KABUPATEN ACEH TENGAH
TAHUN 2021
Kepala Tukang 1 Kepala Tukang 2 Kepala Tukang 3 Kepala Tukang 4 Kepala Tukang 5
A. UPAH SATUAN
Harga Material Harga Material Harga Material Harga Material Harga Material Harga Material
B. BAHAN Merk / Type SATUAN
Toko Besi Riski Toko Bwsi Mitra
Baru Indah Perabot Jasa Angkutan Tuah Dunia Nurul Fata Usaha Mandiri
1 Air Liter
2 Batu Bata Buah 900 1,000
3 Portland Cemen @ 40 Kg Kg
Portland Cemen @ 40 Kg Zak 67,000 60,000
4 Semen Warna @ 50 Kg Kg
Semen Warna @ 50 Kg Zak
5 Besi Beton Polos
- Uk. 8 mm Btg 48,000 44,000
- Uk. 8 mm Kg
- Uk. 12 mm Btg 160,000 95,000
- Uk. 12 mm Kg
6 Besi Beton Ulir
- Uk. 8 mm Btg 75,000
- Uk. 8 mm Kg
- Uk. 12 mm Btg 125,000
- Uk. 12 mm Kg
7 Kawat Beton Kg 25,000 20,000
8 Kawat Duri Diamon Roll 310,000 265,000
Kawat Duri Kg 23,000 14kg
9 Kawat licin diameter 4 mm Kg 25,000
10 Paku Kayu 2" - 5" Kg 20,000 15,000
11 Paku 1/2" - 1" Kg 22,000 20,000
12 Besi Strip Kg
13 Besi WF Kg
14 Besi C Kg
15 Kawat Las Kg 30,000 28000 engko
16 Paku skrup Kg 55000 ktk
17 Screw Buah
18 Profil C 75.75 M' 15,000
19 Reng U 0.5 M' 10,000
20 Baut Truss Buah
21 Baut Reng Buah
22 Baja ringan / Truss 0,75 85,000
23 Baja ringan / Truss 1,00 45,000
24 Baja WF
25 Atap Seng Genteng Metal 0,30 Lembar
26 Rabung Seng Genteng Metal 0,30 Lembar 60,000
27 Seng Gelombang BJLs 0,20 Lembar 60,000
28 Seng Plat BJLs 0,35 Lembar 125,000
29 Atap Spandek M' 48,000
30 Plamir Kg 30,000
31 Dempul Kayu Kg 35,000 25,000
32 Cat Dasar Kaleng 60,000 285000 23kg
Cat Dasar Kg 60,000
33 Cat Menie Kaleng 65,000
Cat Menie Kg 65,000
34 Cat Kayu/Minyak Kaleng 60,000 55,000
Cat Kayu/Minyak Kg 60,000
35 Cat Dinding Avitek Kaleng
Cat Dinding Avitek Kg 30,000
36 Minyak Cat Liter 55,000
37 Minyak Bekisting Liter
38 Kertas Amplas Lembar 10,000 5,000
39 Lem Kayu Kg 20,000 15000/plastik
40 Residu Liter
41 Cat Interior Nippon
42 Cat Eksterior + anti jamur Nippon
Tim Survey
Petugas Survey :
- Busra ____________________
- Nuzulianda, SS ____________________
Estimasi HPS Harga Perkiraan
Harga Pasar Sendiri (HPS/OE)
Rata-rata Mobilisasi
Satuan (Rp) Satuan (Rp) Satuan (Rp)
120,000.00 - 120,000
130,000.00 - 130,000
137,500.00 - 137,500
125,000.00 - 125,000
250,000.00 - 250,000
300,000.00 - 300,000
30,000.00 - 30,000
20,000.00 - 20,000
25,000.00 - 25,000
10,000.00 - 10,000
10,000.00 - 10,000
185,000.00 - 185,000
250,000.00 - 250,000
1,022,500.00 - 1,022,500
350,000.00 - 350,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
85,000.00 - 85,000
10,000.00 - 10,000
18,000.00 - 18,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
36,500.00 - 36,500
230,000.00 - 230,000
350,000.00 - 350,000
35,000.00 - 35,000
25,000.00 - 25,000
#DIV/0! #DIV/0! #DIV/0!
20,000.00 - 20,000
37,500.00 - 37,500
52,500.00 - 52,500
45,000.00 - 45,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
220,000.00 - 220,000
260,000.00 - 260,000
7,500,000.00 - 7,500,000
5,500,000.00 - 5,500,000
5,500,000.00 - 5,500,000
5,000,000.00 - 5,000,000
75,000.00 - 75,000
#DIV/0! #DIV/0! #DIV/0!
