Kepala Tukang 1 Kepala Tukang 2 Kepala Tukang 3 Kepala Tukang 4 Kepala Tukang 5
A. UPAH SATUAN

1 Pekerja Hari 100,000 100,000


2 Tukang Hari 130,000 130,000
3 Kepala Tukang Hari 135,000 140,000
4 Mandor Hari 110,000 125,000

Harga Material Harga Material Harga Material Harga Material Harga Material Harga Material
B. BAHAN Merk / Type SATUAN
Toko Besi Riski Toko Bwsi Mitra
Baru Indah Perabot Jasa Angkutan Tuah Dunia Nurul Fata Usaha Mandiri

1 Profil Aluminium Batang


2 Profil Kaca M2
3 Jendela Naco Buah
4 Eterniet Superquality 1 x 1 m Lembar
5 Plywood 12 mm Lembar 210,000
6 Plywood 9 mm Lembar 145,000
7 Plywood 4 mm ukuran 1,2 x 2,40 m Lembar 95,000
8 Gipsum tebal 6 mm Lembar

1 Air Liter
2 Batu Bata Buah 900 1,000
3 Portland Cemen @ 40 Kg Kg
Portland Cemen @ 40 Kg Zak 67,000 60,000
4 Semen Warna @ 50 Kg Kg
Semen Warna @ 50 Kg Zak
5 Besi Beton Polos
- Uk. 8 mm Btg 48,000 44,000
- Uk. 8 mm Kg
- Uk. 12 mm Btg 160,000 95,000
- Uk. 12 mm Kg
6 Besi Beton Ulir
- Uk. 8 mm Btg 75,000
- Uk. 8 mm Kg
- Uk. 12 mm Btg 125,000
- Uk. 12 mm Kg
7 Kawat Beton Kg 25,000 20,000
8 Kawat Duri Diamon Roll 310,000 265,000
Kawat Duri Kg 23,000 14kg
9 Kawat licin diameter 4 mm Kg 25,000
10 Paku Kayu 2" - 5" Kg 20,000 15,000
11 Paku 1/2" - 1" Kg 22,000 20,000
12 Besi Strip Kg
13 Besi WF Kg
14 Besi C Kg
15 Kawat Las Kg 30,000 28000 engko
16 Paku skrup Kg 55000 ktk
17 Screw Buah
18 Profil C 75.75 M' 15,000
19 Reng U 0.5 M' 10,000
20 Baut Truss Buah
21 Baut Reng Buah
22 Baja ringan / Truss 0,75 85,000
23 Baja ringan / Truss 1,00 45,000
24 Baja WF
25 Atap Seng Genteng Metal 0,30 Lembar
26 Rabung Seng Genteng Metal 0,30 Lembar 60,000
27 Seng Gelombang BJLs 0,20 Lembar 60,000
28 Seng Plat BJLs 0,35 Lembar 125,000
29 Atap Spandek M' 48,000
30 Plamir Kg 30,000
31 Dempul Kayu Kg 35,000 25,000
32 Cat Dasar Kaleng 60,000 285000 23kg
Cat Dasar Kg 60,000
33 Cat Menie Kaleng 65,000
Cat Menie Kg 65,000
34 Cat Kayu/Minyak Kaleng 60,000 55,000
Cat Kayu/Minyak Kg 60,000
35 Cat Dinding Avitek Kaleng
Cat Dinding Avitek Kg 30,000
36 Minyak Cat Liter 55,000
37 Minyak Bekisting Liter
38 Kertas Amplas Lembar 10,000 5,000
39 Lem Kayu Kg 20,000 15000/plastik
40 Residu Liter
41 Cat Interior Nippon
42 Cat Eksterior + anti jamur Nippon

1 Kunci Tanam Buah 250,000 195000/set


2 Kunci Tanam Silinder Buah 300,000 95000/set
3 Engsel Pintu Buah 30,000 45000/tebal
4 Engsel Jendela Buah 20,000 35000/tebal
5 Kait Angin Buah 25,000 25000/ps
6 Tarikan Jendela Buah 10,000 10,000
7 Pacok Jendela Buah 10,000 10000 bagus
8 Pegangan pintu double Buah 185,000
9 Slot pintu double Buah 250,000
10 Kloset duduk American/Toto Buah 1,850,000 195,000
11 Kloset Jongkok American/Toto Buah 350,000
12 Urinoir American/Toto Buah
13 Wastafel American/Toto Buah 385000/2lbg
14 Septick tank + Peresapan Buah
15 Kran diameter 3/4" atau 1/2" (Stainless Steel) Buah 85,000
16 Seal tape Buah 10,000
17 Floor Drain Buah 18,000
18 Pipa beton diameter 5 - 20 cm Buah
19 Pipa beton diameter 30 - 100 cm Buah
20 Pipa PVC tipe AW Ø 1/2" Batang 45,000 28,000
21 Pipa PVC tipe AW Ø 3" Batang 210,000 250,000
22 Pipa PVC tipe AW Ø 4" Batang 350,000 350,000
23 Lampu Dawn Light 18 Watt Buah 35,000 35,000
24 Lampu Dawn Light 11 Watt Buah 25,000 25,000
25 Lampu baret Buah
26 Saklar lampu 1 seri Buah 30,000 10,000
27 Saklar lampu 2 seri Buah 60,000 15,000
28 Saklar lampu 3 seri Buah 80,000 25,000
29 Stop kontak Buah 45,000 25000/4lbg
30 Stop kontak tanam Buah
31 Box Panel Distribusi Buah
32 Pemasangan titik api/stop kontak Titik
33 Pemasangan instalasi air bersih/kotor Titik
34 UPVC
35 Kaca Bening Tebal 5 mm Asahi M2 220,000
36 Kaca Bening Tebal 8 mm Asahi M2 260,000

1 Kayu Kelas I (Seumantok) M3 7,500,000 7,500,000


2 Kayu Kelas II M3 5,500,000 5,500,000
3 Kayu Balok M3 5,500,000 5,500,000
4 Kayu Kasau 5/7 untuk Bouwplank (Kls IV) M3 5,000,000 5,000,000
5 Kosen kayu 6/13 (jadi buatan industri kosen) (Kls II) M' 75,000 75,000
6 Ventilasi Jalusi papan (Kls II) M2
7 Papan Kayu Bouwplank 3/20 (Kls IV) M3 13,500,000 3,500,000
8 Papan kayu Meuranti 3/20 M3 5,000,000 5,000,000
9 Kayu untuk Perancah (Kls IV) M3 4,800,000 4,800,000
10 Dolken Kayu ø 8-10/4 m Batang 13,000 13,000
11 List Kayu Profil M' 10,000 10,000
12 Lat Asbes 4 M' Batang 38,000 38,000
13 Papan Tombak layar M2 1,500,000 1,550,000

1 Tanah Urug Dump Truck 300,000 550,000


Tanah Urug M3
2 Pasir Urug Dump Truck 400,000 850,000
Pasir Urug M3
3 Pasir Pasang Dump Truck 1,300,000 800,000
Pasir Pasang M3
4 Pasir Beton Dump Truck 1,120,000 1,120,000
Pasir Beton M3 280,000 280,000
5 Kerikil Beton Dump Truck 1,120,000 1,120,000
Kerikil Beton M3
6 Koral Beton Dump Truck 850,000 850,000
Koral Beton M3
7 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 cm Damp Trusk 1,200,000 850,000
Batu Kali/Batu Belah (Sungai/Gunung) 15/20 cm M3
8 Batu Apung Kg

Note : Nilai HPS belum ditambah biaya mobilisasi dan keuntungan

Tim Survey

Iskandar Muda Hasibuan, S.Pd Zulfan Effendi, SE.Ak


Ketua Sekretaris

Petugas Survey :
- Busra ____________________

- Nuzulianda, SS ____________________
Estimasi HPS Harga Perkiraan
Harga Pasar Sendiri (HPS/OE)
Rata-rata Mobilisasi
Satuan (Rp) Satuan (Rp) Satuan (Rp)
120,000.00 - 120,000
130,000.00 - 130,000
137,500.00 - 137,500
125,000.00 - 125,000

Estimasi HPS Harga Perkiraan


Harga Pasar Sendiri (HPS/OE)
Rata-rata Mobilisasi
Satuan (Rp) Satuan (Rp) Satuan (Rp)

#DIV/0! #DIV/0! #DIV/0!


#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
210,000.00 - 210,000
145,000.00 - 145,000
95,000.00 - 95,000
#DIV/0! #DIV/0! #DIV/0!

#DIV/0! #DIV/0! #DIV/0!


950.00 - 950
#DIV/0! #DIV/0! #DIV/0!
63,500.00 - 63,500
#DIV/0! #DIV/0! #DIV/0!
90,000.00 - 90,000
#DIV/0! #DIV/0! #DIV/0!
46,000.00 - 46,000
#DIV/0! #DIV/0! #DIV/0!
79,000.00 55,000 134,000 11
15,000.00 - 11,167 159,840
#DIV/0! #DIV/0! #DIV/0! 118,992
75,000.00 - 75,000
#DIV/0! #DIV/0! #DIV/0!
125,000.00 - 125,000
#DIV/0! #DIV/0! #DIV/0!
22,500.00 - 22,500
287,500.00 - 287,500
23,000.00 - 23,000
25,000.00 - 25,000
17,500.00 - 17,500
21,000.00 - 21,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
30,000.00 - 30,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
15,000.00 - 15,000
10,000.00 - 10,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
85,000.00 - 85,000 14,167
45,000.00 - 45,000 7,500
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
60,000.00 - 60,000
60,000.00 - 60,000
125,000.00 - 125,000
48,000.00 - 48,000
30,000.00 - 30,000
30,000.00 - 30,000
60,000.00 - 60,000
60,000.00 - 60,000
65,000.00 - 65,000
65,000.00 - 65,000
57,500.00 - 57,500
60,000.00 - 60,000
#DIV/0! #DIV/0! #DIV/0!
30,000.00 - 30,000
55,000.00 - 55,000
#DIV/0! #DIV/0! #DIV/0!
7,500.00 - 7,500
20,000.00 - 20,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!

250,000.00 - 250,000
300,000.00 - 300,000
30,000.00 - 30,000
20,000.00 - 20,000
25,000.00 - 25,000
10,000.00 - 10,000
10,000.00 - 10,000
185,000.00 - 185,000
250,000.00 - 250,000
1,022,500.00 - 1,022,500
350,000.00 - 350,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
85,000.00 - 85,000
10,000.00 - 10,000
18,000.00 - 18,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
36,500.00 - 36,500
230,000.00 - 230,000
350,000.00 - 350,000
35,000.00 - 35,000
25,000.00 - 25,000
#DIV/0! #DIV/0! #DIV/0!
20,000.00 - 20,000
37,500.00 - 37,500
52,500.00 - 52,500
45,000.00 - 45,000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
220,000.00 - 220,000
260,000.00 - 260,000

7,500,000.00 - 7,500,000
5,500,000.00 - 5,500,000
5,500,000.00 - 5,500,000
5,000,000.00 - 5,000,000
75,000.00 - 75,000
#DIV/0! #DIV/0! #DIV/0!
8,500,000.00 - 8,500,000
5,000,000.00 - 5,000,000
4,800,000.00 - 4,800,000
13,000.00 - 13,000
10,000.00 - 10,000
38,000.00 - 38,000
1,525,000.00 - 1,525,000

425,000.00 - 425,000
106,250.00 - 106,250 106,250
625,000.00 - 625,000
156,000.00 - 156,000 156,250
850,000.00 - 850,000
268,750.00 - 212,500 212,500
1,120,000.00 - 1,120,000 280,000 1400000
280,000.00 - 280,000
1,120,000.00 - 1,120,000 280,000
280,000.00 - 280,000
850,000.00 - 850,000
212,500.00 - 212,500 212,500
850,000.00 - 850,000 212,500
256,000.00 - 212,500
- - -
- - -
AHSP CIPTA KARYA
Analisa Harga Satuan Pekerjaan (AHSP)
4.2.1 HARGA SATUAN PEKERJAAN BESI / ALUMINIUM
4.2.1.1 1 kg, Pemasangan Besi Profil
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.060
Tukang L.02 Oh 0.060
Kepala Tukang L.03 Oh 0.006
Mandor L,04 Oh 0.003
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Profil kg 1.150
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.2 1 kg, Pemasangan Rangka Kuda - Kuda Baja WF
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.060
Tukang L.02 Oh 0.060
Kepala Tukang L.03 Oh 0.006
Mandor L,04 Oh 0.003
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Baja IWF kg 1.150
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.4 1 m2, Pembuatan Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Baja Siku
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 1.050
Tukang L.02 Oh 1.050
Kepala Tukang L.03 Oh 0.105
Mandor L,04 Oh 0.052
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Siku, L.30.30.3 kg 15.000
Besi Plat Baja kg 32.800
Kawat Las kg 0.050
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.5 10 cm, Pengelasan dengan Las Listrik
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.040
Tukang L.02 Oh 0.020
Kepala Tukang L.03 Oh 0.002
Mandor L,04 Oh 0.002
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Kawat las Listrik kg 0.400
Solar ltr 0.300
Minyak Pelumas ltr 0.040
Jumlah Harga bahan
C. PERALATAN
Sewa Alat jam -
Jumlah Harga Alat
Jumlah ( A + B + C)
Overhead & Profit(10%)
Harga Satuan Pekerjaan
AHSP. 4.2.1.6 1 m2, Pembuatan Rangka Jendela Besi Scuare Tube
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.650
Tukang L.02 Oh 0.650
Kepala Tukang L.03 Oh 0.065
Mandor L,04 Oh 0.032
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Scuare Tube m1 4.760
Besi Lis Kaca, 1 x 1 cm m1 4.522
Pengelasan cm 20.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.7 1 m2, Pemasangan Pintu Rolling Door Besi
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 1.200
Tukang L.02 Oh 1.200
Kepala Tukang L.03 Oh 0.120
Mandor L,04 Oh 0.006
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Pintu Gulung Besi m2 1.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.11 1 m1, Pemasangan Kusen Pintu Aluminium
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.043
Tukang L.02 Oh 0.043
Kepala Tukang L.03 Oh 0.004
Mandor L,04 Oh 0.002
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Profile Aluminium m1 1.100
Skrup Fixer bh 2.000
Sealent tube 0.060
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
. 4.2.1.13 1 m2, Pemasangan Pintu Kaca Rangka Aluminium
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.085
Tukang L.02 Oh 0.085
Kepala Tukang L.03 Oh 0.009
Mandor L,04 Oh 0.005
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Pintu Aluminium m1 4.400
Profile Kaca m1 4.500
Sealent tube 0.270
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.15 1 m2, Pemasangan Terali Besi Strip, 2 x 3 mm
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 1.670
Tukang L.02 Oh 1.670
Kepala Tukang L.03 Oh 0.167
Mandor L,04 Oh 0.083
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Besi Strip kg 6.177
Pengelasan cm 27.080
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.16 1 m2, Pemasangan Kawat Nyamuk
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.100
Tukang L.02 Oh 0.100
Kepala Tukang L.03 Oh 0.010
Mandor L,04 Oh 0.005
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Kawat Nyamuk m2 1.100
Besi Strip kg 11.110
Pengelasan cm 1.716
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.20 1 m2, Pemasangan Rangka Besi Hollow, 1 x 40.40.2, Module 60 x 120 cm, untuk Partisi
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.250
Tukang L.02 Oh 0.250
Kepala Tukang L.03 Oh 0.025
Mandor L,04 Oh 0.013
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Rangka Metal Hollow, 40.40.2 mm m1 3.500
Assesories (Perkuatan, Las, Dll) 100% x Rangka Ls 3.500
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.21 1 m2, Pemasangan Rangka Besi Hollow, 1 x 40.40.2, Module 60 x 60 cm, untuk Plafond
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.350
Tukang L.02 Oh 0.350
Kepala Tukang L.03 Oh 0.035
Mandor L,04 Oh 0.018
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Rangka Metal Hollow, 40.40.2 mm m1 4.000
Assesories (Perkuatan, Las, Dll) 100% x Rangka Ls 4.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
4.2.1.22 1 m2, Pemasangan Kuda - Kuda Baja Ringan + Gording
No Uraian Pekerjaan Kode Satuan Koefisien
A. TENAGA KERJA
Pekerja L.01 Oh 0.120
Tukang L.02 Oh 0.120
Kepala Tukang L.03 Oh 0.012
Mandor L,04 Oh 0.006
Jumlah Tenaga Kerja
B. BAHAN / MATERIAL
Baja Ringan Zincalume Truss (Profile C) 0,75 m1 4.200
Baja Ringan Gording U 0.65 m1 2.400
Paku Ulir Profil C bh 14.000
Paku Ulir Goeding U bh 11.000
Jumlah Harga bahan
Jumlah ( A + B )
Overhead & Profit(10%)
Harga Satuan Pekerjaan
n (AHSP)
10%

