NO. URAIAN PEKERJAAN SUB TOTAL JUMLAH BOBOT (%) JUMLAH KESELURUHAN
A GEDUNG
I PEKERJAAN PERSIAPAN DAN SMKK Rp - #DIV/0! Rp 1,532,643,568.43
- Pekerjaan persiapan Rp - Rp 1,471,569,568.43
- sistem manajemen keselamatan konstruksi (smkk) Rp - Rp 61,074,000.00
Terbilang :
Yogyakarta,
Dibuat Oleh :
Konsultan Perencana
PT. POLA DATA CONSULTANT
Catatan Revisi VK 01/09/2023 ASTRI WULANDARI
1 pasangan bata + 11 % Semua lantai DIREKTUR
2 Plesteran + 11 % Semua lantai
3 Acian + 11 % Semua lantai
No :
PEMBANGUNAN GEDUNG TRANSFORMASI DIGITAL Tanggal :
SEKOLAH TINGGI MULTI MEDIA REKAPITULASI Lokasi : STMM
TAHUN ANGGARAN 2023 Owner : STMM
NO. URAIAN PEKERJAAN SUB TOTAL JUMLAH BOBOT (%) JUMLAH KESELURUHAN
A GEDUNG
I PEKERJAAN PERSIAPAN DAN SMKK
II PEKERJAAN STRUKTUR
III. PEKERJAAN ARSITEKTUR
IV. PEKERJAAN ELEKTRIKAL
V PEKERJAAN MEKANIKAL
VI PEKERJAAN LANDSCAPE
Terbilang :
Dibuat Oleh :
PEM
BAN
GUN
AN
GED
UNG
TRA
NSF
ORM
ASI
DIGI
TAL
SEK
OLA
H
TING
GI
MUL
TI
MEDI
A
TAH
UN
ANG
GAR
AN
2023
No.
I
A
1
2
3
4
5
6
7
8
-
-
-
-
-
-
-
-
No.
a
-
a
No.
c
d
e
No.
B
1
-
-
-
2
-
-
3
a
-
No.
b
-
-
-
-
-
-
-
-
4
-
5
-
-
6
-
-
No.
II.1
A
1
No.
2
No.
3
No.
4
No.
5
No.
6
No.
7
No.
8
No.
9
No.
10
No.
11
No.
12
No.
13
No.
14
No.
15
No.
16
No.
17
No.
18
No.
19
No.
20
No.
21
No.
22
No.
23
No.
24
No.
25
No.
26
No.
27
No.
28
No.
29
No.
30
No.
31
No.
32
No.
33
No.
34
No.
35
No.
36
No.
37
38
39
40
41
42
43
No.
a
44
45
46
47
48
1
-
-
-
-
-
-
2
-
-
No.
a
-
-
-
-
3
-
-
-
-
-
-
4
-
-
-
No.
a
-
-
-
5
-
-
-
-
-
-
6
-
-
-
-
-
No.
a
-
7
-
-
-
-
-
-
8
9
D
No.
1
2
No.
a
3
4
5
6
7
8
-
-
-
9
-
-
-
10
-
-
-
No.
11
-
-
-
12
-
-
-
13
-
-
-
14
-
-
-
15
No.
a
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
-
-
No.
a
-
20
-
-
-
-
-
21
-
-
-
-
22
-
-
-
-
No.
a
-
23
-
-
-
24
-
-
-
25
-
-
-
-
-
26
-
-
No.
a
-
-
27
-
-
-
-
-
28
-
-
-
29
-
-
No.
a
-
30
-
-
-
31
-
-
-
32
-
-
-
33
-
No.
a
-
-
34
-
-
-
35
-
-
-
36
-
-
-
37
-
No.
a
-
-
38
-
-
-
39
-
-
-
40
-
-
-
41
-
-
-
No.
a
42
-
-
-
43
-
-
-
44
-
-
-
45
-
-
-
46
-
No.
a
-
-
47
-
-
-
48
-
-
-
49
-
-
-
50
-
-
-
No.
a
51
-
-
-
52
-
-
-
53
-
-
-
54
-
-
-
No.
a
55
-
-
-
56
-
-
-
57
-
-
-
58
-
-
-
59
-
No.
a
-
-
60
-
-
-
61
-
-
-
-
-
62
-
-
-
-
No.
a
-
63
-
-
-
-
-
64
-
-
-
65
-
-
-
66
No.
a
-
-
-
67
-
-
-
68
-
-
-
69
-
-
-
70
-
No.
a
-
-
71
-
-
-
-
72
-
-
-
-
73
-
-
-
No.
a
-
No.
1
No.
a
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
-
-
No.
a
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
10
-
No.
a
-
-
11
-
-
-
12
-
-
-
13
-
-
-
14
-
-
-
15
No.
a
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
-
-
No.
a
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
24
No.
a
-
-
-
25
-
-
-
26
-
-
-
27
-
-
-
28
-
-
-
No.
a
29
-
-
-
30
-
-
-
31
-
-
-
32
-
-
-
33
-
No.
a
-
-
34
-
-
-
35
-
-
-
36
-
-
-
37
No.
a
-
-
-
38
-
-
-
39
-
-
-
40
-
-
-
41
-
No.
a
-
-
42
-
-
-
43
-
-
-
44
-
-
-
45
-
-
-
No.
46
-
-
-
47
-
-
-
No.
1
No.
a
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
-
-
No.
a
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
10
-
No.
a
-
-
11
-
-
-
12
-
-
-
13
-
-
-
14
-
-
-
15
No.
a
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
-
-
No.
a
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
24
-
No.
a
-
-
25
-
-
-
26
-
-
-
27
-
-
-
28
-
-
-
29
No.
a
-
-
-
30
-
-
-
31
-
-
-
32
-
-
-
No.
a
33
-
-
-
34
-
-
-
35
-
-
-
36
-
-
-
37
No.
a
-
-
-
38
-
-
-
39
-
-
-
40
-
-
-
41
-
No.
a
-
-
42
-
-
-
43
-
-
-
44
-
-
-
No.
1
No.
a
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
-
-
No.
a
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
10
-
No.
a
-
-
11
-
-
-
12
-
-
-
13
-
-
-
14
-
-
-
No.
a
15
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
-
-
No.
a
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
24
-
No.
a
-
-
25
-
-
-
26
-
-
-
27
-
-
-
28
-
-
No.
a
-
29
-
-
-
30
-
-
-
31
-
-
-
32
-
No.
a
-
-
33
-
-
-
34
-
-
-
35
-
-
-
36
-
-
-
No.
a
37
-
-
-
38
-
-
-
39
-
-
-
40
-
-
-
No.
a
No.
1
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
No.
a
-
-
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
No.
a
10
-
-
-
11
-
-
-
12
-
-
-
13
-
-
-
14
-
No.
a
-
-
15
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
No.
a
-
-
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
No.
a
24
-
-
-
25
-
-
-
26
-
-
-
27
-
-
-
No.
a
28
-
-
-
29
-
-
-
30
-
-
-
31
-
-
-
No.
a
32
-
-
-
33
-
-
-
34
-
-
-
35
-
-
-
36
-
No.
a
-
-
37
-
-
-
38
-
-
-
39
-
-
-
No.
1
No.
a
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
-
-
No.
a
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
10
-
No.
a
-
-
11
-
-
-
12
-
-
-
13
-
-
-
14
-
-
-
No.
a
15
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
-
-
No.
a
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
24
-
No.
a
-
-
25
-
-
-
26
-
-
-
27
-
-
-
28
No.
a
-
-
-
29
-
-
-
30
-
-
-
31
-
-
-
32
-
No.
a
-
-
33
-
-
-
34
-
-
-
35
-
-
-
36
-
No.
a
-
-
No.
1
No.
a
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
-
No.
a
-
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
10
No.
a
-
-
-
11
-
-
-
12
-
-
-
13
-
-
-
14
-
-
-
No.
a
15
-
-
-
16
-
-
-
17
-
-
-
18
-
-
-
19
-
-
No.
a
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
No.
24
-
-
-
25
-
-
-
26
-
-
-
27
-
-
-
28
No.
a
-
-
-
29
-
-
-
30
-
-
-
31
-
-
-
32
-
No.
a
-
-
33
-
-
-
34
L
No.
1
No.
a
2
3
4
1
2
3
4
1
2
3
4
1
2
No.
a
3
4
1
2
3
4
1
2
3
4
5
6
M
No.
1
No.
a
2
3
4
5
6
7
8
9
10
11
1
2
3
1
2
No.
a
-
-
-
-
N
No.
1
No.
a
2
3
4
5
6
7
8
9
10
11
1
-
2
3
1
No.
1
2
P
1
2
3
No.
a
4
III
A
1
2
3
4
1
2
No.
a
3
4
5
5
6
1
2
3
4
1
2
3
4
No.
a
1
2
3
4
1
2
3
4
1
2
3
4
1
No.
a
2
3
1
2
3
4
5
6
7
8
9
1
2
3
No.
a
4
5
6
7
8
9
10
11
1
2
3
4
5
6
7
8
9
No.
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
No.
a
7
8
9
1
2
3
4
5
6
7
8
9
1
2
3
No.
a
4
5
6
7
8
D
No.
1
No.
3
No.
5
No.
a
6
6
No.
8
No.
10
No.
11
12
No.
13
14
1
No.
3
No.
5
No.
a
6
7
-
-
-
-
-
-
-
-
No.
a
-
-
9
No.
10
11
No.
12
13
14
No.
15
16
17
No.
18
19
20
No.
2
No.
4
No.
6
No.
8
No.
10
No.
11
12
No.
13
14
15
No.
16
17
No.
18
18
No.
a
19
20
No.
a
1
2
No.
4
No.
7
No.
8
No.
9
No.
10
7
No.
10
No.
11
2
No.
4
No.
6
No.
8
No.
10
No.
11
12
No.
a
13
2
No.
4
No.
6
No.
8
No.
10
11
No.
12
13
No.
2
No.
1
No.
3
4
5
6
No.
8
9
10
No.
11
No.
12
13
14
1
No.
3
4
5
No.
4
No.
5
No.
7
8
9
10
No.
11
12
13
No.
14
1
2
3
4
No.
6
No.
7
No.
9
10
11
No.
a
1
2
3
4
No.
6
No.
7
No.
10
1
No.
3
4
5
No.
7
No.
8
No.
10
11
-
No.
a
1
2
3
4
No.
6
No.
7
No.
10
1
No.
a
2
F
No.
1
No.
2
No.
3
No.
4
5
No.
1
No.
2
No.
3
No.
4
No.
5
No.
7
8
No.
1
No.
2
No.
2
No.
3
No.
4
5
No.
1
No.
2
No.
2
No.
3
No.
4
5
No.
1
No.
2
No.
2
No.
3
No.
4
5
No.
1
No.
2
No.
2
No.
3
No.
4
No.
1
No.
1
2
3
4
No.
1
2
3
4
5
6
1
2
3
4
5
6
1
2
No.
a
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
No.
a
6
1
2
3
3
H
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
6
No.
1
2
No.
a
3
4
5
No.
1
No.
a
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
2
No.
a
3
4
5
No.
1
No.
a
No.
1
2
No.
a
3
4
5
No.
1
No.
a
J
1
-
-
No.
2
-
-
No.
1
-
2
No.
a
-
1
-
No.
1
-
No.
a
-
1
-
-
No.
1
-
-
No.
J
No.
1
No.
E
1
No.
a
3
4
2
2
No.
5
No.
a
6
9
No.
10
11
No.
12
13
14
15
No.
16
1
No.
4
No.
6
-
No.
7
-
-
No.
8
-
1
No.
3
No.
5
No.
7
No.
2
No.
a
3
1
No.
L
1
2
No.
5
No.
1
2
3
4
5
1
2
3
No.
a
4
5
3
No.
1
2
IV
A
No.
1
-
No.
-
No.
-
No.
-
-
-
2
-
-
-
3
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
4
-
No.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
a
5
-
-
-
-
-
-
6
-
-
-
-
-
B
1
-
No.
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
1
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
2
-
No.
-
-
-
-
-
-
-
-
-
No.
a
-
2
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
3
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
4
No.
a
-
-
-
-
-
-
-
-
-
-
-
No.
-
-
1
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
2
-
No.
a
-
-
-
-
-
-
-
-
-
-
1
-
No.
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
2
-
-
-
-
-
-
-
-
-
No.
-
-
1
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
-
2
-
No.
-
-
-
-
-
-
-
-
-
-
1
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
2
-
-
-
-
-
-
-
No.
a
-
-
-
-
1
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
2
-
No.
-
-
-
-
-
-
-
-
-
-
No.
1
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
2
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
3
-
No.
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
4
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
-
C
No.
1
-
No.
a
-
-
-
-
-
-
2
-
-
3
-
-
No.
4
No.
5
No.
-
-
-
-
-
No.
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
-
-
-
No.
-
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
-
D
No.
1
No.
a
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
No.
a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
No.
a
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
No.
a
4
5
6
7
8
9
10
11
11
12
13
14
15
15
16
1
2
No.
a
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
No.
a
5
6
7
E
No.
1
No.
a
2
3
No.
-
-
No.
a
-
-
-
-
-
-
-
No.
2
No.
-
No.
-
No.
3
4
5
6
No.
5
No.
a
No.
a
No.
1
No.
2
No.
4
No.
6
No.
1
No.
2
No.
4
No.
6
No.
1
No.
2
No.
4
No.
6
No.
1
No.
2
No.
4
No.
6
No.
1
No.
2
No.
4
No.
6
No.
1
No.
3
No.
F
No.
1
No.
a
2
3
4
1
No.
2
No.
a
No.
a
No.
a
No.
3
No.
a
No.
a
No.
4
No.
a
1
2
No.
a
No.
3
No.
a
No.
a
No.
4
No.
a
1
2
No.
a
No.
3
No.
a
No.
a
No.
4
No.
a
1
2
No.
a
No.
3
No.
a
No.
a
No.
4
No.
a
1
2
No.
a
No.
3
No.
a
No.
a
No.
4
No.
a
1
2
No.
a
No.
G
No.
1
No.
a
-
-
-
2
3
4
5
6
1
2
3
1
2
3
No.
1
2
3
H
No.
1
No.
a
2
3
4
5
1
2
3
4
5
6
1
2
3
4
No.
a
5
6
1
2
3
4
5
6
1
2
3
4
5
6
No.
1
2
3
4
5
6
1
2
3
4
5
6
1
2
No.
a
3
4
5
6
I
No.
1
No.
a
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
No.
a
3
4
5
6
7
1
2
3
4
5
6
7
1
2
No.
a
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
No.
a
10
1
2
3
4
5
6
7
8
9
10
1
2
3
4
No.
a
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
No.
1
2
3
4
5
6
7
8
9
10
K
No.
1
No.
2
3
-
-
4
1
2
3
4
5
6
1
No.
a
2
3
4
5
6
1
2
3
4
5
6
7
8
9
9
10
11
No.
a
12
13
14
1
2
3
4
5
6
7
8
9
10
11
1
No.
a
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
No.
a
9
10
1
2
3
4
5
6
7
8
9
10
1
2
3
No.
a
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
No.
L
No.
a
No.
2
3
No.
a
4
5
6
7
8
9
10
M
No.
1
2
No.
a
-
3
-
-
-
-
-
N
No.
a
No.
2
3
4
5
6
7
8
9
10
11
12
13
14
No.
O
No.
1
2
No.
a
3
4
5
6
7
8
9
10
11
12
-
-
-
-
-
No.
-
-
-
P
No.
1
No.
a
2
Q
No.
1
No.
R
No.
1
No.
a
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
No.
a
4
5
V
A
No.
1
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2
-
-
No.
a
-
-
-
-
-
-
-
-
3
-
-
-
-
-
-
-
No.
4
-
-
-
-
-
-
-
No.
-
No.
5
-
-
-
-
No.
6
-
-
-
-
No.
a
-
-
-
1
2
3
4
5
6
7
8
9
1
2
3
No.
a
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
No.
a
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
No.
a
9
1
2
3
4
5
6
7
8
9
1
2
3
4
No.
a
B
No.
1
2
3
4
5
6
6
7
8
1
2
3
4
5
6
7
No.
a
8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
No.
a
7
3
4
5
6
7
8
9
1
2
3
4
5
6
7
No.
1
2
C
No.
1
No.
a
2
3
4
5
6
7
8
9
10
-
-
-
-
-
-
-
No.
-
-
-
-
11
No.
a
-
-
-
-
-
12
No.
13
-
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
No.
14
-
-
-
-
-
-
-
-
-
-
-
No.
15
16
-
-
-
-
-
-
-
1
2
3
4
5
No.
a
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
No.
1
2
3
4
5
6
1
2
3
4
5
6
1
No.
a
2
D
No.
1
No.
a
2
3
4
5
1
2
3
4
5
1
2
3
4
5
No.
1
2
3
4
5
1
2
3
4
5
1
2
3
4
No.
a
5
6
1
2
3
4
5
1
2
3
4
No.
7
No.
10
11
12
13
No.
1
2
3
5
No.
8
No.
9
10
11
1
2
3
4
No.
7
No.
10
11
No.
a
12
1
2
3
5
No.
7
No.
a
8
9
10
11
1
2
3
4
No.
7
No.
10
11
12
No.
1
2
3
5
No.
8
No.
9
10
11
F
1
-
-
-
-
-
-
-
-
-
No.
a
-
-
3
-
-
-
-
-
-
-
-
-
-
-
No.
5
-
-
-
-
-
-
-
No.
-
-
-
-
6
-
-
-
-
-
No.
a
-
-
-
-
-
6
-
-
-
-
-
-
-
No.
-
-
-
7
No.
a
-
-
-
-
G
No.
1
No.
a
2
3
3
4
5
5
1
2
3
4
5
6
7
8
1
No.
a
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
No.
a
5
6
7
8
9
-
-
-
-
-
-
1
2
3
4
3
4
No.
a
4
5
6
1
2
3
4
5
1
2
3
4
5
No.
a
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
No.
a
3
4
5
1
2
3
4
5
5
6
7
8
1
2
3
No.
a
4
5
5
6
7
1
2
3
4
5
6
7
8
9
10
11
No.
a
12
13
14
15
16
17
18
19
20
1
2
3
1
2
3
No.
a
4
5
5
6
7
7
8
1
2
3
4
5
6
7
8
9
No.
a
10
11
12
13
14
15
16
17
18
1
2
3
4
5
1
No.
a
2
3
4
5
5
6
7
7
8
1
2
3
4
5
6
7
No.
a
8
9
10
11
12
1
2
1
2
3
4
5
6
7
8
No.
1
2
3
4
5
6
7
8
9
10
11
1
2
No.
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
No.
a
8
9
10
11
12
13
14
15
1
2
3
4
1
2
3
No.
a
4
5
6
7
1
2
3
1
2
1
2
No.
a
I
No.
1
-
-
-
-
-
-
2
-
-
-
-
-
1
-
No.
a
-
-
-
-
1
-
-
-
-
-
1
-
-
-
-
No.
a
-
1
-
-
-
-
-
1
-
-
-
-
-
J
No.
a
No.
a
1
2
No.
a
No.
3
No.
4
No.
5
No.
6
7
8
No.
a
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
No.
a
-
-
-
-
1
-
-
-
-
-
-
2
-
-
-
-
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
1
-
-
-
No.
a
-
-
2
-
-
-
-
-
-
3
-
-
-
-
1
No.
a
-
-
-
2
-
-
-
-
-
-
-
-
-
3
-
-
-
No.
1
-
No.
a
-
-
-
-
-
2
3
4
5
6
-
-
-
1
No.
2
No.
a
No.
1
2
No.
1
-
-
-
No.
a
-
-
-
2
3
4
5
6
-
-
-
1
No.
2
No.
1
2
No.
1
-
No.
a
-
-
-
-
-
2
3
4
5
6
-
-
-
1
No.
2
No.
1
2
No.
1
-
-
No.
a
-
-
-
-
2
3
4
5
6
-
-
-
1
No.
2
No.
1
No.
a
2
1
No.
a
-
-
-
-
-
-
2
3
4
5
6
-
-
-
1
No.
2
No.
1
2
No.
1
-
-
No.
a
-
-
-
-
2
3
4
5
6
-
-
-
1
No.
2
No.
1
2
No.
1
No.
K
No.
a
No.
1
No.
3
No.
VI
A
1
2
3
4
5
6
No.
a
7
8
9
10
11
12
13
14
15
16
17
-
-
-
-
-
-
-
-
No.
18
-
-
-
-
-
-
19
-
-
-
-
-
-
-
-
No.
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
-
-
No.