8,500,000.00 - 8,500,000
5,000,000.00 - 5,000,000
4,800,000.00 - 4,800,000
13,000.00 - 13,000
10,000.00 - 10,000
38,000.00 - 38,000
1,525,000.00 - 1,525,000
425,000.00 - 425,000
106,250.00 - 106,250 106,250
625,000.00 - 625,000
156,000.00 - 156,000 156,250
850,000.00 - 850,000
268,750.00 - 212,500 212,500
1,120,000.00 - 1,120,000 280,000 1400000
280,000.00 - 280,000
1,120,000.00 - 1,120,000 280,000
280,000.00 - 280,000
850,000.00 - 850,000
212,500.00 - 212,500 212,500
850,000.00 - 850,000 212,500
256,000.00 - 212,500
- - -
- - -
AHSP CIPTA KARYA
Analisa Harga Satuan Pekerjaan (AHSP)
4.2.1 HARGA SATUAN PEKERJAAN BESI / ALUMINIUM
4.2.1.1 1 kg, Pemasangan Besi Profil
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.060
Tukang L.02 Oh 0.060
Kepala Tukang L.03 Oh 0.006
Mandor L,04 Oh 0.003
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Profil kg 1.150
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.2 1 kg, Pemasangan Rangka Kuda - Kuda Baja WF
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.060
Tukang L.02 Oh 0.060
Kepala Tukang L.03 Oh 0.006
Mandor L,04 Oh 0.003
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Baja IWF kg 1.150
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.4 1 m2, Pembuatan Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Baja Siku
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 1.050
Tukang L.02 Oh 1.050
Kepala Tukang L.03 Oh 0.105
Mandor L,04 Oh 0.052
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Siku, L.30.30.3 kg 15.000
Besi Plat Baja kg 32.800
Kawat Las kg 0.050
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.5 10 cm, Pengelasan dengan Las Listrik
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.040
Tukang L.02 Oh 0.020
Kepala Tukang L.03 Oh 0.002
Mandor L,04 Oh 0.002
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Kawat las Listrik kg 0.400
Solar ltr 0.300
Minyak Pelumas ltr 0.040
Jumlah Harga bahan
C. PERALATAN
Sewa Alat jam -
Jumlah Harga Alat
Jumlah ( A + B + C)
Overhead & Profit(10%)
Harga Satuan Pekerjaan
AHSP. 4.2.1.6 1 m2, Pembuatan Rangka Jendela Besi Scuare Tube
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.650
Tukang L.02 Oh 0.650
Kepala Tukang L.03 Oh 0.065
Mandor L,04 Oh 0.032
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Scuare Tube m1 4.760
Besi Lis Kaca, 1 x 1 cm m1 4.522
Pengelasan cm 20.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.7 1 m2, Pemasangan Pintu Rolling Door Besi
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 1.200
Tukang L.02 Oh 1.200
Kepala Tukang L.03 Oh 0.120
Mandor L,04 Oh 0.006
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Pintu Gulung Besi m2 1.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.11 1 m1, Pemasangan Kusen Pintu Aluminium
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.043
Tukang L.02 Oh 0.043
Kepala Tukang L.03 Oh 0.004
Mandor L,04 Oh 0.002
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Profile Aluminium m1 1.100
Skrup Fixer bh 2.000
Sealent tube 0.060
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
. 4.2.1.13 1 m2, Pemasangan Pintu Kaca Rangka Aluminium
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.085
Tukang L.02 Oh 0.085
Kepala Tukang L.03 Oh 0.009
Mandor L,04 Oh 0.005
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Pintu Aluminium m1 4.400
Profile Kaca m1 4.500
Sealent tube 0.270
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.15 1 m2, Pemasangan Terali Besi Strip, 2 x 3 mm
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 1.670
Tukang L.02 Oh 1.670
Kepala Tukang L.03 Oh 0.167
Mandor L,04 Oh 0.083
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Strip kg 6.177
Pengelasan cm 27.080
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.16 1 m2, Pemasangan Kawat Nyamuk