Harga Satuan Jumlah Harga

100,000.00 6,000.00
100,000.00 6,000.00
100,000.00 600.00
100,000.00 300.00
Jumlah Tenaga Kerja Rp 12,900.00

11,000.00 12,650.00
Jumlah Harga bahan Rp 12,650.00
umlah ( A + B ) Rp 25,550.00
Overhead & Profit(10%) Rp 2,555.00
Harga Satuan Pekerjaan Rp 28,105.00

Harga Satuan Jumlah Harga

100,000.00 6,000.00
100,000.00 6,000.00
100,000.00 600.00
100,000.00 300.00
Jumlah Tenaga Kerja Rp 12,900.00

300,000.00 345,000.00
Jumlah Harga bahan Rp 345,000.00
umlah ( A + B ) Rp 357,900.00
Overhead & Profit(10%) Rp 35,790.00
Harga Satuan Pekerjaan Rp 393,690.00
angka Baja Siku
Harga Satuan Jumlah Harga

100,000.00 105,000.00
100,000.00 105,000.00
100,000.00 10,500.00
100,000.00 5,200.00
Jumlah Tenaga Kerja Rp 225,700.00

40,000.00 600,000.00
23,000.00 754,400.00
23,000.00 1,150.00
Jumlah Harga bahan Rp 1,355,550.00
umlah ( A + B ) Rp 1,581,250.00
Overhead & Profit(10%) Rp 158,125.00
Harga Satuan Pekerjaan Rp 1,739,375.00

Harga Satuan Jumlah Harga

100,000.00 4,000.00
100,000.00 2,000.00
100,000.00 200.00
100,000.00 200.00
Jumlah Tenaga Kerja Rp 6,400.00

23,000.00 9,200.00
10,000.00 3,000.00
45,000.00 1,800.00
Jumlah Harga bahan Rp 14,000.00

- -
Jumlah Harga Alat Rp -
umlah ( A + B + C) Rp 20,400.00
Overhead & Profit(10%) Rp 2,040.00
Harga Satuan Pekerjaan Rp 22,440.00
Harga Satuan Jumlah Harga

100,000.00 65,000.00
100,000.00 65,000.00
100,000.00 6,500.00
100,000.00 3,200.00
Jumlah Tenaga Kerja Rp 139,700.00

70,000.00 333,200.00
25,000.00 113,050.00
20,000.00 400,000.00
Jumlah Harga bahan Rp 846,250.00
umlah ( A + B ) Rp 985,950.00
Overhead & Profit(10%) Rp 98,595.00
Harga Satuan Pekerjaan Rp 1,084,545.00

Harga Satuan Jumlah Harga

100,000.00 120,000.00
100,000.00 120,000.00
100,000.00 12,000.00
100,000.00 600.00
Jumlah Tenaga Kerja Rp 252,600.00

750,000.00 750,000.00
Jumlah Harga bahan Rp 750,000.00
umlah ( A + B ) Rp 1,002,600.00
Overhead & Profit(10%) Rp 100,260.00
Harga Satuan Pekerjaan Rp 1,102,860.00

Harga Satuan Jumlah Harga

100,000.00 4,300.00
100,000.00 4,300.00
100,000.00 430.00
100,000.00 210.00
Jumlah Tenaga Kerja Rp 9,240.00

33,000.00 36,300.00
750.00 1,500.00
20,000.00 1,200.00
Jumlah Harga bahan Rp 39,000.00
umlah ( A + B ) Rp 48,240.00
Overhead & Profit(10%) Rp 4,824.00
Harga Satuan Pekerjaan Rp 53,064.00

Harga Satuan Jumlah Harga

100,000.00 8,500.00
100,000.00 8,500.00
100,000.00 900.00
100,000.00 500.00
Jumlah Tenaga Kerja Rp 18,400.00

750,000.00 3,300,000.00
18,000.00 81,000.00
20,000.00 5,400.00
Jumlah Harga bahan Rp 3,386,400.00
umlah ( A + B ) Rp 3,404,800.00
Overhead & Profit(10%) Rp 340,480.00
Harga Satuan Pekerjaan Rp 3,745,280.00
Harga Satuan Jumlah Harga

100,000.00 167,000.00
100,000.00 167,000.00
100,000.00 16,700.00
100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 359,000.00

24,000.00 148,248.00
23,000.00 622,840.00
Jumlah Harga bahan Rp 771,088.00
umlah ( A + B ) Rp 1,130,088.00
Overhead & Profit(10%) Rp 113,008.80
Harga Satuan Pekerjaan Rp 1,243,096.00

Harga Satuan Jumlah Harga

100,000.00 10,000.00
100,000.00 10,000.00
100,000.00 1,000.00
100,000.00 500.00
Jumlah Tenaga Kerja Rp 21,500.00

20,000.00 22,000.00
24,000.00 266,640.00
23,000.00 39,468.00
Jumlah Harga bahan Rp 328,108.00
umlah ( A + B ) Rp 349,608.00
Overhead & Profit(10%) Rp 34,960.80
Harga Satuan Pekerjaan Rp 384,568.00
0 x 120 cm, untuk Partisi
Harga Satuan Jumlah Harga

100,000.00 25,000.00
100,000.00 25,000.00
100,000.00 2,500.00
100,000.00 1,300.00
Jumlah Tenaga Kerja Rp 53,800.00

17,000.00 59,500.00
17,000.00 59,500.00
Jumlah Harga bahan Rp 119,000.00
umlah ( A + B ) Rp 172,800.00
Overhead & Profit(10%) Rp 17,280.00
Harga Satuan Pekerjaan Rp 190,080.00
0 x 60 cm, untuk Plafond
Harga Satuan Jumlah Harga

100,000.00 35,000.00
100,000.00 35,000.00
100,000.00 3,500.00
100,000.00 1,800.00
Jumlah Tenaga Kerja Rp 75,300.00

17,000.00 68,000.00
17,000.00 68,000.00
Jumlah Harga bahan Rp 136,000.00
umlah ( A + B ) Rp 211,300.00
Overhead & Profit(10%) Rp 21,130.00
Harga Satuan Pekerjaan Rp 232,430.00
Harga Satuan Jumlah Harga

100,000.00 12,000.00
100,000.00 12,000.00
100,000.00 1,200.00
100,000.00 600.00
Jumlah Tenaga Kerja Rp 25,800.00

10,000.00 42,000.00 60,000


8,000.00 19,200.00
200.00 2,800.00
200.00 2,200.00
Jumlah Harga bahan Rp 66,200.00
umlah ( A + B ) Rp 92,000.00
Overhead & Profit(10%) Rp 9,200.00
Harga Satuan Pekerjaan Rp 101,200.00
REKAPITULASI
BILL OF QUANTITY (BOQ)

PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam

LOKASI : Kabupaten Aceh Utara

SUMBER DANA : DAK

TAHUN ANGGARAN : 2021

NO URAIAN PEKERJAAN HARGA SATUAN (Rp.) KET


1 2 3 4

REKAPITULASI PEKERJAAN

A PEKERJAAN PERSIAPAN Rp 16,962,000.00

B PEKERJAAN REHAB DAN PEMASANGAN Rp 115,394,664.00

C PEKERJAAN BETON BERTULANG Rp 23,720,969.80

D PEKERJAAN DINDING BATA DAN PLASTERAN Rp 12,156,365.10

0 PEKERJAAN REHAB JENDELA DAN PINTU Rp 66,513,339.20

F PEKERJAAN PENGECATAN Rp 8,413,680.00

G PEKERJAAN INSTALASI LISTRIK Rp 2,420,000.00

H PEKERJAAN PENGADAAN PERABOT Rp 6,600,000.00

JUMLAH HARGA PEKERJAAN Rp 252,181,018.10

DIBULATKAN Rp 252,181,000.00

TERBILANG : Dua Ratus Lima Puluh Dua Juta Seratus Delapan Puluh Satu Ribu Rupiah

Banda Aceh, 2021


Penawar,
PT/CV

Nama Jelas
Jabatan
Terjemahan kedalam kalimat

### 1 <=== Bahasa <1> Indonesia, <2> Inggris

terbilang = Dua Ratus Lima Puluh Dua Juta Seratus Delapan Puluh Satu Ribu Rupiah

BASIC => satu dua tiga empat lima enam tujuh delapan sembilan sepuluh @
ribu juta milyar triliyun @
000252181000 @
@@ @ @ @ @
basic @ 000 1 @
perhitungan @ 0 @
angka @ sepuluh @
@ 0 @
@ 0 @
@ @
@ @
@ @
@ @
@ 181 2 @
@ 1 delapan puluh @
@ sersebelas @
@ 8 satu @
@ 1 delapan puluh satu @
@ deldelapan puluh satu @
@ seratus delapan puluh satu ribu @
@ @
@ @
@ 252 3 @
@ 2 lima puluh @
@ duadua belas @
@ 5 dua @
@ 2 lima puluh dua @
@ limlima puluh dua @
@ dua ratus lima puluh dua juta @
@ @
@ @
@ 000 4 @
@ 0 @

@ sepuluh @
@ 0 @
@ 0 @
@ @
@ @
@ @
@ 000 1 @
@ 0 @
@ sepuluh @
@ 0 @

@ 0 @
@ @
@ @
@ ***
@
@ 68 00
@ duadua ratus lima puluh dua juta seratus delapan puluh satu ribu rupiah
@ dua ratus lima puluh dua juta seratus delapan puluh satu ribu rupiah
@ Dua ratus lima puluh dua juta seratus delapan puluh satu ribu rupiah
HPS 299,994,000

Nilai Tawar 252,181,018

Nilai Buang 15.94%

Nilai KERJA 84%


PAGU
###

###
BILL OF QUANTITY (BOQ)
PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam
LOKASI : Kabupaten Aceh Utara
SUMBER DANA : DAK
TAHUN ANGGARAN : 2021

PPN
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT ANALISA TOTAL HARGA
(Rp.) ( RP ) 10%
1 2 3 4 5 6 7=(3X6) 8 = ( 7 X 10 % ) 9=(7+8)

I. REHABILITASI RUANG KELAS ( 2 RUANG )


A. PEKERJAAN PERSIAPAN
1 Pengukuran / Pematokan 1.00 Ls Taksir 500,000.00 500,000.00 50,000.00 550,000.00
2 Direksi Keet / Sewa 1.00 Ls Taksir 2,000,000.00 2,000,000.00 200,000.00 2,200,000.00
3 Sistem Manajemen Kesehatan Keselamatan Konstruksi ( SMK3 ) 1.00 Ls Taksir 11,520,000.00 11,520,000.00 1,152,000.00 12,672,000.00
4 Administrasi Dan Dokumentasi 1.00 Ls Taksir 1,000,000.00 1,000,000.00 100,000.00 1,100,000.00
5 Papan Nama Proyek 1.00 Ls Taksir 200,000.00 200,000.00 20,000.00 220,000.00
6 Plakat / Prasasti 1.00 Ls Taksir 200,000.00 200,000.00 20,000.00 220,000.00
Sub Jumlah 15,420,000.00 1,542,000.00 16,962,000.00
B. PEKERJAAN REHAB DAN PEMASANGAN
1 Pekerjaan Pembongkaran Plafon dan Pemasangan Plafon
1 Pemasangan Plafon PVC Rangka + ACC Lengkap Terpasang 177.60 M2 Taksir 145,000.00 25,752,000.00 2,575,200.00 28,327,200.00
2 Pekerjaan Pemasangan Lantai Granit
1 Pekerjaan Pemasangan Lantai Keramik Uk.40 x 40 cm 112.00 M2 4.4.3.35.a 241,900.00 27,092,800.00 2,709,280.00 29,802,080.00
2 Pekerjaan Pemasangan Lantai Keramik Kasar Uk.40 x 40 cm - M2 4.4.3.35.a 241,900.00 0.00 0.00 0.00
3 Pekerjaan Pembongkaran Atap Lama dan Pemasangan
1 Pekerjaan .Pembongkaran Atap Lama 196.00 M2 2.2.1.13.A 40,200.00 7,879,200.00 787,920.00 8,667,120.00
2 Pemasangan Rangka Atap Baja 196.00 M2 4.2.1.22 101,200.00 19,835,200.00 1,983,520.00 21,818,720.00
3 Pemasangan Atap Spandek 0,30 mm 196.00 M2 4.5.2.44 91,600.00 17,953,600.00 1,795,360.00 19,748,960.00
4 Pemasangan Rabung Spandek 0,35 mm 16.00 M' 4.5.2.37 102,465.00 1,639,440.00 163,944.00 1,803,384.00
5 Pekerjaan Pemasangan Listplank 54.00 M' 4.6.1.22 88,000.00 4,752,000.00 475,200.00 5,227,200.00
Sub Jumlah 104,904,240.00 10,490,424.00 115,394,664.00
C. 1 PEKERJAAN BETON BERTULANG
Pekerjaan Ring Balok Uk. 30 x 40 cm
- Perancah / Bekesting 9.60 m2 4.1.1.22 235,900.00 2,264,640.00 226,464.00 2,491,104.00
- Besi Tulangan Polos, U.24 686.53 kg . 4.1.1.17a.1 13,600.00 9,336,808.00 933,680.80 10,270,488.80
- Beton Cor K 200 5.76 m³ 4.1.1.6 1,295,500.00 7,462,080.00 746,208.00 8,208,288.00
2 Pekerjaan Top Gevel Uk. 15 x 10 cm
- Perancah / Bekesting 3.55 M2 4.1.1.22 235,900.00 837,445.00 83,744.50 921,189.50
- Besi Tulangan Polos, U.24 96.60 kg . 4.1.1.17a.1 13,600.00 1,313,760.00 131,376.00 1,445,136.00
- Beton Cor K 200 0.27 M3 4.1.1.6 1,295,500.00 349,785.00 34,978.50 384,763.50
Sub Jumlah 21,564,518.00 2,156,451.80 23,720,969.80
D. PEKERJAAN DINDING BATA DAN PLASTERAN
1 Pas. Dinding Bata 1Pc : 4 Pp 19.29 M2 - 200,900.00 3,875,361.00 387,536.10 4,262,897.10
2 Plasteran 1Pc : 4 Pp 38.58 M2 - 186,000.00 7,175,880.00 717,588.00 7,893,468.00
Sub Jumlah 11,051,241.00 1,105,124.10 12,156,365.10
E PEKERJAAN REHAB JENDELA DAN PINTU
1 Pekerjaan .Pembongkaran Jendela Lama 61.36 M2 2.2.1.13.A 40,200.00 2,466,672.00 246,667.20 2,713,339.20
2 Pemasangan Jendela UPVC J1 6.00 Unit Taksir 6,000,000.00 36,000,000.00 3,600,000.00 39,600,000.00
3 Pemasangan Jendela UPVC J2 6.00 Unit Taksir 2,000,000.00 12,000,000.00 1,200,000.00 13,200,000.00
4 Pemasangan Pintu UPVC P1 2.00 Unit Taksir 5,000,000.00 10,000,000.00 1,000,000.00 11,000,000.00
Sub Jumlah 60,466,672.00 6,046,667.20 66,513,339.20
F PEKERJAAN PENGECATAN
1 Pengikisan / Pengerokan Permukaan Cat Lama 120.00 M2 4.7.1.1 18,100.00 2,172,000.00 217,200.00 2,389,200.00###
2 Pengecatan Tembok Lama 120.00 M2 4.7.1.11 37,900.00 4,548,000.00 454,800.00 5,002,800.00
3 Pengecatan Lisplank 21.60 M2 . 4.7.1.4 43,000.00 928,800.00 92,880.00 1,021,680.00
Sub Jumlah 7,648,800.00 764,880.00 8,413,680.00
G PEKERJAAN INSTALASI LISTRIK
1 Lampu Led Inbow 20 Watt 8.00 Bh Taksir 100,000.00 800,000.00 80,000.00 880,000.00
2 Pemasangan Stop Kontak G 2.00 Bh Taksir 100,000.00 200,000.00 20,000.00 220,000.00
3 Pemasangan Saklar Ganda + Instalasi 2.00 Bh Taksir 60,000.00 120,000.00 12,000.00 132,000.00
4 Instalasi Titik Lampu + Acessories 12.00 bh Taksir 90,000.00 1,080,000.00 108,000.00 1,188,000.00
Sub Jumlah 2,200,000.00 220,000.00 2,420,000.00
H PEKERJAAN PENGADAAN PERABOT
1 Kursi Kerja Pendidik 1.00 Unit Taksir 3,000,000.00 3,000,000.00 300,000.00 3,300,000.00
2 Meja Kerja Pendidik 1.00 Unit Taksir 3,000,000.00 3,000,000.00 300,000.00 3,300,000.00
Sub Jumlah 6,000,000.00 600,000.00 6,600,000.00

47,819,000
5,665,440 39.07

1,796,687 7.43
16,090,272 66.5162133

1.6

0.7
#REF!