-
No.
a
-
20
-
-
-
-
-
-
-
-
-
-
-
-
-
-
No.
a
-
-
-
-
21
-
-
-
22
-
No.
a
-
-
-
-
-
-
-
-
-
-
-
-
-
23
-
No.
a
-
24
25
B
1
2
3
No.
a
4
5
6
7
C
1
2
3
4
5
ITEM PEKERJAAN
b
GEDUNG
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
Pembersihan lahan awal dan akhir
Pengukuran dan pemasangan bouwplank
Air dan listrik kerja
Direksi keet (sewa)
Gudang (sewa)
Papan nama proyek
Pagar pengaman proyek (sewa)
Pekerjaan tower crane, meliputi:
Tower crane (sewa)
Pemasangan tower crane
Pembongkaran tower crane
Mobilisasi tower crane
Demobilisasi tower crane
Pemasangan / setting angkur TC
Claim angkut TC tidak di bongkar kembali / rusak
Biaya perizinan tower crane
ITEM PEKERJAAN
b
Lightning rod, bucket, sling, lamp for night lighting
b
Besi tulangan
Buang lumpur galian pondasi
Bobokan kepala borpile
Pilecape TC
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
b
BIAYA PEKERJAAN PERSIAPAN & SMKK
PEKERJAAN STRUKTUR
PEKERJAAN GALIAN DAN URUGAN
GALIAN PONDASI FOOTPLAT ELEVASI -4.400
URUGAN PASIR
Pasir urug bawah pilecape, tebal 100 mm
Pasir urug bawah footplat, tebal 100 mm
Pasir urug bawah sloof, tebal 100 mm
Pasir urug bawah lantai, tebal 100 mm
Pasir urug bawah pitlift, tebal 100 mm
Pasir urug bawah pondasi genset, tebal 100 mm
ITEM PEKERJAAN
b
Pasir urug pengisi samping pondasi genset
Pasir urug bawah GWT, tebal 100 mm
Urugan kembali dan pemadatan bekas galian pondasi dengan t
Urugan tanah peninggian peil bangunan dengan tanah bekas si
Urugan tanah peninggian peil bangunan dengan mendatangkan
PEKERJAAN PONDASI
BORPILE, ELV. (-15.900) S/D (-1.900)
Pondasi Borpile Ø800 mm (Pile cap type P1a)
Pengeboran Borpile
Pengecoran dengan pipa tremie
Beton ready mix f'c 28 Mpa
Besi tulangan
Buang lumpur galian pondasi
Bobokan kepala borpile
b
Beton ready mix f'c 28 Mpa
Besi tulangan
Buang lumpur galian pondasi
Bobokan kepala borpile
b
Besi tulangan
Buang lumpur galian pondasi
Bobokan kepala borpile
b
Bobokan kepala borpile
PEKERJAAN BETON
LOWER GROUND
Catatan :
ITEM PEKERJAAN
b
Rabat beton bawah footplat, tebal 100 mm (1 pc : 3 ps : 5 kr)
Rabat beton bawah sloof, tebal 100 mm (1 pc : 3 ps : 5 kr)
Rabat beton bawah pitlift, tebal 100 mm (1 pc : 3 ps : 5 kr)
Rabat beton bawah GWT, tebal 100 mm (1 pc : 3 ps : 5 kr)
Pondasi siklop; 60% beton (camp. 1 pc : 3 ps : 5 kr) dan 40 % b
b
PONDASI FOOTPLAT, ELV. -3.000
Footplat F4
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
Footplat F5
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
PONDASI PILECAPE, ELV. -1.900
Pilecape P1a
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
Pilecape P3
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
Pilecape P4
ITEM PEKERJAAN
b
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
Pilecape P6
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
PONDASI PILECAPE, ELV. -1.000
Pilecape P1
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
Pilecape P2
Bekisting dengan pasangan batako
Besi tulangan
Beton ready mix f'c 28 MPa
Pilecape P5
Bekisting dengan pasangan batako
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix f'c 28 MPa
PITLIFT A, ELV. (-1.900) s/d (-0.050)
Dinding beton pitlift, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 28 MPa
Waterstop PVC, lebar 150 mm
Waterproofing cementitious
Plat beton lantai pitlift, tebal 300 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 28 MPa
Waterproofing cementitious
DINDING BETON GRANDTRAIR
Dinding beton DB1, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Waterstop PVC, lebar 150 mm
ITEM PEKERJAAN
b
Waterproofing cementitious
Dinding DB2, tebal 450 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding DB3, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
GROUND WATER TANK (GWT)
Dinding beton GWT, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Waterstop PVC, lebar 150 mm
Waterproofing cementitious
Plat lantai GWT, tebal 300 mm
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Waterproofing cementitious
PLAT BETON DUDUKAN GENSET
Plat beton tebal 300 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
b
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-2.600) S/D (-0.520)
Kolom K14, uk. 450 x 450 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-2.600) S/D (+0.450)
Kolom K14, uk. 450 x 450 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-2.600) S/D (+1.300)
Kolom K14, uk. 450 x 450 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-2.600) S/D (+2.250)
Kolom K14, uk. 450 x 450 mm
Bekisting dipakai 3x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-2.600) S/D (+2.950)
Kolom K14, uk. 450 x 450 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-2.600) S/D (+4.050)
Kolom K14, uk. 450 x 450 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM PEDESTAL, ELV. (-1.900) S/D (-0.050)
Kolom K1, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K5, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM MENERUS, ELV. (-1.000) S/D (+4.150)
ITEM PEKERJAAN
b
Kolom K5, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K8, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K9, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM, ELV. (-0.050) S/D (+4.000)
Kolom K1, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K6, uk. 600 x 800 mm
Bekisting dipakai 3x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 Mpa
KOLOM, ELV. (-0.050) S/D (+4.150)
Kolom K1, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K5, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
ITEM PEKERJAAN
b
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 Mpa
SLOOF, ELV. -1.100
Sloof S1, uk. 300 x 600 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
SLOOF, ELV. -0.700
Sloof S1, uk. 300 x 600 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
SLOOF, ELV. -0.100
ITEM PEKERJAAN
b
Sloof S1, uk. 300 x 600 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Sloof S2, uk. 250 x 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
SLOOF, ELV. -0.050
Sloof S1, uk. 300 x 600 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Sloof S2, uk. 250 x 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Sloof S3, uk. 300 x 800 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (-0.050) s/d (+4.150)
Dinding lift, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING GESER (SHEAR WALL)
Dinding beton SW1, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Waterstop PVC, lebar 150 mm
Waterproofing cementitious
Dinding beton SW2, tebal 350 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Waterstop PVC, lebar 150 mm
ITEM PEKERJAAN
b
Waterproofing cementitious
Dinding beton SW3, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Waterstop PVC, lebar 150 mm
Waterproofing cementitious
BALOK, ELV. +1.300
Balok B15 250 x 400 mm, Elv. +1.300
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +2.050
Balok B11 300 x 500 mm, Elv. +2.050
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +2.600
Balok B15 250 x 400 mm, Elv. +2.600
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +2.725
Balok B15 250 x 400 mm, Elv. +2.725
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
TANGGA BETON
Tangga Beton tipe A, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe B, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe C, tebal 150 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 Mpa
PLAT BETON, ELV. -0.700
Plat beton A0, tebal 120 mm
Bekisting dipakai 2x
Besi wiremesh ## M8-150 mm
Besi dowel
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. -0.100
Plat beton A0, tebal 120 mm
Bekisting dipakai 2x
Besi wiremesh ## M8-150 mm
Besi dowel
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. -0.050
Plat beton A0, tebal 120 mm
Bekisting dipakai 2x
Besi wiremesh ## M8-150 mm
Besi dowel
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
UPPER GROUND
Catatan :
ITEM PEKERJAAN
b
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K5, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K8, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K9, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +4.000
Balok B1 350 x 700 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +4.000
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B4 400 x 600 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6 350 x 700 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B7 300 x 500 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +4.000
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B9 400 x 800 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B12 250 x 600 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B14 250 x 800 mm, Elv. +4.000
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +4.100
Balok B3 300 x 600 mm, Elv. +4.100
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Balok B6 350 x 700 mm, Elv. +4.100
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +4.100
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +4.100
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B16 250 x 400 mm, Elv. +4.100
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +4.150
Balok B1 350 x 700 mm, Elv. +4.150
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B2 350 x 700 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6 350 x 700 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B7 300 x 500 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Balok B8 300 x 450 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B10 350 x 700 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B11 300 x 500 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +4.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +6.150
Balok B15 250 x 800 mm, Elv. +6.150
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +6.670
Balok B11 300 x 500 mm, Elv. +6.670
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +6.800
Balok B15 250 x 800 mm, Elv. +6.800
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +8.150
Balok B15 250 x 800 mm, Elv. +8.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (+4.150) s/d (+9.190)
Dinding lift, tebal 250 mm
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING GESER (SHEAR WALL)
Dinding beton SW1, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW2, tebal 350 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW3, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
TANGGA BETON
Tangga Beton tipe A, tebal 150 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe B, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe C, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
PLAT BETON, ELV. +4.000
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
PLAT BETON, ELV. +4.100
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +4.150
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
LANTAI 03
Catatan :
ITEM PEKERJAAN
b
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K6, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K8, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K9, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +9.140
Balok B1a 350 x 700 mm, Elv. +9.140
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B2a 350 x 700 mm, Elv. +9.140
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +9.140
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +9.140
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +9.140
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B13 250 x 550 mm, Elv. +9.140
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +9.140
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B16 250 x 400 mm, Elv. +9.140
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +9.190
Balok B1a 350 x 700 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B2a 350 x 700 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Balok B4 400 x 600 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B7 300 x 500 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +9.190
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B10 350 x 700 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B11 300 x 500 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B12 250 x 600 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B13 250 x 450 mm, Elv. +9.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +9.190
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +10.150
Balok B15 250 x 400 mm, Elv. +10.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +11.290
Balok B11 300 x 500 mm, Elv. +11.290
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +11.840
Balok B15 250 x 400 mm, Elv. +11.840
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +12.150
ITEM PEKERJAAN
b
Balok B15 250 x 400 mm, Elv. +12.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (+9.190) s/d (+13.390)
Dinding lift, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING GESER (SHEAR WALL)
Dinding beton SW1, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW2, tebal 350 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW3, tebal 400 mm
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
TANGGA BETON
Tangga Beton tipe A, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe B, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe C, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
PLAT BETON, ELV. +9.140
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +9.190
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
LANTAI 04
Catatan :
ITEM PEKERJAAN
b
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K6, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K8, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K9, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +13.340
Balok B3 300 x 600 mm, Elv. +13.340
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +13.340
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +13.340
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +13.340
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B16 250 x 400 mm, Elv. +13.340
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +13.390
Balok B1a 350 x 700 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Balok B2a 350 x 700 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B4 400 x 600 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Balok B7 300 x 500 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B10 350 x 700 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B11 300 x 500 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B12 250 x 600 mm, Elv. +13.390
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B13 250 x 450 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +13.390
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +14.150
Balok B15 250 x 400 mm, Elv. +14.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +15.490
Balok B11 300 x 500 mm, Elv. +15.490
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
BALOK, ELV. +16.040
Balok B15 250 x 400 mm, Elv. +16.040
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +16.150
Balok B15 250 x 400 mm, Elv. +16.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (+13.390) s/d (+17.590)
Dinding lift, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING GESER (SHEAR WALL)
Dinding beton SW1, tebal 400 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW2, tebal 350 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW3, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
TANGGA BETON
Tangga Beton tipe A, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe B, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
ITEM PEKERJAAN
b
Tangga Beton tipe C, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
PLAT BETON, ELV. +13.340
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +13.390
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
LANTAI 05
Catatan :
b
KOLOM, ELV. (+17.590) S/D (+21.790)
Kolom K3, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K7, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K8, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +17.540
Balok B3 300 x 600 mm, Elv. +17.540
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +17.540
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Balok B8 300 x 450 mm, Elv. +17.540
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +17.540
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B16 250 x 400 mm, Elv. +17.540
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +17.590
Balok B1a 350 x 700 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B2a 350 x 700 mm, Elv. +17.590
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B4 400 x 600 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B7 300 x 500 mm, Elv. +17.590
