heights, developers started constructing
middle-class apartment buildings when the subway opened.[107] Around the East Side Branch in
central Harlem, commercial developments such as theaters and banks moved to Lenox Avenue, under
which the subway ran.[53]: 190

When the IRT subway opened, the Bronx and the northern end of Manhattan were largely rural. Real
estate speculators quickly bought up tracts around subway stations, subdivided the land into smaller
lots, and sold these lots to small-scale builders. Tenement housing was the most prevalent type of
development in these neighborhoods, as they were cheap to construct and many speculators intended
to sell their land for profit. The tenements were almost exclusively developed within two blocks of the
subway and were largely concentrated north of 130th Street.[53]: 195–196 The construction of tenement
housing in these neighborhoods allowed greater mobility for lower-class residents of the Lower East
Side and other neighborhoods. From 1900 to 1920, the population of Upper Manhattan and the Bronx
increased at a greater rate than in the rest of the city. The development of tenements caused a change
in reformers' views of the subway, and zoning regulations such as the 1916 Zoning Resolution were
enacted to regulate haphazard development, such as that caused by the construction of subway
lines.[53]: 200–201

After the Dual Contracts


The Dual Contracts, signed in 1913, called for the splitting of the original
Manhattan trunk line into an East Side Line under Lexington Avenue and
a West Side Line under Broadway and Seventh Avenue.[108] The first
portion of the Broadway–Seventh Avenue Line south of Times Square–
42nd Street opened on June 3, 1917, and was extended to South Ferry on
July 1, 1918.[109] The new portion of the Lexington Avenue Line from
Grand Central to 125th Street opened on July 17, 1918.[110] The new "H"
system was implemented on August 1, 1918, joining the two halves of the
Broadway–Seventh Avenue Line, and the two halves of the Lexington
Avenue Line.[111] The portion of the original trunk line between Times
Square and Grand Central was turned into the 42nd Street Shuttle. The
completion of the "H" system doubled the capacity of the IRT system.[112]
The original northbound
The IRT was also extended to Queens through the construction of the
IRT platform at the Times
Flushing Line, the first part of which would open in 1915.[113]
Square station was
converted to serve the
By the 1950s and 1960s, almost all of the original IRT stations had been
42nd Street Shuttle in
lengthened to fit ten 51.4-foot (15.7 m) cars.[114][115][b] Several stations
1918, and it closed in 2021.
were closed during this time. The first of these was City Hall, once the
architectural showpiece of the system, which shuttered in 1945 after it was

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 19/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

deemed too expensive to modernize.[118]


18th Street closed three years later because it was near the
14th Street station. [119] The 180th Street–Bronx Park terminal was closed and demolished in 1952 as a
result of a program to improve service on the White Plains Road Line.[120] 91st Street shuttered in
1959 after platforms at the 86th Street and 96th Street stations were lengthened,[115] and Worth Street
was closed in 1962 after platforms at the Brooklyn Bridge station were lengthened.[121] The original
South Ferry loop station remained operational until 2009, when it was replaced by a new station on
the Broadway–Seventh Avenue Line.[122][c]

Although many design elements on the original IRT have been removed or modified over the
years,[123] some parts of the system have been listed on the National Register of Historic Places
(NRHP) or designated as New York City designated landmarks (NYCL).[124][125] The New York City
Landmarks Preservation Commission (LPC) designated the interiors of twelve original IRT stations as
New York City landmarks in 1979.[18][126] The LPC has also protected other parts of the original IRT,
including control houses at Bowling Green[127] and 72nd Street.[128] In addition, the MTA nominated
many of these structures for NRHP status in 1999.[123]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 20/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

Station listing
Station Structure Tracks[d] Opened Notes[e]
Main Branch
Station and original control
Atlantic Avenue Underground 2 May 1, 1908[50]
house on NRHP[124]

Nevins Street Underground 2 May 1, 1908[50]

Hoyt Street Underground 2 May 1, 1908[50]


Original portions of station on
Borough Hall Underground 2 January 9, 1908[41][49]
NRHP and NYCL[124][125]

South Ferry Underground 1 (loop) July 10, 1905[41] Closed March 16, 2009[c]
Original control house on
Bowling Green Underground 2 July 10, 1905[41]
NRHP and NYCL[124][125]
Original portions of station on
Wall Street Underground 2 June 12, 1905[131]
NRHP and NYCL[124][125]
Original portions of station
Fulton Street Underground 2 January 16, 1905[132]
listed as NYCL[125]
Closed December 31,
City Hall Underground 1 (loop) October 27, 1904[133] 1945.[118] Station on NRHP
and NYCL[124][125]

Brooklyn Bridge Underground 4 (all) October 27, 1904[133] Station on NRHP[124]


Closed September 1,
Worth Street Underground 4 (local) October 27, 1904[133]
1962[121]

Canal Street Underground 4 (local) October 27, 1904[133]

Spring Street Underground 4 (local) October 27, 1904[133]


Original portions of station on
Bleecker Street Underground 4 (local) October 27, 1904[133]
NRHP and NYCL[124][125]
Original portions of station on
Astor Place Underground 4 (local) October 27, 1904[133]
NRHP and NYCL[124][125]
14th Street–Union
Square
Underground 4 (all) October 27, 1904[133] Station on NRHP[124]

18th Street Underground 4 (local) October 27, 1904[133] Closed November 8, 1948[119]

23rd Street Underground 4 (local) October 27, 1904[133]

28th Street Underground 4 (local) October 27, 1904[133] Station on NRHP[124]


Original portions of station on
33rd Street Underground 4 (local) October 27, 1904[133]
NRHP and NYCL[124][125]
Grand Central–42nd
Street
Underground 4 (all) October 27, 1904[133]

Times Square Underground 4 (local) October 27, 1904[133] Station on NRHP[124]

50th Street Underground 4 (local) October 27, 1904[133]

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 21/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

59th Street–Columbus Original portions of station on


Underground 4 (local) October 27, 1904[133]
Circle NRHP and NYCL[124][125]

66th Street Underground 4 (local) October 27, 1904[133]


Original portions of station and
72nd Street Underground 4 (all) [133] control house on NRHP and
October 27, 1904
NYCL[124][125]
Original portions of station on
79th Street Underground 4 (local) October 27, 1904[133]
NRHP and NYCL[124][125]

86th Street Underground 4 (local) October 27, 1904[133]

91st Street Underground 4 (local) October 27, 1904[133] Closed February 2, 1959[115]

96th Street Underground 4 (all) October 27, 1904[133]


West Side Branch
(splits at 96th Street)

103rd Street Underground 3 (local) October 27, 1904[133]


Original portions of station on
110th Street Underground 3 (local) October 27, 1904[133]
NRHP and NYCL[124][125]
Original portions of station on
116th Street Underground 3 (local) October 27, 1904[133]
NRHP and NYCL[124][125]

Elevated (steel Viaduct on NRHP and


Manhattan Street 3 (local) October 27, 1904[133]
arch) NYCL[124][125]

137th Street Underground 3 (local) October 27, 1904[133]

145th Street Underground 3 (local) October 27, 1904[133]

157th Street Underground 2 November 12, 1904[134]


Underground
168th Street
(deep level)
2 April 14, 1906[135] Station on NRHP[124]

Underground
181st Street
(deep level)
2 May 30, 1906[136][40] Station on NRHP[124]

Underground
191st Street
(deep level)
2 January 14, 1911[137]

Elevated
Dyckman Street
(masonry)
2 March 12, 1906[138] Station on NRHP[124]

207th Street Elevated 3 (local) April 1, 1907[40]

215th Street Elevated 3 (local) March 12, 1906[138]

221st Street Elevated 3 (local) March 12, 1906[138] Closed January 14, 1907[40]

225th Street Elevated 3 (local) January 14, 1907[44]

231st Street Elevated 3 (local) January 27, 1907[40]

238th Street Elevated 3 (local) August 1, 1908[139]


Van Cortlandt Park–
242nd Street
Elevated 2 August 1, 1908[139] Station on NRHP[124]

West Side Branch to Lenox Avenue


(splits at 96th Street)

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 22/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

110th Street Underground 2 November 23, 1904[140]

116th Street Underground 2 November 23, 1904[140]

125th Street Underground 2 November 23, 1904[140]

135th Street Underground 2 November 23, 1904[140]

145th Street Underground 2 November 23, 1904[140] Station on NRHP[124]


West Side Branch to West Farms
(splits from branch to Lenox Avenue at 142nd Street Junction)

Underground Original control house on


Mott Avenue 2 July 10, 1905[41]
(deep level) NRHP[124]

149th Street Underground 2 July 10, 1905[41]

Jackson Avenue Elevated 3 (local) November 26, 1904[41] Station on NRHP[124]

Prospect Avenue Elevated 3 (local) November 26, 1904[41] Station on NRHP[124]

Intervale Avenue Elevated 3 (local) April 30, 1910[57]

Simpson Street Elevated 3 (local) November 26, 1904[41]

Freeman Street Elevated 3 (local) November 26, 1904[41]

174th Street Elevated 3 (local) November 26, 1904[41]

177th Street Elevated 3 (local) November 26, 1904[41]


Closed August 4, 1952; only
180th Street Elevated 2 November 26, 1904[41] part of the original subway to
be completely demolished[120]