25

47,819,000

47,819,000
DAFTAR HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang B


SMKS 1 Terpadu Babussalam
LOKASI : Kabupaten Aceh Utara
SUMBER DANA : DAK
TAHUN ANGGARAN : 2021

HARGA SATUAN
NO URAIAN HARGA UPAH SATUAN
(Rp.)
1 2 3 4

1 Pekerja L.01 OH 100,000.00


2 Tukang L.02 OH 100,000.00
3 Kepala Tukang L.03 OH 100,000.00
4 Mandor L.04 OH 100,000.00

HARGA SATUAN
NO URAIAN HARGA BAHAN-BAHAN SATUAN
(Rp.)
1 2 3 4

A BAHAN / MATERIAL
1 Air Ltr 110.00
2 Batu kali belah sungai / gunung M3 250,000.00
3 - M3 162,000.00
4 Kerikil Beton 30 mm Maks. M3 387,000.00
5 Pasir beton M3 140,000.00
6 Pasir pasang M3 160,000.00
7 Pasir urug M3 83,000.00
8 Sirtu M3 306,000.00
9 Tanah timbun Pilihan M3 150,000.00
10 Tanah timbun Biasa M3 69,000.00
11 Semen portland @ 40 kg zak 60,300.00
12 Semen warna @ 50 Kg zak 153,000.00
13 Bambu Ø 6 - 8 / 600 cm btg 20,000.00
14 Dolken kayu Ø 8-10/400 cm btg 15,000.00
15 Kayu papan/balok kls I M3 5,000,000.00
16 Kayu papan/balok kls II M3 4,000,000.00
17 Kayu papan/balok kls III M3 3,000,000.00
18 Kayu papan/balok kls IV M3 2,800,000.00
19 Lem Kayu kg 130,500.00
20 Penjaga jarak bekisting/spacer bh 1,500.00
21 Alluminium Strip M' 35,000.00
22 Alluminium Profil, T M' 62,000.00
23 Alluminium Poil M2 33,000.00
24 Besi Ankur, Ø 8 mm kg 12,500.00
25 Besi Beton polos U.24 kg 9,500.00
26 Besi Beton ulir U.24 kg 11,000.00
27 Besi Plat Strip kg 24,000.00
28 Besi Profil kg 11,000.00
29 Besi Siku, L 30.30.3 M' 40,000.00
30 Besi Siku, L 40.40.4 M' 50,000.00
31 Besi Hollow, 40.40.2 mm M' 17,000.00
32 Besi Plat Baja kg 23,000.00
33 Besi Stanlis 2" M' 30,000.00
34 Besi Baja Zincalume Truss ( Profil C ) M' 18,000.00
35 Baja Ringan C Canal-75,0.8 M' 10,000.00
36 Baja Ringan C Canal-75,0.6 M' 10,000.00
37 Baja Ringan Gording U 0.45 M' 8,000.00
38 Bata merah bh 670.00
39 HB-10 / Batako bh 3,400.00
40 Baut Screw (Driver) bh 450.00
41 Baut Ramset bh 730.00
42 Dynabolt bh 950.00
43 Furing Baja M' 13,000.00
44 Kawat Beton kg 23,200.00
45 Kawat Duri kg 19,800.00
46 Kawat Jaring kg 26,000.00
47 Kawat Las kg 23,000.00
48 Kawat Nyamuk kg 20,000.00
49 Paku biasa kg 17,000.00
50 Paku Seng kg 18,500.00
51 Paku Tripleks kg 19,000.00
52 Paku Skrup bh 30,000.00
53 Skrup Fixer bh 750.00
54 Paku Ulir Profil C bh 200.00
55 Paku Ulir Gording U bh 200.00
56 Minyak bekisting ltr 15,200.00
57 Kosen Pintu Aluminium ( 80 x 210 ) Coklat unit 400,000.00
58 Kosen Pintu Aluminium ( 80 x 210 ) Putih unit 400,000.00
59 Kosen Jendela Aluminium ( 60 x 120 ) Coklat unit 350,000.00
60 Kosen Jendela Aluminium ( 60 x 120 ) Putih unit 350,000.00
61 Pintu Aluminium ( 80 x 120 ) Coklat bh 750,000.00
62 Pintu Aluminium ( 80 x 120 ) Putih bh 750,000.00
63 Pintu PVC bh 400,000.00
64 Pintu Gulung Besi M2 750,000.00
65 Keramik Dinding 25 x 40 cm bh 4,500.00
66 Keramik Dinding, 20 x 25 cm bh 3,500.00
67 Keramik 25 x 25 cm Lantai Km bh 3,000.00
68 Keramik 30 x 30 cm bh 7,000.00
69 Keramik 20 x 30 cm bh 6,500.00
70 Keramik 40 x 40 cm bh 11,000.00
71 Granit 60 x 60 cm bh 77,500.00
72 Paving Block bh 3,000.00
73 Atap Seng Genteng Metal M2 70,000.00
74 Atap Seng Spandek 0,35 mm M2 45,000.00
76 Atap Seng Gelombang Bjls 0,20 mm lbr 55,000.00
77 Seng Plat, BJLS. 0,35 lbr 35,000.00
78 Rabung Seng Spandek lbr 45,000.00
79 Rabung Seng lbr 23,000.00
80 Akustik, 30 x 30 cm lbr 13,000.00
81 Akustik, 30 x 60 cm lbr 25,000.00
82 Akustik, 60 x 120 cm lbr 350,000.00
83 List Kayu Profil M' 7,000.00
84 Plywood Tebal, 4 mm lbr 75,000.00
85 Plywood Tebal, 6 mm lbr 95,000.00
86 Plywood Tebal, 9 mm lbr 130,000.00
87 Tripleks (120 x 240) cm, tebal 4 mm lbr 55,000.00
88 Tripleks (120 x 240) cm, tebal 6 mm lbr 75,000.00
89 Tripleks (120 x 240) cm, tebal 9 mm lbr 120,000.00
90 Bingkai Naco Niki Hitam bh 250,000.00
91 Bingkai Naco Niki Putih bh 200,000.00
92 Cermin Washtafel bh 150,000.00
93 Door Closer set 90,000.00
94 Door Handle set 120,000.00
95 Door Stop set 100,000.00
96 Engsel Pintu 3/4" psg 19,000.00
97 Engsel Jendela 3" psg 17,000.00
98 Engsel ARCH, 3" psg 15,000.00
99 Engsel ARCH, 4" psg 22,000.00
100 Engsel Angin psg 23,000.00
101 Espanyolet bh 80,000.00
102 Grendel Pintu / Jendela bh 25,000.00
103 GLass Block bh 35,000.00
104 Kait Angin bh 25,000.00
105 Kaca Biasa T = 5 mm M2 135,000.00
106 Kaca Block 20 x 20 cm M2 175,000.00
107 Kaca Bening Tebal 5 mm M2 120,000.00
108 Kunci Pintu bh 85,000.00
109 Kunci Tanam Antik bh 250,000.00
110 Kunci Tanam Biasa bh 65,000.00
111 Kunci Tanam Kamar Mandi bh 50,000.00
112 Kunci Silinder bh 95,000.00
113 Kunci Selot bh 35,000.00
114 Kunci Lemari bh 15,000.00
115 Profile Kaca M' 18,000.00
116 Pacok Jendela bh 15,000.00
117 Rel Pintu Dorong bh 190,000.00
118 Sealent kg 20,000.00
119 Tarikan Jendela bh 17,000.00
120 Ampelas lbr 5,000.00
121 Cat dasar kayu kg 30,000.00
122 Cat dasar tembok kg 30,000.00
123 Cat kayu penutup setara property kg 55,000.00
124 Cat menie Kayu kg 18,000.00
125 Cat menie Besi kg 25,000.00
126 Cat tembok penutup Jotun kg 80,000.00
127 Dempul Kayu kg 25,000.00
128 Kapur Pasang kg 2,000.00
129 Kuas bh 25,000.00
130 Minyak bekisting ltr 15,200.00
131 Minyak Pelumas ltr 45,000.00
132 Minyak Solar ltr 5,500.00
133 Minyak Premium ltr 6,600.00
134 Pengencer kg 12,000.00
135 Plamur kg 27,000.00
136 Pernis ltr 15,000.00
137 Politur Dasar ltr 27,000.00
138 Politur Jadi ltr 50,000.00
139 Sabun bh 6,500.00
140 Soda api kg 9,000.00
141 Solar Industri ltr 10,000.00
142 Residu ltr 12,000.00
143 Bak Fibreglass, 1 m3 bh 248,000.00
144 Bak Fibre / Tekylas, 60 x 60 cm bh 220,000.00
145 Floor Drain bh 24,500.00
146 Instalasi Air Bersih unit 150,000.00
147 Instalasi Air Kotor / Limbah unit 200,000.00
148 Ijuk kg 15,000.00
149 Kloset Jongkok Champion bh 220,000.00
150 Kran Air Ø 1/2" - 3/4" bh 15,000.00
151 Kran Air Leher Angsa Ø 1/2" bh 65,000.00
152 Tempat Sabun Keramik KIA bh 120,000.00
153 Tutup Bak Air Ø 1" Kuningan bh 30,000.00
154 Stop Kran Ø 3/4" bh 25,000.00
155 Washtafel bh 1,000,000.00
156 Instalasi Arus Listrik, 4A bh 2,300,000.00
157 Kabel NYA, 2 x 1,5 mm M' 9,000.00
158 Lampu Down Light bh 75,000.00
159 Lampu SL, 18 watt bh 30,000.00
160 Lampu SL, 20 watt bh 45,000.00
161 Lampu SL, 35 watt bh 70,000.00
162 Panel Box + MCB bh 75,000.00
163 Saklar 1 Seri bh 15,000.00
164 Saklar 2 Seri bh 20,000.00
165 Saklar 3 Seri bh 27,000.00
166 Sealtip bh 2,500.00
167 Stop Kontak Biasa bh 15,000.00
168 Stop Kontak Tanam bh 22,000.00
169 Jendela UPVC M2 1,350,000.00
170 Pintu UPVC M2 1,450,000.00
171 AC LG T10EV3 Unit 4,000,000.00
B. BAHAN PERPIPAAN
1 Pipa Galvanis Medium ½” M' 22,000.00
2 Pipa Galvanis Medium 3/4” M' 19,000.00
3 Pipa Galvanis Medium 1” M' 35,000.00
4 Pipa Galvanis Medium 1 ½” M' 44,000.00
5 Pipa Galvanis Medium 2” M' 57,000.00
6 Pipa Galvanis Medium 3” M' 63,000.00
7 Pipa Galvanis Medium 4” M' 70,000.00
8 Pipa Galvanis Medium 6” M' 90,000.00
9 Pipa PVC 1/2” SNI/ S - 12,5 SCJ setara Finnlon M' 3,500.00
10 Pipa PVC 3/4” SNI/ S - 12,5 SCJ setara Finnlon M' 4,500.00
11 Pipa PVC 1” SNI/ S - 12,5 RRJ setara Finnlon M' 6,000.00
12 Pipa PVC 1½” SNI/ S - 12,5 RRJ setara Finnlon M' 6,500.00
13 Pipa PVC 2” SNI/ S - 12,5 RRJ setara Finnlon M' 7,500.00
14 Pipa PVC 2½” SNI/ S - 12,5 RRJ setara Finnlon M' 8,000.00
15 Pipa PVC 3” SNI/ S - 12,5 RRJ setara Finnlon M' 9,500.00
16 Pipa PVC 4” SNI/ S - 12,5 RRJ setara Finnlon M' 12,000.00

C BAHAN PERABOT
1 Kursi Kerja Pendidik Unit 1,800,000
2 Meje Kerja Pendidik Unit 2,800,000
3 Meja dan Kursi Siswa Unit 650,000
4 Lemari Penyimpanan Unit 3,500,000
5 Papan Tulis Mika Unit 2,100,000
6 Pengadaan Tempat Sampah Plastik Pedal 45 Liter Unit 750,000
N
DAFTAR HARGA SATUAN DASAR ( HSD )
imal Sedang Beserta Perabotnya

KETERANGAN

KETERANGAN

311,000.00
286.67 /Kg
100.00 /Kg

1,507.50 /Kg
3,060.00 /Kg
132,000.00 /Btg
114,000.00 /Btg
210,000.00 /Btg
264,000.00 /Btg
342,000.00 /Btg
378,000.00 /Btg
420,000.00 /Btg
540,000.00 /Btg
21,000.00 /Btg
27,000.00 /Btg
36,000.00 /Btg
39,000.00 /Btg
45,000.00 /Btg
48,000.00 /Btg
57,000.00 /Btg
72,000.00 /Btg

Disiapka
KONSULTAN
CV. BUMI DESAIN

ZIKRA WIN
Dire
5

5
Disiapkan Oleh
ONSULTAN PERENCANA
UMI DESAIN CONSULTANT

ZIKRA WIN ARIJA,ST


Direktur
TA, 2021 TA, 2021

1.00 100,000.00 100,000.00


1.00 120,000.00 120,000.00
1.00 125,000.00 125,000.00
1.00 110,000.00 110,000.00

HARGA DASAR HARGA DASAR


WIL - 1
2021 2021
1.00 100.00 100.00
1.00 175,000.00 176,800.00 Batu Gunung / Kali Bela 474,700
1.00 265,000.00 345,700.00 Pasir Urug
1.00 195,000.00 345,700.00 Pasir Beton Bersih 309,200
1.00 185,000.00 191,300.00 Pasir Beton Kerikil 309,200
1.00 185,000.00 191,300.00 Sirtu 461,800
1.00 120,000.00 118,500.00 Pasir Pasang 208,700