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B10 350 x 700 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B11 300 x 500 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B12 250 x 600 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Balok B13 250 x 450 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +17.590
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +18.150
Balok B15 250 x 400 mm, Elv. +18.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +19.690
Balok B11 300 x 500 mm, Elv. +19.690
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +20.150
ITEM PEKERJAAN
b
Balok B15 250 x 400 mm, Elv. +20.150
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +20.240
Balok B15 250 x 400 mm, Elv. +20.240
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (+17.590) s/d (+21.790)
Dinding lift, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING GESER (SHEAR WALL)
Dinding beton SW1, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Dinding beton SW2, tebal 350 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW3, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
TANGGA BETON
Tangga Beton tipe A, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe B, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
Tangga Beton tipe C, tebal 150 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 Mpa
PLAT BETON, ELV. +17.540
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +17.590
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
LANTAI 06
Catatan :
ITEM PEKERJAAN
b
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K4, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K7, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K8, uk. 500 x 700 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +21.740
Balok B3 300 x 600 mm, Elv. +21.740
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +21.740
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +21.740
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B16 250 x 400 mm, Elv. +21.740
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +21.790
Balok B1a 350 x 700 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B2a 350 x 700 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Balok B4 400 x 600 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6a 350 x 700 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B7 300 x 500 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Balok B10 350 x 700 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B11 300 x 500 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B12 250 x 600 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B13 250 x 450 mm, Elv. +21.790
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +21.790
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +23.190
Balok B15 250 x 400 mm, Elv. +23.190
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +23.890
Balok B11 300 x 500 mm, Elv. +23.890
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +24.440
Balok B15 250 x 400 mm, Elv. +24.440
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +24.590
Balok B15 250 x 400 mm, Elv. +24.590
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (+21.790) s/d (+25.990)
Dinding lift, tebal 250 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING GESER (SHEAR WALL)
Dinding beton SW1, tebal 400 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW2, tebal 350 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Dinding beton SW3, tebal 400 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
TANGGA BETON
Tangga Beton tipe B, tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 Mpa
PLAT BETON, ELV. +21.740
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +21.790
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
LANTAI ATAP
Catatan :
ITEM PEKERJAAN
b
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K10, uk. 350 x 350 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
KOLOM, ELV. (+25.990) S/D (+29.610)
Kolom K7, uk. 600 x 800 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K10, uk. 350 x 350 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K11, uk. 250 x 250 x 500 mm (L)
Bekisting dipakai 3x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Kolom K12, uk. 250 x 250 x 500 mm (T)
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
Kolom K13, uk. 800 x 250 x 250 x 500 mm
Bekisting dipakai 3x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +25.990
Balok B1b 350 x 700 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B2 350 x 700 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B3 300 x 600 mm, Elv. +25.990
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B4 400 x 600 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B6 350 x 700 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
Balok B10 350 x 700 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B11 300 x 500 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B12 250 x 600 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B13 250 x 450 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
ITEM PEKERJAAN
b
Beton ready mix F'c 25 MPa
Balok B16 250 x 400 mm, Elv. +25.990
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +26.310
Balok B15 250 x 400 mm, Elv. +26.310
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
BALOK, ELV. +29.610
Balok B8 300 x 450 mm, Elv. +29.610
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B15 250 x 400 mm, Elv. +29.610
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
ITEM PEKERJAAN
b
BALOK, ELV. +29.040
Balok B4 400 x 600 mm, Elv. +29.040
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B5 300 x 500 mm, Elv. +29.040
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B8 300 x 450 mm, Elv. +29.040
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Balok B13 250 x 600 mm, Elv. +29.040
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
DINDING LIFT, ELV. (+25.990) s/d (+29.610)
Dinding lift, tebal 250 mm
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +25.990
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A2 tebal 120 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
Plat beton A3 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +29.610
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 25 MPa
PLAT BETON, ELV. +29.040
Plat beton A1 tebal 150 mm
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 25 MPa
PEKERJAAN KANOPI
Catatan :
ITEM PEKERJAAN
KANOPI KN1
Balok BJ1 - IWF 400 x 200 x 8 x 13 mm
ITEM PEKERJAAN
b
Plat stiffener, tebal 10 mm
Plat plendes, tebal 20 mm
Angkur baut mutu tinggi (galvanis) M20x400 mm & Injectable ad
KANOPI KN2
Balok BJ1 - IWF 400 x 200 x 8 x 13 mm
Plat stiffener, tebal 10 mm
Plat plendes, tebal 20 mm
Angkur baut mutu tinggi (galvanis) M20x400 mm & Injectable ad
KANOPI KN3
Balok BJ1 - IWF 400 x 200 x 8 x 13 mm
Plat stiffener, tebal 10 mm
Plat plendes, tebal 20 mm
Angkur baut mutu tinggi (galvanis) M20x400 mm & Injectable ad
b
Plat sambung, tebal 10 mm
Baut A325 Ø 16 mm (termasuk 2 ring)
b
Haunch IWF 300 x 150 x 6.5 x 9 mm
KJ1 - H-Beam 200 x 200 x 8 x 12 mm
Plat stiffener, tebal 10 mm
Plat sambung, tebal 14 mm
Plat stiffener pengaku kolom, tebal 10 mm
Plat plendes, tebal 16 mm
Angkur baut mutu tinggi (galvanis) M20x240 mm & Injectable ad
Baut A325 Ø 16 mm (termasuk 2 ring)
Grouting, tebal 30 mm
Cap plate, tebal 10 mm
PENUTUP TRIBUN
Papan fiber semen, tebal 20 mm
Plat beton, tebal 120 mm
ITEM PEKERJAAN
b
Steeldeck, tebal 0.7 mm (BMT)
Besi tulangan
Beton ready mix F'c 25 MPa
Stek besi, D16 mm (setiap 500 mm)
b
Haunch IWF 300 x 150 x 6.5 x 9 mm
KJ1 - H-Beam 200 x 200 x 8 x 12 mm
Plat stiffener, tebal 10 mm
Plat sambung, tebal 14 mm
Plat stiffener pengaku kolom, tebal 10 mm
Plat plendes, tebal 16 mm
Angkur baut mutu tinggi (galvanis) M20x400 mm & Injectable ad
Baut A325 Ø 16 mm (termasuk 2 ring)
Grouting, tebal 30 mm
Cap plate, tebal 10 mm
PENUTUP TRIBUN
Papan fiber semen, tebal 20 mm
ITEM PEKERJAAN
PEKERJAAN DILATASI
DILATASI ELV. +4.000
Plat besi 6 mm + zincromate + cat besi (tanpa pengelasan)
Angkur baut Ø 10 mm
b
Tangga maintenance GWT, meliputi:
Pipa stainless steel Ø 2", tebal 1.5 mm
Plat stainless steel, tebal 1.6 mm
Angkur baut Ø 12 mm
Pengelasan
b
Balok praktis (BP1), uk. 100 x 200 mm
Balok lateui (BL1), uk. 100 x 100 mm
Balok lateui (BL2), uk. 100 x 120 mm
Plat meja beton, tebal 100 mm (# D10-150 mm) - Meja wastafel
Rabat beton bawah ramp, tebal 100 mm (camp. 1pc : 2ps : 3 kr)
LANTAI 03
Kolom praktis (KP1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
Balok lateui (BL1), uk. 100 x 100 mm
Plat meja beton, tebal 100 mm (# D10-150 mm) - Meja wastafel
LANTAI 04
ITEM PEKERJAAN
b
Kolom praktis (KP1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
Balok lateui (BL1), uk. 100 x 100 mm
Plat meja beton, tebal 100 mm (# D10-150 mm) - Meja wastafel
LANTAI 05
Kolom praktis (KP1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
Balok lateui (BL1), uk. 100 x 100 mm
Plat meja beton, tebal 100 mm (# D10-150 mm) - Meja wastafel
LANTAI 06
Kolom praktis (KP1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
Balok lateui (BL1), uk. 100 x 100 mm
Plat meja beton, tebal 100 mm (# D10-150 mm) - Meja wastafel
LANTAI ATAP
Kolom praktis (KP1), uk. 100 x 100 mm
ITEM PEKERJAAN
b
Balok lateui (BL1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
b
Acian dinding bata ringan
Plesteran skoning
Pekerjaan tali air
Plesteran dan acian beton
Cement filler plat beton ekspose
Screeding plat
Pasangan kawat ayam dibawah screeding
Peninggian peil lantai dengan pasangan bata ringan, tebal 200 m
LANTAI 3
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Plesteran skoning
Pekerjaan tali air
Plesteran dan acian beton
Cement filler plat beton ekspose
Screeding plat
Pasangan kawat ayam dibawah screeding
ITEM PEKERJAAN
LANTAI 4
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Plesteran skoning
Pekerjaan tali air
Plesteran dan acian beton
Cement filler plat beton ekspose
Screeding plat
Pasangan kawat ayam dibawah screeding
LANTAI 5
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Plesteran skoning
Pekerjaan tali air
Plesteran dan acian beton
ITEM PEKERJAAN
b
Cement filler plat beton ekspose
Screeding plat
Pasangan kawat ayam dibawah screeding
LANTAI 6
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Plesteran skoning
Pekerjaan tali air
Plesteran dan acian beton
Cement filler plat beton ekspose
Screeding plat
Pasangan kawat ayam dibawah screeding
LANTAI ATAP
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
ITEM PEKERJAAN
b
Plesteran skoning
Pekerjaan tali air
Plesteran dan acian beton
Screeding plat
Pasangan kawat ayam dibawah screeding
b
Lipped Channel 100 x 50 x 20 x 2.3 mm (finish cat zinchromate
Hollow Besi 40 x 40 x 1.2 mm (finish cat zinchromate dan cat be
Plat Besi tebal 1.2 mm (finish cat zinchromate dan cat besi)
Handle - Pipa Black Steel ∅ 1" tebal 1.6 mm
Kunci (lockcase, cylinder, escutecheon)
Engsel
b
Door closer
Karet
b
Pintu, tipe P10 (1 unit), meliputi:
Lipped Channel 100 x 50 x 20 x 2.3 mm (finish cat zinchromate
Hollow Besi 40 x 40 x 1.2 mm (finish cat zinchromate dan cat be
Plat Besi tebal 1.2 mm (finish cat zinchromate dan cat besi)
Handle - Pipa Black Steel ∅ 1" tebal 1.6 mm
Kunci (lockcase, cylinder, escutecheon)
Engsel
b
Invisible hinge door
Lever Handle
Kunci (lockcase, cylinder)
b
Pull handle stainless steel, panjang 600mm
Kaca sunergy blue green tempered, tebal 8 mm
Kaca bening tempered, tebal 12 mm
Floor hinge, kap. 85 kg
b
Back mullion
Ekspose transome
Kusen aluminium, tebal 1.1 mm
Frame daun jendela
Kaca sunergy blue green tempered, tebal 8 mm
Friction stay stainless steel 20"
Casement handle
Karet
b
Friction stay stainless steel 20"
Casement handle
Karet
b
Door closer
b
Door closer
Karet
b
Pintu, tipe P09 (2 unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Engineering wood door Flush Core Panel, uk. 750x2365 mm
Engsel pintu
Pull handle stainless steel, panjang 300mm
Kunci (lockcase, cylinder, escutecheon)
Door closer
Flushbolt 12"
Karet
b
Besi siku 30 x 30 x 3 mm
Angkur baut Ø 12 mm
b
Karet
b
Kaca sunergy blue green tempered, tebal 8 mm
Kaca bening tempered, tebal 12 mm
Floor hinge, kap. 85 kg
b
Back mullion
Ekspose transome
Kaca sunergy blue green tempered, tebal 8 mm
b
Back mullion
Ekspose transome
Kaca sunergy blue green tempered, tebal 8 mm
b
Back mullion
Ekspose transome
Frame daun jendela
Kaca sunergy blue green tempered, tebal 8 mm
Friction stay stainless steel 20"
Casement handle
Karet
LANTAI 03
Pintu Darurat, tipe P02 (2 unit), meliputi:
Frame : plat baja 1.5 mm
Daun pintu 1 x 2.1 m tebal 50 mm
Daun pintu berbentuk rebated door
Door closer
b
Pull handle stainless steel, panjang 300mm
Kunci (lockcase, cylinder, escutecheon)
Door closer
Karet
b
Engsel pintu
Pull handle difabel stainless steel, panjang 600mm
Door closer
Karet
b
Pintu Alumunium, uk. 700 x 2065 mm tebal 1.1 mm
Engsel pintu
Lever handle
Kunci (lockcase, cylinder, escutecheon)
Karet
b
Kaca bening, tebal 10 mm
Door closer
Flushbolt 12"
Karet
b
Kunci (lockcase, cylinder)
b
Engsel
Kunci (lockcase, cylinder, escutecheon)
Door Closer
Karet
b
Frame daun jendela
Kaca sunergy blue green tempered, tebal 8 mm
Friction stay stainless steel 20"
Casement handle
Karet
b
Jendela, tipe J20 (1 unit), meliputi:
Back mullion
Ekspose transome
Frame daun jendela
Kaca sunergy blue green tempered, tebal 8 mm
Friction stay stainless steel 20"
Casement handle
Karet
LANTAI 04
ITEM PEKERJAAN
b
Pintu, tipe P03 (6 unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Engineering wood door Flush Core Panel, uk. 800x2365 mm
Engsel pintu
Pull handle stainless steel, panjang 300mm
Kunci (lockcase, cylinder, escutecheon)
Door closer
Karet
b
Karet
b
Ekspose transome
Frame daun pintu
Kaca sunergy blue green tempered, tebal 8 mm
Pull handle stainless steel, panjang 300 mm
Engsel
Kunci (lockcase, cylinder, escutecheon)
Door Closer
Karet
b
Karet
b
Kaca sunergy blue green tempered, tebal 8 mm
Friction stay stainless steel 20"
Casement handle
Karet
LANTAI 05
Pintu Darurat, tipe P02 (2 unit), meliputi:
Frame : plat baja 1.5 mm
Daun pintu 1 x 2.1 m tebal 50 mm
Daun pintu berbentuk rebated door
Door closer
b
Engineering wood door Flush Core Panel, uk. 800x2365 mm
Engsel pintu
Pull handle stainless steel, panjang 300mm
Kunci (lockcase, cylinder, escutecheon)
Door closer
Karet
b
Kusen aluminium, tebal 1.1 mm
Pintu Alumunium, uk. 1000 x 2065 mm tebal 1.1 mm
Engsel pintu
Pull handle difabel stainless steel, panjang 600mm
Door closer
Karet
b
Lever Handle
Kunci (lockcase, cylinder)
b
Pull handle stainless steel, panjang 300 mm
Engsel
Kunci (lockcase, cylinder, escutecheon)
Door Closer
Karet
b
Jendela, tipe J34 (2 unit), meliputi:
Back mullion
Ekspose transome
Kaca sunergy blue green tempered, tebal 8 mm
LANTAI 06
Pintu Darurat, tipe P02 (2 unit), meliputi:
Frame : plat baja 1.5 mm
Daun pintu 1 x 2.1 m tebal 50 mm
Daun pintu berbentuk rebated door
Door closer
b
Karet
b
Karet
b
Kunci (lockcase, cylinder, escutecheon)
Engsel
b
Karet
b
Back mullion
Ekspose transome
Kaca sunergy blue green tempered, tebal 8 mm
b
Casement handle
Karet
LANTAI ATAP
Pintu, tipe P08 (1 unit), meliputi:
Lipped Channel 100 x 50 x 20 x 2.3 mm (finish cat zinchromate
Hollow Besi 40 x 40 x 1.2 mm (finish cat zinchromate dan cat be
Plat Besi tebal 1.2 mm (finish cat zinchromate dan cat besi)
Handle - Pipa Black Steel ∅ 1" tebal 1.6 mm
Kunci (lockcase, cylinder, escutecheon)
Engsel
LANTAI 03
Homogeneous tile matte, uk. 600 x 600 mm
Homogeneous tile matte, uk. 600 x 600 mm - Tangga
Homogeneous tile plint, uk. 100 x 600 mm
Stepnosing, uk. 80 x 600 mm
ITEM PEKERJAAN
LANTAI 04
ITEM PEKERJAAN
b
Homogeneous tile matte, uk. 600 x 600 mm
Homogeneous tile matte, uk. 600 x 600 mm - Tangga
Homogeneous tile plint, uk. 100 x 600 mm
Stepnosing, uk. 80 x 600 mm
ITEM PEKERJAAN
LANTAI 05
Homogeneous tile matte, uk. 600 x 600 mm
ITEM PEKERJAAN
LANTAI 06
ITEM PEKERJAAN
b
Homogeneous tile matte, uk. 600 x 600 mm
Homogeneous tile matte, uk. 600 x 600 mm - Tangga
Homogeneous tile plint, uk. 100 x 600 mm
Stepnosing, uk. 80 x 600 mm
ITEM PEKERJAAN
LANTAI ATAP
Homogeneous tile matte, uk. 600 x 600 mm
ITEM PEKERJAAN
b
Homogeneous tile plint, uk. 100 x 600 mm
PEKERJAAN PLAFOND
LANTAI LOWER GROUND
ITEM PEKERJAAN
LANTAI 03
ITEM PEKERJAAN
LANTAI 04
ITEM PEKERJAAN
LANTAI 05
ITEM PEKERJAAN
LANTAI 06
ITEM PEKERJAAN
LANTAI ATAP
ITEM PEKERJAAN
PEKERJAAN PENGECATAN
LANTAI LOWER GROUND
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan plafond
Pengecatan cement filler
ITEM PEKERJAAN
b
LANTAI UPPER GROUND
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan plafond