See also
History of the New York City Subway

Notes
a. The elevators at Mott Avenue were removed in 1975.[79]
b. As of 2019, three stations from Contracts 1 and 2 remain operational but cannot fit ten 51-foot-
long cars. The platforms at 145th Street and Lenox Avenue are 348 feet (106 m) long and can fit
six-and-a-half 51-foot IRT subway cars.[116] The Times Square and Grand Central stations, now
part of the 42nd Street Shuttle, were extended in 2021 to fit six 51-foot cars.[117]
c. The Original portions of station was the outer of two loops, which became part of the IRT
Broadway–Seventh Avenue Line in 1918. It was closed on March 16, 2009,[122] but was returned
to service from April 4, 2013, to June 26, 2017, while its replacement was being repaired.[129] An
inner loop, not part of the original IRT subway, was in service from 1918 to 1977.[130]
d. The number of tracks in the station prior to the implementation of the "H" system in 1918. Stations
marked "Local" could only be served by local trains on the outermost tracks. Stations marked "All",
with 3 or 4 tracks, could be served by both local and express trains.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 23/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

e. Official landmark designations: NRHP stands for National Register of Historic Places and NYCL
stands for New York City Landmark

References
1. Report of the Board of Rapid Transit Railroad Commissioners Of The City of New York 1900–1901
(https://babel.hathitrust.org/cgi/pt?id=nnc2.ark%3A%2F13960%2Ft0zp7c76m%3Bview%3D1up%
3Bseq%3D9). New York City Board of Rapid Transit Railroad Commissioners. 1902. pp. 6 v.
Archived (https://web.archive.org/web/20220719164151/https://babel.hathitrust.org/cgi/pt?id=nnc
2.ark%3A%2F13960%2Ft0zp7c76m;view=1up;seq=9) from the original on July 19, 2022.
Retrieved February 5, 2023.
2. Walker, James Blaine (1918). Fifty Years of Rapid Transit, 1864–1917 (https://archive.org/details/fi
ftyyearsrapid01walkgoog). Law Printing Company. pp. 98 (https://archive.org/details/fiftyyearsrapid
01walkgoog/page/n129)–100. ISBN 0405024800.
3. "Rapid Transit. The Work from the City Hall to Forty-second Street To Be Finished in Two and a
Half Years at the Latest–Views of Mr. W. H. Vanderbilt–What He Thinks of the Attempt of the City
or State to Build a Road" (https://www.newspapers.com/clip/26696287/new_york_daily_herald/).
New York Daily Herald. January 17, 1873. Archived (https://web.archive.org/web/2019012106470
2/https://www.newspapers.com/clip/26696287/new_york_daily_herald/) from the original on
January 21, 2019. Retrieved December 31, 2018 – via newspapers.com .
4. "New York Locomotion Services. The Rapid Transit Subways" (https://books.google.com/books?id
=pPc9AQAAMAAJ&dq=%22THE+LOCAL+STATIONS+from+50th+Street+south+have+the+platfor
ms+arranged+symmetrically+on+either+side+of+the+cross+street%22&pg=PA4). The Surveyor
and Municipal and County Engineer. Vol. 27. January 6, 1905. pp. 4–7. Archived (https://web.archi
ve.org/web/20230205172815/https://www.google.com/books/edition/The_Surveyor_and_Municipa
l_and_County_En/pPc9AQAAMAAJ?hl=en&gbpv=1&dq=%22THE+LOCAL+STATIONS+from+50t
h+Street+south+have+the+platforms+arranged+symmetrically+on+either+side+of+the+cross+stre
et%22&pg=PA4&printsec=frontcover) from the original on February 5, 2023. Retrieved
December 27, 2020.
5. "Rapid Transit. The Value of the Proposed Lateral and "Loop Lines" of Railway Explained and
Illustrated" (https://www.newspapers.com/clip/26696399/new_york_daily_herald/). New York Daily
Herald. March 1, 1875. Archived (https://web.archive.org/web/20190121065937/https://www.news
papers.com/clip/26696399/new_york_daily_herald/) from the original on January 21, 2019.
Retrieved January 1, 2019 – via newspapers.com .
6. Appendices to the Report of the Royal Commission on London Traffic with Index Presented to
both Houses of Parliament by Command of His Majesty (https://books.google.com/books?id=1wY
6AQAAIAAJ&q=lengthen). Royal Commission on London Traffic. 1906. Archived (https://web.archi
ve.org/web/20230205172919/https://books.google.com/books?id=1wY6AQAAIAAJ&q=lengthen)
from the original on February 5, 2023. Retrieved June 28, 2021.
7. "Vanderbilt's Part In Tunnel Company. Cornelius Represents Only His Own Interests. May Be
Active In the Work. His Presence in the Directory Not Indicative of an Alliance with the New York
Central" (https://www.newspapers.com/clip/26741860/the_new_york_times/). The New York
Times. February 21, 1900. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Archived
(https://web.archive.org/web/20190121064432/https://www.newspapers.com/clip/26741860/the_n
ew_york_times/) from the original on January 21, 2019. Retrieved January 1, 2019 – via
newspapers.com .

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 24/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

8. "New York City Transit Facts & Figures: 1979" (http://www.laguardiawagnerarchive.lagcc.cuny.ed


u/FILES_DOC/WAGNER_FILES/06.021.0058.060284.11.PDF#page=18) (PDF). La Guardia and
Wagner Archives. Metropolitan Transportation Authority, New York City Transit Authority. 1979.
Archived (https://web.archive.org/web/20180929135739/http://www.laguardiawagnerarchive.lagcc.
cuny.edu/FILES_DOC/WAGNER_FILES/06.021.0058.060284.11.PDF#page=18) (PDF) from the
original on September 29, 2018. Retrieved October 24, 2016.
9. "The State Senate And Rapid Transit" (https://timesmachine.nytimes.com/timesmachine/1874/04/2
9/79073038.pdf) (PDF). The New York Times. April 29, 1874. Archived (https://web.archive.org/we
b/20211110034902/https://timesmachine.nytimes.com/timesmachine/1874/04/29/79073038.pdf)
(PDF) from the original on November 10, 2021. Retrieved November 1, 2016.
10. Grogan, Louis V. (1989). The Coming of the New York and Harlem Railroad (https://books.google.
com/books?id=SQAoAQAACAAJ&q=The+Coming+of+the+New+York+and+Harlem+Railroad).
Louis V. Grogan. ISBN 0962120650. Archived (https://web.archive.org/web/20220406145043/http
s://books.google.com/books?id=SQAoAQAACAAJ&q=The+Coming+of+the+New+York+and+Harl
em+Railroad) from the original on April 6, 2022. Retrieved December 28, 2020.
11. "Fruits of Rapid Transit" (https://www.newspapers.com/clip/26696574/the_new_york_times/). The
New York Times. April 1, 1879. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331).
Archived (https://web.archive.org/web/20190121064627/https://www.newspapers.com/clip/266965
74/the_new_york_times/) from the original on January 21, 2019. Retrieved December 31, 2018 –
via newspapers.com .
12. "Another Underground Railroad" (https://www.newspapers.com/clip/26696586/poughkeepsie_eagl
enews/). Poughkeepsie Eagle-News. June 30, 1880. Archived (https://web.archive.org/web/20190
121064628/https://www.newspapers.com/clip/26696586/poughkeepsie_eaglenews/) from the
original on January 21, 2019. Retrieved December 31, 2018 – via newspapers.com .
13. "Tunnel Consolidation: Three Underground Railway Companies Form a Single Corporation" (http
s://www.newspapers.com/clip/26696681/the_new_york_times/). The New York Times. October 3,
1895. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.o
rg/web/20190121064755/https://www.newspapers.com/clip/26696681/the_new_york_times/) from
the original on January 21, 2019. Retrieved December 31, 2018 – via newspapers.com .
14. Report including analysis of operations of the New York City transit system for five years, ended
June 30, 1945 (https://babel.hathitrust.org/cgi/pt?id=mdp.39015020928621;view=1up;seq=8).
New York City: Board of Transportation of the City of New York. 1945. Archived (https://web.archiv
e.org/web/20230205172852/https://babel.hathitrust.org/cgi/pt?id=mdp.39015020928621;view=1u
p;seq=8) from the original on February 5, 2023. Retrieved December 28, 2020.
15. "Board of Transportation : William Reid" (http://www.wnyc.org/story/board-of-transportation-william
-reid/). WNYC (AM). September 3, 1948. Archived (https://web.archive.org/web/20170202002002/
http://www.wnyc.org/story/board-of-transportation-william-reid/) from the original on February 2,
2017. Retrieved October 13, 2016.
16. "The Rapid Transit Act. 1891" (https://archive.org/details/rapidtransitact100newy). New York State
Legislature. 1891. Retrieved October 13, 2016.
17. Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917 (https://archive.org/deta
ils/fiftyyearsrapid00walkgoog). New York, N.Y.: Law Printing. Retrieved November 6, 2016.
18. "IRT Subway System Underground Interior" (http://s-media.nyc.gov/agencies/lpc/lp/1096.pdf)
(PDF). New York City Landmarks Preservation Commission. October 23, 1979. Archived (https://w
eb.archive.org/web/20200921135400/https://s-media.nyc.gov/agencies/lpc/lp/1096.pdf) (PDF)
from the original on September 21, 2020. Retrieved July 28, 2019.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 25/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