1.00 108,000.00 108,000.00 Batu Bata Bireuen 1,000


1.00 85,000.00 85,400.00
1.00 58,000.00 65,200.00 Crusher Sona
1.00 127,000.00 125,000.00 365,000.00
1.00 25,000.00 25,000.00
1.00 12,000.00 12,000.00
1.00 6,232,000.00 8,176,500.00
1.00 4,897,000.00 6,162,000.00
1.00 3,477,000.00 5,688,000.00
1.00 3,477,000.00 4,977,000.00
1.00 25,000.00 25,000.00
1.00 4,600.00 4,600.00
1.00 35,000.00 35,000.00
1.00 62,000.00 62,000.00
1.00 33,000.00 33,000.00
1.00 12,500.00 12,500.00
1.00 13,500.00 15,400.00
1.00 18,000.00 30,100.00
1.00 25,000.00 25,000.00
1.00 13,500.00 13,500.00
1.00 39,900.00 39,900.00
1.00 50,500.00 50,500.00
1.00 17,000.00 17,000.00
1.00 24,000.00 24,000.00

1.00 18,400.00 18,400.00


1.00 16,400.00 16,500.00
1.00 16,400.00 16,500.00 60,000.00
1.00 11,500.00 11,500.00 48,000.00
1.00 700.00 800.00
1.00 3,000.00 3,000.00
1.00 550.00 550.00
1.00 850.00 850.00
1.00 950.00 950.00
1.00 7,500.00 7,500.00
1.00 20,000.00 22,500.00
1.00 4,100.00 4,100.00
1.00 27,300.00 27,300.00
1.00 30,000.00 30,000.00
1.00 36,950.00 36,950.00
1.00 19,500.00 21,300.00
1.00 24,000.00 24,000.00
1.00 22,000.00 36,600.00
1.00 33,000.00 33,000.00
1.00 650.00 650.00
1.00 700.00 700.00
1.00 500.00 500.00
1.00 15,000.00 15,000.00
1.00 410,000.00 410,000.00
1.00 37,500.00 37,500.00
1.00 290,000.00 290,000.00
1.00 245,000.00 245,000.00
1.00 712,000.00 712,000.00
1.00 610,000.00 610,000.00
1.00 350,000.00 350,000.00
1.00 830,500.00 830,500.00
1.00 2,900.00 2,900.00 78000
1.00 3,650.00 3,650.00 75700
1.00 4,100.00 4,100.00
1.00 6,570.00 6,570.00 75000
1.00 6,250.00 6,250.00
1.00 11,680.00 10,600.00 75000
1.00 174,000.00 174,000.00 300,000.00 kotak
1.00 2,800.00 2,800.00 75,000.00
1.00 45,000.00 45,000.00

1.00 80,000.00 80,000.00


1.00 43,700.00 43,700.00
1.00 30,000.00 30,000.00
1.00 15,000.00 15,000.00
1.00 11,000.00 11,000.00
1.00 21,500.00 21,500.00
1.00 570,000.00 570,000.00
1.00 6,500.00 6,500.00
1.00 80,500.00 80,500.00
1.00 90,000.00 90,000.00
1.00 135,000.00 135,000.00
1.00 54,000.00 54,000.00
1.00 78,000.00 78,000.00
1.00 132,000.00 132,000.00
1.00 205,000.00 205,000.00
1.00 170,000.00 170,000.00
1.00 163,000.00 163,000.00
1.00 120,000.00 120,000.00
1.00 140,000.00 140,000.00
1.00 120,000.00 120,000.00
1.00 17,700.00 17,700.00
1.00 16,500.00 16,500.00 132,000.00
1.00 11,600.00 11,600.00
1.00 19,300.00 19,300.00 57,900.00
1.00 25,000.00 25,000.00
1.00 89,000.00 89,000.00
1.00 23,700.00 23,700.00 47,400.00
1.00 25,500.00 25,500.00
1.00 25,700.00 25,700.00
1.00 161,000.00 161,000.00
1.00 200,000.00 200,000.00
1.00 115,000.00 115,000.00
1.00 93,600.00 93,600.00
1.00 225,200.00 225,200.00
1.00 70,000.00 70,000.00
1.00 55,500.00 55,500.00
1.00 100,000.00 100,000.00
1.00 28,500.00 28,500.00
1.00 12,500.00 12,500.00
1.00 15,000.00 15,000.00
1.00 10,000.00 10,000.00
1.00 165,000.00 165,000.00
1.00 15,000.00 15,000.00
1.00 14,000.00 14,000.00
1.00 6,000.00 6,000.00
1.00 28,000.00 28,000.00
1.00 28,000.00 28,000.00
1.00 48,000.00 48,000.00
1.00 21,200.00 21,200.00
1.00 21,200.00 21,200.00
1.00 45,000.00 45,000.00 960,000.00
1.00 31,000.00 31,000.00
1.00 1,200.00 1,200.00
1.00 32,000.00 32,000.00
1.00 15,000.00 15,000.00
1.00 40,000.00 40,000.00
1.00 6,500.00 6,500.00
1.00 6,500.00 6,500.00
1.00 15,000.00 15,000.00
1.00 25,000.00 25,000.00
1.00 17,000.00 17,000.00
1.00 25,000.00 25,000.00
1.00 45,000.00 45,000.00
1.00 8,000.00 8,000.00
1.00 8,000.00 8,000.00
1.00 15,350.00 15,350.00
1.00 12,500.00 12,500.00
1.00 351,500.00 351,500.00
1.00 330,000.00 330,000.00
1.00 100,000.00 100,000.00
1.00 125,000.00 125,000.00
1.00 150,000.00 150,000.00
1.00 5,000.00 5,000.00
1.00 284,400.00 284,400.00
1.00 11,900.00 11,900.00
1.00 77,500.00 77,500.00
1.00 114,000.00 114,000.00
1.00 25,000.00 25,000.00
1.00 27,500.00 27,500.00
1.00 562,800.00 562,800.00
1.00 1,800,000.00 1,800,000.00
1.00 6,000.00 6,000.00
1.00 51,150.00 51,150.00
1.00 26,000.00 26,000.00
1.00 31,000.00 31,000.00
1.00 63,000.00 63,000.00
1.00 65,000.00 65,000.00
1.00 16,000.00 16,000.00
1.00 21,000.00 21,000.00
1.00 25,000.00 25,000.00
1.00 3,000.00 3,000.00
1.00 16,000.00 16,000.00
1.00 20,000.00 20,000.00
1.00 140,200.00 140,200.00 btg
1.00 123,200.00 123,200.00
1.00 201,500.00 201,500.00
1.00 260,700.00 260,700.00
1.00 331,800.00 331,800.00
1.00
1.00
1.00
1.00 22,000.00 22,000.00
1.00 25,000.00 25,000.00
1.00 35,000.00 35,000.00
1.00 30,000.00 30,000.00
1.00 35,000.00 35,000.00
1.00 - 37,500.00
1.00 40,000.00 40,000.00
1.00 60,000.00 60,000.00

1,200,000
3,500,000
1,300,000
700,000
WIL - 2 WIL - 3 WIL - 4 WIL - 5

474,700 355,500 352,000 484,800


321,000 201,700 323,000 938,700
772,200 444,700 512,000 734,400
415,100 222,000 391,000 833,100
660,600 355,000 460,000 158,200
204,500 208,700 123,000 333,800

1,000 1,000 1,000 153,900

Crusher Ongong
375,000.00 / m3
REKAPITU

PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :

NO URAIAN PEKERJAAN

1 2

A HARGA SATUAN PEKERJAAN PERSIAPAN


1 1 m1, Pengukuran dan Pemasangan Bowplank
2 1 m2, Pembersihan Lapangan dan Perataan
3 1 m3, Pembongkaran Beton Lama
4 1 M2, Pembersihan / Pembongkaran

B HARGA SATUAN PEKERJAAN TANAH


1 1 m3, Penggalian Tanah Biasa Sedalam 1 m1
2 1 m3, Menggali Tanah Keras Sedalam 1 m1
3 1 m3, Menggali Tanah Cadas Sedalam 1 m1
4 1 m3, Menggali Tanah Lumpur Sedalam 1 m1
5 1 m3, Pengurugan Kembali Galian Tanah
6 1 m3, Pengurugan Dengan Pasir Urug
7 1 m3, Pengurugan Dengan Sirtu Padat
8 1 m3, Mengurug Tanah Timbun

C HARGA SATUAN PEKERJAAN PONDASI


1 1 m3, Pemasangan Pondasi batu Belah Campuran 1Pc : 3
2 1 m3, Pemasangan Pondasi batu Belah Campuran 1Pc : 4
3 1 m3, Pemasangan Batu Kosong / Aanstamping

D HARGA SATUAN PEKERJAAN BETON


1 1 m3, Membuat Beton Mutu fc = 7,4 Mpa (K.100), Slump
2 1 m3, Membuat Beton Mutu fc = 14,5 Mpa (K.175), Slump
3 1 m3, Membuat Beton Mutu fc = 16,9 Mpa (K.200), Slump
4 1 m3, Membuat Beton Mutu fc = 19,3 Mpa (K.225), Slump
5 1 m3, Membuat Beton Mutu fc = 21,7 Mpa (K.250), Slump
6 1 m3, Membuat Beton Mutu fc = 24,0 Mpa (K.275), Slump
7 1 m3, Membuat Beton Mutu fc = 26,4 Mpa (K.300), Slump
8 1 m3, Membuat Beton Mutu fc = 28,8 Mpa (K.325), Slump
9 1 m3, Membuat Beton Mutu fc = 31,2 Mpa (K.350), Slump
10 Pembesian 10 Kg dengan Besi Polos
11 Pembesian 1 Kg dengan Besi Polos (Harga = 1/10 x Pem
12 Pembesian 10 Kg dengan Besi Ulir
13 Pembesian 1 Kg dengan Besi Ulir (Harga = 1/10 x Pembe
14 1 m2, Pemasangan Bekesting untuk Pondasi
15 1 m2, Pemasangan Bekesting untuk Sloof
16 1 m2, Pemasangan Bekesting untuk Kolom
17 1 m2, Pemasangan Bekesting untuk Balok
18 1 m2, Pemasangan Bekesting untuk Lantai
19 1 m2, Pemasangan Bekesting untuk Dinding
20 Pekerjaan Lain - Lain ( Membongkar dan Menyiram Beto
21 Membuat Tapak Pondasi Beton bertulang
22 Membuat Plat Lantai Beton bertulang

E HARGA SATUAN PEKERJAAN BESI / ALUMINIUM


1 1 m2, Pemasangan Kuda-Kuda Baja Ringan + Gording

F HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 1 m2, Pemasangan Batu Bata Tebal 1/2 Batu Campuran 1
2 1 m2, Pemasangan Batu Bata Tebal 1/2 Batu Campuran 1

G HARGA SATUAN PEKERJAAN PLASTERAN


1 1 m2, Pemasangan Plasteran 1Pc : 2Pp Tebal = 15 mm
2 1 m2, Pemasangan Plasteran 1Pc : 3Pp Tebal = 15 mm
3 1 m2, Pemasangan Plasteran 1Pc : 4Pp Tebal = 15 mm
4 1 m2, Pemasangan Acian

H HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN


1 1 m2, Pemasangan Lantai Keramik uk. 30 x 30 cm
2 1 m2, Pemasangan Lantai Keramik uk. 40 x 40 cm
3 1 m2, Pemasangan Lantai Keramik uk. 20 x 20 cm
4 1 m2, Pemasangan Lantai Keramik uk. 25 x 25 cm
5 1 m2, Pemasangan Dinding Keramik uk. 25 x 40 cm
6 1 m2, Pemasangan Lantai Granit uk. 60 x 60 cm

I HARGA SATUAN PEKERJAAN LANGIT - LANGIT (PLAF


1 1 m2, Pemasangan Langit Langit Tripleks, uk. 120 x 240
2 1 m1, Pemasangan List Langit Langit Kayu Profil
3 1 M2, Pemasangan Plafond PVC

J HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 1 m2, Pemasangan Atap Seng Gelombang
2 1 m1, Pemasangan Nok Seng Gelombang
3 1 m2, Pemasangan Atap Seng Genteng Metal
4 1 m2, Pemasangan Atap Seng Spandek
5 1 m1, Pemasangan Rabung Spandek

K HARGA SATUAN PEKERJAAN KAYU


1 1 m3, Pembuatan dan Pemasangan Kusen Pintu dan Jend
2 1 m3, Pembuatan dan Pemasangan Kusen Pintu dan Jend
3 1 m3, Pemasangan Konstruksi Kuda - Kuda Konvensiona
4 1 m3, Pemasangan Konstruksi Kuda - Kuda Expose, Kay
5 1 m2, Pemasangan Rangka Langit Langit (60 x 60 cm), K
6 1 m2, Pemasangan Kuda - Kuda Baja Ringan + Gording
7 1 m1, Pemasangan Listplank Uk. (3 x 20 cm), Kayu Kelas
8 1 m1, Pemasangan Listplank Uk. (3 x 30 cm), Kayu Kelas

L HARGA SATUAN PEKERJAAN PENGECATAN


1 1 m2, Pengikisan / Pengerokan Permukaan Cat Lama
2 1 m2, Pengecatan Bidang Kayu Baru (1 lps Plamur, 1 Lps
3 1 m2, Pengecatan Tembok Baru (1 Lapis Plamuur, 1 Lapi
4 1 m2, Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 La

M PEKERJAAN SANITASI DAN AIR LIMBAH


1 Pemasangan 1 M1 Pipa PVC Diameter 1/2”
2 Pemasangan 1 M1 Pipa PVC Tipe AW Diameter 3"
3 Pemasangan 1 M1 Pipa Galvanis Diameter 2”
4 Pemasangan Subsitank

K PEKERJAAN LAIN-LAIN
1 m2, Pemasangan Paving Blok
1 Unit, Pemasangan Jendela UPVC J1
1 Unit, Pemasangan Jendela UPVC J2
1 Unit, Pemasangan Jendela UPVC V1. ( VINTALASI )
1 Unit, Pemasangan Pintu UPVC P1
-
REKAPITULASI ANALISA AHSP

Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya SM
Kabupaten Aceh Utara
DAK
2021

URAIAN PEKERJAAN ANALISA

2 3

UAN PEKERJAAN PERSIAPAN 2.2.1


kuran dan Pemasangan Bowplank 2.2.1.4
rsihan Lapangan dan Perataan 2.2.1.9
ngkaran Beton Lama 2.2.1.13
rsihan / Pembongkaran 2.2.1.13.A

UAN PEKERJAAN TANAH


lian Tanah Biasa Sedalam 1 m1 2.3.1.1
ali Tanah Keras Sedalam 1 m1 2.3.1.4
ali Tanah Cadas Sedalam 1 m1 2.3.1.5
ali Tanah Lumpur Sedalam 1 m1 2.3.1.6
ugan Kembali Galian Tanah 2.3.1.9
ugan Dengan Pasir Urug 2.3.1.11
ugan Dengan Sirtu Padat 2.3.1.14
rug Tanah Timbun 2.3.1.15

UAN PEKERJAAN PONDASI 3.2.1


angan Pondasi batu Belah Campuran 1Pc : 3 Pp 3.2.1.2
angan Pondasi batu Belah Campuran 1Pc : 4Pp 3.2.1.3
angan Batu Kosong / Aanstamping 3.2.1.9