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.100
Tukang L.02 Oh 0.100
Kepala Tukang L.03 Oh 0.010
Mandor L,04 Oh 0.005
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Kawat Nyamuk m2 1.100
Besi Strip kg 11.110
Pengelasan cm 1.716
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.20 1 m2, Pemasangan Rangka Besi Hollow, 1 x 40.40.2, Module 60 x 120 cm, untuk Partisi
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.250
Tukang L.02 Oh 0.250
Kepala Tukang L.03 Oh 0.025
Mandor L,04 Oh 0.013
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Rangka Metal Hollow, 40.40.2 mm m1 3.500
Assesories (Perkuatan, Las, Dll) 100% x Rangka Ls 3.500
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.21 1 m2, Pemasangan Rangka Besi Hollow, 1 x 40.40.2, Module 60 x 60 cm, untuk Plafond
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.350
Tukang L.02 Oh 0.350
Kepala Tukang L.03 Oh 0.035
Mandor L,04 Oh 0.018
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Rangka Metal Hollow, 40.40.2 mm m1 4.000
Assesories (Perkuatan, Las, Dll) 100% x Rangka Ls 4.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.22 1 m2, Pemasangan Kuda - Kuda Baja Ringan + Gording
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.120
Tukang L.02 Oh 0.120
Kepala Tukang L.03 Oh 0.012
Mandor L,04 Oh 0.006
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Baja Ringan Zincalume Truss (Profile C) 0,75 m1 4.200
Baja Ringan Gording U 0.65 m1 2.400
Paku Ulir Profil C bh 14.000
Paku Ulir Goeding U bh 11.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
n (AHSP)
10%
100,000.00 6,000.00
100,000.00 6,000.00
100,000.00 600.00
100,000.00 300.00
Jumlah Tenaga Kerja Rp 12,900.00
11,000.00 12,650.00
Jumlah Harga bahan Rp 12,650.00
umlah ( A + B ) Rp 25,550.00
Overhead & Profit(10%) Rp 2,555.00
Harga Satuan Pekerjaan Rp 28,105.00
100,000.00 6,000.00
100,000.00 6,000.00
100,000.00 600.00
100,000.00 300.00
Jumlah Tenaga Kerja Rp 12,900.00
300,000.00 345,000.00
Jumlah Harga bahan Rp 345,000.00
umlah ( A + B ) Rp 357,900.00
Overhead & Profit(10%) Rp 35,790.00
Harga Satuan Pekerjaan Rp 393,690.00
angka Baja Siku
Harga Satuan Jumlah Harga
100,000.00 105,000.00
100,000.00 105,000.00
100,000.00 10,500.00
100,000.00 5,200.00
Jumlah Tenaga Kerja Rp 225,700.00
40,000.00 600,000.00
23,000.00 754,400.00
23,000.00 1,150.00
Jumlah Harga bahan Rp 1,355,550.00
umlah ( A + B ) Rp 1,581,250.00
Overhead & Profit(10%) Rp 158,125.00
Harga Satuan Pekerjaan Rp 1,739,375.00
100,000.00 4,000.00
100,000.00 2,000.00
100,000.00 200.00
100,000.00 200.00
Jumlah Tenaga Kerja Rp 6,400.00
23,000.00 9,200.00
10,000.00 3,000.00
45,000.00 1,800.00
Jumlah Harga bahan Rp 14,000.00
- -
Jumlah Harga Alat Rp -
umlah ( A + B + C) Rp 20,400.00
Overhead & Profit(10%) Rp 2,040.00
Harga Satuan Pekerjaan Rp 22,440.00
Harga Satuan Jumlah Harga
100,000.00 65,000.00
100,000.00 65,000.00
100,000.00 6,500.00
100,000.00 3,200.00
Jumlah Tenaga Kerja Rp 139,700.00
70,000.00 333,200.00
25,000.00 113,050.00
20,000.00 400,000.00
Jumlah Harga bahan Rp 846,250.00
umlah ( A + B ) Rp 985,950.00
Overhead & Profit(10%) Rp 98,595.00
Harga Satuan Pekerjaan Rp 1,084,545.00
100,000.00 120,000.00
100,000.00 120,000.00
100,000.00 12,000.00
100,000.00 600.00
Jumlah Tenaga Kerja Rp 252,600.00
750,000.00 750,000.00
Jumlah Harga bahan Rp 750,000.00
umlah ( A + B ) Rp 1,002,600.00
Overhead & Profit(10%) Rp 100,260.00
Harga Satuan Pekerjaan Rp 1,102,860.00
100,000.00 4,300.00
100,000.00 4,300.00
100,000.00 430.00
100,000.00 210.00
Jumlah Tenaga Kerja Rp 9,240.00
33,000.00 36,300.00
750.00 1,500.00
20,000.00 1,200.00
Jumlah Harga bahan Rp 39,000.00
umlah ( A + B ) Rp 48,240.00
Overhead & Profit(10%) Rp 4,824.00