19. Parsons, W.B. (1894). Report to the Board of Rapid Transit Railroad Commissioners: In and for
the City of New York on Rapid Transit in Foreign Cities (https://books.google.com/books?id=cqXV
AAAAMAAJ&pg=PP13). Archived (https://web.archive.org/web/20230205172803/https://books.go
ogle.com/books?id=cqXVAAAAMAAJ&pg=PP13) from the original on February 5, 2023. Retrieved
August 3, 2019.
20. Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up
to December 31, 1901 (https://books.google.com/books?id=PLonAAAAYAAJ&q=Third+Track+Nort
h+of+Fort+George&pg=PA242). Board of Rapid Transit Railroad Commissioners. 1902. Archived
(https://web.archive.org/web/20230205172804/https://books.google.com/books?id=PLonAAAAYA
AJ&q=Third+Track+North+of+Fort+George&pg=PA242) from the original on February 5, 2023.
Retrieved October 17, 2020.
21. Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The
Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the
Auditor (https://archive.org/details/cu31924022794253/page/n253/mode/2up?q=april+28). Board
of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
22. "Interborough Rapid Transit System, Manhattan Valley Viaduct" (http://s-media.nyc.gov/agencies/l
pc/lp/1094.pdf) (PDF). New York City Landmarks Preservation Commission. October 23, 1979.
Archived (https://web.archive.org/web/20191226173938/http://s-media.nyc.gov/agencies/lpc/lp/10
94.pdf) (PDF) from the original on December 26, 2019. Retrieved November 19, 2019.
23. Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (https://tile.loc.gov/s
torage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf) (PDF). Historic
American Engineering Record. pp. 208–282 (PDF pp. 209–283). Archived (https://web.archive.or
g/web/20210117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny03
87/data/ny0387data.pdf) (PDF) from the original on January 17, 2021. Retrieved December 20,
2020. This article incorporates text from this source, which is in the public domain.
24. Report of the Public Service Commission For The First District of the State of New York For The
Year Ending December 31, 1909 (https://books.google.com/books?id=kKUlAQAAIAAJ&q=novemb
er+26%2C+1904+subway+extension&pg=PA191). Albany: Public Service Commission. 1910.
Archived (https://web.archive.org/web/20230205172826/https://books.google.com/books?id=kKUl
AQAAIAAJ&q=november+26%2C+1904+subway+extension&pg=PA191) from the original on
February 5, 2023. Retrieved October 17, 2020.
25. "New York City's Subway Turns 100" (https://web.archive.org/web/20180403051535/https://eraus
a.org/pdf/bulletin/2004-10-bulletin.pdf) (PDF). The Bulletin. Vol. 47, no. 10. Electric Railroaders'
Association. October 2004. Archived from the original (https://erausa.org/pdf/bulletin/2004-10-bulle
tin.pdf) (PDF) on April 3, 2018. Retrieved April 2, 2018.
26. Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up
to December 31, 1903 (https://books.google.com/books?id=DS9LAAAAYAAJ&q=Third+Track+Nor
th+of+Fort+George&pg=PA35). Board of Rapid Transit Railroad Commissioners. 1904. Archived
(https://web.archive.org/web/20230205172849/https://books.google.com/books?id=DS9LAAAAYA
AJ&q=Third+Track+North+of+Fort+George&pg=PA35) from the original on February 5, 2023.
Retrieved October 17, 2020.
27. Proceedings of the Public Service Commission for the First District State of New York From July 1
to December 31st, 1907 (https://books.google.com/books?id=i1g1AAAAMAAJ&q=November+1%2
C+1906%E2%80%94Van+Cortlandt+Park+Extension&pg=PA83). New York Public Service
Commission, First District. 1907. Archived (https://web.archive.org/web/20230205172812/https://b
ooks.google.com/books?id=i1g1AAAAMAAJ&q=November+1%2C+1906%E2%80%94Van+Cortla
ndt+Park+Extension&pg=PA83) from the original on February 5, 2023. Retrieved October 17,
2020.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 26/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

28. "RAPID TRANSIT EXTENSION.; Mayor Signs Ordinance for Lenox Avenue Line to 150th Street"
(https://www.nytimes.com/1902/04/29/archives/rapid-transit-extension-mayor-signs-ordinance-for-l
enox-avenue-line.html). The New York Times. April 29, 1902. ISSN 0362-4331 (https://www.worldc
at.org/issn/0362-4331). Archived (https://web.archive.org/web/20180405224757/https://www.nytim
es.com/1902/04/29/archives/rapid-transit-extension-mayor-signs-ordinance-for-lenox-avenue-line.
html) from the original on April 5, 2018. Retrieved April 5, 2018.
29. Minutes of the Board of Estimate and Apportionment of the City of New York, Financial and
Franchise Matters (https://books.google.com/books?id=qP8_AQAAMAAJ&q=january+16,+1903+l
enox+avenue+extension). Board of Estimate and Apportionment. 1910. p. 3705. Archived (https://
web.archive.org/web/20230205172821/https://books.google.com/books?id=qP8_AQAAMAAJ&q=j
anuary+16,+1903+lenox+avenue+extension) from the original on February 5, 2023. Retrieved
January 8, 2018.
30. Contract for construction and operation of rapid transit railroad (Manhattan and the Bronx) With
supplemental agreements to November 24th, 1903. Contract dated February 21st, 1900 (https://ar
chive.org/details/contractforconst00newyrich). Board of Rapid Transit Railroad Commissioners.
1903.
31. "SEEK NEW SUBWAY STATION; Commission Hears Pleas for 104th St. Entrance—Reserves
Decision" (https://www.nytimes.com/1921/03/03/archives/seek-new-subway-station-commission-h
ears-pleas-for-104th-st.html). The New York Times. March 3, 1921. ISSN 0362-4331 (https://www.
worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20180405224644/https://ww
w.nytimes.com/1921/03/03/archives/seek-new-subway-station-commission-hears-pleas-for-104th-
st.html) from the original on April 5, 2018. Retrieved April 5, 2018.
32. Saraniero, Nicole (August 16, 2018). "Where Did the Rubble Go?: 6 Spots Built from NYC's
Subway Excavation" (https://untappedcities.com/2018/08/16/where-did-the-rubble-go-6-spots-built
-from-nycs-subway-excavation/). Untapped Cities. Archived (https://web.archive.org/web/2019060
1032931/https://untappedcities.com/2018/08/16/where-did-the-rubble-go-6-spots-built-from-nycs-s
ubway-excavation/) from the original on June 1, 2019. Retrieved May 1, 2019.
33. "Fact Sheet: Statue of Liberty NM – Ellis Island" (https://www.nps.gov/npnh/learn/news/fact-sheet-
elis.htm). National Parks of New York Harbor (U.S. National Park Service). May 11, 1965.
Archived (https://web.archive.org/web/20190601032120/https://www.nps.gov/npnh/learn/news/fact
-sheet-elis.htm) from the original on June 1, 2019. Retrieved May 1, 2019.
34. Chan, Sewell (August 10, 2016). "An Elusive Island of Good Intentions" (http://cityroom.blogs.nyti
mes.com/2008/04/16/an-elusive-island-of-good-intentions/). City Room. Archived (https://web.arch
ive.org/web/20191001101753/https://cityroom.blogs.nytimes.com/2008/04/16/an-elusive-island-of-
good-intentions/) from the original on October 1, 2019. Retrieved May 15, 2019.
35. "On Handcars Through Six Miles of Subway; Tracks Laid All the Way Up to Harlem" (https://www.n
ytimes.com/1904/01/02/archives/on-handcars-through-six-miles-of-subway-tracks-laid-all-the-way-
up.html). The New York Times. January 2, 1904. ISSN 0362-4331 (https://www.worldcat.org/issn/0
362-4331). Archived (https://web.archive.org/web/20220510185717/https://www.nytimes.com/190
4/01/02/archives/on-handcars-through-six-miles-of-subway-tracks-laid-all-the-way-up.html) from
the original on May 10, 2022. Retrieved May 10, 2022.
36. "Through the New York Subway on Hand-cars". The Street Railway Journal. Vol. 23, no. 2.
January 9, 1904. p. 75. ProQuest 747960183 (https://search.proquest.com/docview/747960183).
37. "Subway Trip With Engine; Messrs. Belmont, McDonald, and Others Make a Realistic Journey" (ht
tps://www.nytimes.com/1904/04/14/archives/subway-trip-with-engine-messrs-belmont-mcdonald-a
nd-others-make-a.html). The New York Times. April 14, 1904. ISSN 0362-4331 (https://www.world
cat.org/issn/0362-4331). Archived (https://web.archive.org/web/20220510185718/https://www.nyti
mes.com/1904/04/14/archives/subway-trip-with-engine-messrs-belmont-mcdonald-and-others-ma
ke-a.html) from the original on May 10, 2022. Retrieved May 10, 2022.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 27/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