UAN PEKERJAAN BETON 4.1.1


at Beton Mutu fc = 7,4 Mpa (K.100), Slump (12±2) cm, w/c = 0,87 4.1.1.1
at Beton Mutu fc = 14,5 Mpa (K.175), Slump (12±2) cm, w/c = 0,66 . 4.1.1.5
at Beton Mutu fc = 16,9 Mpa (K.200), Slump (12±2) cm, w/c = 0,61 4.1.1.6
at Beton Mutu fc = 19,3 Mpa (K.225), Slump (12±2) cm, w/c = 0,58 4.1.1.7
at Beton Mutu fc = 21,7 Mpa (K.250), Slump (12±2) cm, w/c = 0,56 4.1.1.8
at Beton Mutu fc = 24,0 Mpa (K.275), Slump (12±2) cm, w/c = 0,53 4.1.1.9
at Beton Mutu fc = 26,4 Mpa (K.300), Slump (12±2) cm, w/c = 0,52 4.1.1.10
at Beton Mutu fc = 28,8 Mpa (K.325), Slump (12±2) cm, w/c = 0,49 4.1.1.11
at Beton Mutu fc = 31,2 Mpa (K.350), Slump (12±2) cm, w/c = 0,48 4.1.1.12
0 Kg dengan Besi Polos 4.1.1.17a
Kg dengan Besi Polos (Harga = 1/10 x Pembesian 10 Kg) . 4.1.1.17a.1
0 Kg dengan Besi Ulir 4.1.1.17b
Kg dengan Besi Ulir (Harga = 1/10 x Pembesian 10 Kg) . 4.1.1.17b.1
angan Bekesting untuk Pondasi 4.1.1.20
angan Bekesting untuk Sloof 4.1.1.21
angan Bekesting untuk Kolom 4.1.1.22
angan Bekesting untuk Balok 4.1.1.23
angan Bekesting untuk Lantai 4.1.1.24
angan Bekesting untuk Dinding 4.1.1.25
in - Lain ( Membongkar dan Menyiram Beton ) Taksir
pak Pondasi Beton bertulang Suplemen 1
Lantai Beton bertulang Suplemen 2

UAN PEKERJAAN BESI / ALUMINIUM 4.2.1


angan Kuda-Kuda Baja Ringan + Gording 4.2.1.22

UAN PEKERJAAN PASANGAN DINDING 4.4.1


angan Batu Bata Tebal 1/2 Batu Campuran 1Pc : 2Pp 4.4.1.7
angan Batu Bata Tebal 1/2 Batu Campuran 1Pc : 4Pp . 4.4.1.9

UAN PEKERJAAN PLASTERAN . 4.4.2


angan Plasteran 1Pc : 2Pp Tebal = 15 mm 4.4.2.2
angan Plasteran 1Pc : 3Pp Tebal = 15 mm 4.4.2.3
angan Plasteran 1Pc : 4Pp Tebal = 15 mm . 4.4.2.4
angan Acian 4.4.2.27

UAN PEKERJAAN PENUTUP LANTAI DAN DINDING 4.4.3


angan Lantai Keramik uk. 30 x 30 cm 4.4.3.35
angan Lantai Keramik uk. 40 x 40 cm 4.4.3.35.a
angan Lantai Keramik uk. 20 x 20 cm 4.4.3.36
angan Lantai Keramik uk. 25 x 25 cm 4.4.3.36.a
angan Dinding Keramik uk. 25 x 40 cm 4.4.3.54
angan Lantai Granit uk. 60 x 60 cm 4.4.3.36.a.1

UAN PEKERJAAN LANGIT - LANGIT (PLAFOND) 4.5.1


angan Langit Langit Tripleks, uk. 120 x 240 cm, tebal, 3 mm, 4 mm, 6 mm . 4.5.1.5
angan List Langit Langit Kayu Profil 4.5.1.9
angan Plafond PVC Taksir

UAN PEKERJAAN PENUTUP ATAP 4.5.2


angan Atap Seng Gelombang 4.5.2.39
angan Nok Seng Gelombang 4.5.2.40
angan Atap Seng Genteng Metal . 4.5.2.43
angan Atap Seng Spandek 4.5.2.44
angan Rabung Spandek 4.5.2.37

UAN PEKERJAAN KAYU 4.6.1


atan dan Pemasangan Kusen Pintu dan Jendela, Kayu Kelas I 4.6.1.1
atan dan Pemasangan Kusen Pintu dan Jendela, Kayu Kelas II dan III . 4.6.1.2
angan Konstruksi Kuda - Kuda Konvensional, Kayu Kelas I, II dan III . 4.6.1.13
angan Konstruksi Kuda - Kuda Expose, Kayu Kelas I 4.6.1.14
angan Rangka Langit Langit (60 x 60 cm), Kayu Kelas II dan III 4.6.1.20
angan Kuda - Kuda Baja Ringan + Gording 4.2.1.22
angan Listplank Uk. (3 x 20 cm), Kayu Kelas I dan II 4.6.1.21
angan Listplank Uk. (3 x 30 cm), Kayu Kelas I dan II 4.6.1.22

UAN PEKERJAAN PENGECATAN 4.7.1


san / Pengerokan Permukaan Cat Lama 4.7.1.1
atan Bidang Kayu Baru (1 lps Plamur, 1 Lps Cat Dasar, 2 Lps Cat Penutup) . 4.7.1.4
atan Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 4.7.1.10
atan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 4.7.1.11

SANITASI DAN AIR LIMBAH B.


1 M1 Pipa PVC Diameter 1/2” AHSP.5.1.1.25
1 M1 Pipa PVC Tipe AW Diameter 3" AHSP.5.1.1.31
1 M1 Pipa Galvanis Diameter 2” Taksir
Taksir

LAIN-LAIN Taksir
angan Paving Blok Taksir
sangan Jendela UPVC J1 Taksir
sangan Jendela UPVC J2 Taksir
sangan Jendela UPVC V1. ( VINTALASI ) Taksir
sangan Pintu UPVC P1 Taksir
0
Banda Aceh,

0.0
0.0
LISA AHSP

Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam

JUMLAH HARGA KET.


(Rp.)
4 5

Rp 434,000.00
Rp 17,200.00
Rp 1,610,000.00
Rp 40,200.00

Rp 89,100.00
Rp 118,600.00
Rp 179,400.00
Rp 143,100.00
Rp 63,200.00
Rp 150,100.00
Rp 453,900.00
Rp 130,800.00

Rp 1,060,400.00
Rp 999,200.00
Rp 529,700.00

Rp 1,118,800.00
Rp 1,253,100.00
Rp 1,295,500.00
Rp 1,329,900.00
Rp 1,349,100.00
Rp 1,382,000.00
Rp 1,392,200.00
Rp 1,494,800.00
Rp 1,508,000.00
Rp 136,000.00
Rp 13,600.00
Rp 154,100.00
Rp 15,400.00
Rp 131,100.00
Rp 140,200.00
Rp 235,900.00
Rp 243,700.00
Rp 274,900.00
Rp 244,300.00
Rp 100,000.00
Rp 4,848,100.00
Rp 4,909,600.00

Rp 166,500.00

Rp 142,600.00
Rp 130,600.00

Rp 76,600.00
Rp 72,900.00
Rp 70,400.00
Rp 42,400.00

Rp 253,600.00
Rp 241,900.00
Rp 288,800.00
Rp 214,700.00
Rp 211,500.00
Rp 407,000.00
Rp 49,000.00
Rp 21,000.00
Rp 182,900.00

Rp 66,700.00
Rp 39,600.00
Rp 120,900.00
Rp 91,600.00
Rp 102,465.00

Rp 10,001,200.00
Rp 8,696,000.00
Rp 7,584,400.00
Rp 10,775,100.00
Rp 119,400.00
Rp 101,200.00
Rp 89,000.00
Rp 88,000.00

Rp 18,100.00
Rp 43,000.00
Rp 41,000.00
Rp 37,900.00

Rp -
Rp -
Rp -
Rp 4,500,000.00

Rp 225,400.00
Rp 5,205,600.00
Rp 2,704,200.00
Rp 2,092,600.00
Rp 4,090,300.00
0
Banda Aceh, 2021

0.00
0.00
AHSP CIPTA KA
Analisa Harga Satuan Pek

PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minim

LOKASI : Kabupaten Aceh Utara

DAK : DAK

TAHUN : 2021

No. Analisa Uraian Pekerjaan Kode Satuan

2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


2.2.1.4 1 m1, Pengukuran dan Pemasangan Bowplank
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu 5 x 7 cm m3
Paku Biasa 2" - 3" kg
Kayu Papan 3 x 20 cm m3

2.2.1.9 1 m2, Pembersihan Lapangan dan Perataan


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

2.2.1.13 1 m3, Pembongkaran Beton Lama


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

2.2.1.13.A 1 M2, Pembersihan / Pembongkaran


TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh
2.3.1 HARGA SATUAN PEKERJAAN TANAH
2.3.1.1 1 m3, Penggalian Tanah Biasa Sedalam 1 m1
A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

2.3.1.4 1 m3, Menggali Tanah Keras Sedalam 1 m1


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

2.3.1.5 1 m3, Menggali Tanah Cadas Sedalam 1 m1


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

2.3.1.6 1 m3, Menggali Tanah Lumpur Sedalam 1 m1


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

2.3.1.9 1 m3, Pengurugan Kembali Galian Tanah


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh
2.3.1.11 1 m3, Pengurugan Dengan Pasir Urug
A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Pasir Urug m3

2.3.1.14 1 m3, Pengurugan Dengan Sirtu Padat


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Sirtu m3

2.3.1.15 1 m3, Mengurug Tanah Timbun


A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Tanah Timbun m3

3.2.1 HARGA SATUAN PEKERJAAN PONDASI


3.2.1.2 1 m3, Pemasangan Pondasi batu Belah Campuran 1Pc : 3 Pp
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Batu Belah m3
Portland Cement kg
Pasir Pasang m3
3.2.1.3 1 m3, Pemasangan Pondasi batu Belah Campuran 1Pc : 4Pp
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Batu Belah m3
Portland Cement kg
Pasir Pasang m3

3.2.1.9 1 m3, Pemasangan Batu Kosong / Aanstamping


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Batu Belah m3
Pasir Urug m3
4.1.1 HARGA SATUAN PEKERJAAN BETON
4.1.1.1 1 m3, Membuat Beton Mutu fc = 7,4 Mpa (K.100), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
. 4.1.1.5 1 m3, Membuat Beton Mutu fc = 14,5 Mpa (K.175), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.6 1 m3, Membuat Beton Mutu fc = 16,9 Mpa (K.200), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.7 1 m3, Membuat Beton Mutu fc = 19,3 Mpa (K.225), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.8 1 m3, Membuat Beton Mutu fc = 21,7 Mpa (K.250), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.9 1 m3, Membuat Beton Mutu fc = 24,0 Mpa (K.275), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.10 1 m3, Membuat Beton Mutu fc = 26,4 Mpa (K.300), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.11 1 m3, Membuat Beton Mutu fc = 28,8 Mpa (K.325), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.12 1 m3, Membuat Beton Mutu fc = 31,2 Mpa (K.350), Slump (12±2) cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Beton kg
Kerikil (Max. 30 mm) kg
Air ltr

Bobot Isi Pasir = 1.400 Kg/m3


Bobot Isi Kerikil = 1.350 Kg/m3
Buckling Factor Pasir = 20 %
4.1.1.17a Pembesian 10 Kg dengan Besi Polos
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Besi Beton Polos kg
Kawat Beton kg
. 4.1.1.17a.1 Pembesian 1 Kg dengan Besi Polos
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Besi Beton Polos kg
Kawat Beton kg

harga Satuan / 10 kg 136,000.00


harga Satuan / 1 kg 13,600.00

4.1.1.17b Pembesian 10 Kg dengan Besi Ulir


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Besi Beton Ulir kg
Kawat Beton kg

. 4.1.1.17b.1 Pembesian 1 Kg dengan Besi Ulir


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Besi Beton Polos kg
Kawat Beton kg

harga Satuan / 10 kg 154,100.00


harga Satuan / 1 kg 15,400.00

4.1.1.20 1 m2, Pemasangan Bekesting untuk Pondasi


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 10 cm kg
Minyak Bekesting ltr

Asumsi : Pemakaian 2 x
4.1.1.21 1 m2, Pemasangan Bekesting untuk Sloof
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 10 cm kg
Minyak Bekesting ltr

Asumsi : Pemakaian 2 x

4.1.1.22 1 m2, Pemasangan Bekesting untuk Kolom


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg

Asumsi : Pemakaian 2 x

4.1.1.23 1 m2, Pemasangan Bekesting untuk Balok


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg
Asumsi : Pemakaian 2 x

4.1.1.24 1 m2, Pemasangan Bekesting untuk Lantai


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg

Asumsi : Pemakaian 2 x

4.1.1.25 1 m2, Pemasangan Bekesting untuk Dinding


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Kelas III m3
Paku 5 - 12 cm kg
Minyak Bekesting ltr
Kayu Kelas II m3
Plywood T = 9 mm lbr
Dolken Kayu Ø 8 - 10 cm x 400 btg
Penjaga Jarak Bekisting / Spacer bh

Asumsi : Pemakaian 2 x
Taksir Pekerjaan Lain - Lain ( Membongkar dan Menyiram Beton )
A. TENAGA KERJA
Pekerja L.01 Oh

Suplemen 1 Membuat Tapak Pondasi Beton bertulang


Bekisting / Cetakan Beton AHSP. 4.1.1.20 m2
Pekerjaan Besi Polos AHSP. 4.1.1.17a kg
Beton Cor K. 200 4.1.1.6 m3
Pekerjaan Lain-Lain Taksir ls

Suplemen 2 Membuat Plat Lantai Beton bertulang


Bekisting / Cetakan Beton AHSP. 4.1.1.25 m2
Pekerjaan Besi Polos AHSP. 4.1.1.17a kg
Beton Cor K. 250 4.1.1.25 m3
Pekerjaan Lain-Lain Taksir ls

4.2.1 HARGA SATUAN PEKERJAAN BESI / ALUMINIUM


4.2.1.22 1 m2, Pemasangan Kuda-Kuda Baja Ringan + Gording
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Baja Ringan Zincalume Truss m1
Baja Ringan Gording U 0.75 m1
Paku Ulir Profil C bh
Paku Ulir Goeding U bh

4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


4.4.1.7 1 m2, Pemasangan Batu Bata Tebal 1/2 Batu Campuran 1Pc : 2Pp
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Bata Merah bh
Portland Cement kg
Pasir Pasang m3

. 4.4.1.9 1 m2, Pemasangan Batu Bata Tebal 1/2 Batu Campuran 1Pc : 4Pp
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Bata Merah bh
Portland Cement kg
Pasir Pasang m3

. 4.4.2 HARGA SATUAN PEKERJAAN PLASTERAN


4.4.2.2 1 m2, Pemasangan Plasteran 1Pc : 2Pp Tebal = 15 mm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Pasang m3
4.4.2.3 1 m2, Pemasangan Plasteran 1Pc : 3Pp Tebal = 15 mm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Pasang m3

. 4.4.2.4 1 m2, Pemasangan Plasteran 1Pc : 4Pp Tebal = 15 mm


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg
Pasir Pasang m3

4.4.2.27 1 m2, Pemasangan Acian


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Portland Cement kg

4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


4.4.3.35 1 m2, Pemasangan Lantai Keramik uk. 30 x 30 cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Keramik uk. 30 x 30 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3

4.4.3.35.a 1 m2, Pemasangan Lantai Keramik uk. 40 x 40 cm


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Keramik uk. 40 x 25 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3

4.4.3.36 1 m2, Pemasangan Lantai Keramik uk. 20 x 20 cm


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Keramik uk. 20 x 20 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3
4.4.3.36.a 1 m2, Pemasangan Lantai Keramik uk. 25 x 25 cm
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Keramik uk. 25 x 25 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3

4.4.3.36.a.1 1 m2, Pemasangan Lantai Granit uk. 60 x 60 cm


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Granit uk. 60 x 60 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3

4.4.3.54 1 m2, Pemasangan Dinding Keramik uk. 25 x 40 cm


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Keramik uk. 25 x 40 cm bh
Semen Portland kg
Semen Warna kg
Pasir Pasang m3