Harga Satuan Pekerjaan Rp 53,064.00
100,000.00 8,500.00
100,000.00 8,500.00
100,000.00 900.00
100,000.00 500.00
Jumlah Tenaga Kerja Rp 18,400.00
750,000.00 3,300,000.00
18,000.00 81,000.00
20,000.00 5,400.00
Jumlah Harga bahan Rp 3,386,400.00
umlah ( A + B ) Rp 3,404,800.00
Overhead & Profit(10%) Rp 340,480.00
Harga Satuan Pekerjaan Rp 3,745,280.00
Harga Satuan Jumlah Harga
100,000.00 167,000.00
100,000.00 167,000.00
100,000.00 16,700.00
100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 359,000.00
24,000.00 148,248.00
23,000.00 622,840.00
Jumlah Harga bahan Rp 771,088.00
umlah ( A + B ) Rp 1,130,088.00
Overhead & Profit(10%) Rp 113,008.80
Harga Satuan Pekerjaan Rp 1,243,096.00
100,000.00 10,000.00
100,000.00 10,000.00
100,000.00 1,000.00
100,000.00 500.00
Jumlah Tenaga Kerja Rp 21,500.00
20,000.00 22,000.00
24,000.00 266,640.00
23,000.00 39,468.00
Jumlah Harga bahan Rp 328,108.00
umlah ( A + B ) Rp 349,608.00
Overhead & Profit(10%) Rp 34,960.80
Harga Satuan Pekerjaan Rp 384,568.00
0 x 120 cm, untuk Partisi
Harga Satuan Jumlah Harga
100,000.00 25,000.00
100,000.00 25,000.00
100,000.00 2,500.00
100,000.00 1,300.00
Jumlah Tenaga Kerja Rp 53,800.00
17,000.00 59,500.00
17,000.00 59,500.00
Jumlah Harga bahan Rp 119,000.00
umlah ( A + B ) Rp 172,800.00
Overhead & Profit(10%) Rp 17,280.00
Harga Satuan Pekerjaan Rp 190,080.00
0 x 60 cm, untuk Plafond
Harga Satuan Jumlah Harga
100,000.00 35,000.00
100,000.00 35,000.00
100,000.00 3,500.00
100,000.00 1,800.00
Jumlah Tenaga Kerja Rp 75,300.00
17,000.00 68,000.00
17,000.00 68,000.00
Jumlah Harga bahan Rp 136,000.00
umlah ( A + B ) Rp 211,300.00
Overhead & Profit(10%) Rp 21,130.00
Harga Satuan Pekerjaan Rp 232,430.00
Harga Satuan Jumlah Harga
100,000.00 12,000.00
100,000.00 12,000.00
100,000.00 1,200.00
100,000.00 600.00
Jumlah Tenaga Kerja Rp 25,800.00
PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam
REKAPITULASI PEKERJAAN
DIBULATKAN Rp 252,181,000.00
TERBILANG : Dua Ratus Lima Puluh Dua Juta Seratus Delapan Puluh Satu Ribu Rupiah
Nama Jelas
Jabatan
Terjemahan kedalam kalimat
terbilang = Dua Ratus Lima Puluh Dua Juta Seratus Delapan Puluh Satu Ribu Rupiah
BASIC => satu dua tiga empat lima enam tujuh delapan sembilan sepuluh @
ribu juta milyar triliyun @
000252181000 @
@@ @ @ @ @
basic @ 000 1 @
perhitungan @ 0 @
angka @ sepuluh @
@ 0 @
@ 0 @
@ @
@ @
@ @
@ @
@ 181 2 @
@ 1 delapan puluh @
@ sersebelas @
@ 8 satu @
@ 1 delapan puluh satu @
@ deldelapan puluh satu @
@ seratus delapan puluh satu ribu @
@ @
@ @
@ 252 3 @
@ 2 lima puluh @
@ duadua belas @
@ 5 dua @
@ 2 lima puluh dua @
@ limlima puluh dua @
@ dua ratus lima puluh dua juta @
@ @
@ @
@ 000 4 @
@ 0 @
@ sepuluh @
@ 0 @
@ 0 @
@ @
@ @
@ @
@ 000 1 @
@ 0 @
@ sepuluh @
@ 0 @
@ 0 @
@ @
@ @
@ ***
@
@ 68 00
@ duadua ratus lima puluh dua juta seratus delapan puluh satu ribu rupiah
@ dua ratus lima puluh dua juta seratus delapan puluh satu ribu rupiah
@ Dua ratus lima puluh dua juta seratus delapan puluh satu ribu rupiah
HPS 299,994,000
###
BILL OF QUANTITY (BOQ)
PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam
LOKASI : Kabupaten Aceh Utara
SUMBER DANA : DAK
TAHUN ANGGARAN : 2021
PPN
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT ANALISA TOTAL HARGA
(Rp.) ( RP ) 10%
1 2 3 4 5 6 7=(3X6) 8 = ( 7 X 10 % ) 9=(7+8)
47,819,000
5,665,440 39.07
1,796,687 7.43
16,090,272 66.5162133
1.6
0.7
#REF!
25
47,819,000
47,819,000
DAFTAR HARGA SATUAN UPAH DAN BAHAN
HARGA SATUAN
NO URAIAN HARGA UPAH SATUAN
(Rp.)
1 2 3 4
HARGA SATUAN
NO URAIAN HARGA BAHAN-BAHAN SATUAN
(Rp.)
1 2 3 4
A BAHAN / MATERIAL
1 Air Ltr 110.00
2 Batu kali belah sungai / gunung M3 250,000.00
3 - M3 162,000.00
4 Kerikil Beton 30 mm Maks. M3 387,000.00
5 Pasir beton M3 140,000.00