Pengecatan cement filler
Waterproofing kamar mandi (cementitious)
Waterproofing plat dak (polyurethane)
LANTAI 03
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan plafond
Pengecatan cement filler
Waterproofing kamar mandi (cementitious)
Waterproofing plat dak (polyurethane)
LANTAI 04
Pengecatan dinding eksterior
Pengecatan dinding interior
ITEM PEKERJAAN
b
Pengecatan plafond
Pengecatan cement filler
Waterproofing kamar mandi (cementitious)
Waterproofing plat dak (polyurethane)
LANTAI 05
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan plafond
Pengecatan cement filler
Waterproofing kamar mandi (cementitious)
Waterproofing plat dak (polyurethane)
LANTAI 06
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan plafond
Pengecatan cement filler
Waterproofing kamar mandi (cementitious)
ITEM PEKERJAAN
b
Waterproofing plat dak (polyurethane)
LANTAI ATAP
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan plafond
Waterproofing plat dak (polyurethane)
PEKERJAAN RAILING
LANTAI LOWER GROUND
TANGGA TIPE A
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R05
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
TANGGA TIPE C
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R05
b
Railing, tipe R07
Railing, tipe R08
Railing, tipe R09
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R05
Railing, tipe R06
Railing, tipe R07
Railing, tipe R09
TANGGA TIPE C
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R07
Railing, tipe R08
Railing, tipe R09
RAILING PLAZA
Catatan :
ITEM PEKERJAAN
b
LANTAI 03
TANGGA TIPE A
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R05
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R09
TANGGA TIPE C
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R05
LANTAI 04
TANGGA TIPE A
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R05
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R09
TANGGA TIPE C
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R05
LANTAI 05
TANGGA TIPE A
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R05
Railing, tipe R10
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R09
TANGGA TIPE C
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R10
b
LANTAI 06
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R03
Railing, tipe R04
Railing, tipe R09
LANTAI ATAP
TANGGA TIPE B
Catatan :
ITEM PEKERJAAN
b
PEKERJAAN FASADE
TAMPAK DEPAN
DETAIL FASAD A
Pasangan alumunium composite Panel (ACP), tebal 4 mm, meli
ACP PVDF coating alloy 5005
Rangka holow aluminium, uk. 40x40x1 mm
Bracket besi siku, uk. 40 x 40 x 4 mm (Finishing zinchromate)
Stiffener
Sealant & Backup
Baut, Sekrup dan Dinabolt
b
Finishing cat
Embosse 50 mm
DETAIL FASAD B
Pasangan alumunium composite Panel (ACP), tebal 4 mm, meli
ACP PVDF coating alloy 5005
Rangka holow aluminium, uk. 40x40x1 mm
Bracket besi siku, uk. 40 x 40 x 4 mm (Finishing zinchromate)
Stiffener
Sealant & Backup
Baut, Sekrup dan Dinabolt
b
TAMPAK BELAKANG
DETAIL FASAD A
Pasangan alumunium composite Panel (ACP), tebal 4 mm, meli
ACP PVDF coating alloy 5005
Rangka holow aluminium, uk. 40x40x1 mm
Bracket besi siku, uk. 40 x 40 x 4 mm (Finishing zinchromate)
Stiffener
Sealant & Backup
Baut, Sekrup dan Dinabolt
DETAIL FASAD B
ITEM PEKERJAAN
b
Pasangan alumunium composite Panel (ACP), tebal 4 mm, meli
ACP PVDF coating alloy 5005
Rangka holow aluminium, uk. 40x40x1 mm
Bracket besi siku, uk. 40 x 40 x 4 mm (Finishing zinchromate)
Stiffener
Sealant & Backup
Baut, Sekrup dan Dinabolt
TAMPAK KANAN
DETAIL FASAD B
Pasangan alumunium composite Panel (ACP), tebal 4 mm, meli
ACP PVDF coating alloy 5005
Rangka holow aluminium, uk. 40x40x1 mm
Bracket besi siku, uk. 40 x 40 x 4 mm (Finishing zinchromate)
ITEM PEKERJAAN
b
Stiffener
Sealant & Backup
Baut, Sekrup dan Dinabolt
b
Rangka perkuatan, meliputi :
Rangka Hollow Alumunium, uk. 50x100x3 mm
Plat Alumunium, tebal 3 mm
Angkur baut Ø 10 mm
b
Besi siku, 40x40x4 mm
TAMPAK KIRI
DETAIL FASAD A
Pasangan alumunium composite Panel (ACP), tebal 4 mm, meli
ACP PVDF coating alloy 5005
Rangka holow aluminium, uk. 40x40x1 mm
Bracket besi siku, uk. 40 x 40 x 4 mm (Finishing zinchromate)
Stiffener
Sealant & Backup
Baut, Sekrup dan Dinabolt
PEKERJAAN CUBICLE
Catatan :
ITEM PEKERJAAN
LANTAI 03
Pasangan dinding cubicle + pintu + aksesorisnya (handle, kunci
LANTAI 04
Pasangan dinding cubicle + pintu + aksesorisnya (handle, kunci
LANTAI 05
Pasangan dinding cubicle + pintu + aksesorisnya (handle, kunci
LANTAI 06
Pasangan dinding cubicle + pintu + aksesorisnya (handle, kunci
PEKERJAAN KANOPI
Rangka atap baja ringan (G550)
ITEM PEKERJAAN
b
Atap galvalum, tebal 0.35 mm (BMT)
Talang BJLS, tebal 0.3 mm (BMT)
GRC cetak, tebal 10 mm, meliputi :
Rangka besi siku, uk. 50x50x5 mm (finishing zinchromate & ca
Pengecatan GRC cetak
PEKERJAAN PARTISI
LANTAI LOWER GROUND
Partisi kaca, tipe PK12 (2 Unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Frame daun pintu alumunium, tebal 1.2 mm
Kaca sunergy blue green tempered, tebal 8 mm
Pull handle stainless steel, panjang 300mm
Engsel pintu
Door closer
Karet
b
Kaca sunergy blue green tempered, tebal 8 mm
b
Partisi kaca, tipe PK17 (1 Unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Frame daun pintu alumunium, tebal 1.2 mm
Kaca sunergy blue green tempered, tebal 8 mm
Pull handle stainless steel, panjang 300mm
Engsel pintu
Door closer
Karet
b
Kaca sunergy blue green tempered, tebal 8 mm
b
Kusen aluminium, tebal 1.1 mm
Frame daun pintu alumunium, tebal 1.2 mm
Kaca sunergy blue green tempered, tebal 8 mm
Pull handle stainless steel, panjang 300mm
Engsel pintu
Door closer
Karet
b
Kaca bening tempered, tebal 12 mm
Floor hinge, kap. 85 kg
b
Akomodasi transportasi material & SDM
b
Angkur baut Ø 12 mm
LANTAI 3
Partisi kaca, tipe PK06 (1 Unit), meliputi:
ITEM PEKERJAAN
b
Kusen aluminium, tebal 1.1 mm
Patch fitting paket HG (PT10,PT20,US10+Cyl)
Patch fitting PT 24 PSS
Pull handle stainless steel, panjang 600mm
Kaca tempered sunergy, tebal 10 mm
Kaca bening tempered, tebal 12 mm
Floor hinge, kap. 85 kg
b
Gypsum board, tebal 12 mm
Pengecatan - Cat dinding interior
Sealant
Stopping angle 10 mm, uk. 0.40 mm (BMT)
Papan fibercement, tebal 6 mm
Plint homogeneous tile, uk. 100x600 mm
b
Pengecatan - Cat dinding interior
Sealant
Stopping angle 10 mm, uk. 0.40 mm (BMT)
Papan fibercement, tebal 6 mm
Plint homogeneous tile, uk. 100x600 mm
b
Sealant
Stopping angle 10 mm, uk. 0.40 mm (BMT)
Papan fibercement, tebal 6 mm
Plint homogeneous tile, uk. 100x600 mm
LANTAI 4
Partisi kaca, tipe PK08 (1 Unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Kaca tempered sunergy, tebal 10 mm
b
Partisi kaca, tipe PK10 (1 Unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Patch fitting paket HG (PT10,PT20,US10+Cyl)
Patch fitting PT 24 PSS
Pull handle stainless steel, panjang 600mm
Kaca tempered sunergy, tebal 10 mm
Kaca bening tempered, tebal 12 mm
Floor hinge, kap. 85 kg
LANTAI 5
Partisi kaca, tipe PK09 (2 Unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Patch fitting paket HG (PT10,PT20,US10+Cyl)
Patch fitting PT 24 PSS
Pull handle stainless steel, panjang 600mm
Kaca tempered sunergy, tebal 10 mm
Kaca bening tempered, tebal 12 mm
Floor hinge, kap. 85 kg
ITEM PEKERJAAN
b
LANTAI 6
Partisi kaca, tipe PK07 (3 Unit), meliputi:
Kusen aluminium, tebal 1.1 mm
Kaca tempered sunergy, tebal 10 mm
b
Angkur baut Ø 10 mm
Plint conwood 100 x 3050 mm, tebal 11 mm
PEKERJAAN TRIBUN
LANTAI UPPER GROUND
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Cat interior
Finishing karpet, tebal 6.5 mm
LANTAI 03
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
ITEM PEKERJAAN
b
Cat interior
Finishing karpet, tebal 6.5 mm
PEKERJAAN INTERIOR
LANTAI UPPER GROUND
Pemasangan Click on Hollow 50x50 mm, meliputi:
Click on hollow 50x50 mm
Tracker X60
Srew
Multipleks, tebal 9 mm
ITEM PEKERJAAN
PEKERJAAN GAZEBO
LANTAI ROOFTOP
Umpak beton (camp. 1pc : 3ps : 5kr)
Gazebo kayu glugu kelapa (2 unit), dengan spesifikasi:
Ukuran 2,5 m x 2,5 m
Balok kayu glugu, uk. 120 x 80 mm
Papan kayu glugu, uk. 200 x 30 mm
Kolom kayu glugu, uk. 150 x 150 mm
Atap sirap
Finishing natural
b
IM - SM6 type Cubicle lengkap dengan :
Switch Cubicle (LBS-SF6) 24kV, 16kA, 630 A
Voltage Indicators 3 Pcs
Busbar 630 A 3 unit
Heater 50 W, 220 VAC
CIT Operating Me
Sensor suhu (Easergy TH110) dan kelembaban (Easergy CL11
Substation monitoring device (Controller dan H
Outgoing Cubicle CB
DM1A Motorised - SM6 type Cubicle lengkap dengan :
Fluarc SF1 Circuit Breaker 24kV ; 16kA ; 630 A
Current Transformer
Voltage Indicators 3 Pcs
Busbar 630A 3 unit
Heater 50 W, 220 VAC
Shunt Trip 220 VAC 50 Hz
Disconnector & Earthing SWITCH with SF6 gas Technology
RI Circuit Breaker & CS Disconnector operating Mechanism
ITEM PEKERJAAN
b
Relay proteksi Easergy P3U20
Sensor suhu (Easergy TH110) dan kelembaban (Easergy CL11
UPS
b
IP degree of protection IP3x
Incoming PLN
ACB 1000 A / 3P / 50 kA
ITEM PEKERJAAN
b
Gear motor (MCH) for ACB (F/T)
Kontak bantu
Under voltage release
Shunt trip
Push button ON (green)
Push button OFF (red)
Emergency stop
Selector Switch M-O-A 2P
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Socket relay
Relay 230VAC
Timer delay
Digital power meter PM 5560
Current transformer 1000 / 5A
ITEM PEKERJAAN
b
Incoming Genset
ACB 1000 A / 3P / 50 kA
Gear motor (MCH) for ACB (F/T)
Kontak bantu
Under voltage release
Shunt trip
Push button ON (green)
Push button OFF (red)
Emergency stop
Selector Switch M-O-A 2P
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Socket relay
Relay 230VAC
Timer delay
Digital power meter PM 5560
ITEM PEKERJAAN
b
Current transformer 1000 / 5A
Outgoing
ACB 1000 A / 3P / 50 kA
MCCB 200 A / 3P / 25 kA
MCCB 50 A / 3P / 18 kA
MCCB 25 A / 3P / 18 kA
MCB 16 A / 1P / 10 kA
Lain-lain
Busbar tembaga 5 x 1000 A
Grounding dengan kabel NYA 150 mm²
Pipa PVC AW Ø 1"
Wiring, aksesoris dan instalasi
Capacitor Bank
Box panel floor standing, uk. 2100 (H) x 1400 (W) x 800 (D) mm
Segregation form 3B
Protection degree IP30
ITEM PEKERJAAN
b
Finishing powder coating RAL 7032
Incoming
LBS 1000 A / 4P
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 1000 / 5A
Capacitor bank
MCCB 100 A / 3P / 10 kA
MCCB 50 A / 3P / 10 kA
MCCB 30 A / 3P / 10 kA
Contactor 3P 100A
Contactor 3P 50A
Contactor 3P 32A
ITEM PEKERJAAN
b
Capasitor bank 50 KVAR
Capasitor bank 25 KVAR
Capasitor bank 15 KVAR
Power regulator 12 step
Push button ON (green)
Push button OFF (red)
Pilot lamp 230/240V (green)
Indicator alarm
Exhaust fan 220 300 m3/h 230V IP53
Thermostat
Socket relay
Relay 230VAC
Contactor 9 A
Selector Switch M-O-A 2P
Busbar tembaga 5 x 1600 A
Grounding - Kabel NYA 150 mm2
Pipa PVC AW Ø 1"
Wiring, aksesoris dan instalasi
ITEM PEKERJAAN
b
Pekerjaan grounding elektrikal (ruang panel)
Busbar tembaga, uk. 4 x 40 mm
Grounding dengan kabel NYA 150 mm²
Pipa PVC AW Ø 1"
Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupl
Bak grounding
Pengeboran sumur grounding
PEKERJAAN PANEL
Main Distribution Panel
Box panel floor standing, uk. 2100 (H) x 1400 (W) x 800 (D) mm
Segregation form 3B
ITEM PEKERJAAN
b
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
ACB 1000 A / 3P / 50 kA
Emergency stop
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 1000 / 5A
Outgoing
MCCB 350-500 A / 3P / 36 kA
MCCB 175-250 A / 3P / 25 kA
MCCB 75 A / 3P / 18 kA
MCCB 50 A / 3P / 18 kA
ITEM PEKERJAAN
b
MCCB 40 A / 3P / 18 kA
MCCB 20 A / 3P / 18 kA
Lain-lain
Busbar tembaga 5 x 1000 A
Grounding dengan kabel NYA 150 mm²
Pipa PVC AW Ø 1"
Wiring, aksesoris dan instalasi
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
ITEM PEKERJAAN
b
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
MCB 6 A / 1P / 6 kA
Timer 24H
Contactor 1NO 16A
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
b
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 20 A / 3P / 10 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 40 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
ITEM PEKERJAAN
b
Wiring, aksesoris dan instalasi
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
ITEM PEKERJAAN
b
MCB 16 A / 3P / 10 kA
MCB 10 A / 3P / 10 kA
MCB 10 A / 1P / 10 kA
Timer 24H
Contactor 1NO 16A
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
Incoming
MCCB 175-250 A / 3P / 25 kA
Pilot lamp 230/240V (red)
ITEM PEKERJAAN
b
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 250 / 5A
Outgoing
MCB 125 A / 3P / 15 kA
MCB 40 A / 3P / 15 kA
MCB 16 A / 3P / 10 kA
MCB 16 A / 1P / 10 kA
MCB 10 A / 1P / 10 kA
Lain-lain
Busbar tembaga 5 x 400 A
Wiring, aksesoris dan instalasi
b
Box panel wall mounted, uk. 600 (H) x 500 (W) x 230 (D) mm
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
MCB 16 A / 3P / 10 kA
MCB 16 A / 1P / 10 kA
ITEM PEKERJAAN
b
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
ITEM PEKERJAAN
b
Current transformer 50 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
MCB 6 A / 1P / 6 kA
Timer 24H
Contactor 1NO 16A
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
Incoming
ITEM PEKERJAAN
b
MCCB 20 A / 3P / 10 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 40 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
LANTAI 3
Panel Daya Lantai 3
Box panel wall mounted, uk. 800 (H) x 600 (W) x 230 (D) mm
ITEM PEKERJAAN
b
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
MCB 6 A / 1P / 6 kA
Lain-lain
ITEM PEKERJAAN
b
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
Incoming
MCCB 20 A / 3P / 10 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 40 / 5A
ITEM PEKERJAAN
b
Outgoing
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
LANTAI 4
Panel Daya Lantai 4
Box panel wall mounted, uk. 800 (H) x 600 (W) x 230 (D) mm
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
ITEM PEKERJAAN
b
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
MCB 6 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
b
Incoming
MCCB 20 A / 3P / 10 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 40 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
LANTAI 5
Panel Daya Lantai 5
ITEM PEKERJAAN
b
Box panel wall mounted, uk. 800 (H) x 600 (W) x 230 (D) mm
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
MCB 6 A / 1P / 6 kA
Timer 24H
ITEM PEKERJAAN
b
Contactor 1NO 16A
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
Incoming
MCCB 20 A / 3P / 10 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
ITEM PEKERJAAN
b
Digital power meter PM 2220
Current transformer 40 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
LANTAI 6
Panel Daya Lantai 6
Box panel wall mounted, uk. 600 (H) x 500 (W) x 230 (D) mm
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 40 A / 3P / 18 kA
ITEM PEKERJAAN
b
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 50 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
MCB 6 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
b
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 20 A / 3P / 10 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 40 / 5A
Outgoing
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
ITEM PEKERJAAN
LANTAI ATAP
Panel Daya Outdoor AC
Box panel wall mounted, uk. 900 (H) x 700 (W) x 300 (D) mm
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 350-500 A / 3P / 36 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 500 / 5A
Outgoing
ITEM PEKERJAAN
b
MCCB 100 A / 3P / 18 kA
MCCB 75 A / 3P / 18 kA
MCCB 60 A / 3P / 18 kA
MCCB 50 A / 3P / 18 kA
MCCB 40 A / 3P / 18 kA
Lain-lain
Busbar tembaga 5 x 500 A
Wiring, aksesoris dan instalasi
Incoming
MCCB 40 A / 3P / 18 kA
Pilot lamp 230/240V (red)
ITEM PEKERJAAN
b
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 40 / 5A
Outgoing
MCB 16 A / 3P / 10 kA
MCB 16 A / 1P / 10 kA
MCB 10 A / 3P / 10 kA
MCB 10 A / 1P / 6 kA
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
b
Segregation form 2A
Protection degree IP30
Finishing powder coating RAL 7032
Incoming
MCCB 75 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Digital power meter PM 2220
Current transformer 75 / 5A
Outgoing
MCB 40 A / 3P / 15 kA
MCB 32 A / 3P / 15 kA
Lain-lain
ITEM PEKERJAAN
b
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
Incoming
MCCB 50 A / 3P / 18 kA
Pilot lamp 230/240V (red)
Pilot lamp 230/240V (yellow)
Pilot lamp 230/240V (green)
STI (Fuse Carrier)
Tabung sekring (fuse catridge)
Push button ON (green)
Push button OFF (red)
Emergency stop
ITEM PEKERJAAN
b
Current transformer 75 / 5A
Outgoing
MCB 32 A / 3P / 15 kA
Contactor 3P 100A
Lain-lain
Busbar tembaga 5 x 100 A
Wiring, aksesoris dan instalasi
b
Kabel N2XSY 70 mm2
b
Panel Daya Lantai 6 - Kabel NYY 4 x 10 mm2
Panel Daya Tata Udara Lower Ground - Kabel NYY 4 x 4 mm2
Panel Daya Tata Udara Upper Ground - Kabel NYY 4 x 4 mm2