4.5.1 HARGA SATUAN PEKERJAAN LANGIT - LANGIT (PLAFOND)


. 4.5.1.5 1 m2, Pemasangan Langit Langit Tripleks, uk. 120 x 240 cm, tebal,
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Tripleks lbr
Paku Tripleks kg

4.5.1.9 1 m1, Pemasangan List Langit Langit Kayu Profil


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
List Kayu Profil m1
Paku kg

Taksir 1 M2, Pemasangan Plafond PVC


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Papan PVC (L.20 cm T.8 mm ) M2
Rangka Akustik M'
Profil PVC M'
Lem Bh

4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


4.5.2.39 1 m2, Pemasangan Atap Seng Gelombang
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Seng Gelombang, 3" x 6" lbr
Paku Biasa kg

4.5.2.40 1 m1, Pemasangan Nok Seng Gelombang


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Seng Plat, 3" x 6" bjls, 28 lbr
Paku Biasa kg

. 4.5.2.43 1 m2, Pemasangan Atap Seng Genteng Metal


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Seng Genteng Metal 0,35 mm M2
Paku Ulir bh

4.5.2.44 1 m2, Pemasangan Atap Seng Spandek


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Seng Spandek 0,30 mm M2
Paku Ulir bh

4.6.1 HARGA SATUAN PEKERJAAN KAYU


4.6.1.1 1 m3, Pembuatan dan Pemasangan Kusen Pintu dan Jendela, Kayu K
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Balok Kayu m3
Paku, 10 cm kg
Lem Kayu kg

. 4.6.1.2 1 m3, Pembuatan dan Pemasangan Kusen Pintu dan Jendela, Kayu K
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Balok Kayu m3
Paku, 10 cm kg
Lem Kayu kg
. 4.6.1.13 1 m3, Pemasangan Konstruksi Kuda - Kuda Konvensional, Kayu Ke
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Balok Kayu m3
Besi Strip kg
Paku, 12 cm kg

4.6.1.14 1 m3, Pemasangan Konstruksi Kuda - Kuda Expose, Kayu Kelas I


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Balok Kayu m3
Besi Strip kg
Paku, 12 cm kg

4.6.1.20 1 m2, Pemasangan Rangka Langit Langit (60 x 60 cm), Kayu Kelas I
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kaso Kaso, 5 x 7 cm m3
Paku, 7 - 10 cm kg

4.6.1.21 1 m1, Pemasangan Listplank Uk. (3 x 20 cm), Kayu Kelas I dan II


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh
B. BAHAN / MATERIAL
Kayu Papan m3
Paku, 5 - 7 cm kg

4.6.1.22 1 m1, Pemasangan Listplank Uk. (3 x 30 cm), Kayu Kelas I dan II


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Kayu Papan m3
Paku, 5 - 7 cm kg

4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


4.7.1.1 1 m2, Pengikisan / Pengerokan Permukaan Cat Lama
A. TENAGA KERJA
Pekerja L.01 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Soda Api kg

. 4.7.1.4 1 m2, Pengecatan Bidang Kayu Baru (1 lps Plamur, 1 Lps Cat Dasar
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Cat Menie kg
Plamuur kg
Cat Dasar kg
Cat Penutup kg
Kuas bh
Pengencer kg
Ampelas lbr
4.7.1.10 1 m2, Pengecatan Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasa
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Plamuur kg
Cat Dasar kg
Cat Penutup kg

4.7.1.11 1 m2, Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Pe
A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Cat Dasar kg
Cat Penutup Jotun kg

Taksir 1 m2, Pemasangan Paving Blok


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
Kepala Tukang L.03 Oh
Mandor L,04 Oh

B. BAHAN / MATERIAL
Paving Blok Bh
Ongkos Angkut Bh
Pasir Urug M3
Alat Bantu M2

Taksir 1 Unit, Pemasangan AC


A. TENAGA KERJA
Pekerja L.01 Oh
Tukang L.02 Oh
B. BAHAN / MATERIAL
AC LG T10EV3 Unit
Ongkos Angkut Unit

Taksir 1 Unit, Pemasangan Jendela UPVC J1


A. TENAGA KERJA
Upah Pembentukan Lubang M Oh

B. BAHAN / MATERIAL
Jendela UPVC Terpasang M2
Taksir 1 Unit, Pemasangan Jendela UPVC J2
A. TENAGA KERJA
Upah Pembentukan Lubang M Oh

B. BAHAN / MATERIAL

Jendela UPVC Terpasang M2

Taksir 1 Unit, Pemasangan Jendela UPVC V1. ( VINTALASI )


A. TENAGA KERJA
Upah Pembentukan Lubang M Oh

B. BAHAN / MATERIAL

Jendela UPVC Terpasang M2


Taksir 1 Unit, Pemasangan Pintu UPVC P1
A. TENAGA KERJA
Upah Pembentukan Lubang M Oh

B. BAHAN / MATERIAL
Pintu UPVC M2

Taksir 1 Titik Instalasi Penerangan, Kabel NYA 2,5 mm dalam Pipa PVC
A. TENAGA KERJA
Upah

B. BAHAN / MATERIAL
Kabel NYA 2,5 mm M1
Pipa Listrik M1
- Bh
Elbow Bh
T Dus Bh

Taksir 1 Unit MCB


A. TENAGA KERJA
Upah

B. BAHAN / MATERIAL
Pipa Listrik 5/8 Btg
Kabel NYM 3 x2.5 mm M
T dus Bh
L Bow Bh
Klem Biasa Bh
MCB 16 A Bh
P CIPTA KARYA
Satuan Pekerjaan (AHSP)
15%
Kerusakan Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu Babussalam

Koefisien Harga Satuan Jumlah Harga

0.100 100,000.00 10,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.005 100,000.00 500.00
Jumlah Tenaga Kerja Rp 21,500.00

0.120 2,800,000.00 336,000.00


0.020 17,000.00 340.00
0.007 2,800,000.00 19,600.00
Jumlah Harga bahan Rp 355,940.00
Jumlah ( A + B ) Rp 377,440.00
Overhead & Profit(15%) Rp 56,616.00
Harga Satuan Pekerjaan Rp 434,000.00

0.100 100,000.00 10,000.00


0.050 100,000.00 5,000.00
Jumlah Tenaga Kerja Rp 15,000.00
Overhead & Profit(15%) Rp 2,250.00
Harga Satuan Pekerjaan Rp 17,200.00

13.334 100,000.00 1,333,400.00


0.666 100,000.00 66,600.00
Jumlah Tenaga Kerja Rp 1,400,000.00
Overhead & Profit(15%) Rp 210,000.00
Harga Satuan Pekerjaan Rp 1,610,000.00

0.300 100,000.00 30,000.00


0.050 100,000.00 5,000.00
Jumlah Tenaga Kerja Rp 35,000.00
Overhead & Profit(15%) Rp 5,250.00
Harga Satuan Pekerjaan Rp 40,200.00

0.750 100,000.00 75,000.00


0.025 100,000.00 2,500.00
Jumlah Tenaga Kerja Rp 77,500.00
Overhead & Profit(15%) Rp 11,625.00
Harga Satuan Pekerjaan Rp 89,100.00

1.000 100,000.00 100,000.00


0.032 100,000.00 3,200.00
Jumlah Tenaga Kerja Rp 103,200.00
Overhead & Profit(15%) Rp 15,480.00
Harga Satuan Pekerjaan Rp 118,600.00

1.500 100,000.00 150,000.00


0.060 100,000.00 6,000.00
Jumlah Tenaga Kerja Rp 156,000.00
Overhead & Profit(15%) Rp 23,400.00
Harga Satuan Pekerjaan Rp 179,400.00

1.200 100,000.00 120,000.00


0.045 100,000.00 4,500.00
Jumlah Tenaga Kerja Rp 124,500.00
Overhead & Profit(15%) Rp 18,675.00
Harga Satuan Pekerjaan Rp 143,100.00

0.500 100,000.00 50,000.00


0.050 100,000.00 5,000.00
Jumlah Tenaga Kerja Rp 55,000.00
Overhead & Profit(15%) Rp 8,250.00
Harga Satuan Pekerjaan Rp 63,200.00
0.300 100,000.00 30,000.00
0.010 100,000.00 1,000.00
Jumlah Tenaga Kerja Rp 31,000.00

1.200 83,000.00 99,600.00


Jumlah Harga bahan Rp 99,600.00
Jumlah ( A + B ) Rp 130,600.00
Overhead & Profit(15%) Rp 19,590.00
Harga Satuan Pekerjaan Rp 150,100.00

0.250 100,000.00 25,000.00


0.025 100,000.00 2,500.00
Jumlah Tenaga Kerja Rp 27,500.00

1.200 306,000.00 367,200.00


Jumlah Harga bahan Rp 367,200.00
Jumlah ( A + B ) Rp 394,700.00
Overhead & Profit(15%) Rp 59,205.00
Harga Satuan Pekerjaan Rp 453,900.00

0.300 100,000.00 30,000.00


0.010 100,000.00 1,000.00
Jumlah Tenaga Kerja Rp 31,000.00

1.200 69,000.00 82,800.00


Jumlah Harga bahan Rp 82,800.00
Jumlah ( A + B ) Rp 113,800.00
Overhead & Profit(15%) Rp 17,070.00
Harga Satuan Pekerjaan Rp 130,800.00

1.500 100,000.00 150,000.00


0.750 100,000.00 75,000.00
0.075 100,000.00 7,500.00
0.075 100,000.00 7,500.00
Jumlah Tenaga Kerja Rp 240,000.00

1.200 250,000.00 300,000.00


202.000 1,507.50 304,515.00
0.485 160,000.00 77,600.00
Jumlah Harga bahan Rp 682,115.00
Jumlah ( A + B ) Rp 922,115.00
Overhead & Profit(15%) Rp 138,317.25
Harga Satuan Pekerjaan Rp 1,060,400.00
1.500 100,000.00 150,000.00
0.750 100,000.00 75,000.00
0.075 100,000.00 7,500.00
0.075 100,000.00 7,500.00
Jumlah Tenaga Kerja Rp 240,000.00

1.200 250,000.00 300,000.00


163.000 1,507.50 245,722.50
0.520 160,000.00 83,200.00
Jumlah Harga bahan Rp 628,922.50
Jumlah ( A + B ) Rp 868,922.50
Overhead & Profit(15%) Rp 130,338.38
Harga Satuan Pekerjaan Rp 999,200.00

0.780 100,000.00 78,000.00


0.390 100,000.00 39,000.00
0.039 100,000.00 3,900.00
0.039 100,000.00 3,900.00
Jumlah Tenaga Kerja Rp 124,800.00

1.200 250,000.00 300,000.00


0.432 83,000.00 35,856.00
Jumlah Harga bahan Rp 335,856.00
Jumlah ( A + B ) Rp 460,656.00
Overhead & Profit(15%) Rp 69,098.40
Harga Satuan Pekerjaan Rp 529,700.00
Slump (12±2) cm, w/c = 0,87

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

247.000 1,507.50 372,352.50


869.000 100.00 86,900.00
999.000 286.67 286,380.00
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 769,282.50
Jumlah ( A + B ) Rp 972,882.50
Overhead & Profit(15%) Rp 145,932.38
Harga Satuan Pekerjaan Rp 1,118,800.00
, Slump (12±2) cm, w/c = 0,66

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

326.000 1,507.50 491,445.00


760.000 100.00 76,000.00
1,029.000 286.67 294,980.00
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 886,075.00
Jumlah ( A + B ) Rp 1,089,675.00
Overhead & Profit(15%) Rp 163,451.25
Harga Satuan Pekerjaan Rp 1,253,100.00
, Slump (12±2) cm, w/c = 0,61

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

352.000 1,507.50 530,640.00


731.000 100.00 73,100.00
1,031.000 286.67 295,553.33
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 922,943.33
Jumlah ( A + B ) Rp 1,126,543.33
Overhead & Profit(15%) Rp 168,981.50
Harga Satuan Pekerjaan Rp 1,295,500.00
, Slump (12±2) cm, w/c = 0,58

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

371.000 1,507.50 559,282.50


698.000 100.00 69,800.00
1,047.000 286.67 300,140.00
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 952,872.50
Jumlah ( A + B ) Rp 1,156,472.50
Overhead & Profit(15%) Rp 173,470.88
Harga Satuan Pekerjaan Rp 1,329,900.00
, Slump (12±2) cm, w/c = 0,56

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

384.000 1,507.50 578,880.00


692.000 100.00 69,200.00
1,039.000 286.67 297,846.67
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 969,576.67
Jumlah ( A + B ) Rp 1,173,176.67
Overhead & Profit(15%) Rp 175,976.50
Harga Satuan Pekerjaan Rp 1,349,100.00
Slump (12±2) cm, w/c = 0,53

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

406.000 1,507.50 612,045.00


684.000 100.00 68,400.00
1,026.000 286.67 294,120.00
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 998,215.00
Jumlah ( A + B ) Rp 1,201,815.00
Overhead & Profit(15%) Rp 180,272.25
Harga Satuan Pekerjaan Rp 1,382,000.00
Slump (12±2) cm, w/c = 0,52

1.650 100,000.00 165,000.00


0.275 100,000.00 27,500.00
0.028 100,000.00 2,800.00
0.083 100,000.00 8,300.00
Jumlah Tenaga Kerja Rp 203,600.00

413.000 1,507.50 622,597.50


681.000 100.00 68,100.00
1,021.000 286.67 292,686.67
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 1,007,034.17
Jumlah ( A + B ) Rp 1,210,634.17
Overhead & Profit(15%) Rp 181,595.13
Harga Satuan Pekerjaan Rp 1,392,200.00
Slump (12±2) cm, w/c = 0,49

2.100 100,000.00 210,000.00


0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.105 100,000.00 10,500.00
Jumlah Tenaga Kerja Rp 259,000.00

439.000 1,507.50 661,792.50


670.000 100.00 67,000.00
1,006.000 286.67 288,386.67
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 1,040,829.17
Jumlah ( A + B ) Rp 1,299,829.17
Overhead & Profit(15%) Rp 194,974.38
Harga Satuan Pekerjaan Rp 1,494,800.00
Slump (12±2) cm, w/c = 0,48

2.100 100,000.00 210,000.00


0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.105 100,000.00 10,500.00
Jumlah Tenaga Kerja Rp 259,000.00

448.000 1,507.50 675,360.00


667.000 100.00 66,700.00
1,000.000 286.67 286,666.67
215.000 110.00 23,650.00
Jumlah Harga bahan Rp 1,052,376.67
Jumlah ( A + B ) Rp 1,311,376.67
Overhead & Profit(15%) Rp 196,706.50
Harga Satuan Pekerjaan Rp 1,508,000.00

0.070 100,000.00 7,000.00


0.070 100,000.00 7,000.00
0.007 100,000.00 700.00
0.004 100,000.00 400.00
Jumlah Tenaga Kerja Rp 15,100.00

10.500 9,500.00 99,750.00


0.150 23,200.00 3,480.00
Jumlah Harga bahan Rp 103,230.00
Jumlah ( A + B ) Rp 118,330.00
Overhead & Profit(15%) Rp 17,749.50
Harga Satuan Pekerjaan Rp 136,000.00
0.007 100,000.00 700.00
0.007 100,000.00 700.00
0.001 100,000.00 70.00
0.000 100,000.00 40.00
Jumlah Tenaga Kerja Rp 1,510.00

1.050 9,500.00 9,975.00


0.015 23,200.00 348.00
Jumlah Harga bahan Rp 10,323.00
Jumlah ( A + B ) Rp 11,833.00
Overhead & Profit(15%) Rp 1,774.95
Harga Satuan Pekerjaan Rp 13,600.00

0.070 100,000.00 7,000.00


0.070 100,000.00 7,000.00
0.007 100,000.00 700.00
0.004 100,000.00 400.00
Jumlah Tenaga Kerja Rp 15,100.00