6 Pasir pasang M3 160,000.00
7 Pasir urug M3 83,000.00
8 Sirtu M3 306,000.00
9 Tanah timbun Pilihan M3 150,000.00
10 Tanah timbun Biasa M3 69,000.00
11 Semen portland @ 40 kg zak 60,300.00
12 Semen warna @ 50 Kg zak 153,000.00
13 Bambu Ø 6 - 8 / 600 cm btg 20,000.00
14 Dolken kayu Ø 8-10/400 cm btg 15,000.00
15 Kayu papan/balok kls I M3 5,000,000.00
16 Kayu papan/balok kls II M3 4,000,000.00
17 Kayu papan/balok kls III M3 3,000,000.00
18 Kayu papan/balok kls IV M3 2,800,000.00
19 Lem Kayu kg 130,500.00
20 Penjaga jarak bekisting/spacer bh 1,500.00
21 Alluminium Strip M' 35,000.00
22 Alluminium Profil, T M' 62,000.00
23 Alluminium Poil M2 33,000.00
24 Besi Ankur, Ø 8 mm kg 12,500.00
25 Besi Beton polos U.24 kg 9,500.00
26 Besi Beton ulir U.24 kg 11,000.00
27 Besi Plat Strip kg 24,000.00
28 Besi Profil kg 11,000.00
29 Besi Siku, L 30.30.3 M' 40,000.00
30 Besi Siku, L 40.40.4 M' 50,000.00
31 Besi Hollow, 40.40.2 mm M' 17,000.00
32 Besi Plat Baja kg 23,000.00
33 Besi Stanlis 2" M' 30,000.00
34 Besi Baja Zincalume Truss ( Profil C ) M' 18,000.00
35 Baja Ringan C Canal-75,0.8 M' 10,000.00
36 Baja Ringan C Canal-75,0.6 M' 10,000.00
37 Baja Ringan Gording U 0.45 M' 8,000.00
38 Bata merah bh 670.00
39 HB-10 / Batako bh 3,400.00
40 Baut Screw (Driver) bh 450.00
41 Baut Ramset bh 730.00
42 Dynabolt bh 950.00
43 Furing Baja M' 13,000.00
44 Kawat Beton kg 23,200.00
45 Kawat Duri kg 19,800.00
46 Kawat Jaring kg 26,000.00
47 Kawat Las kg 23,000.00
48 Kawat Nyamuk kg 20,000.00
49 Paku biasa kg 17,000.00
50 Paku Seng kg 18,500.00
51 Paku Tripleks kg 19,000.00
52 Paku Skrup bh 30,000.00
53 Skrup Fixer bh 750.00
54 Paku Ulir Profil C bh 200.00
55 Paku Ulir Gording U bh 200.00
56 Minyak bekisting ltr 15,200.00
57 Kosen Pintu Aluminium ( 80 x 210 ) Coklat unit 400,000.00
58 Kosen Pintu Aluminium ( 80 x 210 ) Putih unit 400,000.00
59 Kosen Jendela Aluminium ( 60 x 120 ) Coklat unit 350,000.00
60 Kosen Jendela Aluminium ( 60 x 120 ) Putih unit 350,000.00
61 Pintu Aluminium ( 80 x 120 ) Coklat bh 750,000.00
62 Pintu Aluminium ( 80 x 120 ) Putih bh 750,000.00
63 Pintu PVC bh 400,000.00
64 Pintu Gulung Besi M2 750,000.00
65 Keramik Dinding 25 x 40 cm bh 4,500.00
66 Keramik Dinding, 20 x 25 cm bh 3,500.00
67 Keramik 25 x 25 cm Lantai Km bh 3,000.00
68 Keramik 30 x 30 cm bh 7,000.00
69 Keramik 20 x 30 cm bh 6,500.00
70 Keramik 40 x 40 cm bh 11,000.00
71 Granit 60 x 60 cm bh 77,500.00
72 Paving Block bh 3,000.00
73 Atap Seng Genteng Metal M2 70,000.00
74 Atap Seng Spandek 0,35 mm M2 45,000.00
76 Atap Seng Gelombang Bjls 0,20 mm lbr 55,000.00
77 Seng Plat, BJLS. 0,35 lbr 35,000.00
78 Rabung Seng Spandek lbr 45,000.00
79 Rabung Seng lbr 23,000.00
80 Akustik, 30 x 30 cm lbr 13,000.00
81 Akustik, 30 x 60 cm lbr 25,000.00
82 Akustik, 60 x 120 cm lbr 350,000.00
83 List Kayu Profil M' 7,000.00
84 Plywood Tebal, 4 mm lbr 75,000.00
85 Plywood Tebal, 6 mm lbr 95,000.00
86 Plywood Tebal, 9 mm lbr 130,000.00
87 Tripleks (120 x 240) cm, tebal 4 mm lbr 55,000.00
88 Tripleks (120 x 240) cm, tebal 6 mm lbr 75,000.00
89 Tripleks (120 x 240) cm, tebal 9 mm lbr 120,000.00
90 Bingkai Naco Niki Hitam bh 250,000.00
91 Bingkai Naco Niki Putih bh 200,000.00
92 Cermin Washtafel bh 150,000.00
93 Door Closer set 90,000.00
94 Door Handle set 120,000.00
95 Door Stop set 100,000.00
96 Engsel Pintu 3/4" psg 19,000.00
97 Engsel Jendela 3" psg 17,000.00
98 Engsel ARCH, 3" psg 15,000.00
99 Engsel ARCH, 4" psg 22,000.00
100 Engsel Angin psg 23,000.00
101 Espanyolet bh 80,000.00
102 Grendel Pintu / Jendela bh 25,000.00
103 GLass Block bh 35,000.00
104 Kait Angin bh 25,000.00
105 Kaca Biasa T = 5 mm M2 135,000.00
106 Kaca Block 20 x 20 cm M2 175,000.00
107 Kaca Bening Tebal 5 mm M2 120,000.00
108 Kunci Pintu bh 85,000.00
