SUMMARY TRIAL MIX

Proyek : Rehabilitasi Jalan Subang-Bantarwaru ( Bts. Kab. Subang


/Indramayu )
Kontraktor : : PT.Laksana Dharma Putra
Type Of Mix : AC-WC √ AC-BC AC-Base HRS - WC
……..
Laboratorium : : PT.Laksana Dharma Putra
Tanggal produk: : 14 juli 2015

COMPOSITION OF MIX :
NO. COLD BIN NO.
HOT BIN
1 Aggregat Kasar : 21 % 1 HOT BIN I
: 15
2 Screen : 39 % 2 HOT BIN II
: 14
3 Abu Batu : 40 % 3 HOT BIN
III : 29
4 Pasir : - % 4 HOT BIN IV
: 36
5 Filler : - % 5 FILLER
: 6

GRADATION OF MIX :
NO. SIEVE SIZE 1" 3/4" 1/2" 3/8" No.4 No.8
No.16 No.30 No.50 No.100
6 COMBINED COLD BIN 100 93.03 84.08 74.48 49.46 32.61
19.51 12.96 7.98 6.41
7 COMBINED HOT BIN (DMF ) 100 99.98 83.42 71.55 40.42 32.90
18.82 11.54 7.67 6.84
8 HOT BIN QUALITY 100 99.98 83.42 71.47 40.07 32.93
18.91 11.18 7.21 6.30
9 GRADASI EXTRAKSI 100 99.25 83.52 71.41 41.92 32.58
18.47 11.29 7.32 6.62
10 GRAD OF FULLER 100 88.4 73.2 64.7 47.4 34.6
25.3 18.7 13.7 9.9
11 RESTRICTION ZONE 34.6 22.3 -
28.316.7 - 20.7 13.7
12 SPECIFICATION 100 90 - 100max 90 23 - 49

GRADATION OF MIX :

NO. MIX PROPERTIES Unit Test Result


Spesifikasi Keterangan

13 STABILITY Kg 1081 Min 800


14 FLOW mm 3.63 Min 3.00
15 MARSHALL QUOTIENT Kg/mm 298 Min 250
16 AIR VOID MARSHALL ( VIM ) % 4.99 3.5 - 5.5
17 VOID MINERAL AGGREGATE ( VMA ) % 19.51 Min 14.00
18 VOID FILLED ASPHALT ( VFA ) % 74.44 Min 63.00
19 ASPHALT CONTENT % 5.50 -
20 AIR VOID PRD % 2.89 Min 2.50
21 BULK DENSITY (JSD) g/cc 2.233 -
22 RETAINED MARSHALL STABILITY % 86.81 Min 75.00
23 TEMPERATURE OF MIXING °C 170 -
24 TEMPERATURE OF COMPACTION °C 140 -
Dibuat Diperiksa
Disetujui

Teknisi Lab. Ka. Div. Laboratorium Konsultan


PU Bina Marga
UMMARY TRIAL MIX

HOT BIN
%
%
%
%
%

No.200
4.71
5.74
5.35
5.35
7.3

4-8

Keterangan
HASIL
PENGUJIAN MARSHALL
SNI. 06 -
2489 - 1991

Jenis Pemeriksa : √ JMF ( Job Mix Formula √) Asphalt Optimum √ PRD


( Percentage Refusal DensityRetained

√ Marshall
Jenis Campuran : AC-WC √ AC-BC AC-Base ………..
Proyek : Rehabilitasi Jalan Subang-Bantarwaru ( Bts. Kab. Subang
/Indramayu )
Kontraktor : : PT.Laksana Dharma Putra
Tgl Produksi : : 14 juli 2015
Tgl Selesai Pengu: : 15 juli 2015
: Trial Mix
No.
a b c d e f g
h i j k l m n o p
Contoh
Optimum
1 5.50 1099.7 1104.5 621.25 483.22 2.276
92 948 1080 3.65
2 5.50 ### ### 620.34 482.22 2.280
91 937 1069 3.66
3 5.50 1097.7 1101.3 600.54 500.74 2.192
94 968 1104 3.61
4 5.50 1095.6 1099 612.34 486.69 2.251
91 937 1069 3.59
5 5.50 1098.4 1101.6 603.63 497.93 2.206
92 948 1080 3.60
6 5.50 1099.6 1103.3 602.47 500.78 2.196
91 937 1069 3.62
7 5.50 1097.6 1100.7 604.65 496.03 2.213
2.350 19.51 4.99 74.44 91 937 1069 3.68 298
8 5.50 1096.9 1100.7 603.23 497.46 2.205
92 948 1080 3.55
9 5.50 1093.5 1096.8 613.07 483.68 2.261
90 927 1057 3.59
10 5.50 1094.9 1098.7 610.22 488.43 2.242
94 968 1104 3.67
11 5.50 1097.8 1101.7 610.74 490.98 2.236
92 948 1080 3.68
12 5.50 1098.7 1101.9 610.82 491.03 2.237
95 979 1115 3.66
Rata - rata 2.233
92 948 1081 3.63