10.500 11,000.00 115,500.00


0.150 23,200.00 3,480.00
Jumlah Harga bahan Rp 118,980.00
Jumlah ( A + B ) Rp 134,080.00
Overhead & Profit(15%) Rp 20,112.00
Harga Satuan Pekerjaan Rp 154,100.00

0.007 100,000.00 700.00


0.007 100,000.00 700.00
0.001 100,000.00 70.00
0.000 100,000.00 40.00
Jumlah Tenaga Kerja Rp 1,510.00

1.050 11,000.00 11,550.00


0.015 23,200.00 348.00
Jumlah Harga bahan Rp 11,898.00
Jumlah ( A + B ) Rp 13,408.00
Overhead & Profit(15%) Rp 2,011.20
Harga Satuan Pekerjaan Rp 15,400.00

0.520 100,000.00 52,000.00


0.260 100,000.00 26,000.00
0.026 100,000.00 2,600.00
0.026 100,000.00 2,600.00
Jumlah Tenaga Kerja Rp 83,200.00
0.040 2,800,000.00 112,000.00
0.300 17,000.00 5,100.00
0.100 15,200.00 1,520.00
Jumlah Harga bahan Rp 118,620.00
Jumlah ( A + B ) Rp 201,820.00
Jumlah / 2 Rp 100,910.00
Overhead & Profit(15%) Rp 30,273.00
Harga Satuan Pekerjaan Rp 131,100.00
0.520 100,000.00 52,000.00
0.260 100,000.00 26,000.00
0.026 100,000.00 2,600.00
0.026 100,000.00 2,600.00
Jumlah Tenaga Kerja Rp 83,200.00

0.045 2,800,000.00 126,000.00


0.300 17,000.00 5,100.00
0.100 15,200.00 1,520.00
Jumlah Harga bahan Rp 132,620.00
Jumlah ( A + B ) Rp 215,820.00
Jumlah / 2 Rp 107,910.00
Overhead & Profit(15%) Rp 32,373.00
Harga Satuan Pekerjaan Rp 140,200.00

0.660 100,000.00 66,000.00


0.330 100,000.00 33,000.00
0.033 100,000.00 3,300.00
0.033 100,000.00 3,300.00
Jumlah Tenaga Kerja Rp 105,600.00

0.040 2,800,000.00 112,000.00


0.400 17,000.00 6,800.00
0.200 15,200.00 3,040.00
0.015 4,000,000.00 60,000.00
0.350 130,000.00 45,500.00
2.000 15,000.00 30,000.00
Jumlah Harga bahan Rp 257,340.00
Jumlah ( A + B ) Rp 362,940.00
Jumlah / 2 Rp 181,470.00
Overhead & Profit(15%) Rp 54,441.00
Harga Satuan Pekerjaan Rp 235,900.00

0.660 100,000.00 66,000.00


0.330 100,000.00 33,000.00
0.033 100,000.00 3,300.00
0.033 100,000.00 3,300.00
Jumlah Tenaga Kerja Rp 105,600.00

0.040 2,800,000.00 112,000.00


0.400 17,000.00 6,800.00
0.200 15,200.00 3,040.00
0.018 4,000,000.00 72,000.00
0.350 130,000.00 45,500.00
2.000 15,000.00 30,000.00
Jumlah Harga bahan Rp 269,340.00
Jumlah ( A + B ) Rp 374,940.00
Jumlah / 2 Rp 187,470.00
Overhead & Profit(15%) Rp 56,241.00
Harga Satuan Pekerjaan Rp 243,700.00

0.660 100,000.00 66,000.00


0.330 100,000.00 33,000.00
0.033 100,000.00 3,300.00
0.033 100,000.00 3,300.00
Jumlah Tenaga Kerja Rp 105,600.00

0.040 2,800,000.00 112,000.00


0.400 17,000.00 6,800.00
0.200 15,200.00 3,040.00
0.015 4,000,000.00 60,000.00
0.350 130,000.00 45,500.00
6.000 15,000.00 90,000.00
Jumlah Harga bahan Rp 317,340.00
Jumlah ( A + B ) Rp 422,940.00
Jumlah / 2 Rp 211,470.00
Overhead & Profit(15%) Rp 63,441.00
Harga Satuan Pekerjaan Rp 274,900.00

0.660 100,000.00 66,000.00


0.330 100,000.00 33,000.00
0.033 100,000.00 3,300.00
0.033 100,000.00 3,300.00
Jumlah Tenaga Kerja Rp 105,600.00

0.030 2,800,000.00 84,000.00


0.400 17,000.00 6,800.00
0.200 15,200.00 3,040.00
0.020 4,000,000.00 80,000.00
0.350 130,000.00 45,500.00
3.000 15,000.00 45,000.00
4.000 1,500.00 6,000.00
Jumlah Harga bahan Rp 270,340.00
Jumlah ( A + B ) Rp 375,940.00
Jumlah / 2 Rp 187,970.00
Overhead & Profit(15%) Rp 56,391.00
Harga Satuan Pekerjaan Rp 244,300.00
1.000 100,000.00 100,000.00
Jumlah Tenaga Kerja Rp 100,000.00
Harga Satuan Pekerjaan Rp 100,000.00

1.667 131,100.00 218,543.70


191.302 13,600.00 2,601,707.20
1.000 1,295,500.00 1,295,500.00
1.000 100,000.00 100,000.00
Jumlah Harga bahan Rp 4,215,750.90
Overhead & Profit(15%) Rp 632,362.64
Harga Satuan Pekerjaan Rp 4,848,100.00

3.889 244,300.00 950,082.70


141.448 13,600.00 1,923,692.80
1.000 1,295,500.00 1,295,500.00
1.000 100,000.00 100,000.00
Jumlah Harga bahan Rp 4,269,275.50
Overhead & Profit(15%) Rp 640,391.33
Harga Satuan Pekerjaan Rp 4,909,600.00

0.140 100,000.00 14,000.00


0.400 100,000.00 4,000.00
0.040 100,000.00 7,000.00
0.070 100,000.00 7,000.00
Jumlah Tenaga Kerja Rp 32,000.00

4.260 16,500.00 70,290.00


4.930 8,000.00 39,440.00
14.000 200.00 2,800.00
1.600 200.00 320.00
Jumlah Harga bahan Rp 112,850.00
Jumlah ( A + B ) Rp 144,850.00
Overhead & Profit(15%) Rp 21,727.50
Harga Satuan Pekerjaan Rp 166,500.00

puran 1Pc : 2Pp

0.300 100,000.00 30,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.015 100,000.00 1,500.00
Jumlah Tenaga Kerja Rp 42,500.00

70.000 670.00 46,900.00


18.950 1,507.50 28,567.13
0.038 160,000.00 6,080.00
Jumlah Harga bahan Rp 81,547.13
Jumlah ( A + B ) Rp 124,047.13
Overhead & Profit(15%) Rp 18,607.07
Harga Satuan Pekerjaan Rp 142,600.00
puran 1Pc : 4Pp

0.300 100,000.00 30,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.015 100,000.00 1,500.00
Jumlah Tenaga Kerja Rp 42,500.00

70.000 670.00 46,900.00


11.500 1,507.50 17,336.25
0.043 160,000.00 6,880.00
Jumlah Harga bahan Rp 71,116.25
Jumlah ( A + B ) Rp 113,616.25
Overhead & Profit(15%) Rp 17,042.44
Harga Satuan Pekerjaan Rp 130,600.00

0.300 100,000.00 30,000.00


0.150 100,000.00 15,000.00
0.015 100,000.00 1,500.00
0.015 100,000.00 1,500.00
Jumlah Tenaga Kerja Rp 48,000.00

10.224 1,507.50 15,412.68


0.020 160,000.00 3,200.00
Jumlah Harga bahan Rp 18,612.68
Jumlah ( A + B ) Rp 66,612.68
Overhead & Profit(15%) Rp 9,991.90
Harga Satuan Pekerjaan Rp 76,600.00
0.300 100,000.00 30,000.00
0.150 100,000.00 15,000.00
0.015 100,000.00 1,500.00
0.015 100,000.00 1,500.00
Jumlah Tenaga Kerja Rp 48,000.00

7.776 1,507.50 11,722.32


0.023 160,000.00 3,680.00
Jumlah Harga bahan Rp 15,402.32
Jumlah ( A + B ) Rp 63,402.32
Overhead & Profit(15%) Rp 9,510.35
Harga Satuan Pekerjaan Rp 72,900.00

0.300 100,000.00 30,000.00


0.150 100,000.00 15,000.00
0.015 100,000.00 1,500.00
0.015 100,000.00 1,500.00
Jumlah Tenaga Kerja Rp 48,000.00

6.240 1,507.50 9,406.80


0.024 160,000.00 3,840.00
Jumlah Harga bahan Rp 13,246.80
Jumlah ( A + B ) Rp 61,246.80
Overhead & Profit(15%) Rp 9,187.02
Harga Satuan Pekerjaan Rp 70,400.00

0.200 100,000.00 20,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.010 100,000.00 1,000.00
Jumlah Tenaga Kerja Rp 32,000.00

3.250 1,507.50 4,899.38


Jumlah Harga bahan Rp 4,899.38
Jumlah ( A + B ) Rp 36,899.38
Overhead & Profit(15%) Rp 5,534.91
Harga Satuan Pekerjaan Rp 42,400.00
AI DAN DINDING 10%

0.700 100,000.00 70,000.00


0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.035 100,000.00 3,500.00
Jumlah Tenaga Kerja Rp 112,000.00
11.870 7,000.00 83,090.00
10.000 1,507.50 15,075.00
1.050 3,060.00 3,213.00
0.045 160,000.00 7,200.00
Jumlah Harga bahan Rp 108,578.00
Jumlah ( A + B ) Rp 220,578.00
Overhead & Profit(15%) Rp 33,086.70
Harga Satuan Pekerjaan Rp 253,600.00

0.700 100,000.00 70,000.00


0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.035 100,000.00 3,500.00
Jumlah Tenaga Kerja Rp 112,000.00

6.630 11,000.00 72,930.00


10.000 1,507.50 15,075.00
1.050 3,060.00 3,213.00
0.045 160,000.00 7,200.00
Jumlah Harga bahan Rp 98,418.00
Jumlah ( A + B ) Rp 210,418.00
Overhead & Profit(15%) Rp 31,562.70
Harga Satuan Pekerjaan Rp 241,900.00

0.700 100,000.00 70,000.00


0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.035 100,000.00 3,500.00
Jumlah Tenaga Kerja Rp 112,000.00

25.000 4,500.00 112,500.00


10.400 1,507.50 15,678.00
1.250 3,060.00 3,825.00
0.045 160,000.00 7,200.00
Jumlah Harga bahan Rp 139,203.00
Jumlah ( A + B ) Rp 251,203.00
Overhead & Profit(15%) Rp 37,680.45
Harga Satuan Pekerjaan Rp 288,800.00
0.700 100,000.00 70,000.00
0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.035 100,000.00 3,500.00
Jumlah Tenaga Kerja Rp 112,000.00

16.000 3,000.00 48,000.00


10.400 1,507.50 15,678.00
1.250 3,060.00 3,825.00
0.045 160,000.00 7,200.00
Jumlah Harga bahan Rp 74,703.00
Jumlah ( A + B ) Rp 186,703.00
Overhead & Profit(15%) Rp 28,005.45
Harga Satuan Pekerjaan Rp 214,700.00

0.700 100,000.00 70,000.00


0.350 100,000.00 35,000.00
0.035 100,000.00 3,500.00
0.035 100,000.00 3,500.00
Jumlah Tenaga Kerja Rp 112,000.00
4.000
2.778 77,500.00 215,277.78 9.600
10.400 1,507.50 15,678.00 0.045
1.250 3,060.00 3,825.00 1.500
0.045 160,000.00 7,200.00
Jumlah Harga bahan Rp 241,980.78
Jumlah ( A + B ) Rp 353,980.78
Overhead & Profit(15%) Rp 53,097.12
Harga Satuan Pekerjaan Rp 407,000.00

0.090 100,000.00 9,000.00


0.450 100,000.00 45,000.00
0.045 100,000.00 4,500.00
0.045 100,000.00 4,500.00
Jumlah Tenaga Kerja Rp 63,000.00

10.000 4,500.00 45,000.00


9.300 1,507.50 14,019.75
1.940 3,060.00 5,936.40
0.350 160,000.00 56,000.00
Jumlah Harga bahan Rp 120,956.15
Jumlah ( A + B ) Rp 183,956.15
Overhead & Profit(15%) Rp 27,593.42
Harga Satuan Pekerjaan Rp 211,500.00

x 240 cm, tebal, 3 mm, 4 mm, 6 mm


0.100 100,000.00 10,000.00
0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.005 100,000.00 500.00
Jumlah Tenaga Kerja Rp 21,500.00

0.375 55,000.00 20,625.00


0.030 19,000.00 570.00
Jumlah Harga bahan Rp 21,195.00
Jumlah ( A + B ) Rp 42,695.00
Overhead & Profit(15%) Rp 6,404.25
Harga Satuan Pekerjaan Rp 49,000.00

0.050 100,000.00 5,000.00


0.050 100,000.00 5,000.00
0.005 100,000.00 500.00
0.003 100,000.00 300.00
Jumlah Tenaga Kerja Rp 10,800.00

1.050 7,000.00 7,350.00


0.010 17,000.00 170.00
Jumlah Harga bahan Rp 7,520.00
Jumlah ( A + B ) Rp 18,320.00
Overhead & Profit(15%) Rp 2,748.00
Harga Satuan Pekerjaan Rp 21,000.00

0.100 100,000.00 10,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.005 100,000.00 500.00
Jumlah Tenaga Kerja Rp 21,500.00
180
1.000 83,000.00 83,000.00
2.400 9,000.00 21,600.00 54000
1.000 22,000.00 22,000.00
1.000 11,000.00 11,000.00
Jumlah Harga bahan Rp 137,600.00
Jumlah ( A + B ) Rp 159,100.00
Overhead & Profit(15%) Rp 23,865.00
Harga Satuan Pekerjaan Rp 182,900.00
10%

0.120 100,000.00 12,000.00


0.060 100,000.00 6,000.00
0.006 100,000.00 600.00
0.006 100,000.00 600.00
Jumlah Tenaga Kerja Rp 19,200.00
0.700 55,000.00 38,500.00
0.020 17,000.00 340.00
Jumlah Harga bahan Rp 38,840.00
Jumlah ( A + B ) Rp 58,040.00
Overhead & Profit(15%) Rp 8,706.00
Harga Satuan Pekerjaan Rp 66,700.00

0.150 100,000.00 15,000.00


0.070 100,000.00 7,000.00
0.007 100,000.00 700.00
0.006 100,000.00 600.00
Jumlah Tenaga Kerja Rp 23,300.00

0.300 35,000.00 10,500.00


0.040 17,000.00 680.00
Jumlah Harga bahan Rp 11,180.00
Jumlah ( A + B ) Rp 34,480.00
Overhead & Profit(15%) Rp 5,172.00
Harga Satuan Pekerjaan Rp 39,600.00

0.200 100,000.00 20,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.010 100,000.00 1,000.00
Jumlah Tenaga Kerja Rp 32,000.00

1.020 70,000.00 71,400.00


9.000 200.00 1,800.00
Jumlah Harga bahan Rp 73,200.00
Jumlah ( A + B ) Rp 105,200.00
Overhead & Profit(15%) Rp 15,780.00
Harga Satuan Pekerjaan Rp 120,900.00

0.200 100,000.00 20,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.010 100,000.00 1,000.00
Jumlah Tenaga Kerja Rp 32,000.00