109 Kunci Tanam Antik bh 250,000.00
110 Kunci Tanam Biasa bh 65,000.00
111 Kunci Tanam Kamar Mandi bh 50,000.00
112 Kunci Silinder bh 95,000.00
113 Kunci Selot bh 35,000.00
114 Kunci Lemari bh 15,000.00
115 Profile Kaca M' 18,000.00
116 Pacok Jendela bh 15,000.00
117 Rel Pintu Dorong bh 190,000.00
118 Sealent kg 20,000.00
119 Tarikan Jendela bh 17,000.00
120 Ampelas lbr 5,000.00
121 Cat dasar kayu kg 30,000.00
122 Cat dasar tembok kg 30,000.00
123 Cat kayu penutup setara property kg 55,000.00
124 Cat menie Kayu kg 18,000.00
125 Cat menie Besi kg 25,000.00
126 Cat tembok penutup Jotun kg 80,000.00
127 Dempul Kayu kg 25,000.00
128 Kapur Pasang kg 2,000.00
129 Kuas bh 25,000.00
130 Minyak bekisting ltr 15,200.00
131 Minyak Pelumas ltr 45,000.00
132 Minyak Solar ltr 5,500.00
133 Minyak Premium ltr 6,600.00
134 Pengencer kg 12,000.00
135 Plamur kg 27,000.00
136 Pernis ltr 15,000.00
137 Politur Dasar ltr 27,000.00
138 Politur Jadi ltr 50,000.00
139 Sabun bh 6,500.00
140 Soda api kg 9,000.00
141 Solar Industri ltr 10,000.00
142 Residu ltr 12,000.00
143 Bak Fibreglass, 1 m3 bh 248,000.00
144 Bak Fibre / Tekylas, 60 x 60 cm bh 220,000.00
145 Floor Drain bh 24,500.00
146 Instalasi Air Bersih unit 150,000.00
147 Instalasi Air Kotor / Limbah unit 200,000.00
148 Ijuk kg 15,000.00
149 Kloset Jongkok Champion bh 220,000.00
150 Kran Air Ø 1/2" - 3/4" bh 15,000.00
151 Kran Air Leher Angsa Ø 1/2" bh 65,000.00
152 Tempat Sabun Keramik KIA bh 120,000.00
153 Tutup Bak Air Ø 1" Kuningan bh 30,000.00
154 Stop Kran Ø 3/4" bh 25,000.00
155 Washtafel bh 1,000,000.00
156 Instalasi Arus Listrik, 4A bh 2,300,000.00
157 Kabel NYA, 2 x 1,5 mm M' 9,000.00
158 Lampu Down Light bh 75,000.00
159 Lampu SL, 18 watt bh 30,000.00
160 Lampu SL, 20 watt bh 45,000.00
161 Lampu SL, 35 watt bh 70,000.00
162 Panel Box + MCB bh 75,000.00
163 Saklar 1 Seri bh 15,000.00
164 Saklar 2 Seri bh 20,000.00
165 Saklar 3 Seri bh 27,000.00
166 Sealtip bh 2,500.00
167 Stop Kontak Biasa bh 15,000.00
168 Stop Kontak Tanam bh 22,000.00
169 Jendela UPVC M2 1,350,000.00
170 Pintu UPVC M2 1,450,000.00
171 AC LG T10EV3 Unit 4,000,000.00
B. BAHAN PERPIPAAN
1 Pipa Galvanis Medium ½” M' 22,000.00
2 Pipa Galvanis Medium 3/4” M' 19,000.00
3 Pipa Galvanis Medium 1” M' 35,000.00
4 Pipa Galvanis Medium 1 ½” M' 44,000.00
5 Pipa Galvanis Medium 2” M' 57,000.00
6 Pipa Galvanis Medium 3” M' 63,000.00
7 Pipa Galvanis Medium 4” M' 70,000.00
8 Pipa Galvanis Medium 6” M' 90,000.00
9 Pipa PVC 1/2” SNI/ S - 12,5 SCJ setara Finnlon M' 3,500.00
10 Pipa PVC 3/4” SNI/ S - 12,5 SCJ setara Finnlon M' 4,500.00
11 Pipa PVC 1” SNI/ S - 12,5 RRJ setara Finnlon M' 6,000.00
12 Pipa PVC 1½” SNI/ S - 12,5 RRJ setara Finnlon M' 6,500.00
13 Pipa PVC 2” SNI/ S - 12,5 RRJ setara Finnlon M' 7,500.00
14 Pipa PVC 2½” SNI/ S - 12,5 RRJ setara Finnlon M' 8,000.00
15 Pipa PVC 3” SNI/ S - 12,5 RRJ setara Finnlon M' 9,500.00
16 Pipa PVC 4” SNI/ S - 12,5 RRJ setara Finnlon M' 12,000.00
C BAHAN PERABOT
1 Kursi Kerja Pendidik Unit 1,800,000
2 Meje Kerja Pendidik Unit 2,800,000
3 Meja dan Kursi Siswa Unit 650,000
4 Lemari Penyimpanan Unit 3,500,000
5 Papan Tulis Mika Unit 2,100,000
6 Pengadaan Tempat Sampah Plastik Pedal 45 Liter Unit 750,000
N
DAFTAR HARGA SATUAN DASAR ( HSD )
imal Sedang Beserta Perabotnya
KETERANGAN
KETERANGAN
311,000.00
286.67 /Kg
100.00 /Kg
1,507.50 /Kg
3,060.00 /Kg
132,000.00 /Btg
114,000.00 /Btg
210,000.00 /Btg
264,000.00 /Btg
342,000.00 /Btg
378,000.00 /Btg
420,000.00 /Btg
540,000.00 /Btg
21,000.00 /Btg
27,000.00 /Btg
36,000.00 /Btg
39,000.00 /Btg
45,000.00 /Btg
48,000.00 /Btg
57,000.00 /Btg
72,000.00 /Btg
Disiapka
KONSULTAN
CV. BUMI DESAIN
ZIKRA WIN
Dire
5
5
Disiapkan Oleh
ONSULTAN PERENCANA
UMI DESAIN CONSULTANT
1,200,000
