You are on page 1of 1

Water Tank #4

Water Tank #3
24.6’
Water Tank #2

Tank
Secuation
107’ Water Tank #1

PoorBoy FBOS B8 Rig


tion
MCC tion
Pipe Rack

Shale Shaker
114
ne 1
ne 2 Doo 230’

En

#2
g

#2

Pump
ser Unit

En

#1
g

#1
BOP Accumulator
Store
Pump
Mud

164.8
224
Store
Elect

137.
3
Drilling
Shop
Work

HSE Office 1 Man


Mousqe 2 Man W. 2 Man Office Office W.
Store Sleeper
Sleeper C Sleeper C
TDS Mech Elect Coffee TP 1 Man 1 Man
1 Man
Store

W.C
W.C
Shop Shop Public W.C Sleeper
Shop Store Sleeper Sleeper
W.C
Store CLINIC 1 Man Water 1 Man
Store 1 Man

W.C
W.C
Sleeper
Tank 1 Man 1 Man Sleeper Sleeper

W.C
W.C
Sleeper Sleeper

WAST PIT
DRAWING BY APPROVED BY
TITLE
Salem Elnaas BELQASEM IBRAHIM Faiad Bergen Oil Services Company
COPYRIGHT:
DATE AMENDMENT Mini Camp Of Rig B8
THIS DRAWING 04-08-2023 ISSUED
IS THE PROPERTY FOR
OF FBOS OR FAIAD BERGEN
COMMENTS OIL SERVICES COMPANY AND SHALL NOT BE COPIED OR El Farnaj, Tripoli, Tel : + 218 21 588 0490 SCAL SIZE DRAWING No AUDIT
REV No CHECKED BY USED Libya E

V 2.0 SULIMAN MUKHTER IN ANYWAY WITHOUT THEIR PRIOR Fax : + 218 21 483 3506 N.T.S A3 R-B8-0007
PERMISSION . Email: Info@fbos.ly 04-08-2023

You might also like