38. "EXERCISES IN CITY HALL.; Mayor Declares Subway Open – Ovations for Parsons and
McDonald" (https://www.nytimes.com/1904/10/28/archives/exercises-in-city-hall-mayor-declares-s
ubway-open-ovations-for.html). The New York Times. October 28, 1904. Archived (https://web.arc
hive.org/web/20220504023722/https://www.nytimes.com/1904/10/28/archives/exercises-in-city-hal
l-mayor-declares-subway-open-ovations-for.html) from the original on May 4, 2022. Retrieved
December 16, 2018.
39. "Subway at Fulton Street Busy" (https://www.nytimes.com/1905/01/17/archives/subway-at-fulton-st
reet-busy.html). The New York Times. January 17, 1905. p. 9. Archived (https://web.archive.org/w
eb/20180726013443/https://www.nytimes.com/1905/01/17/archives/subway-at-fulton-street-busy.h
tml) from the original on July 26, 2018. Retrieved November 6, 2016.
40. Merritt, A. L. (1914). "Ten Years of the Subway (1914)" (http://www.nycsubway.org/wiki/Ten_Years
_of_the_Subway_(1914)). www.nycsubway.org. Interborough Bulletin. Archived (https://web.archiv
e.org/web/20190408062048/https://www.nycsubway.org/wiki/Ten_Years_of_the_Subway_(1914))
from the original on April 8, 2019. Retrieved March 19, 2017.
41. "Subway Trains Running From Bronx to Battery — West Farms and South Ferry Stations Open at
Midnight — Start Without a Hitch — Bowling Green Station Also Opened — Lenox Avenue Locals
Take City Hall Loop Hereafter" (https://www.nytimes.com/1905/07/10/archives/subway-trains-runni
ng-from-bronx-to-battery-west-farms-and-south.html&legacy=true). The New York Times. July 10,
1905. p. 1. Retrieved November 6, 2016.
42. "Discuss Subway Signs in 18th St. Station — Engineer Parsons and Mr. Hedley Inspect
Advertising Scheme — Bronx Viaduct Works Well — Delays There Only Those of Newness —
Lenox Avenue Service Makes Fuss Below Ninety-Sixth Street" (http://timesmachine.nytimes.com/ti
mesmachine/1904/11/27/101350060.html?pageNumber=3). The New York Times. November 27,
1904. p. 3. Archived (https://web.archive.org/web/20230205172809/https://timesmachine.nytimes.
com/timesmachine/1904/11/27/101350060.html?pageNumber=3) from the original on February 5,
2023. Retrieved November 6, 2016.
43. Kahn, Alan Paul; May, Jack (1973). Tracks of New York Number 3 Manhattan and Bronx Elevated
Railroads 1920 (https://archive.org/details/tracksofnewyork03kahn). New York City: Electric
Railroaders' Association. Retrieved November 6, 2016.
44. "Farthest North in Town by the Interborough — Take a Trip to the New Station, 225th Street West
— It's Quite Lke the Country — You Might Be in Dutchess County, but You Are Still In Manhattan
Borough — Place Will Bustle Soon" (https://www.nytimes.com/1907/01/14/archives/farthest-north-i
n-town-by-the-interborough-take-a-trip-to-the-new.html). The New York Times. January 14, 1907.
p. 18. Archived (https://web.archive.org/web/20190408062041/https://www.nytimes.com/1907/01/1
4/archives/farthest-north-in-town-by-the-interborough-take-a-trip-to-the-new.html) from the original
on April 8, 2019. Retrieved November 6, 2016.
45. Media:1906 IRT map north.png (https://upload.wikimedia.org/wikipedia/commons/1/15/1906_IRT_
map_north.png)
46. Report of the Board of Rapid Transit Railroad Commissioners for and in the City of New York For
The Year Ending December 31, 1906 (https://books.google.com/books?id=bX0jAQAAIAAJ&q=len
ox+avenue+extension&pg=PA177). 1907. Archived (https://web.archive.org/web/2023020517280
7/https://books.google.com/books?id=bX0jAQAAIAAJ&q=lenox+avenue+extension&pg=PA177)
from the original on February 5, 2023. Retrieved October 17, 2020.
47. Burroughs and Company, the New York City Subway Souvenir (http://www.nycsubway.org/articles/
subwaysouvenir.html) Archived (https://web.archive.org/web/20120515211549/http://www.nycsub
way.org/articles/subwaysouvenir.html) May 15, 2012, at the Wayback Machine, 1904.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 28/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

48. "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System
Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street
for a Nickel Is Possible Now" (https://www.nytimes.com/1908/08/02/archives/our-first-subway-com
pleted-at-last-opening-of-the-van-cortlandt.html). The New York Times. August 2, 1908. p. 10.
Archived (https://web.archive.org/web/20200530191523/https://www.nytimes.com/1908/08/02/arch
ives/our-first-subway-completed-at-last-opening-of-the-van-cortlandt.html) from the original on
May 30, 2020. Retrieved November 6, 2016.
49. "Subway to Brooklyn Opened for Traffic — First Regular Passenger Train Went Under the East
River Early This Morning — Not a Hitch in the Service — Gov. Hughes and Brooklyn Officials to
Join in a Formal Celebration of Event To-day" (https://www.nytimes.com/1908/01/09/archives/sub
way-to-brooklyn-opened-for-traffic-first-regular-passenger-train.html). The New York Times.
January 9, 1908. p. 1. Archived (https://web.archive.org/web/20180726011441/https://www.nytime
s.com/1908/01/09/archives/subway-to-brooklyn-opened-for-traffic-first-regular-passenger-train.htm
l) from the original on July 26, 2018. Retrieved November 6, 2016.
50. "Brooklyn Joyful Over New Subway — Celebrates Opening of Extension with Big Parade and a
Flow of Oratory — An Ode to August Belmont — Anonymous Poet Calls Him "the Brownie of the
Caisson and Spade" — He Talks on Subways" (https://www.nytimes.com/1908/05/02/archives/bro
oklyn-joyful-over-new-subway-celebrates-opening-of-extension.html). The New York Times. May
2, 1908. p. 1. Archived (https://web.archive.org/web/20200530193739/https://www.nytimes.com/19
08/05/02/archives/brooklyn-joyful-over-new-subway-celebrates-opening-of-extension.html) from
the original on May 30, 2020. Retrieved November 6, 2016.
51. "Another Centennial–Original Subway Extended To Fulton Street" (https://issuu.com/erausa/docs/
2005-01-bulletin). New York Division Bulletin. Vol. 48, no. 1. New York Division, Electric
Railroaders' Association. January 2005. Archived (https://web.archive.org/web/20170214174902/h
ttps://issuu.com/erausa/docs/2005-01-bulletin) from the original on February 14, 2017. Retrieved
August 31, 2016 – via Issu.
52. Agreement Modifying Contract For Construction And Operation Of Rapid Transit Railroad
Additional Tracks Near 96th Street (https://archive.org/details/pamphletsoninter00newyrich). Rapid
Transit Board. June 27, 1907.
53. Hood, Clifton (1978). "The Impact of the IRT in New York City" (https://tile.loc.gov/storage-service
s/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf) (PDF). Historic American
Engineering Record. pp. 146–207 (PDF pp. 147–208). Archived (https://web.archive.org/web/2021
0117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0
387data.pdf) (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. This
article incorporates text from this source, which is in the public domain.
54. Minutes of the Board of Estimate and Apportionment of the City of New York Financial and
Franchise Matters From April 1 to June 30, 1908 (https://books.google.com/books?id=c8YzAQAA
MAAJ&q=June+18%2C+1908+shuttle+irt+bowling+green&pg=PA2292). Board of Estimate and
Apportionment. 1908. pp. 2292–2296. Archived (https://web.archive.org/web/20230205172855/htt
ps://books.google.com/books?id=c8YzAQAAMAAJ&q=June+18%2C+1908+shuttle+irt+bowling+g
reen&pg=PA2292) from the original on February 5, 2023. Retrieved October 17, 2020.
55. "All Express Trains To Brooklyn" (https://www.newspapers.com/clip/65811858/new-york-tribune/).
New-York Tribune. February 25, 1909. Archived (https://web.archive.org/web/20220627195104/htt
ps://www.newspapers.com/clip/65811858/new-york-tribune/) from the original on June 27, 2022.
Retrieved December 22, 2020.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 29/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