3,500,000
1,300,000
700,000
WIL - 2 WIL - 3 WIL - 4 WIL - 5
Crusher Ongong
375,000.00 / m3
REKAPITU
PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :
NO URAIAN PEKERJAAN
1 2
K PEKERJAAN LAIN-LAIN
1 m2, Pemasangan Paving Blok
1 Unit, Pemasangan Jendela UPVC J1
1 Unit, Pemasangan Jendela UPVC J2
1 Unit, Pemasangan Jendela UPVC V1. ( VINTALASI )
1 Unit, Pemasangan Pintu UPVC P1
-
REKAPITULASI ANALISA AHSP
Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya SM
Kabupaten Aceh Utara
DAK
2021
2 3
LAIN-LAIN Taksir
angan Paving Blok Taksir
sangan Jendela UPVC J1 Taksir
sangan Jendela UPVC J2 Taksir
sangan Jendela UPVC V1. ( VINTALASI ) Taksir
sangan Pintu UPVC P1 Taksir
0
Banda Aceh,
0.0
0.0
LISA AHSP
Rp 434,000.00
Rp 17,200.00
Rp 1,610,000.00
Rp 40,200.00
Rp 89,100.00
Rp 118,600.00
Rp 179,400.00
Rp 143,100.00
Rp 63,200.00
Rp 150,100.00
Rp 453,900.00
Rp 130,800.00
Rp 1,060,400.00
Rp 999,200.00
Rp 529,700.00
Rp 1,118,800.00
Rp 1,253,100.00
Rp 1,295,500.00
Rp 1,329,900.00
Rp 1,349,100.00
Rp 1,382,000.00
Rp 1,392,200.00
Rp 1,494,800.00
Rp 1,508,000.00
Rp 136,000.00
Rp 13,600.00
Rp 154,100.00
Rp 15,400.00
Rp 131,100.00
Rp 140,200.00
Rp 235,900.00
Rp 243,700.00
Rp 274,900.00
Rp 244,300.00
Rp 100,000.00
Rp 4,848,100.00
Rp 4,909,600.00
Rp 166,500.00
Rp 142,600.00
Rp 130,600.00
Rp 76,600.00
Rp 72,900.00
Rp 70,400.00
Rp 42,400.00
Rp 253,600.00
Rp 241,900.00
Rp 288,800.00
Rp 214,700.00
Rp 211,500.00
Rp 407,000.00
Rp 49,000.00
Rp 21,000.00
Rp 182,900.00
Rp 66,700.00
Rp 39,600.00
Rp 120,900.00
Rp 91,600.00
Rp 102,465.00
Rp 10,001,200.00
Rp 8,696,000.00
Rp 7,584,400.00
Rp 10,775,100.00
Rp 119,400.00
Rp 101,200.00
Rp 89,000.00
Rp 88,000.00
Rp 18,100.00
Rp 43,000.00
Rp 41,000.00
Rp 37,900.00
Rp -
Rp -
Rp -
Rp 4,500,000.00
Rp 225,400.00
Rp 5,205,600.00
Rp 2,704,200.00
Rp 2,092,600.00
Rp 4,090,300.00
0
Banda Aceh, 2021
0.00
0.00
AHSP CIPTA KA
Analisa Harga Satuan Pek
DAK : DAK
TAHUN : 2021
B. BAHAN / MATERIAL
Kayu 5 x 7 cm m3
Paku Biasa 2" - 3" kg
Kayu Papan 3 x 20 cm m3
B. BAHAN / MATERIAL
Pasir Urug m3
B. BAHAN / MATERIAL
Sirtu m3
B. BAHAN / MATERIAL
Tanah Timbun m3
B. BAHAN / MATERIAL
Batu Belah m3
Portland Cement kg
Pasir Pasang m3
3.2.1.3 1 m3, Pemasangan Pondasi batu Belah Campuran 1Pc : 4Pp
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Batu Belah m3
Portland Cement kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Batu Belah m3
Pasir Urug m3
4.1.1 HARGA SATUAN PEKERJAAN BETON
4.1.1.1 1 m3, Membuat Beton Mutu fc = 7,4 Mpa (K.100), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr
B. BAHAN / MATERIAL
Besi Beton Polos kg
Kawat Beton kg
B. BAHAN / MATERIAL
Besi Beton Ulir kg
Kawat Beton kg
B. BAHAN / MATERIAL
Besi Beton Polos kg
Kawat Beton kg
B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 10 cm kg
Minyak Bekesting ltr
Asumsi : Pemakaian 2 x
4.1.1.21 1 m2, Pemasangan Bekesting untuk Sloof
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 10 cm kg
Minyak Bekesting ltr
Asumsi : Pemakaian 2 x
B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg
Asumsi : Pemakaian 2 x
B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg
Asumsi : Pemakaian 2 x
B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg
Asumsi : Pemakaian 2 x
B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg
Penjaga Jarak Bekisting / Spacer bh
Asumsi : Pemakaian 2 x
Taksir Pekerjaan Lain - Lain ( Membongkar dan Menyiram Beton )
A. TENAGA KERJA
Pekerja L.01 Oh
B. BAHAN / MATERIAL
Baja Ringan Zincalume Truss m1
Baja Ringan Gording U 0.75 m1
Paku Ulir Profil C bh
Paku Ulir Goeding U bh
B. BAHAN / MATERIAL
Bata Merah bh
Portland Cement kg
Pasir Pasang m3
. 4.4.1.9 1 m2, Pemasangan Batu Bata Tebal 1/2 Batu Campuran 1Pc : 4Pp
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Bata Merah bh