Panel Daya Tata Udara Lantai 3 - Kabel NYY 4 x 4 mm2
Panel Daya Tata Udara Lantai 4 - Kabel NYY 4 x 4 mm2
Panel Daya Tata Udara Lantai 5 - Kabel NYY 4 x 4 mm2
Panel Daya Tata Udara Lantai 6 - Kabel NYY 4 x 4 mm2
Panel Daya Ruang Pompa - Kabel NYY 4 x 16 mm2
Panel Daya Lift - Kabel NYY 4 x 25 mm2
Panel Daya Outdoor AC - Kabel NYY 4 x (1x 300 mm2)
Panel Daya Utilitas Rooftop - Kabel NYY 4 x 10 mm2
Panel Daya Amphitheater - Kabel NYY 4 x 16 mm2
Panel Daya Videotron - Kabel NYY 4 x 150 mm2
ITEM PEKERJAAN
b
Panel Daya Lantai 5 - Kabel NYA 16 mm2
Panel Daya Lantai 6 - Kabel NYA 10 mm2
Panel Daya Tata Udara Lower Ground - Kabel NYA 4 mm2
Panel Daya Tata Udara Upper Ground - Kabel NYA 4 mm2
Panel Daya Tata Udara Lantai 3 - Kabel NYA 4 mm2
Panel Daya Tata Udara Lantai 4 - Kabel NYA 4 mm2
Panel Daya Tata Udara Lantai 5 - Kabel NYA 4 mm2
Panel Daya Tata Udara Lantai 6 - Kabel NYA 4 mm2
Panel Daya Ruang Pompa - Kabel NYA 16 mm2
Panel Daya Lift - Kabel NYA 25 mm2
Panel Daya Outdoor AC - Kabel NYA 150 mm2
Panel Daya Utilitas Rooftop - Kabel NYA 10 mm2
Panel Daya Amphitheater - Kabel NYA 16 mm2
Panel Daya Videotron - Kabel NYA 70 mm2
b
Instalasi penerangan dengan kabel NYY 2 x 2.5 mm² w/ pipa co
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
LED Panel 600 x 600 mm 40 W 6500K Ceiling
Downlight Slim Inbow 6 W 6500K
Downlight Slim Inbow 12 W 6500K
Downlight Inbow Ø 5" LED Emergency 9 W 6500 K
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
Lampu Taman tipe B
Saklar ganda
Saklar tunggal
Saklar tukar ganda
Saklar tukar tunggal
Kotak kontak dinding tunggal 16 A
Kotak kontak lantai single 10A
Kotak kontak dinding tunggal outbow waterproof 16 A
Kotak kontak dinding tunggal 16 A (wallmount rack)
b
Instalasi penerangan dengan kabel NYM 2 x 2.5 mm² w/ pipa co
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
LED Panel 600 x 600 mm 40 W 6500K Ceiling
Downlight Slim Inbow 6 W 6500K
Downlight Slim Inbow 12 W 6500K
Linier Light 52 W
Lampu Uplight LED 12 W
Lampu Spotlight LED 6 W
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K, panjang 1.500 m
Exit lamp 5 W c/w battery
Saklar ganda
Saklar tunggal
Saklar tukar ganda
Kotak kontak dinding tunggal 16 A
Kotak kontak lantai single 10A
Kotak kontak dinding tunggal 16 A (wallmount rack)
ITEM PEKERJAAN
b
LANTAI 3
Instalasi penerangan dengan kabel NYM 2 x 2.5 mm² w/ pipa co
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
LED Panel 600 x 600 mm 40 W 6500K Ceiling
Downlight Slim Inbow 6 W 6500K
Downlight Slim Inbow 12 W 6500K
Linier Light 52 W
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
Exit lamp 5 W c/w battery
Saklar ganda
Saklar tunggal
Saklar tukar ganda
Kotak kontak dinding tunggal 16 A
Kotak kontak lantai single 10A
Kotak kontak dinding tunggal 16 A (wallmount rack)
LANTAI 4
Instalasi penerangan dengan kabel NYM 2 x 2.5 mm² w/ pipa co
ITEM PEKERJAAN
b
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
LED Panel 600 x 600 mm 40 W 6500K Ceiling
Downlight Slim Inbow 6 W 6500K
Downlight Slim Inbow 12 W 6500K
Linier Light 52 W
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
Exit lamp 5 W c/w battery
Saklar ganda
Saklar tunggal
Saklar tukar ganda
Kotak kontak dinding tunggal 16 A
Kotak kontak lantai single 10A
Kotak kontak dinding tunggal 16 A (wallmount rack)
LANTAI 5
Instalasi penerangan dengan kabel NYM 2 x 2.5 mm² w/ pipa co
Instalasi penerangan dengan kabel NYY 2 x 2.5 mm² w/ pipa co
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
ITEM PEKERJAAN
b
LED Panel 600 x 600 mm 40 W 6500K Ceiling
Downlight Slim Inbow 6 W 6500K
Downlight Slim Inbow 12 W 6500K
Linier Light 52 W
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
Exit lamp 5 W c/w battery
Lampu Taman tipe A
Saklar ganda
Saklar tunggal
Saklar tukar ganda
Kotak kontak dinding tunggal 16 A
Kotak kontak dinding tunggal outbow waterproof 16 A
Kotak kontak lantai single 10A
Kotak kontak dinding tunggal 16 A (wallmount rack)
LANTAI 6
Instalasi penerangan dengan kabel NYM 2 x 2.5 mm² w/ pipa co
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
ITEM PEKERJAAN
b
LED Panel 600 x 600 mm 40 W 6500K Ceiling
Downlight Slim Inbow 6 W 6500K
Downlight Slim Inbow 12 W 6500K
Downlight Inbow Ø 5" LED Emergency 9 W 6500 K
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
Exit lamp 5 W c/w battery
Saklar ganda
Saklar tunggal
Saklar tukar ganda
Saklar tukar tunggal
Kotak kontak dinding tunggal 16 A
Kotak kontak dinding tunggal 16 A (wallmount rack)
LANTAI ATAP
Instalasi penerangan dengan kabel NYM 2 x 2.5 mm² w/ pipa co
Instalasi kotak kontak dengan kabel NYM 3 x 2.5 mm² w/ pipa c
Downlight Slim Outbow 11 W 6500K
Downlight Outbow Ø 5" LED Emergency 9 W 6500 K
ITEM PEKERJAAN
b
Saklar tunggal
Saklar tukar tunggal
Kotak kontak dinding tunggal 16 A
PERALATAN UTAMA
Standing rack 32U
ITEM PEKERJAAN
b
Core switch 24 Port
Optical terminal box 12 core
KABEL FEEDER
ITEM PEKERJAAN
b
Penyambungan kabel fiber optic (splicing)
Kabel patchcord fiber optic singlemode SC-LC, panjang 5 mete
Galian kabel, sedalam 1 meter
Urugan pasir bawah galian tebal 100 mm
Pipa HDPE PN 10 Ø 2"
Urugan tanah kembali bekas galian + pemadatan
Patok penanda kabel
ITEM PEKERJAAN
Switch lantai 3
Switch lantai 4
ITEM PEKERJAAN
Switch lantai 5
Switch lantai 6
Instalasi titik LAN dengan Kabel UTP cat.6 dalam pipa konduit P
ITEM PEKERJAAN
Instalasi titik LAN dengan Kabel UTP cat.6 dalam pipa konduit P
ITEM PEKERJAAN
LANTAI 3
ITEM PEKERJAAN
Instalasi titik LAN dengan Kabel UTP cat.6 dalam pipa konduit P
ITEM PEKERJAAN
LANTAI 4
ITEM PEKERJAAN
Instalasi titik LAN dengan Kabel UTP cat.6 dalam pipa konduit P
ITEM PEKERJAAN
LANTAI 5
ITEM PEKERJAAN
Instalasi titik LAN dengan Kabel UTP cat.6 dalam pipa konduit P
ITEM PEKERJAAN
LANTAI 6
ITEM PEKERJAAN
Instalasi titik LAN dengan Kabel UTP cat.6 dalam pipa konduit P
ITEM PEKERJAAN
PERALATAN UTAMA
Instalasi NVR menuju switch dengan kabel UTP cat.6
ITEM PEKERJAAN
b
Instalasi monitor menuju NVR dengan kabel HDMI
Network video recorder (NVR) 32 channel
TV LED 43", dengan spesifikasi :
Resolution : UHD 4K
Power supply : AC100-240V 50/60Hz
HDMI, USB, Ethernet outlet
b
Instalasi CCTV, UTP Cat. 6 dalam pipa konduit Ø 20 mm
Dome fixed IP camera, dengan spesifikasi :
LANTAI 3
ITEM PEKERJAAN
b
Instalasi CCTV, UTP Cat. 6 dalam pipa konduit Ø 20 mm
Dome fixed IP camera, dengan spesifikasi :
LANTAI 4
ITEM PEKERJAAN
b
Instalasi CCTV, UTP Cat. 6 dalam pipa konduit Ø 20 mm
Dome fixed IP camera, dengan spesifikasi :
LANTAI 5
ITEM PEKERJAAN
b
Instalasi CCTV, UTP Cat. 6 dalam pipa konduit Ø 20 mm
Dome fixed IP camera, dengan spesifikasi :
LANTAI 6
ITEM PEKERJAAN
b
Instalasi CCTV, UTP Cat. 6 dalam pipa konduit Ø 20 mm
Dome fixed IP camera, dengan spesifikasi :
PEKERJAAN TELEPON
Catatan :
ITEM PEKERJAAN
PERALATAN UTAMA
Penarikan Kabel ITC 10x2x0.6 mm² dari Ruang Kontrol Lantai L
ITEM PEKERJAAN
b
Terminal Box Telepon Lantai Lower Ground
Terminal Box Telepon Lantai Upper Ground
Terminal Box Telepon Lantai 3
LANTAI 3
Instalasi telepon dengan kabel ITC 1x2x0.6 mm² dalam pipa kon
Kotak kontak dinding data RJ.45 Cat. 6
Phone (staff)
PERALATAN UTAMA
Cabinet Rack Sound System, tinggi 1 meter
ITEM PEKERJAAN
b
Pagging Microphone
Power Amplifier 240 W
Mixer Amplifier
10 Zone speaker selector system
KABEL FEEDER
Penarikan kabel NYMHY 2 x 1.5 mm2 dari zone selector (ruang
Terminal box tata suara lower ground
Terminal box tata suara upper ground
Terminal box tata suara lantai 3
Terminal box tata suara lantai 4
Terminal box tata suara lantai 5
Terminal box tata suara lantai 6
b
Wall speaker 6 Watt
Attenuator
LANTAI 3
Instalasi speaker dengan kabel NYMHY 2 x 1.5 mm2 dalam pip
Instalasi attenuator NYMHY 3 x 1.5 mm2 dalam pipa konduit PV
Sound Terminal Box
Ceiling speaker 6 Watt
Wall speaker 6 Watt
Attenuator
ITEM PEKERJAAN
b
LANTAI 4
Instalasi speaker dengan kabel NYMHY 2 x 1.5 mm2 dalam pip
Instalasi attenuator NYMHY 3 x 1.5 mm2 dalam pipa konduit PV
Sound Terminal Box
Ceiling speaker 6 Watt
Wall speaker 6 Watt
Attenuator
LANTAI 5
Instalasi speaker dengan kabel NYMHY 2 x 1.5 mm2 dalam pip
Instalasi attenuator NYMHY 3 x 1.5 mm2 dalam pipa konduit PV
Sound Terminal Box
Ceiling speaker 6 Watt
Wall speaker 6 Watt
Attenuator
LANTAI 6
Instalasi speaker dengan kabel NYMHY 2 x 1.5 mm2 dalam pip
Instalasi attenuator NYMHY 3 x 1.5 mm2 dalam pipa konduit PV
ITEM PEKERJAAN
b
Sound Terminal Box
Ceiling speaker 6 Watt
Wall speaker 6 Watt
Attenuator
b
Instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² dalam pipa
Kotak kontak dinding HDMI type A
Kotak kontak dinding single 16A
Proyektor
Screen Proyektor 120"
Projector Bracket
LANTAI 3
Instalasi projector dengan kabel HDMI type A dalam pipa condu
Instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² dalam pipa
Kotak kontak dinding HDMI type A
Kotak kontak dinding single 16A
Proyektor
Screen Proyektor 120"
Projector Bracket
LANTAI 4
Instalasi projector dengan kabel HDMI type A dalam pipa condu
Instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² dalam pipa
ITEM PEKERJAAN
b
Kotak kontak dinding HDMI type A
Kotak kontak dinding single 16A
Proyektor
Screen Proyektor 70"
Projector Bracket
LANTAI 6
Instalasi projector dengan kabel HDMI type A dalam pipa condu
Instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² dalam pipa
Kotak kontak dinding HDMI type A
Kotak kontak dinding single 16A
Proyektor
Screen Proyektor 70"
Projector Bracket
b
Tee tray uk. 400 x 100 mm
Tee tray uk. 300 x 100 mm
Elbow tray uk. 400 x 100 mm
Elbow tray uk. 300 x 100 mm
Outside riser tray uk. 400 x 100 mm
Outside riser tray uk. 300 x 100 mm
Kabel ladder uk. 400 x 100 mm
Kabel ladder uk. 300 x 100 mm
b
Kabel ladder uk. 300 x 100 mm
LANTAI 3
Kabel tray uk. 400 x 100 mm
Kabel tray uk. 300 x 100 mm
Tee tray uk. 400 x 100 mm
Tee tray uk. 300 x 100 mm
Elbow tray uk. 400 x 100 mm
Elbow tray uk. 300 x 100 mm
Outside riser tray uk. 400 x 100 mm
Outside riser tray uk. 300 x 100 mm
Kabel ladder uk. 400 x 100 mm
Kabel ladder uk. 300 x 100 mm
LANTAI 4
Kabel tray uk. 400 x 100 mm
Kabel tray uk. 300 x 100 mm
Tee tray uk. 400 x 100 mm
Tee tray uk. 300 x 100 mm
ITEM PEKERJAAN
b
Elbow tray uk. 400 x 100 mm
Elbow tray uk. 300 x 100 mm
Outside riser tray uk. 400 x 100 mm
Outside riser tray uk. 300 x 100 mm
Kabel ladder uk. 400 x 100 mm
Kabel ladder uk. 300 x 100 mm
LANTAI 5
Kabel tray uk. 400 x 100 mm
Kabel tray uk. 300 x 100 mm
Tee tray uk. 400 x 100 mm
Tee tray uk. 300 x 100 mm
Elbow tray uk. 400 x 100 mm
Elbow tray uk. 300 x 100 mm
Outside riser tray uk. 400 x 100 mm
Outside riser tray uk. 300 x 100 mm
Kabel ladder uk. 400 x 100 mm
Kabel ladder uk. 300 x 100 mm
ITEM PEKERJAAN
b
LANTAI 6
Kabel tray uk. 400 x 100 mm
Kabel tray uk. 300 x 100 mm
Tee tray uk. 400 x 100 mm
Tee tray uk. 300 x 100 mm
Elbow tray uk. 400 x 100 mm
Elbow tray uk. 300 x 100 mm
Outside riser tray uk. 400 x 100 mm
Outside riser tray uk. 300 x 100 mm
Kabel ladder uk. 400 x 100 mm
Kabel ladder uk. 300 x 100 mm
PERALATAN UTAMA
Master Control Fire Alarm Panel (MCFA), cap. 1 loop include :
ITEM PEKERJAAN
b
Power Supply & Battery 2x12 VDC, 12 AH
LCD Display
10 Button Remote Display
Instalasi Button Remote Display, meliputi :
Kabel AWG 16 TSP /w pipa konduit PVC Ø 20 mm
Kabel FRC 2 x 1.5 mm2 /w pipa konduit PVC Ø 20 mm
Programming & Testing commissioning
KABEL FEEDER
Penarikan kabel AWG 16 TSP /w pipa konduit Ø 20 mm dari
Terminal box fire alarm Lower Ground
Terminal box fire alarm Upper Ground
Terminal box fire alarm Lantai 3
Terminal box fire alarm Lantai 4
Terminal box fire alarm Lantai 5
Terminal box fire alarm Lantai 6
b
Terminal box fire alarm Upper Ground
Terminal box fire alarm Lantai 3
Terminal box fire alarm Lantai 4
Terminal box fire alarm Lantai 5
Terminal box fire alarm Lantai 6
b
Flow switch Lantai 4
Flow switch Lantai 5
Flow switch Lantai 6
b
Terminal Box Fire Alarm (TBFA)
Monitor Module
Zone Module
Control Module
Optical smoke detector (Konvensional)
Manual Call Point lengkap dengan back box
Alarm Bell
Indicator Lamp
End of Line
LANTAI 3
Instalasi fire alarm - Kabel FRC 2x1.5 mm2 /w pipa konduit PVC
Terminal Box Fire Alarm (TBFA)
Monitor Module
Zone Module
Control Module
Optical smoke detector (Konvensional)
Manual Call Point lengkap dengan back box
Alarm Bell
ITEM PEKERJAAN
b
Indicator Lamp
End of Line
LANTAI 4
Instalasi fire alarm - Kabel FRC 2x1.5 mm2 /w pipa konduit PVC
Terminal Box Fire Alarm (TBFA)
Monitor Module
Zone Module
Control Module
Optical smoke detector (Konvensional)
Manual Call Point lengkap dengan back box
Alarm Bell
Indicator Lamp
End of Line
LANTAI 5
Instalasi fire alarm - Kabel FRC 2x1.5 mm2 /w pipa konduit PVC
Terminal Box Fire Alarm (TBFA)
Monitor Module
ITEM PEKERJAAN
b
Zone Module
Control Module
Optical smoke detector (Konvensional)
Manual Call Point lengkap dengan back box
Alarm Bell
Indicator Lamp
End of Line
LANTAI 6
Instalasi fire alarm - Kabel FRC 2x1.5 mm2 /w pipa konduit PVC
Terminal Box Fire Alarm (TBFA)
Monitor Module
Zone Module
Control Module
Optical smoke detector (Konvensional)
Manual Call Point lengkap dengan back box
Alarm Bell
Indicator Lamp
End of Line
ITEM PEKERJAAN
Connecting Sleeve
Down conductor - Kabel NYY 1x70 mm2
ITEM PEKERJAAN
b
Pelindung kabel down conductor - Pipa PVC AW Ø 1"
Pipa galvanis Ø 2" (Medium SNI-0039)
Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupl
Bak grounding
Pengeboran sumur grounding
Biaya instalasi dan material bantu proteksi petir
Sertifikasi proteksi petir dari Depnaker
b
Lampu PJU single LED 40 W Solar Panel + tiang lampu tinggi 7
PEKERJAAN GENSET
Catatan :
ITEM PEKERJAAN
b
Pressurized fan 28" 10655 CFM 3000 W
Include :
Motor IP 55 class F
Impeller ALU (Alumunium)
GRN (Glass Reinforced Nylon)
Ducting Pressurized fan - BJLS tebal 0.5 uk. 1000 x 1000 mm
Ducting Pressurized fan - BJLS tebal 0.5 uk. 800 x 800 mm
Ducting Pressurized fan - BJLS tebal 0.5 uk. 450 x 450 mm
Ducting Pressurized fan - BJLS tebal 0.5 uk. 400 x 400 mm
Fresh air linear grill, uk. 1000 x 600 mm
Fresh air linear grill, uk. 800 x 800 mm
Fresh air linear grill, uk. 450 x 450 mm
Fresh air linear grill, uk. 400 x 400 mm
Dudukan pressurized fan, meliputi :
Hollow besi, uk. 75 x 150 x 3 mm (Finishing cat zincromate & ca
Hollow besi, uk. 40 x 40 x 1.5 mm (Finishing cat zincromate & c
Plat plendes, tebal 3 mm + cat zinhcromate + cat besi
Rabat beton, tebal 150 mm (camp. 1pc : 2ps : 3 kr)
Plat beton, tebal 150 mm
ITEM PEKERJAAN
b
Bekisting dipakai 2x
Besi wiremesh ## M8-150 mm
Besi dowel
Beton (camp. 1pc : 2ps : 3kr)
Angkur baut mutu tinggi (galvanis) M10x95 mm & Injectable adh
Trekstang Ø 16 mm
Spanskrof Ø 16 mm
b
Monitor Display 220"
LANTAI 3
Instalasi projector dengan kabel HDMI type A dalam pipa condu
LANTAI ATAP
Kabel Duct uk. 100 x 150 mm
ITEM PEKERJAAN
b
Connector jack RCA Male
Slim Line Array Speaker
Subwoofer System
Speaker System
Digital Speaker Processor
Multi Channel Power Amplifier
Dual Power Amplifier
Wireless Set (Dual Lavalier And Handheld)
Media Player (with adapter)
Flight Case 16U w/ Acc & Squencer
Dynamic Microphone w/ Floor Stand
Powered Box Speaker
16-Channel Mixing Console
Testing & Comissioning
b
Wireless mic (2 unit)
Wall speaker 30 Watt
PERALATAN UTAMA
Pekerjaan sumur dalam, meliputi:
ITEM PEKERJAAN
b
Mobilisasi dan demobilisasi pek. sumur bor
Pembuatan bak dan tampungan sirkulasi bentonit
Bentonite
Pekerjaan pemboran pilot hole 8"
Logging test
Reaming 12"
Pengadaan pipa casing GIP 6"
Pengadaan screen stainless steel 6"
Pengadaan kerikil pembalut gravel pack
Grouting
Pengadaan pipa pizzo meter 1" galvanis
Pencucian sumur metode air jetting
Pumping test dan analisa air pengecoran sumur
Apron bak (bak kontrol sumur)
Perizinan
b
Rabat beton, tebal 100 mm
Urugan kembali tanah bekas galian & pemadatan
Kolom praktis (KP2), uk. 120 x 120 mm (camp. beton 1pc : 3Ps
Pasangan dinding bata merah campuran 1SP : 6PP
Plesteran 1SP : 6PP tebal 15 mm
Acian bata merah
Plat besi penutup, tebal 1.2 mm
Pengait besi Ø 10 mm
b
Debit : 250 liter/menit
Termasuk panel kontrol pompa
b
Total head : 40 m
Debit : 2 x 150 liter/menit
Include panel kontrol
b
Gate valve screwed PN-10 Ø 1"
b
Pressure Tank
Control Panel
b
Gate valve screwed PN-10 Ø 1-1/4"
Gate valve screwed PN-10 Ø 1"
Dudukan roof tank - Rabat beton, tebal 200 mm (camp. 1pc : 2p
b
Pipa distribusi air bersih - Pipa PVC AW Ø 1/2"
Pipa distribusi air bersih - Pipa PVC AW Ø 3/4"
Pipa distribusi air bersih - Pipa PVC AW Ø 1"
Pipa distribusi air bersih - Pipa PVC AW Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 3
Gate valve PN-10 Ø 1-1/4"
Water Hammer Ø 1-1/4"
Riser pipa distribusi air bersih - Pipa PVC AW Ø 2"
Pipa distribusi air bersih - Pipa PVC AW Ø 1/2"
