Professional Documents
Culture Documents
Dokumen - Tips Mini Proposal 1docx
Dokumen - Tips Mini Proposal 1docx
STUDENT’S NAME:
DKM 6B
1.0 INTRODUCTION
The history of badminton can be traced back many to the games of battledore and
shuttlecock which were played in ancient Greece over 2000 years ago. The game we
all know as badminton began in the 19th century (1870) and was named by the Duke
1
of Beaufort after Badminton House in Gloucestershire . The International Badminton
Federation now has its base in Gloucestershire.
Now days, badminton has grown and become one of the popular sports in Malaysia
where the standard faciliti and players have reached world standards. for example, our
country has courts that have recognized and able to host major championships such as
the super series and world championship. In addition, that our
country has produced world class players for example, Dato’ Lee Chong Wei is
the world's No. 1 player now has won many world-class championship
The problem that we found when we conduct research, installation and storage of
badminton nets are take a long time. We have to open and role up the nets first, and
the installation process and storage currently using two people to operate them. In
addition, difficulties during the process of lifting the net because they can cause
injuries to the hand. With the problems there are in the process of assembly and
storage, we will make changes and improvements in the system installation process
and storage badminton nets.
1.2 PROJECT’S GOALS
1.3 OBJECTIVE
Our purpose produce storage badminton netting case to achieve a few that objective :
1.4 SCOPE
2.0 INTRODUCTION
Each product is designed mainly as a result of earlier studies. Although it is only a recent
discovery but it would have similar or the continuation of the form, manner and method it
is a modification of what has been created by an earlier generation, but it is just opinion
or is removed.
With observation that we do at the court badminton they still used the manual
method within they need to tie off the end of the rope to a stake. Pull the stake so the rope
is at a 45-degree angle from the pole and pull it to the side. Secure the stake into the
ground. The stake provides extra stability for the pole and repeat this process on the other
pole, this has their own advantage and disadvantages
2.1.1 ADVANTAGES
Cheap.
No need maintenance cost.
2.1.2 DISADVANTAGES
3.0 INTRODUCTION
Among the tools we use are metal cutting machine (Grinder), welding equipment,
lathe machine and so on. All the above methods and tools work is important in
completing the planned project. To implement this
project go smoothly, systematic measures should be planned in advance according to the
sequence. These measures ensure the project is importance for satisfactory and according
as planned.
3.1 PROCEDURES OF PROJECT
3.2.1 Procedures
1. Start work, make sure all required tools such as saws and grinder must be in a state that
can be used.
2. Make sure the components to be used in good condition and no damage or blemish .
7.Build a shaft of bevel gear on body project, this bevel gear was weld with the shaft.
8. Joining motor to the body project. Installation work must be done carefully to ensure
that the motors in parallel on the Bevel gear shaft to produce a good round.
9. Joining shaft to body. Shaft will parellel to the gear motor. This shaft include support
by bearing at upper and lower interior case.
11. Build the Perspex box, this box for protect motor and battery. It also to precaution
from players badminton from any injury
12. Net assemble at shaft.
14. Make a wiring switch, this process is must proper to avoid a problem to operate a
motor of project. This switch similar system a power window switch.
4.0 DESIGN
Factor of Design
Factor of safety can mean the situation that become injury to safety.
In this project when a design is complete, model for design tool to build a design
must be search first. By this estimate about tool cost, manufacturing cost, raw materials
cost have calculate to estimated income from the design.
Before build a design, we have research weather the design that will build is
suitable with environment. Environment and design is put influence each other.
It is the main component to drive the movement in and out on the badminton.
These motors are connected in modified with screws on the side of the body.
Motor movement will be controlled by a switch that almost the same as the power
window system of the car.
5.1.6 Bearing
After several months of the project, through some parts from the first design to
development this project. Project Netting Badminton Storage Case finally be completed.
Here we have a photo our project.
After the project is almost completed and work, we have made an attempt on this
project. This attempt to ensure that all components of the installation is in a good
situation and right to Avoid the problems that will occur during this project work. After
Ensuring that the project is safe and can work well, we will make the trial function of the
project.
This project started with installing the first by inserting into the hole and make
sure the additional columns filled the holes. Then, press and hold the switch pull and pull
until the opening of the second pillar and attach the hook. After that, be sure to follow the
standard tension pole, and start the game.
After the session, the storage process is done by opening the second pole and
hangers on and the hold switch and the process of winding up into the storage container
begins. After completion of the process. All equipment packed and stored completion.
In the middle of the field there is a high net 155 cm. Net is a limiting form of the
net that stretches between the two areas that were tied to the post game. Pillars had to be
strong, so the net set will not go down when pulled taut so that a straight line. High net in
the middle of the field, should be 152 cm from the surface.
5.4 FLOW CHART OF THE SYSTEM
Push the storage box to the release the stopper into the hole,
court, make sure the correct so that a stable storage box
area
after that, take the net to the press the button switch to move
second pillar is on the left court the badminton net
net tie in the second pillar tighten the net by using the
motor switch
6.1 DISCUSSION
Our group has also held discussions with the lecturer on project problems we face
as difficult to find materials and tools for our projects such as the difficulty to find the
'gear'. But this problem can be overcome is the result of our discussions with lecturers
and fellow project at the Department of Mechanical Engineering.
In addition, we also discussed about the project can’t walk properly or as intended
when the tests on him. Here we have a lot has to do a lot of discussion to find a good and
effective solution to overcome the problem.
Therefore, discussion groups and lecturers is very important in the success of this
project and overcome problems that arise during the project. In addition, the cooperation
of the group is also very important because without the cooperation of the members of a
planned project may not be able to run smoothly.
6.1.1 Advantages
6.2 SUGGESTION
The proposal is an idea given to enable an object that was created improved its
ability to be the thing to function effectively and efficiently and more effectively. Based
on the projects that have been made, there remain some deficiencies or weaknesses that
can reduce consumption rates. Maybe in the near future it can be further improved in line
with the requirements of users. Among the proposed improvements to be implemented
are:
• In order to redesign looks very neat and organized and electric system.
• Create columns that can be adjusted for use for people who are less height.
• Various functions are not only based on the badminton net. It is also to net takraw and
tennis.