56. 1908–1909 Annual Report of the Interborough Rapid Transit Company for the Year Ended June
30, 1909 (https://babel.hathitrust.org/cgi/pt?id=uiug.30112111474968&view=1up&seq=192&q1=18
1ST%20STREET). Interborough Rapid Transit Company. 1909. pp. 12–13. Archived (https://web.a
rchive.org/web/20220422120156/https://babel.hathitrust.org/cgi/pt?id=uiug.30112111474968&view
=1up&seq=192&q1=181ST%20STREET) from the original on April 22, 2022. Retrieved
December 22, 2020.
57. Report of the Public Service Commission for the First District of the State of New York For The
Year Ending December 31, 1910 (https://books.google.com/books?id=0fBLAQAAMAAJ&q=+zoolo
gical+station&pg=PA596). Public Service Commission. 1911. Archived (https://web.archive.org/we
b/20230205172820/https://books.google.com/books?id=0fBLAQAAMAAJ&q=+zoological+station&
pg=PA596) from the original on February 5, 2023. Retrieved October 17, 2020.
58. The Commercial and Financial Chronicle (https://books.google.com/books?id=UkM9AQAAMAAJ&
q=February+23,+1909+lenox+avenue+subway+express&pg=PA713). National News Service.
1911. p. 713. Archived (https://web.archive.org/web/20230205172822/https://books.google.com/bo
oks?id=UkM9AQAAMAAJ&q=February+23,+1909+lenox+avenue+subway+express&pg=PA713)
from the original on February 5, 2023. Retrieved June 28, 2021.
59. "TEN-CAR TRAINS IN SUBWAY TO-DAY; New Service Begins on Lenox Av. Line and Will Be
Extended to Broadway To-morrow" (https://www.nytimes.com/1911/01/23/archives/tencar-trains-in-
subway-today-new-service-begins-on-lenox-av-line.html). The New York Times. January 23, 1911.
ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/we
b/20180405224750/https://www.nytimes.com/1911/01/23/archives/tencar-trains-in-subway-today-n
ew-service-begins-on-lenox-av-line.html) from the original on April 5, 2018. Retrieved April 5,
2018.
60. The Merchants' Association of New York Pocket Guide to New York (https://archive.org/details/poc
ketguidetone00yorkgoog). Merchants' Association of New York. March 1906. pp. 19 (https://archiv
e.org/details/pocketguidetone00yorkgoog/page/n42)–26.
61. Herries, William (1916). Brooklyn Daily Eagle Almanac (https://babel.hathitrust.org/cgi/pt?id=nyp.3
3433081730503;view=1up;seq=151). Brooklyn Daily Eagle. p. 119. Archived (https://web.archive.o
rg/web/20210511155639/https://babel.hathitrust.org/cgi/pt?id=nyp.33433081730503;view=1up;seq
=151) from the original on May 11, 2021. Retrieved March 25, 2018.
62. Brooklyn Daily Eagle Almanac (https://archive.org/details/brooklyndailyea01conggoog). Brooklyn
Daily Eagle. 1917 – via Hathitrust. "subway."
63. "New Subway Expresses; Part of the Service Ordered Will Begin To-morrow" (https://www.nytime
s.com/1906/11/18/archives/new-subway-expresses-part-of-the-service-ordered-will-begin.html).
The New York Times. November 18, 1906. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4
331). Retrieved July 12, 2023.
64. "Say Subway Ignores Order for Expresses; Washington Heights Residents Appeal to the Mayor"
(https://www.nytimes.com/1907/01/26/archives/say-subway-ignores-order-for-expresses-washingt
on-heights-residents.html). The New York Times. January 26, 1907. ISSN 0362-4331 (https://ww
w.worldcat.org/issn/0362-4331). Retrieved July 12, 2023.
65. "Open New Subway Lines to Traffic; Called a Triumph" (https://timesmachine.nytimes.com/timesm
achine/1918/08/02/97011929.pdf) (PDF). The New York Times. August 2, 1918. p. 1. ISSN 0362-
4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20210221
065215/https://timesmachine.nytimes.com/timesmachine/1918/08/02/97011929.pdf) (PDF) from
the original on February 21, 2021. Retrieved October 4, 2011.
66. "New Hi-Speed Locals" (https://www.flickr.com/photos/127872292@N06/27076258093/). Flickr.
New York City Transit Authority. 1959. Archived (https://web.archive.org/web/20201117125717/http
s://www.flickr.com/photos/127872292@N06/27076258093/) from the original on November 17,
2020. Retrieved June 15, 2016.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 30/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

67. "Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side
Changes Take Effect" (https://www.nytimes.com/1959/02/07/archives/wagner-praises-modernized-
irt-mayor-and-transit-authority-are.html?_r=0). The New York Times. February 7, 1959. p. 21.
Archived (https://web.archive.org/web/20180101082503/http://www.nytimes.com/1959/02/07/archi
ves/wagner-praises-modernized-irt-mayor-and-transit-authority-are.html?_r=0) from the original on
January 1, 2018. Retrieved November 6, 2016.
68. Levey, Stanley (January 26, 1959). "Modernized IRT To Bow on Feb. 6 — West Side Line to
Eliminate Bottleneck at 96th Street" (https://www.nytimes.com/1959/01/26/archives/modernized-irt
-to-bow-0n-feb-6-west-side-line-to-eliminate.html). The New York Times. p. 1. Archived (https://we
b.archive.org/web/20170107164331/http://www.nytimes.com/1959/01/26/archives/modernized-irt-t
o-bow-0n-feb-6-west-side-line-to-eliminate.html) from the original on January 7, 2017. Retrieved
November 6, 2016.
69. Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (https://tile.loc.g
ov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf) (PDF). Historic
American Engineering Record. pp. 1–46 (PDF pp. 367–412). Archived (https://web.archive.org/we
b/20210117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/d
ata/ny0387data.pdf) (PDF) from the original on January 17, 2021. Retrieved December 20, 2020.
This article incorporates text from this source, which is in the public domain.
70. Ruhl, Arthur (October 1902). "Building New York's Subway". Century Illustrated Monthly Magazine.
Vol. LXIV, no. 6. p. 894. ProQuest 125503986 (https://search.proquest.com/docview/125503986).
71. "Eighty Years of Subway Service to the Bronx" (https://erausa.org/pdf/bulletin/1980s/1985/1985-07
-bulletin.pdf) (PDF). The Bulletin. Vol. 28, no. 7. Electric Railroaders' Association. July 1985.
Archived (https://web.archive.org/web/20230205172815/https://erausa.org/pdf/bulletin/1980s/198
5/1985-07-bulletin.pdf) (PDF) from the original on February 5, 2023. Retrieved April 2, 2018.
72. "Passenger Stations and Engineering Details of the New York Subway System". The Street
Railway Journal. Vol. 24, no. 14. October 1, 1904. ProQuest 747960894 (https://search.proquest.c
om/docview/747960894).
73. Report of the Public Service Commission for the First District of the State of New York (https://boo
ks.google.com/books?id=PCc_AQAAMAAJ&pg=PA194). J.B. Lyon Company, printers. 1908.
p. 194. Archived (https://web.archive.org/web/20230205172813/https://books.google.com/books?i
d=PCc_AQAAMAAJ&pg=PA194) from the original on February 5, 2023. Retrieved February 22,
2020.
74. "Subway Trains Running From Bronx to Battery; West Farms and South Ferry Stations Open at
Midnight" (https://www.nytimes.com/1905/07/10/archives/subway-trains-running-from-bronx-to-batt
ery-west-farms-and-south.html). The New York Times. July 10, 1905. ISSN 0362-4331 (https://ww
w.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20190513144329/https://w
ww.nytimes.com/1905/07/10/archives/subway-trains-running-from-bronx-to-battery-west-farms-an
d-south.html) from the original on May 13, 2019. Retrieved January 12, 2021.
75. Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (https://books.google.c
om/books?id=VovXXwAACAAJ) (3rd ed.). Dougherty. OCLC 49777633 (https://www.worldcat.org/
oclc/49777633) – via Google Books.
76. Kahn, Alan Paul (January 1, 1973). Tracks of New York (https://archive.org/details/tracksofnewyor
k03kahn). New York: Electric Railroaders' Association. p. 33.
77. "The Subway Car: the Present Car Present Service Supplied Analysis of Delays at Station
Platforms Defects in Present Arrangements Possible Improvements Arrangement of Seats Types
of Subway Cars Cars With Double Doors Near Ends Recommendations". Railroad Gazette.
Vol. 44, no. 2. February 28, 1908. p. 273. ProQuest 895747298 (https://search.proquest.com/docv
iew/895747298).

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 31/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

