Professional Documents
Culture Documents
I W
N
06 S E
RECREATIONAL FACILITY
GARBAGE
DOCK AREA
CONCRETE
SMOKING
SHED
PAD
ACCOMMODATION BUILDING
MZ-15 FFL:+7.40M
B-90 STAFF
BASKETBALL
TENNIS GRAVEL FINISH
UG GRAVEL
GRAVEL (FOR FUTURE EXPANSION)
(FOR FUTURE TANK
EXPANSION)
ACCOMMODATION BUILDING UP
A-126 STAFF
PUMP
FD
ROOM
SEWAGE
WATER
WATER
GREY
UP
P
KSHO
DN
STOREE
FRIDG
WOR
SD1
COLD STORE
BUILDING
SD1
باةب س ةبسن
SLOPE
SLOPE SLOPE
LEGEND
0.10M
32Ø
1.8 1.ALARM INDICATION ON FECP.
32Ø 0M 2.ALARM BELL WILL RING.
PIP 3.SIGNAL TO CLOSE FIRE DAMPER / AC UNIT
9 E
4.FIRE SIGNAL TO MAIN FIRE ALARM PANEL.
B) SIMULTANEOUS ACTIVATION OF A SECOND DETECTOR IN THE OTHER
6 5 CIRCUIT WILL CAUSE
1.PREDISCHARGE INDICATION ON FECP.
2.STROBE HORN WILL ACTIVATE.
3.STARTS COUNTDOWN OF SET TIME DELAY.
4.SIGNAL TO CLOSE FIRE DAMPER / AC UNIT
5.SIGNAL TO CLOSE THE ROOM ENTRANCE DOOR.
C) AT THE END OF SET TIME DELAY.
1.RELEASE INDICATION ON THE PANEL.
2.ACTIVATES IMPULSE RELEASE MODULE WHICH GIVES SIGNAL TO IMPULSE VALVE
OPERATOR TO RUPTURE THE DISC & RELEASE THE GAS.
3.WARNING LIGHT ON THE ENTRANCE OF THE HAZARD.
MANUAL RELEASE OPERATION
ACTIVATION OF MANUAL RELEASE SWITCH WILL CAUSE
- ALL OPERATION A,B&C ABOVE WITHOUT ANY TIME DELAY
ABORT SWITCH OPERATION.
IF THE MANUAL ABORT SWITCH IS ACTIVATED IN PRE DISCHARGE PERIOD
- ABORT INDICATION ON PANEL.
- RELEASE OF GAS HOLDED TILL THE SWITCH IS DEACTIVATED.
- AFTER THE ABORT IS DEACTIVATE COUNTDOWN WILL START FROM THE INITIAL
TIME AND THEN GAS WILL RELEASE
NOTES:-
06
SERVER ROOM
MZ-15 FFL:+7.40M
PROJECT :-
CLIENT :-
MAIN CONTRACTOR :-
OCC Weavers - Ltd. P.O. BOX 11163, JEDDAH 21453, SAUDI ARABIA
OS OS General Contractor TEL. NO. (012) 651 7741 / 45 FAX NO. (012) 651 3864
MEP CONTRACTOR :-
NAFFCO
t if i
Ce r ed
m
na
te
ge y s
m en t S
NAFFCO KSA
ISO 9001
OR
LS F F I
VA
R
E
SH APPRO
EQ
UIPMEN
Black 16, Reemas city, Istanbul Road (South), Exit 18, Al Sulay, Riyadh, K.S.A.
ITI
T
R
S
B
TEL: +966 (1) 282 4444; FAX:+966 (1) 282 4333; Email: ksa-info@naffco.ae
NFPA
R
TITLE :-
LAYOUT OF HFC-227ea FIRE DETECTION
& SUPPRESSION SYSTEM FOR
SERVER ROOM MZ-15 @ MEZZANINE FLOOR
DRAWN BY: CHECKED BY: APPROVED BY: DATE SCALE
MANI UPPILI UPPILI 05.02.2023 1:25