1.020 45,000.00 45,900.00


9.000 200.00 1,800.00
Jumlah Harga bahan Rp 47,700.00
Jumlah ( A + B ) Rp 79,700.00
Overhead & Profit(15%) Rp 11,955.00
Harga Satuan Pekerjaan Rp 91,600.00
10%
an Jendela, Kayu Kelas I
7.000 100,000.00 700,000.00
21.000 100,000.00 2,100,000.00
2.100 100,000.00 210,000.00
0.350 100,000.00 35,000.00
Jumlah Tenaga Kerja Rp 3,045,000.00

1.100 5,000,000.00 5,500,000.00


1.250 17,000.00 21,250.00
1.000 130,500.00 130,500.00
Jumlah Harga bahan Rp 5,651,750.00
Jumlah ( A + B ) Rp 8,696,750.00
Overhead & Profit(15%) Rp 1,304,512.50
Harga Satuan Pekerjaan Rp 10,001,200.00
an Jendela, Kayu Kelas II dan III

6.000 100,000.00 600,000.00


18.000 100,000.00 1,800,000.00
1.800 100,000.00 180,000.00
0.300 100,000.00 30,000.00
Jumlah Tenaga Kerja Rp 2,610,000.00

1.200 4,000,000.00 4,800,000.00


1.250 17,000.00 21,250.00
1.000 130,500.00 130,500.00
Jumlah Harga bahan Rp 4,951,750.00
Jumlah ( A + B ) Rp 7,561,750.00
Overhead & Profit(15%) Rp 1,134,262.50
Harga Satuan Pekerjaan Rp 8,696,000.00
nsional, Kayu Kelas I, II dan III

4.000 100,000.00 400,000.00


12.000 100,000.00 1,200,000.00
1.200 100,000.00 120,000.00
0.200 100,000.00 20,000.00
Jumlah Tenaga Kerja Rp 1,740,000.00

1.100 4,000,000.00 4,400,000.00


15.000 24,000.00 360,000.00
5.600 17,000.00 95,200.00
Jumlah Harga bahan Rp 4,855,200.00
Jumlah ( A + B ) Rp 6,595,200.00
Overhead & Profit(15%) Rp 989,280.00
Harga Satuan Pekerjaan Rp 7,584,400.00
e, Kayu Kelas I

6.700 100,000.00 670,000.00


20.100 100,000.00 2,010,000.00
2.010 100,000.00 201,000.00
0.335 100,000.00 33,500.00
Jumlah Tenaga Kerja Rp 2,914,500.00

1.200 5,000,000.00 6,000,000.00


15.000 24,000.00 360,000.00
5.600 17,000.00 95,200.00
Jumlah Harga bahan Rp 6,455,200.00
Jumlah ( A + B ) Rp 9,369,700.00
Overhead & Profit(15%) Rp 1,405,455.00
Harga Satuan Pekerjaan Rp 10,775,100.00
cm), Kayu Kelas II dan III

0.200 100,000.00 20,000.00


0.300 100,000.00 30,000.00
0.030 100,000.00 3,000.00
0.010 100,000.00 1,000.00
Jumlah Tenaga Kerja Rp 54,000.00

0.016 2,800,000.00 45,640.00


0.250 17,000.00 4,250.00
Jumlah Harga bahan Rp 49,890.00
Jumlah ( A + B ) Rp 103,890.00
Overhead & Profit(15%) Rp 15,583.50
Harga Satuan Pekerjaan Rp 119,400.00
u Kelas I dan II

0.100 100,000.00 10,000.00


0.200 100,000.00 20,000.00
0.020 100,000.00 2,000.00
0.005 100,000.00 500.00
Jumlah Tenaga Kerja Rp 32,500.00

0.011 4,000,000.00 43,200.00


0.100 17,000.00 1,700.00
Jumlah Harga bahan Rp 44,900.00
Jumlah ( A + B ) Rp 77,400.00
Overhead & Profit(15%) Rp 11,610.00
Harga Satuan Pekerjaan Rp 89,000.00
u Kelas I dan II

0.100 100,000.00 10,000.00


0.200 100,000.00 20,000.00
0.020 100,000.00 2,000.00
0.005 100,000.00 500.00
Jumlah Tenaga Kerja Rp 32,500.00

0.011 4,000,000.00 43,200.00


0.050 17,000.00 850.00
Jumlah Harga bahan Rp 44,050.00
Jumlah ( A + B ) Rp 76,550.00
Overhead & Profit(15%) Rp 11,482.50
Harga Satuan Pekerjaan Rp 88,000.00
10%

0.150 100,000.00 15,000.00


0.003 100,000.00 300.00
Jumlah Tenaga Kerja Rp 15,300.00

0.050 9,000.00 450.00


Jumlah Harga bahan Rp 450.00
Jumlah ( A + B ) Rp 15,750.00
Overhead & Profit(15%) Rp 2,362.50
Harga Satuan Pekerjaan Rp 18,100.00
, 1 Lps Cat Dasar, 2 Lps Cat Penutup)

0.070 100,000.00 7,000.00


0.009 100,000.00 900.00
0.006 100,000.00 600.00
0.003 100,000.00 300.00
Jumlah Tenaga Kerja Rp 8,800.00

0.200 18,000.00 3,600.00


0.150 27,000.00 4,050.00
0.170 30,000.00 5,100.00
0.260 55,000.00 14,300.00
0.010 25,000.00 250.00
0.030 12,000.00 360.00
0.200 5,000.00 1,000.00
Jumlah Harga bahan Rp 28,660.00
Jumlah ( A + B ) Rp 37,460.00
Overhead & Profit(15%) Rp 5,619.00
Harga Satuan Pekerjaan Rp 43,000.00
1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

0.020 100,000.00 2,000.00


0.063 100,000.00 6,300.00
0.006 100,000.00 630.00
0.003 100,000.00 300.00
Jumlah Tenaga Kerja Rp 9,230.00

0.100 27,000.00 2,700.00


0.100 30,000.00 3,000.00
0.260 80,000.00 20,800.00
Jumlah Harga bahan Rp 26,500.00
Jumlah ( A + B ) Rp 35,730.00
Overhead & Profit(15%) Rp 5,359.50
Harga Satuan Pekerjaan Rp 41,000.00
ar, 2 Lapis Cat Penutup)

0.020 100,000.00 2,000.00


0.063 100,000.00 6,300.00
0.006 100,000.00 630.00
0.003 100,000.00 300.00
Jumlah Tenaga Kerja Rp 9,230.00

0.100 30,000.00 3,000.00


0.260 80,000.00 20,800.00
Jumlah Harga bahan Rp 23,800.00
Jumlah ( A + B ) Rp 33,030.00
Overhead & Profit(15%) Rp 4,954.50
Harga Satuan Pekerjaan Rp 37,900.00

0.300 100,000.00 30,000.00


0.100 100,000.00 10,000.00
0.010 100,000.00 1,000.00
0.015 100,000.00 1,500.00
Jumlah Tenaga Kerja Rp 42,500.00

44.000 3,000.00 132,000.00


44.000 300.00 13,200.00
0.050 160,000.00 8,000.00
1.000 300.00 300.00
Jumlah Harga bahan Rp 153,500.00
Jumlah ( A + B ) Rp 196,000.00
Overhead & Profit(15%) Rp 29,400.00
Harga Satuan Pekerjaan Rp 225,400.00

0.300 100,000.00 30,000.00


0.100 100,000.00 10,000.00

Jumlah Tenaga Kerja Rp 40,000.00


1.000 3,400,000.00 3,400,000.00
1.000 250,000.00 250,000.00

Jumlah Harga bahan Rp 3,650,000.00


Jumlah ( A + B ) Rp 3,690,000.00
Overhead & Profit(15%) Rp 553,500.00
Harga Satuan Pekerjaan Rp 4,243,500.00

6.376 35,000.00 223,146.00

3.15
Jumlah Tenaga Kerja Rp 223,146.00

3.188 1,350,000.00 4,303,530.00 3.2

Jumlah Harga bahan Rp 4,303,530.00


Jumlah ( A + B ) Rp 4,526,676.00
Overhead & Profit(15%) Rp 679,001.40
Harga Satuan Pekerjaan Rp 5,205,600.00
3.312 35,000.00 115,920.00

Jumlah Tenaga Kerja Rp 115,920.00

1.66 1,350,000.00 2,235,600.00

Jumlah Harga bahan Rp 2,235,600.00


Jumlah ( A + B ) Rp 2,351,520.00
Overhead & Profit(15%) Rp 352,728.00
Harga Satuan Pekerjaan Rp 2,704,200.00

5.660 35,000.00 198,100.00

Jumlah Tenaga Kerja Rp 198,100.00

1.20 1,350,000.00 1,621,620.00

Jumlah Harga bahan Rp 1,621,620.00


Jumlah ( A + B ) Rp 1,819,720.00
Overhead & Profit(15%) Rp 272,958.00
Harga Satuan Pekerjaan Rp 2,092,600.00
4.68 35,000.00 163,800.00

Jumlah Tenaga Kerja Rp 163,800.00

2.34 1,450,000.00 3,393,000.00

Jumlah Harga bahan Rp 3,393,000.00


Jumlah ( A + B ) Rp 3,556,800.00
Overhead & Profit(15%) Rp 533,520.00
Harga Satuan Pekerjaan Rp 4,090,300.00
m dalam Pipa PVC dan Kelengkapan Instalasi Terpasang

1.000 70,000.00 70,000.00


Jumlah Tenaga Kerja Rp 70,000.00

1.000 4,000.00 4,000.00


1.000 5,000.00 5,000.00
1.000 65,000.00 65,000.00
1.000 2,000.00 2,000.00
1.000 3,000.00 3,000.00
Jumlah Harga bahan Rp 79,000.00
Jumlah ( A + B ) Rp 149,000.00
Overhead & Profit(15%) Rp 22,350.00
Harga Satuan Pekerjaan Rp 171,300.00

`100% 348,800.00 348,800.00

Jumlah Tenaga Kerja Rp 348,800.00

3.000 35,000.00 105,000.00


15.000 6,000.00 90,000.00
1.000 3,000.00 3,000.00
2.000 2,000.00 4,000.00
24.000 700.00 16,800.00
2.000 65,000.00 130,000.00
Jumlah Harga bahan Rp 348,800.00
Jumlah ( A + B ) Rp 697,600.00
Overhead & Profit(15%) Rp 104,640.00
Harga Satuan Pekerjaan Rp 802,200.00
71,759.26
30,000
8,333
1,400,000
4,410,000

1,200,000

3,840,000

(686,676.00)
2.55
PEKERJAAN : Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Bese
Babussalam
LOKASI : Kabupaten Aceh Utara

NO. URAIAN SATUAN KUANTITAS

1 Penyiapan RK3K :

a Pembuatan dokumen Rencana Keselamatan Konstruksi Set


b Pembuatan prosedur dan instruksi kerja Set -
c Penyiapan formulir Set
A Sub Total Penyiapan RKK

2 Sosialisasi, Promosi dan Pelatihan


a Induksi K3 (Safety Induction) Org -
b Pengarahan K3 (Safety Briefing) Org
c Pertemuan keselamatan (Safety Talkdan/atau Tool Box Meeting Org -
d Pelatihan K3
1) Bekerja di ketinggian Org 1.00
2) Penggunaan bahan kimia (MSDS) Org
3) Analisis keselamatan pekerjaan Org
4) Perilaku berbasis keselamatan (Budaya K3) Org
5) P3K Org 1.00
e Simulasi K3 Org -
f Spanduk (Banner) Lb -
g Poster Lb -
h Papan Informasi K3 Bh -
B Sub Total Sosialisasi, Promosi dan Pelatihan

3 Alat Pelindung Kerja dan Alat Pelindung Diri:


a APK antara lain:
1) Tali Keselamatan (Life Line) Ls -
2) Pagar Pengaman (Guard Railling) Ls
3) Pembatas Area (Restricted Area) Ls -
b APD antara lain:
1) Topi Pelindung (Safety Helmet) Bh 6.00
2) Pelindung Mata (Goggles, Spectacles) Psg -
3) Tameng Muka (Face Shield) Bh
4) Pelindung Pernafasan dan Mulut (Masker) Box -
5) Sarung Tangan (Safety Gloves Psg -
6) Sepatu Keselamatan (Safety Shoes) Psg 5.00
7) Sepatu Keselamatan (Rubber Safety Shoes and Toe Cap) Psg -
8) Penunjang Seluruh Tubuh (Full Body Harness) Bh -
9) Rompi Keselamatan (Safety Vest) Bh 5.00
13) Pagar Pengaman Proyek Ls -
C Sub Total Alat Pelindung Kerja dan Alat Pelindung Diri
4 Asuransi dan perizinan:
a Asuransi Ls -
b Surat Izin Laik Operasi (SILO) Set
c Sertifikat Kompetensi Operator yang diterbitkan oleh lembag Bh

d Surat Pengesahan Organisasi K3 (P2K3), sesuai dengan peratur Bh

e Perizinan terkait lingkungan kerja Ls


D Sub Total Asuransi dan Perizinan
5 Personil K3 Konstruksi :
a Ahli K3 Konstruksi OB
b Petugas K3 Konstruksi OH 4.00
c Petugas Tanggap Darurat OB
d Petugas P3K OB -
e Petugas pengatur lalu lintas (Flagman) OB
f Tenaga Paramedis OB
E Sub Total Personel K3 Konstruksi

6 Fasilitas, sarana dan prasarana kesehatan :


a Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban,dll) Ls -
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Ls -
c Peralatan Pengasapan (Fogging) Ls -
F Sub Total Fasilitas, sarana dan prasarana kesehatan

7 Rambu- Rambu yang diperlukan :


a Rambu petunjuk Bh -
b Rambu larangan Bh -
c Rambu peringatan Bh -
d Rambu kewajiban Bh -
e Rambu informasi Bh -
f Rambu pekerjaan sementara Bh
g Jalur Evakuasi (Escape Route) Ls -
h Tongkat pengatur lalu lintas (Warning Lights Stick) Bh
i Kerucut lalu lintas (Traffic Cone) Bh
j Lampu putar (Rotary Lamp ) Bh
k Lampu selang lalu lintas Ls
G Sub Total Rambu-rambu yang diperlukan
8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi :
a Ahli Lingkungan OJ
b Ahli Perpipaan OJ
H Sub Total Konsultasi dengan Ahli terkait Keselamatan Konstruksi

9 Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi:


a Alat Pemadam Api Ringan (APAR) Bh -
b Sirine Bh
c Bendera K3 Bh -
d Lampu Darurat (Emergency Lamp) Bh
e Pembuatan Kartu Identitas Pekerja (KIP) Lb -
f Program Inspeksi dan Audit Internal Ls -
g Pelaporan dan Penyelidikan Insiden Ls -
G Sub Total Rambu-rambu yang diperlukan

D TOTAL BIAYA
-

n Minimal Sedang Beserta Perabotnya SMKS 1 Terpadu

HARGA TOTAL
SATUAN HARGA
(Rp.) (Rp.)

- -

- -
-
- -

15,000.00 15,000.00
- -
- -
- -
300,000.00 300,000.00
- -
- -
- -
- -
315,000.00

- -
- -
- -

30,000.00 180,000.00 10.00 300,000.00


- -
-
- -
- -
220,000.00 1,100,000.00 - -
- - - -
- -
65,000.00 325,000.00 10.00 650,000.00
- - 172.40
1,605,000.00
- - 1.00 -
-
-

- =60 btg/ 6 m
60.00 kg/m'
- 360.00 3,600,000.00
- 216,000,000.00

-
2,400,000.00 9,600,000.00 2,400,000.00
-
- -
-
-
9,600,000.00

- -
- -
- -
-

- -
- -
- -
- -
- -
-
- -
-
-
-
-
-
-
-
-

- - 2.00 -
-
- -
-
- -
- -
- -
-

11,520,000.00 11,520,000.00

-
17,240,000.00