78. "The Elevator and Escalator Equipment of the New York Subway" (https://hdl.handle.net/2027/iau.
31858033398698?urlappend=;seq=83). The Engineering Record, Building Record and the
Sanitary Engineer. Vol. 56. 1907. pp. 69–70. hdl:2027/iau.31858033398698 (https://hdl.handle.ne
t/2027%2Fiau.31858033398698?urlappend=%3Bseq=83). Archived (https://web.archive.org/web/
20220521165012/https://babel.hathitrust.org/cgi/pt?id=iau.31858033398698;seq=83;a=zoom:1)
from the original on May 21, 2022. Retrieved December 23, 2020 – via HathiTrust.
79. "Group Calls For South Bronx Subway Elevator To Be Restored After 30 Years" (https://newyork.c
bslocal.com/2014/01/20/group-calls-for-south-bronx-subway-elevator-to-be-restored-after-30-year
s/). CBS New York. January 20, 2014. Archived (https://web.archive.org/web/20190423131435/htt
ps://newyork.cbslocal.com/2014/01/20/group-calls-for-south-bronx-subway-elevator-to-be-restored
-after-30-years/) from the original on April 23, 2019. Retrieved May 1, 2020.
80. Kurtz, Josh (August 12, 1991). "Washington Heights Journal; A Subway Passageway Just for the
Courageous" (https://www.nytimes.com/1991/08/12/nyregion/washington-heights-journal-a-subwa
y-passageway-just-for-the-courageous.html). The New York Times. ISSN 0362-4331 (https://www.
worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20201117065249/https://ww
w.nytimes.com/1991/08/12/nyregion/washington-heights-journal-a-subway-passageway-just-for-th
e-courageous.html) from the original on November 17, 2020. Retrieved July 30, 2016.
81. Brooks, Michael W. (1997). Subway City: Riding the Trains, Reading New York (https://books.goog
le.com/books?id=kr40kS6yK1AC). Rutgers University Press. ISBN 978-0-8135-2396-5. Archived
(https://web.archive.org/web/20230205172832/https://books.google.com/books?id=kr40kS6yK1A
C) from the original on February 5, 2023. Retrieved December 23, 2020.
82. Gray, Christopher (June 17, 1990). "Streetscapes: IRT Stations; Underground Art the Way It Was
Meant to Look" (https://www.nytimes.com/1990/06/17/realestate/streetscapes-irt-stations-undergro
und-art-the-way-it-was-meant-to-look.html). The New York Times. ISSN 0362-4331 (https://www.w
orldcat.org/issn/0362-4331). Retrieved May 9, 2023.
83. Stern, Robert A. M.; Gilmartin, Gregory; Massengale, John Montague (1983). New York 1900:
Metropolitan Architecture and Urbanism, 1890–1915 (https://archive.org/details/newyork1900metr
o0000ster). New York: Rizzoli. ISBN 0-8478-0511-5. OCLC 9829395 (https://www.worldcat.org/ocl
c/9829395).
84. "More Slot Machines Slip Into the Subway; Put Into Downtown Stations at Midnight by Somebody"
(https://www.nytimes.com/1906/05/07/archives/more-slot-machines-slip-into-the-subway-put-into-d
owntown-stations.html). The New York Times. May 7, 1906. ISSN 0362-4331 (https://www.worldca
t.org/issn/0362-4331). Archived (https://web.archive.org/web/20230507074314/https://www.nytime
s.com/1906/05/07/archives/more-slot-machines-slip-into-the-subway-put-into-downtown-stations.h
tml) from the original on May 7, 2023. Retrieved May 6, 2023.
85. "The experience of the week of Subway operation..." (https://rerecord.library.columbia.edu/docum
ent.php?vol=ldpd_7031148_034&page=ldpd_7031148_034_00001057&no=1) The Real Estate
Record: Real estate record and builders' guide. Vol. 74, no. 1912. November 5, 1904. p. 949 – via
columbia.edu.
86. "Advertisements Mar It" (https://www.newspapers.com/clip/124334952/advertisements-mar-it/).
New-York Tribune. October 29, 1904. p. 1. Retrieved May 9, 2023.
87. Cuniff, M.G. (October 1904). "The New York Subway" (https://archive.org/details/worldswork08gar
d/page/5346/mode/2up). The World's work. Retrieved December 23, 2020 – via Internet Archive.
88. Benjamin, Philip (May 25, 1957). "IND Motorman-Archaeologist Traces Origins of IRT Wall Art;
What Means the Art in the IRT? Every Little Picture Has a Meaning All Its Own" (https://www.nytim
es.com/1957/05/25/archives/ind-motormanarchaeologist-traces-origins-of-irt-wall-art-what-means.
html). The New York Times. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331).
Retrieved May 8, 2023.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 32/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

89. Blakinger, Keri (June 30, 2016). "The story of Squire Vickers, the man behind the distinctive look
of the New York City subway" (https://www.nydailynews.com/new-york/manhattan/story-mysteriou
s-man-behind-nyc-subway-article-1.2693468). nydailynews.com. Archived (https://web.archive.or
g/web/20220505224536/https://www.nydailynews.com/new-york/manhattan/story-mysterious-man
-behind-nyc-subway-article-1.2693468) from the original on May 5, 2022. Retrieved August 3,
2019.
90. Architectural League of New York (1904). Year Book of the Architectural League of New York, and
Catalogue of the Annual Exhibition (https://books.google.com/books?id=aTE_AQAAMAAJ&pg=PA
53). Secretary of the Architectural League of New York. p. 53. Archived (https://web.archive.org/we
b/20230205172921/https://books.google.com/books?id=aTE_AQAAMAAJ&pg=PA53) from the
original on February 5, 2023. Retrieved August 3, 2019.
91. Croly, Herbert D. (April 1906). "Glazed and Colored Terra-Cotta" (https://usmodernist.org/AR/AR-1
906-04.pdf) (PDF). Architectural Record. Vol. 19. pp. 321–322. Archived (https://web.archive.org/w
eb/20210227115828/https://usmodernist.org/AR/AR-1906-04.pdf) (PDF) from the original on
February 27, 2021. Retrieved December 22, 2020.
92. "Subway Stations in New York City". The Street Railway Review. Vol. 13, no. 9. September 20,
1903. p. 729. ProQuest 574970238 (https://search.proquest.com/docview/574970238).
93. Carlson, Jen (February 20, 2019). "Wowza, Is This The Most Instagrammable Subway Station In
NYC?" (http://gothamist.com/arts-entertainment/wowza-is-this-the-most-instagrammable-subway-
station-in-nyc). Gothamist. Archived (https://web.archive.org/web/20201205141432/https://gothami
st.com/arts-entertainment/wowza-is-this-the-most-instagrammable-subway-station-in-nyc) from
the original on December 5, 2020. Retrieved December 22, 2020.
94. "Interborough Rapid Transit System, 72nd Street Control House" (http://s-media.nyc.gov/agencies/
lpc/lp/1021.pdf) (PDF). New York City Landmarks Preservation Commission. January 9, 1979.
Archived (https://web.archive.org/web/20210511153619/http://s-media.nyc.gov/agencies/lpc/lp/102
1.pdf) (PDF) from the original on May 11, 2021. Retrieved November 19, 2019.
95. Gasparini, D. A. (February 2006). "Battery-Joralemon Street Tunnel" (https://archive.today/201205
30160547/http://cedb.asce.org/cgi/WWWdisplay.cgi?0600470). Journal of Performance of
Constructed Facilities. Vol. 20, no. 1. American Society of Civil Engineers. pp. 92–107.
doi:10.1061/(asce)0887-3828(2006)20:1(92) (https://doi.org/10.1061%2F%28asce%290887-382
8%282006%2920%3A1%2892%29). Archived from the original (http://cedb.asce.org/cgi/WWWdis
play.cgi?0600470#) on May 30, 2012. Retrieved October 12, 2007.
96. Interborough Rapid Transit Company (1904). New York Subway: Its Construction and Equipment
(https://books.google.com/books?id=MHURuDBc8VUC). Interborough Rapid Transit Company.
This article incorporates text from this source, which is in the public domain.
97. Transit Journal (https://books.google.com/books?id=Yj4_AQAAMAAJ&pg=PA470). 1904. p. 470.
Archived (https://web.archive.org/web/20230205172821/https://books.google.com/books?id=Yj4_
AQAAMAAJ&pg=PA470) from the original on February 5, 2023. Retrieved April 16, 2020. This
article incorporates text from this source, which is in the public domain.
98. Glueck, Grace (April 18, 1997). "Appreciating the Palaces of a Sumptuous Past" (https://www.nyti
mes.com/1997/04/18/arts/appreciating-the-palaces-of-a-sumptuous-past.html). The New York
Times. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.
org/web/20171229003612/http://www.nytimes.com/1997/04/18/arts/appreciating-the-palaces-of-a-
sumptuous-past.html) from the original on December 29, 2017. Retrieved December 23, 2020.
99. Baldock, Melissa (March 19, 2009). "IRT Powerhouse: Hoping Third Time's A Charm for
Landmarking" (https://web.archive.org/web/20090326115527/http://mas.org/irt-powerhouse-hopin
g-third-times-a-charm-for-landmarking/). Municipal Arts Society of New York. Archived from the
original (http://mas.org/irt-powerhouse-hoping-third-times-a-charm-for-landmarking/) on March 26,
2009. Retrieved December 23, 2020.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 33/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

