Professional Documents
Culture Documents
Report From 1 To 23 Sep..
Report From 1 To 23 Sep..
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
mohammadiya site ( maintenance and repeated problems to be monitored) Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance
corrected, and all door setting to be done some problem in drive or wiring loose Done
connection should be checked. Done
Breakdown. Reported by shiva Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
lift
Repeated Breakdown shutdown
Breakdown emergency..Lift working now.without sensor Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Breakdown Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
4 - Kone lifts - complete maintenance(behind Indian School rakha) Done
5 - Kone lifts - complete maintenance(behind Indian School rakha) Done
6 - Kone lifts - complete maintenance(behind Indian School rakha) Done
7 - Kone lifts - complete maintenance(behind Indian School rakha) Done
site visit Done
Installation work progress survey & materials lists Done
Breakdown..second floor issues at the door Done
Breakdown..door closer problem.Now adjusted working good
Breakdown.. Done
Nasma site #1014 - (B) Khobar(installation work guide Rails and doors). on going
Installation of the lift- Office otis Jubail # 1013(A - 370). on going
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
control reading Done
Push to complete the Nasma site#1014 (B)
Breakdown..Overtravel to up .working now Done
Installation
Nasma of the -lift-
site #1014 Office otis Jubail # 1013(A - 370).
(B) Khobar Done
(installation work guide Rails and doors). Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance pending
Maintenance
Installation sites requirements and for the completions and new Schindler site Done
startups. on going
Breakdown Done
Breakdown pending
Breakdown observation
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance pending
Maintenance Done
Maintenance pending
Maintenance Done
Maintenance Done
Maintenance Done
Schindler installation site#1016. (scaffolding & installation startup) on going
Installation of the lift- Office otis Jubail # 1013(A - 370). Day 7 on going
Schindler installation site#1016(arrangements) on going
Jubail hospital lift#1010 (control preparations)
Bandariyah Khobar need to check
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance pending
Maintenance pending
Maintenance pending
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
(sort out) pending
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Schindler installation site#1016. ( installation startup) on going
Installation of the lift- Office otis Jubail # 1013(A - 370)..Day 8 on going
Installation follow ups on going
Rashid Mall dismantling project - survey Done
Child spark - formal visit observation
Otis office lift - safe locker to the control panel Done
Observatio
morning hours one family was stuck in the lift, later automatically door opened n
Breakdown pending
Breakdown Done
Maintenance pending
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
fuji otis site - found out solution) pending
Schindler
Nasma site installation site#1016.
#1014 - (B) Khobar ( installation startup) on going
(installation work-- Motors) on going
Maintenance Done
Control
Nasma sitepreparations (hospital site - Jubail)
cabin arrangements.
(Main Rope-- speed governor & Rope along with the clips) Done
Jubail lift#572 requirements Done
Need to visit Badia site for Marking.. Done
Sheraton lift as Sound kindly check Done
Breakdown. Done
Breakdown. Done
573 checked speed governer. Its working fine. Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
change spotlights pending
maintenance & final run pending
Maintenance Done
Maintenance pending
Maintenance Done
Maintenance Done
(encoder replacement) pending
Al manar new lift visit & repair)
Nasma site #1014 - (B) Khobar (installation work-- Motors & Cabin) Day 10 on going
Rashid Mall dismantling project. Day 1 on going
Breakdown. Done
Breakdown. Done
Maintenance Done
Maintenance Done
Maintenance pending
Maintenance pending
Maintenance pending
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
( Finalize today) Done
Otis Mezban building (Finalize to deliver today) Done
(re-check)
(re-check)
Nasma site #1014 - (B) Khobar (installation work-- Motors & Cabin) Day 11 on going
Rashid Mall dismantling project. on going
Seiko-- warehouse lift visit
OTIS Mezban building
(re-check)
(re-check)
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Pending
Maintenance Done
Maintenance Done
Maintenance Pending
Maintenance Pending
Maintenance Pending
Maintenance Pending
Maintenance Pending
(ventilation fan and light) Pending
(fully focus)
Nasma site #1014 - (B) Khobar (Commissioning) Day 13 on going
Schindler installation site#1016. ( installation of landing doors) on going
Maintenance Done
Nasma site #1014 - (B) Khobarn(Commissioning & final start-up) Day 14 on going
Rashid Mall 3 goods lift dismantling project. Day 5 on going
M. Nahdi Renovation Site- Khobar on going
Nasma site#1014(B) (Commissioning and startup) on going
Breakdown….Urgent Pending
Breakdown….emergency Done
Breakdown Repeated Done
Breakdown Done
Breakdown emergency Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Pending
Maintenance Done
Maintenance
Renovation of lift (replacing with all the new landing doors-- Push buttons---VVVF Done
control--- Flat cable-- Sensor) Day 1 on going
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
PRO Work on fuji drive Done
Rashid Mall 3 goods lift dismantling project. Day 7 on going
Renovation site - (control replacement - VVVF Drive) M. Nahdi Bandariyah.
Nasma site#1014(B) Final clearance.
Breakdown observation
lift
Breakdown shutdown
Maintenance Done
Maintenance Pending
Maintenance Pending
Maintenance Done
Maintenance Pending
PRO Building fuji frenic drive refixing
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance
Renovation of lift (replacing with all the new landing doors-- Push buttons---VVVF Done
control--- Flat cable-- Sensor) Day 2 on going
Rashid Mall 3 goods lift dismantling project. (completion of 1 lift) Day 8 on going
Breakdown Done
Breakdown
Breakdown
Renovation of lift (replacing with all the new landing doors-- Push buttons---VVVF Done
control--- Flat cable-- Sensor). Day 3 on going
Buhr 2 site - inspection run on going
Renovation site - (control replacement - VVVF Drive) M. Nahdi Bandariyah. observation
Nasma site#1014(B) Final clearance. observation
Rashid Mall 3 goods lift dismantling project. (Startup of 2 lift) DAY 2 on
lift going
otis level out issues shutdown
Kone Lifts to be monitored. Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Breakdown Done
lift
Again there is a sound, kindly any other major issues shutdown
Repeated Breakdown Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Maintenance Done
Plant- tech Kone Pending
Maintenance Done
Maintenance Done
Maintenance Pending
Maintenance Done
Rashid Mall 3 goods lift dismantling project. (Startup of 2 lift) Day 2 on going
Renovation of lift (replacing with all the new landing doors) Day 3 on going
door as Sound observation
Breakdown emergency Done
Breakdown Done
lift
Breakdown shutdown
Breakdown Done
breakdown - - second time level final happened. done
clutch act clearance. Pending
Jalawiyah - new site. Done
Breakdown Done
Breakdown Done
Breakdown Done
Breakdown Done
Sensor replaced
New door drive and encoder fixed.
Brake liner fixed