Retained
1 5.50 1094.8 1099.2 610.54 488.64 2.240
80 824 939 3.56
2 5.50 ### ### 610.11 491.65 2.231
78 803 916 3.54

2.350 19.49 4.97 74.52 261


3 5.50 1097.7 1102.6 609.96 492.66 2.228
79 814 928 3.55
Rata - rata 2.233
79 814 928 3.55

Retained (%) : 86.81

PRD
1 5.50 ### 1096.6 620.39 476.16 2.292
2 5.50 ### ### 622.22 475.39 2.298

2.350 17.73 2.89


3 5.50 ### 1096 612.51 483.52 2.257
Rata - rata 2.282
Keterangan :
a % Aspal terhadap batuan i % rongga
diantara aggregat Bj.Bulk Aggregat

: 2.621
b % aspal terhadap campuran =100 -
( 100 - b ) g/Bj.Bulk.Aggregat Bj. Aspal : 1.031
c Berat contoh kering ( gr ) j % rongga
terhadap campuran 100 * ( 100 g/h ) Bj. Efektif : 2.669
d Berat contoh keadaan jenuh ( gr ) k % rongga
berisi aspal( i - j / i ) Absp Aspal : 0.70%
e Berat contoh didalam air ( gr ) l Pembacaan
arloji Gmm :
f Isi contoh = ( d - e ) m Stabilitas
( l x kalibrasi proving ). ( kg ) Kalibrasi Proving

: 10.3 Kg
g Berat isi ( c/f ) n Stabilitas
( m x koreksi benda uji ). ( kg ) Aggregat Cold bin
h =Berat maksimum teoritis o Kelelehan (
mm ) Aggregat Hot bin
100 p Hasil bagi
marshall - n/o ( kn/mm )
100 - b b Absp Aspal
terhadap total agg
+
Bj.Eff.Agg Bj.Aspal
Bj.Eff.Agg. - Bj.Bulk Agg
100
x Bj.Aspal
Gmm : ditentukan dengan cara AASHTO T. 209 x
Bj.Eff.Agg. x Bj.Bulk Agg
pada kadar aspal optimum perkiraan ( Pb )
Pb = 0,035 ( % CA ) + 0,045 ( % FA ) + 0,18 ( FF ) + K
Absorsi Aspal ( 100 - b )
b
k = 0,5 - 1 untuk laston ; 2,0 - 3,0 lataston -
100
Bj.Eff.Agg : ( 100 - Pb )
100 Pb
-
Gmm Bj.Aspal
Dibuat
Diperiksa Disetujui

Kontraktor Ka. Div. Laboratorium


Konsultan PU Bina Marga
LAPORAN ANALISA AGREGAT GABUNGAN

Proyek Rehabilitasi Jalan Subang-Bantarwaru ( Bts. Kab. Subang /Indramayu )


Tgl Produksi: : 14 juli 2015
Kontraktor : PT.Laksana Dharma Putra
Jenis campu: AC - BC
Laboratori : PT.Laksana Dharma Putra
Ukuran Saringan Hot- Bin Hot - Bin Hot - Bin Hot Bin Agregat
Garis Daerah
Filler
Spesifikasi
Mm Inch I II III IV Gabungan
Fuller Terlarang
37,5 1,5
25,4 1 100 100 100 100 100 100
100 100
19,1 3/4 99.84 100 100 100 100 99.98
88.4 90 - 100
12,7 1/2 35.22 51.01 100 100 100 83.42
73.2 maks. 90
9,4 3/8 6.11 16.10 90.69 100 100 71.47
64.7 -
4,75 No.4 0.09 1.99 8.31 87.13 100 40.07
47.4 -
2,36 No.8 0.35 0.32 74.42 100 32.93
34.6 23 - 49 34.6
1,18 No.16 0.17 35.72 100 18.91
25.3 - 22,3 - 28,3
0,6 No.30 15.20 95.09 11.18
18.7 - 16,7 - 20,7
0,3 No.50 4.45 93.56 7.21
13.7 - 13,7
0,15 No.100 3.77 82.29 6.30
9.9 -
0,075 No.200 2.21 75.84 5.35
7.3 4-8
Komposisi Campuran
A. HOT - BIN I 15 0.15
B. HOT - BIN II 14 0.14
C. HOT - BIN III 29 0.29
D. HOT - BIN IV 36 0.36
E. Filler 6 0.06
Persen Lolos (%)