100. Kimmelman, Barbara (1978). "Design and Construction of the IRT: Electrical Engineering" (https://t
ile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf) (PDF).
Historic American Engineering Record. pp. 284–364 (PDF pp. 285–365). Archived (https://web.arc
hive.org/web/20210117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny030
0/ny0387/data/ny0387data.pdf) (PDF) from the original on January 17, 2021. Retrieved
December 20, 2020. This article incorporates text from this source, which is in the public
domain.
101. Sansone, Gene (2004). New York Subways: An Illustrated History of New York City's Transit Cars
(https://books.google.com/books?id=6WFHNSXBpocC&pg=PA44). Johns Hopkins University
Press. ISBN 978-0-8018-7922-7. Archived (https://web.archive.org/web/20230205172816/https://b
ooks.google.com/books?id=6WFHNSXBpocC&pg=PA44) from the original on February 5, 2023.
Retrieved December 23, 2020.
102. Cudahy, Brian J. (2003). A Century of Subways: Celebrating 100 Years of New York's
Underground Railways. New York: Fordham University Press. ISBN 0-8232-2292-6.
103. "CITY NEEDS MORE ROADS, STATE COMMISSION SAYS; Subways Won't Accommodate
Increase in Traffic" (https://www.nytimes.com/1906/11/21/archives/city-needs-more-roads-state-co
mmission-says-subways-wont.html). The New York Times. November 21, 1906. ISSN 0362-4331
(https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/2023020517282
1/https://www.nytimes.com/1906/11/21/archives/city-needs-more-roads-state-commission-says-su
bways-wont.html) from the original on February 5, 2023. Retrieved December 23, 2020.
104. "Tammany Hall" (http://s-media.nyc.gov/agencies/lpc/lp/2490.pdf) (PDF). New York City
Landmarks Preservation Commission. October 29, 2013. p. 2. Archived (https://web.archive.org/w
eb/20200809133101/http://s-media.nyc.gov/agencies/lpc/lp/2490.pdf) (PDF) from the original on
August 9, 2020. Retrieved October 10, 2019.
105. Federal Writers' Project (1939). New York City Guide (https://archive.org/details/newyorkcityguide
00federich). New York: Random House. pp. 198–203. ISBN 978-1-60354-055-1. (Reprinted by
Scholarly Press, 1976; often referred to as WPA Guide to New York City.)
106. Barron, James (April 8, 2004). "100 Years Ago, an Intersection's New Name: Times Square" (http
s://www.nytimes.com/2004/04/08/nyregion/100-years-ago-an-intersection-s-new-name-times-squa
re.html). The New York Times. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331).
Archived (https://web.archive.org/web/20151224120212/http://www.nytimes.com/2004/04/08/nyre
gion/100-years-ago-an-intersection-s-new-name-times-square.html?_r=0) from the original on
December 24, 2015. Retrieved December 27, 2020.
107. Dolkart, Andrew S. (1998). Morningside Heights: A History of its Architecture and Development.
New York: Columbia University Press. pp. 305–306. ISBN 978-0-231-07850-4. OCLC 37843816
(https://www.worldcat.org/oclc/37843816).
108. "Money Set Aside for New Subways; Board of Estimate Approves City Contracts to be Signed To-
day with Interboro and B.R.T." (https://timesmachine.nytimes.com/timesmachine/1913/03/19/1049
10612.pdf) (PDF). The New York Times. March 19, 1913. ISSN 0362-4331 (https://www.worldcat.
org/issn/0362-4331). Archived (https://web.archive.org/web/20210707225820/https://timesmachin
e.nytimes.com/timesmachine/1913/03/19/104910612.pdf) (PDF) from the original on July 7, 2021.
Retrieved November 10, 2017.
109. "Open New Subway to Regular Traffic; First Train on Seventh Avenue Line Carries Mayor and
Other Officials" (https://timesmachine.nytimes.com/timesmachine/1918/07/02/106215771.pdf)
(PDF). The New York Times. July 2, 1918. Archived (https://web.archive.org/web/2020053019154
2/https://timesmachine.nytimes.com/timesmachine/1918/07/02/106215771.pdf) (PDF) from the
original on May 30, 2020. Retrieved October 30, 2016.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 34/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

110. "Lexington Av. Line to Be Opened Today; Subway Service to East Side of Harlem and the Bronx
Expected to Relieve Congestion" (https://timesmachine.nytimes.com/timesmachine/1918/07/17/10
2723156.pdf) (PDF). The New York Times. July 17, 1918. p. 13. Archived (https://web.archive.org/
web/20211214183011/https://timesmachine.nytimes.com/timesmachine/1918/07/17/102723156.pd
f) (PDF) from the original on December 14, 2021. Retrieved October 30, 2016.
111. "Open New Subway Lines to Traffic; Called a Triumph; Great H System Put in Operation Marks an
Era in Railroad Construction" (https://www.nytimes.com/1918/08/02/archives/open-new-subway-lin
es-to-traffic-called-a-triumph-great-h-system.html). The New York Times. August 2, 1918. p. 1.
ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/we
b/20180415190431/https://www.nytimes.com/1918/08/02/archives/open-new-subway-lines-to-traffi
c-called-a-triumph-great-h-system.html) from the original on April 15, 2018. Retrieved October 30,
2016.
112. "The Seventh and Lexington Avenue Subways Will Revive Dormant Sections; Change in
Operation That Will Transform Original Four-Tracked Subway Into Two Four-Tracked Systems and
Double Present Capacity of the Interborough" (https://timesmachine.nytimes.com/timesmachine/1
918/03/10/118138743.pdf) (PDF). The New York Times. March 10, 1918. Archived (https://web.arc
hive.org/web/20191212141413/https://timesmachine.nytimes.com/timesmachine/1918/03/10/1181
38743.pdf) (PDF) from the original on December 12, 2019. Retrieved October 30, 2016.
113. "Steinway Tunnel Will Open Today; Officials Will Attend Ceremony in the Long Island City Station
at 11 A.M. First Public Train At Noon Public Service Commission Renames the Under-River Route
the Queensboro Subway" (https://www.nytimes.com/1915/06/22/archives/steinway-tunnel-will-ope
n-today-officials-will-attend-ceremony-in.html). The New York Times. June 22, 1915. ISSN 0362-
4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20220504
023723/https://www.nytimes.com/1915/06/22/archives/steinway-tunnel-will-open-today-officials-wil
l-attend-ceremony-in.html) from the original on May 4, 2022. Retrieved April 14, 2018.
114. Report for the three and one-half years ending June 30, 1949. New York City Board of
Transportation. 1949. hdl:2027/mdp.39015023094926 (https://hdl.handle.net/2027%2Fmdp.39015
023094926).
115. "High-Speed Broadway Local Service Began in 1959" (https://issuu.com/erausa/docs/2009-02-bull
etin/1). The Bulletin. Vol. 52, no. 2. New York Division, Electric Railroaders' Association. February
2009. Archived (https://web.archive.org/web/20160916212657/https://issuu.com/erausa/docs/2009
-02-bulletin/1) from the original on September 16, 2016. Retrieved August 26, 2016 – via Issuu.
116. "New York MPS 145th Street Subway Station (IRT) (https://catalog.archives.gov/id/75313909)".
Records of the National Park Service, 1785 – 2006, Series: National Register of Historic Places
and National Historic Landmarks Program Records, 2013 – 2017, Box: National Register of
Historic Places and National Historic Landmarks Program Records: New York, ID: 75313909, p. 6.
National Archives.
117. "42nd Street Shuttle ADA, State of Good Repair, and Capacity Enhancement Project & Grand
Central Station Elevator and Escalator Replacements" (https://web.archive.org/web/20190819025
539/http://cbsix.org/wp-content/uploads/2019/06/Times-Square-ADA_MN-CB5_final.pdf) (PDF).
cbsix.org. Metropolitan Transportation Authority. May 30, 2019. Archived from the original (http://cb
six.org/wp-content/uploads/2019/06/Times-Square-ADA_MN-CB5_final.pdf) (PDF) on August 19,
2019. Retrieved June 14, 2019.
118. "Historic Station Closed After 41 Years" (https://select.nytimes.com/gst/abstract.html?res=FB0715
F63D5D107A93C3A9178AD85F428485F9). The New York Times. January 1, 1946. p. 22.
Archived (https://web.archive.org/web/20110606155245/http://select.nytimes.com/gst/abstract.htm
l?res=FB0715F63D5D107A93C3A9178AD85F428485F9) from the original on June 6, 2011.
Retrieved October 26, 2011.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 35/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