Pipa distribusi air bersih - Pipa PVC AW Ø 3/4"
Pipa distribusi air bersih - Pipa PVC AW Ø 1"
Pipa distribusi air bersih - Pipa PVC AW Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 4
ITEM PEKERJAAN
b
Gate valve PN-10 Ø 1-1/4"
Water Hammer Ø 1-1/4"
Riser pipa distribusi air bersih - Pipa PVC AW Ø 2"
Pipa distribusi air bersih - Pipa PVC AW Ø 1/2"
Pipa distribusi air bersih - Pipa PVC AW Ø 3/4"
Pipa distribusi air bersih - Pipa PVC AW Ø 1"
Pipa distribusi air bersih - Pipa PVC AW Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 5
Gate valve PN-10 Ø 1-1/4"
Water Hammer Ø 1-1/4"
Riser pipa distribusi air bersih - Pipa PVC AW Ø 2"
Pipa distribusi air bersih - Pipa PVC AW Ø 1/2"
Pipa distribusi air bersih - Pipa PVC AW Ø 3/4"
Pipa distribusi air bersih - Pipa PVC AW Ø 1"
Pipa distribusi air bersih - Pipa PVC AW Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
ITEM PEKERJAAN
b
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 6
Gate valve PN-10 Ø 1-1/4"
Water Hammer Ø 1-1/4"
Riser pipa distribusi air bersih - Pipa PVC AW Ø 2"
Pipa distribusi air bersih - Pipa PVC AW Ø 1/2"
Pipa distribusi air bersih - Pipa PVC AW Ø 3/4"
Pipa distribusi air bersih - Pipa PVC AW Ø 1"
Pipa distribusi air bersih - Pipa PVC AW Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI ATAP
Riser pipa distribusi air bersih - Pipa PVC AW Ø 2"
Pipa distribusi air bersih - Pipa PVC AW Ø 1"
Pipa distribusi air bersih - Pipa PVC AW Ø 2"
Material bantu - Klem pipa multi dengan besi kanal
ITEM PEKERJAAN
b
INSTALASI AIR BEKAS
Catatan :
b
LANTAI LOWER GROUND
Riser pipa air bekas - Pipa PVC AW Ø 4"
Riser pipa air bekas - Pipa PVC AW Ø 3"
Pipa air bekas - Pipa PVC AW Ø 1-1/4''
Pipa air bekas - Pipa PVC AW Ø 3"
Pipa air bekas - Pipa PVC AW Ø 4"
Pipa air bekas - Pipa PVC AW Ø 6"
Clean out SS Ø 3"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
b
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 3
Riser pipa air bekas - Pipa PVC AW Ø 4"
Riser pipa air bekas - Pipa PVC AW Ø 3"
Pipa air bekas - Pipa PVC AW Ø 1-1/4"
Pipa air bekas - Pipa PVC AW Ø 2"
Pipa air bekas - Pipa PVC AW Ø 3"
Clean out SS Ø 3"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 4
Riser pipa air bekas - Pipa PVC AW Ø 4"
Pipa air bekas - Pipa PVC AW Ø 1-1/4"
Pipa air bekas - Pipa PVC AW Ø 2"
Pipa air bekas - Pipa PVC AW Ø 3"
Clean out SS Ø 3"
Material bantu - Penggantung pipa multi dengan besi kanal
ITEM PEKERJAAN
b
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 5
Riser pipa air bekas - Pipa PVC AW Ø 4"
Pipa air bekas - Pipa PVC AW Ø 1-1/4"
Pipa air bekas - Pipa PVC AW Ø 2"
Pipa air bekas - Pipa PVC AW Ø 3"
Clean out SS Ø 3"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 6
Riser pipa air bekas - Pipa PVC AW Ø 4"
Pipa air bekas - Pipa PVC AW Ø 1-1/4"
Pipa air bekas - Pipa PVC AW Ø 2"
Pipa air bekas - Pipa PVC AW Ø 3"
Clean out SS Ø 3"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
ITEM PEKERJAAN
LANTAI ATAP
Riser pipa air bekas - Pipa PVC AW Ø 2"
Vent cup BJLS Ø 2"
b
Riser pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 8"
Pipa air kotor - Pipa PVC AW Ø 6"
Pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 2"
Clean out SS Ø 4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
b
Besi tulangan
Beton ready mix F'c 28 Mpa
Waterproofing cementitious
Waterstop PVC, lebar 150 mm
Pengait - Besi P10 mm
Tangga maintenance - Besi P13 mm
b
Instalasi power pompa - Kabel NYY 4 x 2.5 mm2 w/ pipa kondui
Instalasi grounding pompa - Kabel NYA 2.5 mm2 w/ pipa kondu
Check valve Ø 4"
Pipa buang - Pipa PVC AW Ø 4"
Pompa Sewage pit (Terdiri dari 2 Pompa)
Tipe : Submersible Borehole Pump
Total head : 20 m
Debit : 2x300 liter/menit
Termasuk panel kontrol pompa
b
Wire ropes+clamp (pengikat tangki)
Manholes
Control panel
Aeration blower 120 liter/min
Airlift blower 60 liter/min
Submersible effluent pump ( 2 unit )
Float Switch
Test laboratory (BOD, COD, TSS, PH)
Control panel wall/stand type
Instalasi pipa PVC AW untuk blower dan proteksi kabel
Instalasi listrik dari control panel menuju blower & pompa
b
Rabat beton, tebal 100 mm (camp. 1pc:3ps:5kr)
Urugan kembali tanah bekas galian & pemadatan
b
Bekisting (dipakai 2x)
Besi tulangan
Beton ready mix F'c 25 Mpa
Pengait - Besi P10 mm
b
Beton (camp. 1pc : 2ps : 3kr)
Bak Kontrol
b
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 3
Riser pipa air kotor - Pipa PVC AW Ø 6"
Riser pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 2"
Clean out SS Ø 4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 4
Riser pipa air kotor - Pipa PVC AW Ø 6"
Pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 2"
Clean out SS Ø 4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
ITEM PEKERJAAN
LANTAI 5
Riser pipa air kotor - Pipa PVC AW Ø 6"
Pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 2"
Clean out SS Ø 4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 6
Riser pipa air kotor - Pipa PVC AW Ø 6"
Pipa air kotor - Pipa PVC AW Ø 4"
Pipa air kotor - Pipa PVC AW Ø 2"
Clean out SS Ø 4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI ATAP
Riser pipa air bekas - Pipa PVC AW Ø 2"
ITEM PEKERJAAN
b
Vent cup BJLS Ø 2"
b
Pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 3
Riser pipa vent - Pipa PVC D Ø 3"
Pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
ITEM PEKERJAAN
b
LANTAI 4
Riser pipa vent - Pipa PVC D Ø 3"
Pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 5
Riser pipa vent - Pipa PVC D Ø 3"
Pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 1-1/4"
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 6
Riser pipa vent - Pipa PVC D Ø 3"
Riser pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 1-1/4"
ITEM PEKERJAAN
b
Material bantu - Penggantung pipa multi dengan besi kanal
Material bantu - Klem pipa multi dengan besi kanal
LANTAI ATAP
Riser pipa vent - Pipa PVC D Ø 3"
Riser pipa vent - Pipa PVC D Ø 2"
Pipa vent - Pipa PVC D Ø 3"
Pipa vent - Pipa PVC D Ø 2"
Vent cup BJLS Ø 2"
PERALATAN SANITER
LANTAI LOWER GROUND
Kran Ø 1/2"
Kran Taman Ø 1/2"
Floordrain
Wastafel meja, meliputi :
Self rimming lavatory
Kran wastafel
P-Trap for lavatory
ITEM PEKERJAAN
b
Stop valve w/ flexible hose
b
Dual flush tank-trim
Tank cover
Plastic seat & cover
Urinoir, meliputi :
Urinal
Urinal flushing system
Installation fitting set (flexible hose, wall flange/connector set, s
Hangers & screw
b
Installation fitting set (flexible hose, 2 outlet stop valve,floor flan
Dual flush tank-trim
Tank cover
Plastic seat & cover
Urinoir, meliputi :
Urinal
Urinal flushing system
Installation fitting set (flexible hose, wall flange/connector set, s
Hangers & screw
b
Shower spray / jet shower
Flexible hose (valve menjadi satu dengan kloset)
Hangers & screw
LANTAI 3
Kran Ø 1/2"
Hand Shower Set
Wall mounted bath shower
Hanger
Flexible nose
Hand shower
Floordrain
Wastafel meja, meliputi :
Self rimming lavatory
ITEM PEKERJAAN
b
Kran wastafel
P-Trap for lavatory
Stop valve w/ flexible hose
b
Single bowl toilet (for the disable)
Installation fitting set (flexible hose, 2 outlet stop valve,floor flan
Dual flush tank-trim
Tank cover
Plastic seat & cover
Urinoir, meliputi :
Urinal
Urinal flushing system
Installation fitting set (flexible hose, wall flange/connector set, s
Hangers & screw
b
Pegangan stainless steel
LANTAI 4
Kran Ø 1/2"
Floordrain
Wastafel meja, meliputi :
Self rimming lavatory
Kran wastafel
P-Trap for lavatory
Stop valve w/ flexible hose
b
Single bowl toilet
Installation fitting set (flexible hose, 2 outlet stop valve,floor flan
Dual flush tank-trim
Tank cover
Plastic seat & cover
Urinoir, meliputi :
Urinal
Urinal flushing system
Installation fitting set (flexible hose, wall flange/connector set, s
Hangers & screw
ITEM PEKERJAAN
b
Jet washer, meliputi :
Shower spray / jet shower
Flexible hose (valve menjadi satu dengan kloset)
Hangers & screw
LANTAI 5
Kran Ø 1/2"
Kran Taman Ø 1/2"
Floordrain
Wastafel meja, meliputi :
Self rimming lavatory
Kran wastafel
P-Trap for lavatory
Stop valve w/ flexible hose
ITEM PEKERJAAN
b
Tank cover
Plastic seat & cover
Urinoir, meliputi :
Urinal
Urinal flushing system
Installation fitting set (flexible hose, wall flange/connector set, s
Hangers & screw
b
LANTAI 6
Kran Ø 1/2"
Floordrain
Wastafel meja, meliputi :
Self rimming lavatory
Kran wastafel
P-Trap for lavatory
Stop valve w/ flexible hose
b
Dual flush tank-trim
Tank cover
Plastic seat & cover
Urinoir, meliputi :
Urinal
Urinal flushing system
Installation fitting set (flexible hose, wall flange/connector set, s
Hangers & screw
b
Flexible hose (valve menjadi satu dengan kloset)
Hangers & screw
b
Penutup saluran U-ditch 400 x 600 mm
Penutup saluran U-ditch 500 x 600 mm
b
Beton (camp. 1pc : 2ps : 3kr)
b
Besi tulangan
Beton ready mix F'c 28 Mpa
Waterproofing cementitious
Waterstop PVC, lebar 150 mm
Pengait - Besi P10 mm
Tangga maintenance - Besi P13 mm
b
Pipa distribusi - Pipa PVC AW Ø 1-1/2"
Pipa distribusi - Pipa PVC AW Ø 1-1/4"
Pipa distribusi - Pipa PVC AW Ø 1"
Pipa distribusi - Pipa PVC AW Ø 3/4"
Pompa Bak Penampung Air Hujan
Tipe : Submersible Borehole Pump
Total head : 8 m
Debit : 150 liter/menit
Termasuk panel kontrol pompa
b
Bekisting dipakai 2x
Besi tulangan
Beton ready mix F'c 28 Mpa
Waterproofing cementitious
Waterstop PVC, lebar 150 mm
Pengait - Besi P10 mm
b
Instalasi power pompa - Kabel NYY 4 x 2.5 mm2 w/ pipa kondui
Instalasi grounding pompa - Kabel NYA 2.5 mm2 w/ pipa kondu
Pipa buang - Pipa PVC AW Ø 4"
Pompa Sump pit
Tipe : Submersible Borehole Pump
Total head : 8 m
Debit : 300 liter/menit
Termasuk panel kontrol pompa
b
Riser pipa air hujan - Pipa PVC D Ø 4"
Riser pipa air hujan - Pipa PVC D Ø 3"
Pipa air hujan - Pipa PVC AW Ø 6"
Pipa air hujan - Pipa PVC AW Ø 4"
Pipa air hujan - Pipa PVC AW Ø 3"
Material bantu - Klem pipa multi dengan besi kanal
LANTAI 3
Riser pipa air hujan - Pipa PVC D Ø 6"
ITEM PEKERJAAN
b
Riser pipa air hujan - Pipa PVC D Ø 4"
Pipa air hujan - Pipa PVC AW Ø 3"
Material bantu - Klem pipa multi dengan besi kanal
Roofdrain Ø 3"
Gutter 200 x 50 mm Kemiringan 0.5%
LANTAI 4
Riser pipa air hujan - Pipa PVC D Ø 6"
Riser pipa air hujan - Pipa PVC D Ø 4"
Pipa air hujan - Pipa PVC AW Ø 3"
Material bantu - Klem pipa multi dengan besi kanal
Roofdrain Ø 3"
Gutter 200 x 50 mm Kemiringan 0.5%
LANTAI 5
Riser pipa air hujan - Pipa PVC D Ø 6"
Riser pipa air hujan - Pipa PVC D Ø 4"
Pipa air hujan - Pipa PVC AW Ø 3"
Material bantu - Klem pipa multi dengan besi kanal
ITEM PEKERJAAN
b
Roofdrain Ø 4"
Roofdrain Ø 3"
Gutter 200 x 50 mm Kemiringan 0.5%
Sparing planterbox - Pipa PVC AW Ø 2"
Green Roof System, meliputi :
Membrane , Thickness (1.27mm) 10’ x 100’ (92.9 m2/roll) Size:
Bonding Adhesive 18.9 Litres/Pail
Solvent Based Liquid Cleaner 15.2 Litres/pax (4 cans/pax)
Protection Fleece 300gsm non woven (4m x 100m)
Filter Fleece 150gsm, non woven (4m x 100m)
Drainage Cell Planter (Water Storage) Height 30mm, Size 500m
LANTAI 6
Riser pipa air hujan - Pipa PVC D Ø 6"
Riser pipa air hujan - Pipa PVC D Ø 4"
Pipa air hujan - Pipa PVC AW Ø 6"
Pipa air hujan - Pipa PVC AW Ø 4"
Pipa air hujan - Pipa PVC AW Ø 3"
Material bantu - Klem pipa multi dengan besi kanal
ITEM PEKERJAAN
b
Roofdrain Ø 4"
Roofdrain Ø 3"
Gutter 200 x 50 mm Kemiringan 0.5%
LANTAI ATAP
Riser pipa air hujan - Pipa PVC D Ø 4"
Pipa air hujan - Pipa PVC AW Ø 4"
Material bantu - Klem pipa multi dengan besi kanal
Roofdrain Ø 4"
Gutter 200 x 50 mm Kemiringan 0.5%
b
Indoor unit air conditioner 4 way cassette, kap. 36.000 Btu/H
Indoor unit air conditioner wall mounted, kap. 5.000 Btu/H
Indoor unit air conditioner wall mounted, kap. 9.000 Btu/H
Indoor unit air conditioner wall mounted, kap. 12.000 Btu/H
Indoor unit air conditioner wall mounted, kap. 15.000 Btu/H
Outdoor unit, kap. 152.900 Btu/H
Outdoor unit, kap. 343.900 Btu/H
Sentral kontrol AC
Wired remote controller
Wireless remote
Percabangan pipa reffrigerant
Outdoor pipe connection / piping connection kits
Stop kontak AC
Dudukan indoor unit
Dudukan outdoor unit
b
Pipa drain PVC AW Ø 1-1/4"
Pipa drain PVC AW Ø 1-1/2"
Pipa drain PVC AW Ø 2"
Pekerjaan Ducting AC
Ducting polyisocyanurate (PIR), uk. 200 x 200 mm + perakitan
Ducting polyisocyanurate (PIR), uk. 250 x 250 mm + perakitan
Ducting polyisocyanurate (PIR), uk. 300 x 200 mm + perakitan
ITEM PEKERJAAN
b
Ducting polyisocyanurate (PIR), uk. 350 x 200 mm + perakitan
Ducting polyisocyanurate (PIR), uk. 400 x 200 mm + perakitan
Ducting polyisocyanurate (PIR), uk. 450 x 200 mm + perakitan
Ducting polyisocyanurate (PIR), uk. 500 x 200 mm + perakitan
Ducting polyisocyanurate (PIR), uk. 700 x 200 mm + perakitan
b
Indoor unit air conditioner wall mounted, kap. 12.000 Btu/H
Outdoor unit, kap. 305.700 Btu/H
Outdoor unit, kap. 363.000 Btu/H
Wired remote controller
Wireless remote
Percabangan pipa reffrigerant
Stop kontak AC
Dudukan indoor unit
Dudukan outdoor unit
b
Pipa refrigerant + Insulasi (m) Ø 15.88 mm
Pipa refrigerant + Insulasi (m) Ø 19.05 mm
Pipa refrigerant + Insulasi (m) Ø 22.2 mm
Pipa refrigerant + Insulasi (m) Ø 28.58 mm
Pipa refrigerant + Insulasi (m) Ø 34.9 mm
Pipa refrigerant + Insulasi (m) Ø 41.3 mm
Refrigerant 410A
LANTAI 3
Peralatan Utama
Instalasi power unit outdoor AC - Kabel NYY 4 x 25 mm2 w/ pip
Instalasi grounding unit outdoor AC - Kabel NYA 25 mm2 w/ pip
Instalasi power unit indoor AC - Kabel NYM 3 x 2.5 mm2 w/ pipa
Instalasi kabel kontrol - Kabel AWG 16 TSP w/ pipa conduit PVC
Indoor unit air conditioner 4 way cassette, kap. 36.000 Btu/H
Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H
Indoor unit air conditioner cassette ceiling round 360°, kap. 36.0
Indoor unit air conditioner wall mounted, kap. 7.000 Btu/H
Indoor unit air conditioner wall mounted, kap. 15.000 Btu/H
ITEM PEKERJAAN
b
Indoor unit air conditioner wall mounted, kap. 18.000 Btu/H
Outdoor unit, kap. 229.300 Btu/H
Outdoor unit, kap. 363.000 Btu/H
Wired remote controller
Wireless remote
Percabangan pipa reffrigerant
Stop kontak AC
Dudukan indoor unit
Dudukan outdoor unit
b
Pipa refrigerant + Insulasi (m) Ø 9.52 mm
Pipa refrigerant + Insulasi (m) Ø 12.7 mm
Pipa refrigerant + Insulasi (m) Ø 15.88 mm
Pipa refrigerant + Insulasi (m) Ø 19.05 mm
Pipa refrigerant + Insulasi (m) Ø 22.2 mm
Pipa refrigerant + Insulasi (m) Ø 28.58 mm
Pipa refrigerant + Insulasi (m) Ø 34.9 mm
Pipa refrigerant + Insulasi (m) Ø 41.3 mm
Refrigerant 410A
LANTAI 4
Peralatan Utama
Instalasi power unit outdoor AC - Kabel NYY 4 x 25 mm2 w/ pip
Instalasi grounding unit outdoor AC - Kabel NYA 25 mm2 w/ pip
Instalasi power unit indoor AC - Kabel NYM 3 x 2.5 mm2 w/ pipa
Instalasi kabel kontrol - Kabel AWG 16 TSP w/ pipa conduit PVC
Indoor unit air conditioner 4 way cassette, kap. 48.000 Btu/H
Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H
Indoor unit air conditioner cassette ceiling round 360°, kap. 36.0
ITEM PEKERJAAN
b
Outdoor unit, kap. 363.000 Btu/H
Wired remote controller
Percabangan pipa reffrigerant
Dudukan indoor unit
Dudukan outdoor unit
LANTAI 5
Peralatan Utama
Instalasi power unit outdoor AC - Kabel NYY 4 x 25 mm2 w/ pip
Instalasi grounding unit outdoor AC - Kabel NYA 25 mm2 w/ pip
Instalasi power unit indoor AC - Kabel NYM 3 x 2.5 mm2 w/ pipa
Instalasi kabel kontrol - Kabel AWG 16 TSP w/ pipa conduit PVC
Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H
Indoor unit air conditioner cassette ceiling round 360°, kap. 36.0
Outdoor unit, kap. 401.300 Btu/H
Wired remote controller
Percabangan pipa reffrigerant
Dudukan indoor unit
Dudukan outdoor unit
b
Pekerjaan Instalasi pipa reffrigerant & insulasi
Pipa refrigerant + Insulasi (m) Ø 9.52 mm
Pipa refrigerant + Insulasi (m) Ø 12.7 mm
Pipa refrigerant + Insulasi (m) Ø 15.88 mm
Pipa refrigerant + Insulasi (m) Ø 19.05 mm
Pipa refrigerant + Insulasi (m) Ø 28.58 mm
Pipa refrigerant + Insulasi (m) Ø 34.9 mm
Pipa refrigerant + Insulasi (m) Ø 41.3 mm
Refrigerant 410A
LANTAI 6
Peralatan Utama
Instalasi power unit outdoor AC - Kabel NYY 4 x 25 mm2 w/ pip
Instalasi grounding unit outdoor AC - Kabel NYA 25 mm2 w/ pip
Instalasi power unit indoor AC - Kabel NYM 3 x 2.5 mm2 w/ pipa
Instalasi kabel kontrol - Kabel AWG 16 TSP w/ pipa conduit PVC
Indoor unit air conditioner 4 way cassette, kap. 36.000 Btu/H
Indoor unit air conditioner 4 way cassette, kap. 48.000 Btu/H
Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H
ITEM PEKERJAAN
b
Indoor unit air conditioner wall mounted, kap. 18.000 Btu/H
Outdoor unit, kap. 248.400 Btu/H
Wired remote controller
Wireless remote
Percabangan pipa reffrigerant
Stop kontak AC
Dudukan indoor unit
Dudukan outdoor unit
b
Pipa refrigerant + Insulasi (m) Ø 15.88 mm
Pipa refrigerant + Insulasi (m) Ø 28.58 mm
Pipa refrigerant + Insulasi (m) Ø 34.9 mm