100
Titik
Kontrol
90

80
Agregat
70 Gabungan

60
Fuller
50

40

30

20 Daerah
Larangan
10
0.07 0.150.3 0.6 1.1 2.3 4.7
9.4 12. 19. 25.
5 8 6 5
7 1 4
0
Ukuran Saringan
(mm)

Dibuat
Diperiksa Disetujui

Teknisi Lab. Ka. Div. Laboratorium


Konsultan PU Bina Marga
LAPORAN ANALISA
SARINGAN

Nama proyek Rehabilitasi Jalan Subang-Bantarwaru ( Bts. Kab. Subang


/Indramayu )
Kontraktor : PT.Laksana Dharma Putra
Contoh Bahan : Hot Bin (Trial Mix )
Tanggal Produksi: 14 juli 2015
Tanggal pengujian
: 14 juli 2015
Laboratorium : PT.Laksana Dharma Putra
Untuk campuran : AC - BC
Ukuran saringan HB I HB II
HB III HB IV Filler
Berat tertahan (%) Berat tertahan (%)
Berat tertahan (%) Berat tertahan (%) Berat tertahan (%)
mm inch
(gr) (%) Lolos (gr) (%) Lolos
(gr) (%) Lolos (gr) (%) Lolos (gr) (%)
Lolos
25.4 1" 100
19.1 3/4" 8.19 0.16 99.84 100
12.7 1/2" 3301.23 64.78 35.22 1249.56 48.99 51.01
100
9.50 3/8" 4784.45 93.89 6.11 2139.73 83.90 16.10
98.47 9.31 90.69 100
6.35 1/4"
4.76 No. 4 5091.52 99.91 0.09 2499.78 98.01 1.99
969.63 91.69 8.31 146.85 12.87 87.13
100
2.38 No. 8 2541.62 99.65 0.35
1054.16 99.68 0.32 291.91 25.58 74.42 0.00 0.00
100
2.00 No. 10
1.60 No. 12
1.19 No. 16
1055.75 99.83 0.17 733.52 64.28 35.72 0.00 0.00
100
0.84 No. 20
0.59 No. 30
967.73 84.80 15.20 26.21 4.91 95.09
0.42 No. 40
0.279 No. 50
1090.46 95.55 4.45 34.35 6.44 93.56
0.177 No. 80
0.149 No. 100
1098.12 96.23 3.77 94.46 17.71 82.29
0.079 No. 200
1115.99 97.79 2.21 128.85 24.16 75.84
Berat contoh 5095.86 gr 2550.47 gr
1057.56 gr 1141.19 gr 533.33 gr

Dibuat
Diperiksa Disetujui

Teknisi Lab. Ka. Div.


Konsultan PU Bina Marga
Laboratorium
LAPORAN PENGUJIAN EKTRAKSI ASPAL

Proyek Rehabilitasi Jalan Subang-Bantarwaru ( Bts. Kab. Subang /Indramayu )


Kontraktor : PT.Laksana Dharma Putra
Contoh bahan : Trial Mix
Tanggal Produks: 14 juli 2015
Tanggal Uji : 15 juli 2015 Untuk campuran : AC
- BC

PENGUJIAN
NO URAIAN SAT
Rata - rata Spec
I II
1 Berat contoh sebelum ektraksi gram 500.02 500.00
2 Berat contoh sesudah ektraksi gram 475.99 475.92
3 Berat penyaring sebelum ektraksi gram 3.41 3.45
4 Berat total agregat (2-3) gram 472.58 472.47
5 Berat aspal (1-4) gram 27.44 27.53
6 % aspal / Kadar aspal ( 5/1*100 ) gram 5.49 5.51
5.50

Ukuran Saringan Berat tertahan Persen Persen Berat tertahan Persen Persen
Persen Lolos

Spec
mm Inch ( gram ) Tertahan Lolos ( gram ) Tertahan Lolos
Rata- rata
37.5 1 1/2
25.4 1 100 100
100 100
19.1 3/4 3.50 0.74 99.26 3.56 0.75 99.25
99.25 90 - 100
12.7 1/2 78.25 16.56 83.44 77.45 16.39 83.61
83.52 Max. 90
9.4 3/8 134.14 28.38 71.62 136.02 28.79 71.21
71.41 -
4.75 No.4 279.54 59.15 40.85 269.34 57.01 42.99
41.92 -
2.36 No.8 319.85 67.68 32.32 317.33 67.16 32.84
32.58 23 - 49
1.18 No.16 384.94 81.45 18.55 385.56 81.61 18.39
18.47 -
0.6 No.30 418.56 88.57 11.43 419.84 88.86 11.14
11.29 -
0.3 No.50 439.09 92.91 7.09 436.76 92.44 7.56
7.32 -
0.15 No.100 442.47 93.63 6.37 439.99 93.13 6.87
6.62 -
0.075 No.200 445.73 94.32 5.68 448.75 94.98 5.02
5.35 4-8
Berat contoh 472.58 472.47

Dibuat Diperiksa
Disetujui
Teknisi Lab Ka. Div. Konsultan
PU Bina Marga