119. "IRT Station to be Closed — East Side Subway Trains to End Stops at 18th Street" (https://www.n
ytimes.com/1948/11/06/archives/irt-station-to-be-closed-east-side-subway-trains-to-end-stops-at.h
tml). The New York Times. November 6, 1948. p. 29. Archived (https://web.archive.org/web/20180
723065232/https://www.nytimes.com/1948/11/06/archives/irt-station-to-be-closed-east-side-subwa
y-trains-to-end-stops-at.html) from the original on July 23, 2018. Retrieved October 26, 2011.
120. "Notice to Passengers" (https://www.flickr.com/photos/127872292@N06/16965436879/). Flickr.
New York City Board of Transportation. 1952. Archived (https://web.archive.org/web/20220427023
620/https://www.flickr.com/photos/127872292@N06/16965436879/) from the original on April 27,
2022. Retrieved August 26, 2019.
121. Grutzner, Charles (September 1, 1962). "New Platform for IRT Locals At Brooklyn Bridge to End
Jams — Sharp Curve on Northbound Side Removed — Station Extended to Worth St" (https://ww
w.nytimes.com/1962/09/01/archives/new-platform-for-irt-locals-at-brooklyn-bridge-to-end-jams-sha
rp.html). The New York Times. p. 42. Archived (https://web.archive.org/web/20180405094907/http
s://www.nytimes.com/1962/09/01/archives/new-platform-for-irt-locals-at-brooklyn-bridge-to-end-ja
ms-sharp.html) from the original on April 5, 2018. Retrieved October 26, 2011.
122. Neuman, William (March 17, 2009). "New Station at South Ferry Opens, but a Main Breaks
Upstream" (https://www.nytimes.com/2009/03/17/nyregion/17southferry.html). The New York
Times. ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.
org/web/20170808153622/http://www.nytimes.com/2009/03/17/nyregion/17southferry.html) from
the original on August 8, 2017. Retrieved December 17, 2016.
123. Rozhon, Tracie (October 29, 1998). "Turf; On the Express Track to Venerability" (https://www.nytim
es.com/1998/10/29/garden/turf-on-the-express-track-to-venerability.html). The New York Times.
ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Retrieved May 10, 2023.
124. "National Register Information System" (https://npgallery.nps.gov/NRHP). National Register of
Historic Places. National Park Service. November 2, 2013.
125. "Discover New York City Landmarks" (https://nyclpc.maps.arcgis.com/apps/webappviewer/index.ht
ml?id=93a88691cace4067828b1eede432022b). New York City Landmarks Preservation
Commission. Archived (https://web.archive.org/web/20210109050713/https://nyclpc.maps.arcgis.c
om/apps/webappviewer/index.html?id=93a88691cace4067828b1eede432022b) from the original
on January 9, 2021. Retrieved December 21, 2019 – via ArcGIS.
126. "12 IRT Subway Stops Get Landmark Status" (https://www.nytimes.com/1979/10/27/archives/12-irt
-subway-stops-get-landmark-status.html). The New York Times. October 27, 1979. ISSN 0362-
4331 (https://www.worldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20180309
164713/https://www.nytimes.com/1979/10/27/archives/12-irt-subway-stops-get-landmark-status.ht
ml) from the original on March 9, 2018. Retrieved December 26, 2020.
127. "Landmark Status Given To Queensboro Bridge" (https://www.nytimes.com/1973/11/24/archives/la
ndmark-status-given-to-queensboro-bridge.html). The New York Times. November 24, 1973.
ISSN 0362-4331 (https://www.worldcat.org/issn/0362-4331). Retrieved May 10, 2023.
128. Fowler, Glenn (January 10, 1979). "Its Status Is More Than Token: Subway Kiosk Now Landmark"
(https://www.nytimes.com/1979/01/10/archives/its-status-is-more-than-token-subway-kiosk-now-la
ndmark-beauxarts.html). The New York Times. ISSN 0362-4331 (https://www.worldcat.org/issn/03
62-4331). Retrieved May 10, 2023.
129. Warerkar, Tanay (June 26, 2017). "South Ferry subway station readies for its reopening after
Sandy" (https://ny.curbed.com/2017/6/26/15872784/south-ferry-station-reopening-1-train-mta-san
dy). Curbed NY. Archived (https://web.archive.org/web/20170804113155/https://ny.curbed.com/20
17/6/26/15872784/south-ferry-station-reopening-1-train-mta-sandy) from the original on August 4,
2017. Retrieved June 27, 2017.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 36/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

130. "M.T.A. Expected to Save Franklin Avenue Shuttle, Once an Austerity Target" (https://www.nytime
s.com/1977/02/10/archives/mta-expected-to-save-franklin-avenue-shuttle-once-an-austerity.html).
The New York Times. February 10, 1977. p. 27. Archived (https://web.archive.org/web/201807232
12442/https://www.nytimes.com/1977/02/10/archives/mta-expected-to-save-franklin-avenue-shuttl
e-once-an-austerity.html) from the original on July 23, 2018. Retrieved July 18, 2010.
131. "Subway Trains Run Again This Morning — Through Service Promised for the Rush-Hour Crowds
— Tunnel Pumped Out At Last — Big Water Main That Burst Was an Old One, Pressed Into
Service Again After a Five-Hour Watch" (https://www.nytimes.com/1905/06/13/archives/subway-tra
ins-run-again-this-morning-through-service-promised-for.html). The New York Times. June 13,
1905. p. 1. Archived (https://web.archive.org/web/20180311050045/https://www.nytimes.com/190
5/06/13/archives/subway-trains-run-again-this-morning-through-service-promised-for.html) from
the original on March 11, 2018. Retrieved November 6, 2016.
132. "Subway at Fulton Street Busy" (https://www.nytimes.com/1905/01/17/archives/subway-at-fulton-st
reet-busy.html). New York Times. January 17, 1905. p. 9. Archived (https://web.archive.org/web/20
180726013443/https://www.nytimes.com/1905/01/17/archives/subway-at-fulton-street-busy.html)
from the original on July 26, 2018. Retrieved November 6, 2016.
133. "Our Subway Open, 150,000 Try It — Mayor McClellan Runs the First Official Train — Big Crowds
Ride At Night — Average of 25,000 an Hour from 7 P.M. Till Past Midnight — Exercises in the City
Hall — William Barclay Parsons, John B. McDonald, August Belmont, Alexander E. Orr, and John
Starin Speak — Dinner at Night" (https://www.nytimes.com/1904/10/28/archives/our-subway-open
-150000-try-it-mayor-mcclellan-runs-the-first.html%26legacy%3Dtrue). The New York Times.
October 28, 1904. p. 1. Archived (https://web.archive.org/web/20180726103813/https://www.nytim
es.com/1904/10/28/archives/our-subway-open-150000-try-it-mayor-mcclellan-runs-the-first.html%
26legacy%3Dtrue) from the original on July 26, 2018. Retrieved November 6, 2016.
134. "Subway on the East Side Will Be Opened Soon — New Switching Station on West Side Nearly
Ready, Too — Football Trains On To-Day — Trains to Fulton Street in a Few Weeks Are Promised
— Commission's Counsel on the Sign Question" (https://www.nytimes.com/1904/11/12/archives/s
ubway-on-east-side-will-be-opened-soon-new-switching-station-on.html). The New York Times.
November 12, 1904. p. 16. Archived (https://web.archive.org/web/20180516014856/https://www.ny
times.com/1904/11/12/archives/subway-on-east-side-will-be-opened-soon-new-switching-station-o
n.html) from the original on May 16, 2018. Retrieved November 6, 2016.
135. "New Subway Station Open — Also a Short Express Service for Baseball Enthusiasts" (https://ww
w.nytimes.com/1906/04/15/archives/mob-burns-two-negroes-first-hangs-them-to-goddess-of-libert
y-in.html). The New York Times. April 15, 1906. p. 1. Archived (https://web.archive.org/web/20190
408062041/https://www.nytimes.com/1906/04/15/archives/mob-burns-two-negroes-first-hangs-the
m-to-goddess-of-liberty-in.html) from the original on April 8, 2019. Retrieved November 6, 2016.
136. "Expresses to 221st Street — Will Run in the Subway Today — New 181st Street Station Ready"
(https://www.nytimes.com/1906/05/30/archives/oyster-boat-blows-up-captain-and-his-crew-have-a
-narrow-escape-in.html). The New York Times. May 30, 1906. p. 1. Archived (https://web.archive.o
rg/web/20180516103435/https://www.nytimes.com/1906/05/30/archives/oyster-boat-blows-up-capt
ain-and-his-crew-have-a-narrow-escape-in.html) from the original on May 16, 2018. Retrieved
November 6, 2016.
137. "Era of Building Activity Opening for Fort George — New Subway Station at 191st Street and
Proposed Underground Road to Fairview Avenue Important Factors in Coming Development —
One Block of Apartments Finished" (https://www.nytimes.com/1911/01/22/archives/article-17-no-titl
e.html). The New York Times. January 22, 1911. p. X11. Archived (https://web.archive.org/web/20
190408062043/https://www.nytimes.com/1911/01/22/archives/article-17-no-title.html) from the
original on April 8, 2019. Retrieved November 6, 2016.

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 37/38
10/26/23, 10:19 PM Early history of the IRT subway - Wikipedia

138. "Trains To Ship Canal — But They Whiz by Washington Heights Stations" (https://www.nytimes.co
m/1906/03/13/archives/trains-to-ship-canal-but-they-whiz-by-washington-heights-stations.html).
The New York Times. March 13, 1906. p. 16. Archived (https://web.archive.org/web/20200630073
115/https://www.nytimes.com/1906/03/13/archives/trains-to-ship-canal-but-they-whiz-by-washingto
n-heights-stations.html) from the original on June 30, 2020. Retrieved August 16, 2015.
139. "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System
Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street
for a Nickel Is Possible Now" (https://www.nytimes.com/1908/08/02/archives/our-first-subway-com
pleted-at-last-opening-of-the-van-cortlandt.html). The New York Times. August 2, 1908. p. 10.
Archived (https://web.archive.org/web/20200530191523/https://www.nytimes.com/1908/08/02/arch
ives/our-first-subway-completed-at-last-opening-of-the-van-cortlandt.html) from the original on
May 30, 2020. Retrieved November 6, 2016.
140. "East Side Subway Open – Train from 145th Street to Broadway in 9 Minutes and 40 Seconds" (ht
tps://www.nytimes.com/1904/11/23/archives/east-side-subway-open-train-from-145th-street-to-bro
adway-in-9.html). The New York Times. November 23, 1904. p. 1. ISSN 0362-4331 (https://www.w
orldcat.org/issn/0362-4331). Archived (https://web.archive.org/web/20211221185506/https://www.n
ytimes.com/1904/11/23/archives/east-side-subway-open-train-from-145th-street-to-broadway-in-9.
html) from the original on December 21, 2021. Retrieved March 27, 2016.

External links
Interior New York Subway, 14th Street to 42nd Street (1905) (https://www.loc.gov/item/00694394),
a short film with footage of the first IRT subway line as taken from a train cab

Retrieved from "https://en.wikipedia.org/w/index.php?title=Early_history_of_the_IRT_subway&oldid=1172887500"

https://en.wikipedia.org/wiki/Early_history_of_the_IRT_subway 38/38