Refrigerant 410A
LANTAI ATAP
Peralatan Utama
Instalasi power menuju stop kontak AC - Kabel NYM 3 x 2.5 mm
Air conditioner wall mounted, kap. 2 PK
Stop kontak AC
b
INSTALASI EXHAUST FAN
Catatan :
b
LANTAI LOWER GROUND
Pekerjaan exhaust fan, meliputi :
Instalasi titik exhaust fan - Kabel NYM 2 x 2.5 mm² w/ pipa con
Exhaust Fan Sirocco 10" 180 CMH 19 W
Wall exhaust fan 14" 3110 CMH 150 W
Pipa PVC AW Ø 4"
Flexible duct Ø 4"
Exhaust air grille (EAG), uk. 200 x 200 mm
b
Exhaust Fan Sirocco 10" 180 CMH 19 W
Pipa PVC AW Ø 4"
Flexible duct Ø 4"
Exhaust air grille (EAG), uk. 200 x 200 mm
LANTAI 3
Pekerjaan exhaust fan, meliputi :
Instalasi titik exhaust fan - Kabel NYM 2 x 2.5 mm² w/ pipa con
Exhaust Fan Sirocco 10" 180 CMH 19 W
Pipa PVC AW Ø 4"
Flexible duct Ø 4"
Exhaust air grille (EAG), uk. 200 x 200 mm
LANTAI 4
Pekerjaan exhaust fan, meliputi :
Instalasi titik exhaust fan - Kabel NYM 2 x 2.5 mm² w/ pipa con
Exhaust Fan Sirocco 10" 180 CMH 19 W
Pipa PVC AW Ø 4"
Flexible duct Ø 4"
ITEM PEKERJAAN
b
Exhaust air grille (EAG), uk. 200 x 200 mm
LANTAI 5
Pekerjaan exhaust fan, meliputi :
Instalasi titik exhaust fan - Kabel NYM 2 x 2.5 mm² w/ pipa con
Exhaust Fan Sirocco 10" 180 CMH 19 W
Pipa PVC AW Ø 4"
Flexible duct Ø 4"
Exhaust air grille (EAG), uk. 200 x 200 mm
LANTAI 6
Pekerjaan exhaust fan, meliputi :
Instalasi titik exhaust fan - Kabel NYM 2 x 2.5 mm² w/ pipa con
Exhaust Fan Sirocco 10" 180 CMH 19 W
Pipa PVC AW Ø 4"
Flexible duct Ø 4"
Exhaust air grille (EAG), uk. 200 x 200 mm
b
Catatan :
b
Kabel kontrol diesel pump - Kabel FRC 4 x 2.5 mm2 w/ pipa kon
Head : 110 m
Head : 110 m
Head : 120 m
Debit : 25 GPM
ITEM PEKERJAAN
b
OS&Y Gate Valve Flange End (Fig. No.: 3299)
Wet Alarm Valve c/w basic trimming (Fig. AV-1-300)
Retard Chamber (Fig RC-1)
Alarm Gong (Fig. WMA-1)
b
Reducer SCH. 40, Size : 4" x 2-1/2"
Reducer SCH. 40, Size : 2" x 1-1/2"
Tee SCH. 40, Size : 6"
Tee SCH. 40, Size : 4"
Tee SCH. 40, Size : 1"
Tee Reducer SCH. 40, Size : 6" x 4"
Weld Outlet 2"
Thread Outlet 1"
Flange 6" ANSI 150 c/w gasket
Flange 4" ANSI 150 c/w gasket
Flange 2" ANSI 150 c/w gasket
Flange 1-1/2" ANSI 150 c/w gasket
Blinde Flange 6" ANSI 150 c/w gasket
b
Pondasi - Cor kosong (camp. 1pc : 3ps : 5kr)
Bak kontrol, uk. 750x750 mm
b
Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 6"
Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 4"
Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
b
Fire hose Ø 1.5" x 30 meter
Hose nozle Ø 1.5"
Hose rack Ø 1.5"
Hydrant valve Ø 2.5"
Hydrant valve Ø 1.5"
b
- Riser - Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/4"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 3"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 6"
b
- Elbow 90 deg. SCH. 40, Size : 3"
- Elbow 90 deg. SCH. 40, Size : 6"
- Tee SCH. 40, Size : 1"
- Tee SCH. 40, Size : 1-1/4"
- Tee SCH. 40, Size : 2-1/2"
- Tee SCH. 40, Size : 3"
- Tee Reduce SCH. 40, Size : 6" x 3"
- Tee Reduce SCH. 40, Size : 6" x 2-1/2"
- Tee Reduce SCH. 40, Size : 3" x 2"
- Tee Reduce SCH. 40, Size : 3" x 1-1/2"
- Tee Reduce SCH. 40, Size : 3" x 1"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1"
- Tee Reduce SCH. 40, Size : 2" x 1-1/2"
- Tee Reduce SCH. 40, Size : 2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2" x 1"
- Tee Reduce SCH. 40, Size : 1-1/2" x1-1/4"
- Tee Reduce SCH. 40, Size : 1-1/2" x1"
- Tee Reduce SCH. 40, Size : 1-1/4" x1"
ITEM PEKERJAAN
b
- Reducer SCH. 40, Size : 3" x 2-1/2"
- Reducer SCH. 40, Size : 2-1/2" x 2"
- Reducer SCH. 40, Size : 2" x 1-1/2"
- Reducer SCH. 40, Size : 2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1"
- Reducer SCH. 40, Size : 1-1/4" x 1"
- Grooved Coupling 3"
- Grooved Coupling 6"
Fire Extinguisher
Portable fire extinguisher dry chemical agent : 3.5 kg
Thermatic fire extinguisher : 5 kg
b
Hose rack Ø 1.5"
Hydrant valve Ø 2.5"
Hydrant valve Ø 1.5"
b
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/4"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 3"
b
- Tee Reduce SCH. 40, Size : 2-1/2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1"
- Tee Reduce SCH. 40, Size : 2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2" x 1"
- Tee Reduce SCH. 40, Size : 1-1/2" x1-1/4"
- Tee Reduce SCH. 40, Size : 1-1/2" x1"
- Tee Reduce SCH. 40, Size : 1-1/4" x1"
- Reducer SCH. 40, Size : 3" x 2-1/2"
- Reducer SCH. 40, Size : 2-1/2" x 2"
- Reducer SCH. 40, Size : 2" x 1-1/2"
- Reducer SCH. 40, Size : 2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1"
- Reducer SCH. 40, Size : 1-1/4" x 1"
- Grooved Coupling 3"
Fire Extinguisher
Portable fire extinguisher dry chemical agent : 3.5 kg
Thermatic fire extinguisher : 5 kg
ITEM PEKERJAAN
LANTAI 3
b
Fire hose Ø 1.5" x 30 meter
Hose nozle Ø 1.5"
Hose rack Ø 1.5"
Hydrant valve Ø 2.5"
Hydrant valve Ø 1.5"
b
- Riser - Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/4"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 3"
b
- Tee Reduce SCH. 40, Size : 2-1/2" x 1-1/2"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1"
- Tee Reduce SCH. 40, Size : 2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2" x 1"
- Tee Reduce SCH. 40, Size : 1-1/2" x1"
- Tee Reduce SCH. 40, Size : 1-1/4" x1"
- Reducer SCH. 40, Size : 3" x 2-1/2"
- Reducer SCH. 40, Size : 2-1/2" x 2"
- Reducer SCH. 40, Size : 2" x 1-1/2"
- Reducer SCH. 40, Size : 2" x 1"
- Reducer SCH. 40, Size : 1-1/2" x 1"
- Reducer SCH. 40, Size : 1-1/4" x 1"
- Grooved Coupling 3"
Fire Extinguisher
Portable fire extinguisher dry chemical agent : 3.5 kg
Thermatic fire extinguisher : 5 kg
ITEM PEKERJAAN
b
LANTAI 4
b
Hose nozle Ø 1.5"
Hose rack Ø 1.5"
Hydrant valve Ø 2.5"
Hydrant valve Ø 1.5"
b
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/4"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 3"
b
- Tee Reduce SCH. 40, Size : 2-1/2" x 2"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1"
- Tee Reduce SCH. 40, Size : 2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2" x 1"
- Tee Reduce SCH. 40, Size : 1-1/2" x1-1/4"
- Tee Reduce SCH. 40, Size : 1-1/2" x1"
- Tee Reduce SCH. 40, Size : 1-1/4" x1"
- Reducer SCH. 40, Size : 3" x 2-1/2"
- Reducer SCH. 40, Size : 2-1/2" x 2"
- Reducer SCH. 40, Size : 2" x 1-1/2"
- Reducer SCH. 40, Size : 2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1"
- Reducer SCH. 40, Size : 1-1/4" x 1"
- Grooved Coupling 3"
Fire Extinguisher
Portable fire extinguisher dry chemical agent : 3.5 kg
ITEM PEKERJAAN
b
Thermatic fire extinguisher : 5 kg
LANTAI 5
b
Indoor Hydrant box, uk. 750 (W) x 1250 (H) x 180 (D) mm
Fire hose Ø 1.5" x 30 meter
Hose nozle Ø 1.5"
Hose rack Ø 1.5"
Hydrant valve Ø 2.5"
Hydrant valve Ø 1.5"
b
- Riser - Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 6"
- Riser - Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/4"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 3"
b
- Tee Reduce SCH. 40, Size : 6" x 2-1/2"
- Tee Reduce SCH. 40, Size : 3" x 1-1/4"
- Tee Reduce SCH. 40, Size : 3" x 1"
- Tee Reduce SCH. 40, Size : 2-1/2" x 1"
- Tee Reduce SCH. 40, Size : 2" x 1"
- Tee Reduce SCH. 40, Size : 1-1/2" x1"
- Tee Reduce SCH. 40, Size : 1-1/4" x1"
- Reducer SCH. 40, Size : 3" x 2-1/2"
- Reducer SCH. 40, Size : 2-1/2" x 2"
- Reducer SCH. 40, Size : 2" x 1-1/2"
- Reducer SCH. 40, Size : 1-1/2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1"
- Reducer SCH. 40, Size : 1-1/4" x 1"
- Grooved Coupling 3"
Fire Extinguisher
Portable fire extinguisher dry chemical agent : 3.5 kg
Thermatic fire extinguisher : 5 kg
ITEM PEKERJAAN
b
LANTAI 6
b
Hose nozle Ø 1.5"
Hose rack Ø 1.5"
Hydrant valve Ø 2.5"
Hydrant valve Ø 1.5"
b
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/4"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2-1/2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 3"
b
- Tee Reduce SCH. 40, Size : 2" x 1-1/4"
- Tee Reduce SCH. 40, Size : 2" x 1"
- Tee Reduce SCH. 40, Size : 1-1/2" x1"
- Tee Reduce SCH. 40, Size : 1-1/4" x1"
- Reducer SCH. 40, Size : 3" x 2-1/2"
- Reducer SCH. 40, Size : 2-1/2" x 2"
- Reducer SCH. 40, Size : 2" x 1-1/2"
- Reducer SCH. 40, Size : 2" x 1-1/4"
- Reducer SCH. 40, Size : 1-1/2" x 1"
- Reducer SCH. 40, Size : 1-1/4" x 1"
- Grooved Coupling 3"
Fire Extinguisher
Portable fire extinguisher dry chemical agent : 3.5 kg
Thermatic fire extinguisher : 5 kg
LANTAI ATAP
ITEM PEKERJAAN
b
- Riser - Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 6"
- Riser - Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 1"
- Pipa black steel SCH. 40 (SNI 0039 : 2013) Ø 2"
b
Include SLO Disnaker, testing, and comissioning
b
Stopper mobil, tebal 100 mm
Galian tanah pondasi batu kali, sedalam 1 meter
Urugan pasir bawah pondasi, tebal 100 mm
Urugan kembali dengan tanah bekas galian pondasi & dipadatk
Pasangan pondasi batu kali (camp. 1 pc : 6 ps)
Plesteran & acian pondasi batu kali
Urugan pasir bawah rabat beton, tebal 50 mm
Pekerjaan rabat beton, tebal 100 mm
Urugan pasir bawah paving block, tebal 50 mm
Paving block K-200, tebal 60 mm
Pekerjaan pebblescape terrazo dan finish lantai seamless syste
Pebblescape terrazo, tipe white sand
Pebblescape terrazo, tipe BW stone flake
Pebblescape terrazo, tipe dark grey
Finishing lantai seamless system, tipe dark grey
Finishing lantai seamless system, tipe light grey
Urugan pasir bawah rabat beton, tebal 50 mm
Pekerjaan rabat beton, tebal 100 mm
Kawat ayam
ITEM PEKERJAAN
b
Besi tulangan
Beton ready mix F'c 21 Mpa
Tanah humus
Rumput manila
Homogeneous tile rustic 600 x 600 mm
Stepnoising, uk. 80 x 600 mm
Plint homogenous tile, uk. 100 x 275 mm
Sloof praktis (SP1), uk. 100 x 200 mm
Kolom praktis (KP1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
Pasangan bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Pengecatan dinding eksterior
Plesteran & acian pondasi batu kali
PEKERJAAN RAILING
RAILING GRAND STAIR
Catatan :
ITEM PEKERJAAN
b
Railing, tipe R04
b
Bekisting dipakai (2x)
Wiremesh # M8-150 mm
Besi dowel Ø10
Rabat beton (camp. 1pc : 3ps : 5kr)
b
Urugan pasir bawah pondasi, tebal 100 mm
Urugan kembali dengan tanah bekas galian pondasi & dipadatk
Sloof praktis (SP1), uk. 100 x 200 mm
Kolom praktis (KP1), uk. 100 x 100 mm
Balok praktis (BP1), uk. 100 x 200 mm
Pasangan pondasi batu kali (camp. 1 pc : 6 ps)
Pasangan dinding bata ringan
Plesteran dinding bata ringan
Acian dinding bata ringan
Pengecatan dinding eksterior
Plesteran & acian pondasi batu kali
Pipa PVC AW Ø 3" - Pipa suling - suling 1000mm
GRC cetak, tebal 10 mm, meliputi :
Rangka besi siku, uk. 40 x 40 x 4 mm
Angkur baut Ø 12 mm
Cat dinding eksterior
b
Rumput manila (Zoysia matrella)
PEKERJAAN SOFTSCAPE
Urugan tanah media tanam
Rumput manila (Zoysia matrella)
Pohon kiara payung (Filicium decipiens), tinggi 2,5 meter
ITEM PEKERJAAN
b
Pohon bungur (Lagerstroemis speciosa), tinggi 3 meter
Pohon tabebuya (Tabebuia Rosea), tinggi 4 meter
Pohon pucuk merah (Syzyrgium Myrtifolium), tinggi 2 meter
Pohon tanjung (Mimusops elengi), tinggi 3 meter
c d e
2,240.00 m2 A.06
208.00 m¹ A.01
10.00 bln A.02
30.00 m2 A.03
18.00 m2 A.03
1.00 unit A.05
216.00 m' A.04
c d e
1.00 ls BN
47.61 m3 B.01
VOLUME SAT. KODE
c d e
45.23 m3 B.02
4.76 m3 B.05
4.76 m3 D.02.01
70.00 m1 B.19
30.79 m3 D.02.15
30.79 m3 D.02.11
VOLUME SAT. KODE
c d e
4,773.42 Kg D.01.01
35.19 m3 B.17
5.00 titik D.02.14
45.50 m2 C.02.14
5,728.01 Kg D.01.01
73.94 m3 D.02.11
1.00 set BN
100.00 org BN
1.00 bh BN
1.00 ls BN
VOLUME SAT. KODE
c d e
100.00 bh BN
20.00 psg BN
2.00 psg BN
30,000.00 bh BN
7,500.00 psg BN
100.00 psg BN
100.00 bh BN
10.00 bh BN
1.00 ls BN
10.00 bh BN
1.00 ls BN
4.00 bh BN
2.00 bh BN
VOLUME SAT. KODE
c d e
46.24 m3 B.01
VOLUME SAT. KODE
c d e
46.24 m3 B.02
VOLUME SAT. KODE
c d e
46.24 m3 B.03
VOLUME SAT. KODE
c d e
27.74 m3 B.04
VOLUME SAT. KODE
c d e
30.72 m3 B.01
VOLUME SAT. KODE
c d e
30.72 m3 B.02
VOLUME SAT. KODE
c d e
30.72 m3 B.03
VOLUME SAT. KODE
c d e
18.43 m3 B.04
VOLUME SAT. KODE
c d e
87.04 m3 B.01
VOLUME SAT. KODE
c d e
87.04 m3 B.02
VOLUME SAT. KODE
c d e
87.04 m3 B.03
VOLUME SAT. KODE
c d e
52.22 m3 B.04
VOLUME SAT. KODE
c d e
38.58 m3 B.01
VOLUME SAT. KODE
c d e
38.58 m3 B.02
VOLUME SAT. KODE
c d e
7.72 m3 B.03
VOLUME SAT. KODE
c d e
35.02 m3 B.01
VOLUME SAT. KODE
c d e
35.02 m3 B.02
VOLUME SAT. KODE
c d e
7.00 m3 B.03
VOLUME SAT. KODE
c d e
212.96 m3 B.01
VOLUME SAT. KODE
c d e
191.66 m3 B.02
VOLUME SAT. KODE
c d e
54.56 m3 B.01
VOLUME SAT. KODE
c d e
49.10 m3 B.02
VOLUME SAT. KODE
c d e
106.56 m3 B.01
VOLUME SAT. KODE
c d e
106.56 m3 B.02
VOLUME SAT. KODE
c d e
74.59 m3 B.03
VOLUME SAT. KODE
c d e
21.66 m3 B.01
VOLUME SAT. KODE
c d e
7.98 m3 B.02
VOLUME SAT. KODE
c d e
58.08 m3 B.01
VOLUME SAT. KODE
c d e
232.32 m3 B.01
VOLUME SAT. KODE
c d e
120.96 m3 B.01
VOLUME SAT. KODE
c d e
120.96 m3 B.02
VOLUME SAT. KODE
c d e
28.72 m3 B.01
VOLUME SAT. KODE
c d e
26.42 m3 B.02
VOLUME SAT. KODE
c d e
50.14 m3 B.01
VOLUME SAT. KODE
c d e
16.02 m3 B.01
VOLUME SAT. KODE
c d e
7.21 m3 B.02
VOLUME SAT. KODE
c d e
52.38 m3 B.01
80.71 m3 B.05
23.76 m3 B.05
32.79 m3 B.05
179.58 m3 B.05
2.87 m3 B.05
1.60 m3 B.05
VOLUME SAT. KODE
c d e
3.66 m3 B.05
7.48 m3 B.05
1,060.16 m3 B.08
677.08 m3 B.08
576.49 m3 B.09
616.00 m1 B.19
291.94 m3 D.02.15
291.94 m3 D.02.11
44,581.24 Kg D.01.01
309.64 m3 B.17
44.00 titik D.02.14
168.00 m1 B.19
79.62 m3 D.02.15
VOLUME SAT. KODE
c d e
79.62 m3 D.02.11
12,158.52 Kg D.01.01
84.45 m3 B.17
12.00 titik D.02.14
360.00 m1 B.19
164.87 m3 D.02.15
164.87 m3 D.02.11
24,628.96 Kg D.01.01
180.96 m3 B.17
20.00 titik D.02.14
36.00 m1 B.19
16.29 m3 D.02.15
16.29 m3 D.02.11
VOLUME SAT. KODE
c d e
3,225.06 Kg D.01.01
18.10 m3 B.17
6.00 titik D.02.14
168.00 m1 B.19
79.62 m3 D.02.15
79.62 m3 D.02.11
12,158.52 Kg D.01.01
84.45 m3 B.17
12.00 titik D.02.14
504.00 m1 B.19
238.86 m3 D.02.15
238.86 m3 D.02.11
36,475.56 Kg D.01.01
253.34 m3 B.17
VOLUME SAT. KODE
c d e
36.00 titik D.02.14
432.00 m1 B.19
195.43 m3 D.02.15
195.43 m3 D.02.11
29,258.44 Kg D.01.01
217.15 m3 B.17
24.00 titik D.02.14
c d e
179.58 m3 D.02.01
80.71 m3 D.02.01
VOLUME SAT. KODE
c d e
23.76 m3 D.02.01
32.79 m3 D.02.01
2.87 m3 D.02.01
7.48 m3 D.02.01
14.57 m3 C.01.05
19.20 m2 C.02.14
992.67 Kg D.01.01
14.40 m3 D.02.11
13.44 m2 C.02.14
658.56 Kg D.01.01
9.41 m3 D.02.11
28.80 m2 C.02.14
1,904.99 Kg D.01.01
28.80 m3 D.02.11
VOLUME SAT. KODE
c d e
14.14 m2 C.02.14
1,649.60 Kg D.01.01
12.54 m3 D.02.11
12.95 m2 C.02.14
1,494.97 Kg D.01.01
11.35 m3 D.02.11
140.80 m2 C.02.14
13,163.10 Kg D.01.01
140.80 m3 D.02.11
25.60 m2 C.02.14
3,255.99 Kg D.01.01
38.40 m3 D.02.11
VOLUME SAT. KODE
c d e
70.40 m2 C.02.14
12,803.81 Kg D.01.01
156.16 m3 D.02.11
21.60 m2 C.02.14
1,357.59 Kg D.01.01
8.10 m3 D.02.11
38.40 m2 C.02.14
3,589.94 Kg D.01.01
38.40 m3 D.02.11
153.60 m2 C.02.14
16,671.62 Kg D.01.01
153.60 m3 D.02.11
79.20 m2 C.02.14
15,918.83 Kg D.01.01
VOLUME SAT. KODE
c d e
201.60 m3 D.02.11
81.68 m2 D.04.12.A
1,778.26 Kg D.01.01
10.21 m3 D.02.11
26.35 m1 D.09.01
55.26 m2 K.20
23.37 m2 D.04.11.A
817.69 Kg D.01.01
7.01 m3 D.02.11
23.37 m2 K.20
161.28 m2 D.04.12.A
4,459.20 Kg D.01.01
20.16 m3 D.02.09
22.80 m1 D.09.01
VOLUME SAT. KODE
c d e
80.65 m2 K.20
119.16 m2 D.04.12.A
3,038.98 Kg D.01.01
26.81 m3 D.02.09
107.20 m2 D.04.12.A
2,657.95 Kg D.01.01
13.40 m3 D.02.09
291.52 m2 D.04.12.A
5,674.57 Kg D.01.01
36.44 m3 D.02.09
29.75 m1 D.09.01
183.36 m2 K.20
68.07 m2 D.04.11.A
2,079.83 Kg D.01.01
VOLUME SAT. KODE
c d e
20.42 m3 D.02.09
68.06 m2 K.20
4.45 m2 D.04.11.A
430.70 Kg D.01.01
3.36 m3 D.02.09
43.76 Kg D.01.01
53.42 kg D.01.07
165.90 m2 D.04.09.A
6,467.10 Kg D.01.01
28.44 m3 D.02.09
4.18 m2 D.04.09.A
110.85 Kg D.01.01
VOLUME SAT. KODE
c d e
0.47 m3 D.02.09
3.73 m2 D.04.09.A
101.72 Kg D.01.01
0.42 m3 D.02.09
11.02 m2 D.04.09.A
272.77 Kg D.01.01
1.24 m3 D.02.09
14.04 m2 D.04.09.A
332.24 Kg D.01.01
1.58 m3 D.02.09
17.42 m2 D.04.09.A
VOLUME SAT. KODE
c d e
401.27 Kg D.01.01
1.96 m3 D.02.09
20.00 m2 D.04.09.A
451.64 Kg D.01.01
2.25 m3 D.02.09
12.00 m2 D.04.09.A
265.44 Kg D.01.01
1.35 m3 D.02.09
93.22 m2 D.04.09.A
7,302.99 Kg D.01.01
15.98 m3 D.02.09
8.91 m2 D.04.09.A
VOLUME SAT. KODE
c d e
619.38 Kg D.01.01
1.30 m3 D.02.09
15.52 m2 D.04.09.A
1,079.45 Kg D.01.01
2.66 m3 D.02.09
6.19 m2 D.04.09.A
134.05 Kg D.01.01
0.58 m3 D.02.09
9.28 m2 D.04.09.A
201.07 Kg D.01.01
0.87 m3 D.02.09
5.57 m2 D.04.09.A
131.65 Kg D.01.01
0.60 m3 D.02.09
VOLUME SAT. KODE
c d e
72.10 m2 D.04.09.A
4,974.58 Kg D.01.01
12.36 m3 D.02.09
24.75 m2 D.04.09.A
1,642.51 Kg D.01.01
3.61 m3 D.02.09
173.02 m2 D.04.09.A
6,497.00 Kg D.01.01
29.66 m3 D.02.09
68.02 m2 D.04.09.A
4,046.03 Kg D.01.01
11.66 m3 D.02.09
170.10 m2 D.04.09.A
VOLUME SAT. KODE
c d e
6,778.39 Kg D.01.01
29.16 m3 D.02.09