Portland Cement kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Pasang m3
4.4.2.3 1 m2, Pemasangan Plasteran 1Pc : 3Pp Tebal = 15 mm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Portland Cement kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Portland Cement kg
B. BAHAN / MATERIAL
Keramik uk. 40 x 25 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Keramik uk. 20 x 20 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3
4.4.3.36.a 1 m2, Pemasangan Lantai Keramik uk. 25 x 25 cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Keramik uk. 25 x 25 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Granit uk. 60 x 60 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Keramik uk. 25 x 40 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3
B. BAHAN / MATERIAL
Tripleks lbr
Paku Tripleks kg
B. BAHAN / MATERIAL
List Kayu Profil m1
Paku kg
B. BAHAN / MATERIAL
Papan PVC (L.20 cm T.8 mm ) M2
Rangka Akustik M'
Profil PVC M'
Lem Bh
B. BAHAN / MATERIAL
Seng Plat, 3" x 6" bjls, 28 lbr
Paku Biasa kg
B. BAHAN / MATERIAL
Seng Genteng Metal 0,35 mm M2
Paku Ulir bh
B. BAHAN / MATERIAL
Seng Spandek 0,30 mm M2
Paku Ulir bh
B. BAHAN / MATERIAL
Balok Kayu m3
Paku, 10 cm kg
Lem Kayu kg
. 4.6.1.2 1 m3, Pembuatan dan Pemasangan Kusen Pintu dan Jendela, Kayu K
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Balok Kayu m3
Paku, 10 cm kg
Lem Kayu kg
. 4.6.1.13 1 m3, Pemasangan Konstruksi Kuda - Kuda Konvensional, Kayu Ke
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Balok Kayu m3
Besi Strip kg
Paku, 12 cm kg
B. BAHAN / MATERIAL
Balok Kayu m3
Besi Strip kg
Paku, 12 cm kg
4.6.1.20 1 m2, Pemasangan Rangka Langit Langit (60 x 60 cm), Kayu Kelas I
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Kaso Kaso, 5 x 7 cm m3
Paku, 7 - 10 cm kg
B. BAHAN / MATERIAL
Kayu Papan m3
Paku, 5 - 7 cm kg
B. BAHAN / MATERIAL
Soda Api kg
. 4.7.1.4 1 m2, Pengecatan Bidang Kayu Baru (1 lps Plamur, 1 Lps Cat Dasar
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Cat Menie kg
Plamuur kg
Cat Dasar kg
Cat Penutup kg
Kuas bh
Pengencer kg
Ampelas lbr
4.7.1.10 1 m2, Pengecatan Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasa
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Plamuur kg
Cat Dasar kg
Cat Penutup kg
4.7.1.11 1 m2, Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Pe
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Cat Dasar kg
Cat Penutup Jotun kg
B. BAHAN / MATERIAL
Paving Blok Bh
Ongkos Angkut Bh
Pasir Urug M3
Alat Bantu M2
B. BAHAN / MATERIAL
Jendela UPVC Terpasang M2
Taksir 1 Unit, Pemasangan Jendela UPVC J2
A. TENAGA KERJA
Upah Pembentukan Lubang M Oh
B. BAHAN / MATERIAL
B. BAHAN / MATERIAL
B. BAHAN / MATERIAL
Pintu UPVC M2
Taksir 1 Titik Instalasi Penerangan, Kabel NYA 2,5 mm dalam Pipa PVC
A. TENAGA KERJA
Upah
B. BAHAN / MATERIAL
Kabel NYA 2,5 mm M1
Pipa Listrik M1
- Bh
Elbow Bh
T Dus Bh
B. BAHAN / MATERIAL
Pipa Listrik 5/8 Btg
Kabel NYM 3 x2.5 mm M
T dus Bh
L Bow Bh
Klem Biasa Bh
MCB 16 A Bh
P CIPTA KARYA
Satuan Pekerjaan (AHSP)
15%
Kerusakan Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam
3.15
Jumlah Tenaga Kerja Rp 223,146.00
1,200,000
3,840,000
(686,676.00)
2.55
PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Bese
Babussalam
LOKASI : Kabupaten Aceh Utara
1 Penyiapan RK3K :
D TOTAL BIAYA
-
HARGA TOTAL
SATUAN HARGA
(Rp.) (Rp.)
- -
- -
-
- -
15,000.00 15,000.00
- -
- -
- -
300,000.00 300,000.00
- -
- -
- -
- -
315,000.00
- -
- -
- -
- =60 btg/ 6 m
60.00 kg/m'
- 360.00 3,600,000.00
- 216,000,000.00
-
2,400,000.00 9,600,000.00 2,400,000.00
-
- -
-
-
9,600,000.00
- -
- -
- -
-
- -
- -
- -
- -
- -
-
- -
-
-
-
-
-
-
-
-
- - 2.00 -
-
- -
-
- -
- -
- -
-
11,520,000.00 11,520,000.00
-
17,240,000.00