You are on page 1of 1

SITE ANALYSIS NAME:

4.UTILITIES AND NEIGHBOURHOOD 4.3 WATER DISTRIBUTION


ERICK MARAGA

4.1 ELECTRICAL DISTRIBUTION REG:NO


B12/5557/2020

UNIT CODE
BCM 309

UNIT TITLE
Water supply is through existing reservoirs with the kenyatta university
vicinity since KU is supplied with water from its own supply systems and
INTERGRATED 1
underground pumped waters. DESIGN STUDIO
Electricity is supplied by use of high voltage transmission masts from the 1.DESIGN
supply company and on a written request supplied to eligible consumers as
per the KPLC regulations RESPONSE
1.DESIGN RESPONSE
:
PROJECT TITLE
Apply for connection
fron KU authorities to
PROPOSED
supply water direct to APARTMENTS
the site during
operations and
construction and useful 4.4 COMMUNICATION SCALE:
life of the building
N/A
1.DESIGN RESPONSE

Apply for electrical connection from the local supplier in the countys
NOTES
substation locatedin Ruiru town
All dimensions to be in
mm except where stated otherwise
4.1 WASTE DISPOSAL THROUGH SEWERS
site orientation to ne mantained
Communication is facilitated through the use of communication trasmision
masts from the local communication suppliers across the region All design responses to be included in

DESIGN .RESPONSE

Obtain permits for draining into the drainage sewer lines from local
authorities and through the services of a civil engineer
, obtain layout
drawings showing levels and connections

high speed internet coonections and enabled mobile communications to be


There is an existing sewer line around the site that drains off at Ruiru adopted to facilitate smooth flow of information, storage and retrieval in
collection and waste disposal area oredr to improve efficiency
GSEducationalVersion

GSPublisherVersion 0.0.100.100