141.11 m2 D.04.09.A
8,288.35 Kg D.01.01
24.19 m3 D.02.09
20.16 m2 D.04.09.A
1,053.59 Kg D.01.01
2.94 m3 D.02.09
35.29 m2 D.04.09.A
1,832.77 Kg D.01.01
6.05 m3 D.02.09
16.85 m2 D.04.09.A
314.43 Kg D.01.01
1.58 m3 D.02.09
VOLUME SAT. KODE
c d e
25.17 m2 D.04.09.A
469.65 Kg D.01.01
2.36 m3 D.02.09
15.14 m2 D.04.09.A
307.95 Kg D.01.01
1.63 m3 D.02.09
8.23 m2 D.04.08.A
249.25 Kg D.01.01
0.94 m3 D.02.09
227.33 m2 D.04.08.A
6,888.88 Kg D.01.01
25.98 m3 D.02.09
VOLUME SAT. KODE
c d e
26.69 m2 D.04.08.A
808.74 Kg D.01.01
3.05 m3 D.02.09
4.17 m2 D.04.08.A
109.01 Kg D.01.01
0.36 m3 D.02.09
478.54 m2 D.04.08.A
14,501.66 Kg D.01.01
54.69 m3 D.02.09
4.17 m2 D.04.08.A
109.01 Kg D.01.01
0.36 m3 D.02.09
92.36 m2 D.04.08.A
VOLUME SAT. KODE
c d e
2,328.09 Kg D.01.01
11.35 m3 D.02.09
20.80 m2 D.04.12.A
452.84 Kg D.01.01
2.60 m3 D.02.09
111.60 m2 D.04.12.A
3,399.71 Kg D.01.01
22.32 m3 D.02.09
7.20 m1 D.09.01
13.68 m2 K.20
87.14 m2 D.04.12.A
2,623.83 Kg D.01.01
15.25 m3 D.02.09
7.20 m1 D.09.01
VOLUME SAT. KODE
c d e
26.64 m2 K.20
50.45 m2 D.04.12.A
1,813.92 Kg D.01.01
10.09 m3 D.02.09
4.90 m1 D.09.01
9.31 m2 K.20
16.15 m2 D.04.10.A
597.99 Kg D.01.01
1.38 m3 D.02.09
8.86 m2 D.04.10.A
514.44 Kg D.01.01
0.93 m3 D.02.09
VOLUME SAT. KODE
c d e
7.14 m2 D.04.10.A
264.33 Kg D.01.01
0.61 m3 D.02.09
16.27 m2 D.04.10.A
602.32 Kg D.01.01
1.39 m3 D.02.09
66.16 m2 D.04.13.A
1,783.49 Kg D.01.01
4.44 m3 D.02.09
105.60 m2 D.04.13.A
2,807.82 Kg D.01.01
7.38 m3 D.02.09
61.45 m2 D.04.13.A
VOLUME SAT. KODE
c d e
1,687.00 Kg D.01.01
4.11 m3 D.02.09
29.81 m2 D.04.11.A
824.67 m2 D.01.05
299.63 Kg D.01.01
61.85 m3 D.02.09
8.40 m2 D.04.11.A
232.53 m2 D.01.05
84.49 Kg D.01.01
17.44 m3 D.02.09
65.64 m2 D.04.11.A
1,816.00 m2 D.01.05
659.81 Kg D.01.01
VOLUME SAT. KODE
c d e
136.20 m3 D.02.09
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
169.34 m2 D.04.09.A
9,736.35 Kg D.01.01
29.03 m3 D.02.09
24.21 m2 D.04.09.A
1,236.57 Kg D.01.01
3.53 m3 D.02.09
112.88 m2 D.04.09.A
5,746.09 Kg D.01.01
19.35 m3 D.02.09
24.21 m2 D.04.09.A
1,179.30 Kg D.01.01
3.53 m3 D.02.09
169.34 m2 D.04.09.A
5,412.96 Kg D.01.01
29.03 m3 D.02.09
VOLUME SAT. KODE
c d e
20.16 m2 D.04.09.A
378.05 Kg D.01.01
1.89 m3 D.02.09
30.29 m2 D.04.09.A
568.07 Kg D.01.01
2.84 m3 D.02.09
18.12 m2 D.04.09.A
370.11 Kg D.01.01
1.95 m3 D.02.09
53.48 m2 D.04.10.A
2,284.99 Kg D.01.01
7.10 m3 D.02.09
27.73 m2 D.04.10.A
VOLUME SAT. KODE
c d e
979.16 Kg D.01.01
3.12 m3 D.02.09
77.21 m2 D.04.10.A
4,928.61 Kg D.01.01
10.69 m3 D.02.09
59.05 m2 D.04.10.A
2,014.96 Kg D.01.01
6.20 m3 D.02.09
116.00 m2 D.04.10.A
4,045.22 Kg D.01.01
15.40 m3 D.02.09
98.29 m2 D.04.10.A
2,711.81 Kg D.01.01
10.32 m3 D.02.09
VOLUME SAT. KODE
c d e
45.90 m2 D.04.10.A
1,427.74 Kg D.01.01
4.59 m3 D.02.09
19.35 m2 D.04.10.A
828.47 Kg D.01.01
2.96 m3 D.02.09
251.08 m2 D.04.10.A
4,694.81 Kg D.01.01
24.90 m3 D.02.09
65.44 m2 D.04.10.A
1,063.24 Kg D.01.01
6.91 m3 D.02.09
9.51 m2 D.04.10.A
335.80 Kg D.01.01
VOLUME SAT. KODE
c d e
1.07 m3 D.02.09
30.58 m2 D.04.10.A
1,066.47 Kg D.01.01
4.06 m3 D.02.09
5.10 m2 D.04.10.A
158.64 Kg D.01.01
0.51 m3 D.02.09
1.29 m2 D.04.10.A
47.67 Kg D.01.01
0.11 m3 D.02.09
3.47 m2 D.04.10.A
107.19 Kg D.01.01
0.30 m3 D.02.09
VOLUME SAT. KODE
c d e
192.53 m2 D.04.10.A
8,225.96 Kg D.01.01
25.56 m3 D.02.09
126.92 m2 D.04.10.A
3,672.72 Kg D.01.01
16.85 m3 D.02.09
121.51 m2 D.04.10.A
4,290.11 Kg D.01.01
13.67 m3 D.02.09
20.19 m2 D.04.10.A
703.97 Kg D.01.01
2.68 m3 D.02.09
20.95 m2 D.04.10.A
578.10 Kg D.01.01
2.20 m3 D.02.09
VOLUME SAT. KODE
c d e
11.30 m2 D.04.10.A
351.49 Kg D.01.01
1.13 m3 D.02.09
53.18 m2 D.04.10.A
4,772.16 Kg D.01.01
7.06 m3 D.02.09
10.19 m2 D.04.10.A
591.88 Kg D.01.01
1.07 m3 D.02.09
6.79 m2 D.04.10.A
251.33 Kg D.01.01
0.58 m3 D.02.09
16.15 m2 D.04.10.A
VOLUME SAT. KODE
c d e
597.99 Kg D.01.01
1.38 m3 D.02.09
8.86 m2 D.04.10.A
514.44 Kg D.01.01
0.93 m3 D.02.09
7.14 m2 D.04.10.A
264.33 Kg D.01.01
0.61 m3 D.02.09
23.29 m2 D.04.10.A
862.32 Kg D.01.01
1.99 m3 D.02.09
VOLUME SAT. KODE
c d e
24.96 m2 D.04.12.A
543.41 Kg D.01.01
3.12 m3 D.02.09
72.60 m2 D.04.12.A
2,186.32 Kg D.01.01
14.52 m3 D.02.09
72.57 m2 D.04.12.A
2,160.04 Kg D.01.01
12.70 m3 D.02.09
49.40 m2 D.04.12.A
1,758.69 Kg D.01.01
9.88 m3 D.02.09
66.76 m2 D.04.13.A
VOLUME SAT. KODE
c d e
1,799.56 Kg D.01.01
4.48 m3 D.02.09
105.46 m2 D.04.13.A
2,804.02 Kg D.01.01
7.37 m3 D.02.09
62.19 m2 D.04.13.A
1,707.52 Kg D.01.01
4.16 m3 D.02.09
885.07 m2 D.04.11.A
24,034.07 Kg D.01.01
132.76 m3 D.02.09
275.50 m2 D.04.11.A
5,535.07 Kg D.01.01
33.06 m3 D.02.09
VOLUME SAT. KODE
c d e
127.80 m2 D.04.11.A
3,470.42 Kg D.01.01
19.17 m3 D.02.09
757.67 m2 D.04.11.A
20,574.51 Kg D.01.01
113.65 m3 D.02.09
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
141.11 m2 D.04.09.A
5,547.09 Kg D.01.01
24.19 m3 D.02.09
20.16 m2 D.04.09.A
1,053.59 Kg D.01.01
2.94 m3 D.02.09
94.09 m2 D.04.09.A
3,698.83 Kg D.01.01
16.13 m3 D.02.09
20.16 m2 D.04.09.A
1,002.42 Kg D.01.01
2.94 m3 D.02.09
141.11 m2 D.04.09.A
4,586.78 Kg D.01.01
24.19 m3 D.02.09
VOLUME SAT. KODE
c d e
16.85 m2 D.04.09.A
314.43 Kg D.01.01
1.58 m3 D.02.09
25.17 m2 D.04.09.A
469.65 Kg D.01.01
2.36 m3 D.02.09
15.14 m2 D.04.09.A
307.95 Kg D.01.01
1.63 m3 D.02.09
21.39 m2 D.04.10.A
1,062.21 Kg D.01.01
2.84 m3 D.02.09
10.47 m2 D.04.10.A
VOLUME SAT. KODE
c d e
326.01 Kg D.01.01
1.39 m3 D.02.09
33.60 m2 D.04.10.A
1,186.29 Kg D.01.01
3.78 m3 D.02.09
30.58 m2 D.04.10.A
1,239.39 Kg D.01.01
4.06 m3 D.02.09
14.90 m2 D.04.10.A
463.47 Kg D.01.01
1.49 m3 D.02.09
6.29 m2 D.04.10.A
142.34 Kg D.01.01
0.57 m3 D.02.09
VOLUME SAT. KODE
c d e
1.29 m2 D.04.10.A
47.67 Kg D.01.01
0.11 m3 D.02.09
3.70 m2 D.04.10.A
114.33 Kg D.01.01
0.32 m3 D.02.09
171.14 m2 D.04.10.A
8,497.69 Kg D.01.01
22.72 m3 D.02.09
127.30 m2 D.04.10.A
3,963.71 Kg D.01.01
16.90 m3 D.02.09
91.64 m2 D.04.10.A
3,235.63 Kg D.01.01
VOLUME SAT. KODE
c d e
10.31 m3 D.02.09
55.83 m2 D.04.10.A
3,563.90 Kg D.01.01
7.73 m3 D.02.09
37.43 m2 D.04.10.A
1,277.22 Kg D.01.01
3.93 m3 D.02.09
20.19 m2 D.04.10.A
818.12 Kg D.01.01
2.68 m3 D.02.09
31.81 m2 D.04.10.A
877.66 Kg D.01.01
3.34 m3 D.02.09
21.30 m2 D.04.10.A
VOLUME SAT. KODE
c d e
662.55 Kg D.01.01
2.13 m3 D.02.09
52.95 m2 D.04.10.A
4,751.88 Kg D.01.01
7.03 m3 D.02.09
10.19 m2 D.04.10.A
591.88 Kg D.01.01
1.07 m3 D.02.09
221.03 m2 D.04.10.A
4,132.94 Kg D.01.01
21.92 m3 D.02.09
12.46 m2 D.04.10.A
282.18 Kg D.01.01
1.13 m3 D.02.09
VOLUME SAT. KODE
c d e
6.79 m2 D.04.10.A
251.33 Kg D.01.01
0.58 m3 D.02.09
16.15 m2 D.04.10.A
597.99 Kg D.01.01
1.38 m3 D.02.09
8.86 m2 D.04.10.A
514.44 Kg D.01.01
0.93 m3 D.02.09
7.14 m2 D.04.10.A
264.33 Kg D.01.01
0.61 m3 D.02.09
VOLUME SAT. KODE
c d e
16.03 m2 D.04.10.A
593.65 Kg D.01.01
1.37 m3 D.02.09
20.80 m2 D.04.12.A
452.84 Kg D.01.01
2.60 m3 D.02.09
60.50 m2 D.04.12.A
1,843.03 Kg D.01.01
12.10 m3 D.02.09
60.46 m2 D.04.12.A
1,820.34 Kg D.01.01
10.58 m3 D.02.09
VOLUME SAT. KODE
c d e
41.15 m2 D.04.12.A
1,479.54 Kg D.01.01
8.23 m3 D.02.09
63.33 m2 D.04.13.A
1,707.17 Kg D.01.01
4.25 m3 D.02.09
100.02 m2 D.04.13.A
2,659.44 Kg D.01.01
6.99 m3 D.02.09
58.75 m2 D.04.13.A
1,613.12 Kg D.01.01
3.93 m3 D.02.09
374.27 m2 D.04.11.A
VOLUME SAT. KODE
c d e
10,163.25 Kg D.01.01
56.14 m3 D.02.09
10.58 m2 D.04.11.A
212.63 Kg D.01.01
1.27 m3 D.02.09
697.33 m2 D.04.11.A
18,936.16 Kg D.01.01
104.60 m3 D.02.09
281.58 m2 D.04.11.A
5,657.29 Kg D.01.01
33.79 m3 D.02.09
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
141.11 m2 D.04.09.A
5,547.09 Kg D.01.01
24.19 m3 D.02.09
20.16 m2 D.04.09.A
1,053.59 Kg D.01.01
2.94 m3 D.02.09
94.09 m2 D.04.09.A
3,698.83 Kg D.01.01
16.13 m3 D.02.09
20.16 m2 D.04.09.A
1,002.42 Kg D.01.01
2.94 m3 D.02.09
141.11 m2 D.04.09.A
4,586.78 Kg D.01.01
24.19 m3 D.02.09
VOLUME SAT. KODE
c d e
16.85 m2 D.04.09.A
314.43 Kg D.01.01
1.58 m3 D.02.09
25.17 m2 D.04.09.A
469.65 Kg D.01.01
2.36 m3 D.02.09
15.14 m2 D.04.09.A
307.95 Kg D.01.01
1.63 m3 D.02.09
9.51 m2 D.04.10.A
335.80 Kg D.01.01
1.07 m3 D.02.09
30.58 m2 D.04.10.A
VOLUME SAT. KODE
c d e
1,239.39 Kg D.01.01
4.06 m3 D.02.09
5.10 m2 D.04.10.A
158.64 Kg D.01.01
0.51 m3 D.02.09
1.29 m2 D.04.10.A
47.67 Kg D.01.01
0.11 m3 D.02.09
3.47 m2 D.04.10.A
107.19 Kg D.01.01
0.30 m3 D.02.09
192.38 m2 D.04.10.A
9,552.42 Kg D.01.01
25.54 m3 D.02.09
VOLUME SAT. KODE
c d e
127.00 m2 D.04.10.A
3,954.33 Kg D.01.01
16.86 m3 D.02.09
115.91 m2 D.04.10.A
4,092.39 Kg D.01.01
13.04 m3 D.02.09
75.83 m2 D.04.10.A
4,841.01 Kg D.01.01
10.50 m3 D.02.09
45.33 m2 D.04.10.A
1,546.97 Kg D.01.01
4.76 m3 D.02.09
20.19 m2 D.04.10.A
818.12 Kg D.01.01
VOLUME SAT. KODE
c d e
2.68 m3 D.02.09
20.95 m2 D.04.10.A
578.10 Kg D.01.01
2.20 m3 D.02.09
31.00 m2 D.04.10.A
964.27 Kg D.01.01
3.10 m3 D.02.09
52.80 m2 D.04.10.A
4,738.36 Kg D.01.01
7.01 m3 D.02.09
10.19 m2 D.04.10.A
591.88 Kg D.01.01
1.07 m3 D.02.09
227.48 m2 D.04.10.A
VOLUME SAT. KODE
c d e
4,253.61 Kg D.01.01
22.56 m3 D.02.09
19.30 m2 D.04.10.A
437.00 Kg D.01.01
1.75 m3 D.02.09
6.79 m2 D.04.10.A
251.33 Kg D.01.01
0.58 m3 D.02.09
16.15 m2 D.04.10.A
597.99 Kg D.01.01
1.38 m3 D.02.09
8.86 m2 D.04.10.A
514.44 Kg D.01.01
VOLUME SAT. KODE
c d e
0.93 m3 D.02.09
7.14 m2 D.04.10.A
264.33 Kg D.01.01
0.61 m3 D.02.09
16.03 m2 D.04.10.A
593.65 Kg D.01.01
1.37 m3 D.02.09
20.80 m2 D.04.12.A
452.84 Kg D.01.01
2.60 m3 D.02.09
60.50 m2 D.04.12.A
VOLUME SAT. KODE
c d e
1,843.03 Kg D.01.01
12.10 m3 D.02.09
60.46 m2 D.04.12.A
1,820.34 Kg D.01.01
10.58 m3 D.02.09
41.15 m2 D.04.12.A
1,479.54 Kg D.01.01
8.23 m3 D.02.09
63.33 m2 D.04.13.A
1,707.17 Kg D.01.01
4.25 m3 D.02.09
100.02 m2 D.04.13.A
2,659.44 Kg D.01.01
6.99 m3 D.02.09
VOLUME SAT. KODE
c d e
58.75 m2 D.04.13.A
1,613.12 Kg D.01.01
3.93 m3 D.02.09
127.87 m2 D.04.11.A
3,472.23 Kg D.01.01
19.18 m3 D.02.09
898.67 m2 D.04.11.A
24,403.38 Kg D.01.01
134.80 m3 D.02.09
368.83 m2 D.04.11.A
7,410.23 Kg D.01.01
44.26 m3 D.02.09
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
141.11 m2 D.04.09.A
5,066.94 Kg D.01.01
24.19 m3 D.02.09
20.16 m2 D.04.09.A
1,053.59 Kg D.01.01
2.94 m3 D.02.09
94.09 m2 D.04.09.A
3,378.66 Kg D.01.01
16.13 m3 D.02.09
20.16 m2 D.04.09.A
1,002.42 Kg D.01.01
2.94 m3 D.02.09
16.85 m2 D.04.09.A
VOLUME SAT. KODE
c d e
314.43 Kg D.01.01
1.58 m3 D.02.09
25.17 m2 D.04.09.A
469.65 Kg D.01.01
2.36 m3 D.02.09
15.14 m2 D.04.09.A
307.95 Kg D.01.01
1.63 m3 D.02.09
9.42 m2 D.04.10.A
332.66 Kg D.01.01
1.06 m3 D.02.09
30.58 m2 D.04.10.A
1,239.39 Kg D.01.01
4.06 m3 D.02.09
VOLUME SAT. KODE
c d e
5.10 m2 D.04.10.A
158.64 Kg D.01.01
0.51 m3 D.02.09
1.40 m2 D.04.10.A
52.00 Kg D.01.01
0.12 m3 D.02.09
3.47 m2 D.04.10.A
107.19 Kg D.01.01
0.30 m3 D.02.09
192.38 m2 D.04.10.A
9,552.42 Kg D.01.01
25.54 m3 D.02.09
127.52 m2 D.04.10.A
VOLUME SAT. KODE
c d e
3,970.75 Kg D.01.01
16.93 m3 D.02.09
115.91 m2 D.04.10.A
4,092.39 Kg D.01.01
13.04 m3 D.02.09
66.73 m2 D.04.10.A
4,260.09 Kg D.01.01
9.24 m3 D.02.09
40.95 m2 D.04.10.A
1,397.47 Kg D.01.01
4.30 m3 D.02.09
20.19 m2 D.04.10.A
818.12 Kg D.01.01
2.68 m3 D.02.09
VOLUME SAT. KODE
c d e
20.95 m2 D.04.10.A
578.10 Kg D.01.01
2.20 m3 D.02.09
30.80 m2 D.04.10.A
958.05 Kg D.01.01
3.08 m3 D.02.09
52.50 m2 D.04.10.A
4,711.32 Kg D.01.01
6.97 m3 D.02.09
10.19 m2 D.04.10.A
591.88 Kg D.01.01
1.07 m3 D.02.09
223.85 m2 D.04.10.A
4,185.73 Kg D.01.01
22.20 m3 D.02.09
VOLUME SAT. KODE
c d e
19.52 m2 D.04.10.A
442.00 Kg D.01.01
1.77 m3 D.02.09
6.79 m2 D.04.10.A
251.33 Kg D.01.01
0.58 m3 D.02.09
16.15 m2 D.04.10.A
597.99 Kg D.01.01
1.38 m3 D.02.09
8.86 m2 D.04.10.A
514.44 Kg D.01.01
0.93 m3 D.02.09
VOLUME SAT. KODE
c d e
16.03 m2 D.04.10.A
593.65 Kg D.01.01
1.37 m3 D.02.09
7.14 m2 D.04.10.A
264.33 Kg D.01.01
0.61 m3 D.02.09
20.80 m2 D.04.12.A
452.84 Kg D.01.01
2.60 m3 D.02.09
60.50 m2 D.04.12.A
1,843.03 Kg D.01.01
12.10 m3 D.02.09
VOLUME SAT. KODE
c d e
60.46 m2 D.04.12.A
1,820.34 Kg D.01.01
10.58 m3 D.02.09
41.15 m2 D.04.12.A
1,479.54 Kg D.01.01
8.23 m3 D.02.09
63.33 m2 D.04.13.A
1,707.17 Kg D.01.01
4.25 m3 D.02.09
100.02 m2 D.04.13.A
2,659.44 Kg D.01.01
6.99 m3 D.02.09
58.60 m2 D.04.13.A
VOLUME SAT. KODE
c d e
1,609.01 Kg D.01.01
3.92 m3 D.02.09
128.00 m2 D.04.11.A
3,475.85 Kg D.01.01
19.20 m3 D.02.09
891.20 m2 D.04.11.A
24,200.62 Kg D.01.01
133.68 m3 D.02.09
333.25 m2 D.04.11.A
6,695.32 Kg D.01.01
39.99 m3 D.02.09
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
141.11 m2 D.04.09.A
5,066.94 Kg D.01.01
24.19 m3 D.02.09
20.16 m2 D.04.09.A
1,053.59 Kg D.01.01
2.94 m3 D.02.09
94.09 m2 D.04.09.A
3,378.66 Kg D.01.01
16.13 m3 D.02.09
20.16 m2 D.04.09.A
1,002.42 Kg D.01.01
2.94 m3 D.02.09
16.85 m2 D.04.09.A
314.43 Kg D.01.01
1.58 m3 D.02.09
VOLUME SAT. KODE
c d e
25.17 m2 D.04.09.A
469.65 Kg D.01.01
2.36 m3 D.02.09
15.14 m2 D.04.09.A
307.95 Kg D.01.01
1.63 m3 D.02.09
9.51 m2 D.04.10.A
335.80 Kg D.01.01
1.07 m3 D.02.09
30.58 m2 D.04.10.A
1,239.39 Kg D.01.01
4.06 m3 D.02.09
1.29 m2 D.04.10.A
VOLUME SAT. KODE
c d e
47.67 Kg D.01.01
0.11 m3 D.02.09
3.70 m2 D.04.10.A
114.33 Kg D.01.01
0.32 m3 D.02.09
85.42 m2 D.04.10.A
4,241.37 Kg D.01.01
11.34 m3 D.02.09
64.10 m2 D.04.10.A
1,995.93 Kg D.01.01
8.51 m3 D.02.09
70.13 m2 D.04.10.A
2,476.15 Kg D.01.01
7.89 m3 D.02.09
VOLUME SAT. KODE
c d e
43.77 m2 D.04.10.A
2,793.95 Kg D.01.01
6.06 m3 D.02.09
24.95 m2 D.04.10.A
851.48 Kg D.01.01
2.62 m3 D.02.09
20.19 m2 D.04.10.A
818.12 Kg D.01.01
2.68 m3 D.02.09
10.48 m2 D.04.10.A
289.05 Kg D.01.01
1.10 m3 D.02.09
20.90 m2 D.04.10.A
650.10 Kg D.01.01
VOLUME SAT. KODE
c d e
2.09 m3 D.02.09
53.18 m2 D.04.10.A
4,772.16 Kg D.01.01
7.06 m3 D.02.09
10.19 m2 D.04.10.A
591.88 Kg D.01.01
1.07 m3 D.02.09
125.54 m2 D.04.10.A
2,347.40 Kg D.01.01
12.45 m3 D.02.09
9.71 m2 D.04.10.A
219.75 Kg D.01.01
0.88 m3 D.02.09
6.79 m2 D.04.10.A
VOLUME SAT. KODE
c d e
251.33 Kg D.01.01
0.58 m3 D.02.09
16.03 m2 D.04.10.A
593.65 Kg D.01.01
1.37 m3 D.02.09
5.71 m2 D.04.10.A
331.89 Kg D.01.01
0.60 m3 D.02.09
7.14 m2 D.04.10.A
264.33 Kg D.01.01
0.61 m3 D.02.09
VOLUME SAT. KODE
c d e
16.03 m2 D.04.10.A
593.65 Kg D.01.01
1.37 m3 D.02.09
20.80 m2 D.04.12.A
452.84 Kg D.01.01
2.60 m3 D.02.09
60.50 m2 D.04.12.A
1,843.03 Kg D.01.01
12.10 m3 D.02.09
60.46 m2 D.04.12.A
1,820.34 Kg D.01.01
10.58 m3 D.02.09
41.15 m2 D.04.12.A
VOLUME SAT. KODE
c d e
1,479.54 Kg D.01.01
8.23 m3 D.02.09
100.02 m2 D.04.13.A
2,659.44 Kg D.01.01
6.99 m3 D.02.09
87.13 m2 D.04.11.A
2,366.11 Kg D.01.01
13.07 m3 D.02.09
491.60 m2 D.04.11.A
13,349.45 Kg D.01.01
73.74 m3 D.02.09
208.25 m2 D.04.11.A
VOLUME SAT. KODE
c d e
4,183.95 Kg D.01.01
24.99 m3 D.02.09
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
16.80 m2 D.04.09.A
638.23 Kg D.01.01
2.88 m3 D.02.09
16.80 m2 D.04.09.A
437.49 Kg D.01.01
1.47 m3 D.02.09
20.30 m2 D.04.09.A
756.25 Kg D.01.01
3.48 m3 D.02.09
15.20 m2 D.04.09.A
388.34 Kg D.01.01
1.33 m3 D.02.09
14.51 m2 D.04.09.A
278.86 Kg D.01.01
VOLUME SAT. KODE
c d e
1.36 m3 D.02.09
21.76 m2 D.04.09.A
418.29 Kg D.01.01
2.04 m3 D.02.09
13.01 m2 D.04.09.A
272.42 Kg D.01.01
1.40 m3 D.02.09
118.41 m2 D.04.10.A
4,129.27 Kg D.01.01
15.72 m3 D.02.09
51.22 m2 D.04.10.A
1,482.17 Kg D.01.01
6.80 m3 D.02.09
VOLUME SAT. KODE
c d e
68.53 m2 D.04.10.A
2,419.66 Kg D.01.01
7.71 m3 D.02.09
23.69 m2 D.04.10.A
1,512.24 Kg D.01.01
3.28 m3 D.02.09
15.24 m2 D.04.10.A
519.99 Kg D.01.01
1.60 m3 D.02.09
60.94 m2 D.04.10.A
2,125.05 Kg D.01.01
8.09 m3 D.02.09
15.60 m2 D.04.10.A
485.24 Kg D.01.01
1.56 m3 D.02.09
VOLUME SAT. KODE
c d e
52.20 m2 D.04.10.A
4,684.29 Kg D.01.01
6.93 m3 D.02.09
4.38 m2 D.04.10.A
254.45 Kg D.01.01
0.46 m3 D.02.09
129.47 m2 D.04.10.A
2,420.94 Kg D.01.01
12.84 m3 D.02.09
9.71 m2 D.04.10.A
219.75 Kg D.01.01
0.88 m3 D.02.09
7.84 m2 D.04.10.A
290.33 Kg D.01.01
VOLUME SAT. KODE
c d e
0.67 m3 D.02.09
3.47 m2 D.04.10.A
107.19 Kg D.01.01
0.30 m3 D.02.09
18.26 m2 D.04.10.A
675.99 Kg D.01.01
1.56 m3 D.02.09
9.80 m2 D.04.10.A
304.83 Kg D.01.01
0.98 m3 D.02.09
19.78 m2 D.04.10.A
732.32 Kg D.01.01
1.69 m3 D.02.09
VOLUME SAT. KODE
c d e
2.74 m2 D.04.10.A
175.20 Kg D.01.01
0.38 m3 D.02.09
1.14 m2 D.04.10.A
39.00 Kg D.01.01
0.12 m3 D.02.09
24.90 m2 D.04.10.A
774.52 Kg D.01.01
2.49 m3 D.02.09
11.80 m2 D.04.10.A
267.20 Kg D.01.01
1.07 m3 D.02.09
VOLUME SAT. KODE
c d e
17.92 m2 D.04.12.A
390.14 Kg D.01.01
2.24 m3 D.02.09
592.53 m2 D.04.11.A
16,090.30 Kg D.01.01
88.88 m3 D.02.09
126.25 m2 D.04.11.A
2,536.49 Kg D.01.01
15.15 m3 D.02.09
43.19 m2 D.04.11.A
1,196.11 Kg D.01.01
6.91 m3 D.02.09
49.40 m2 D.04.11.A
VOLUME SAT. KODE
c d e
1,341.46 Kg D.01.01
7.41 m3 D.02.09
61.07 m2 D.04.11.A
1,658.27 Kg D.01.01
9.16 m3 D.02.09
c d e
503.12 kg D.01.03
VOLUME SAT. KODE
c d e
51.84 kg D.01.04
62.43 kg D.01.04
16.00 bh D.09.04
503.12 kg D.01.03
51.84 kg D.01.04
62.43 kg D.01.04
16.00 bh D.09.04
251.56 kg D.01.03
25.92 kg D.01.04
31.21 kg D.01.04
8.00 bh D.09.04
404.04 kg D.01.03
35.44 kg D.01.04
VOLUME SAT. KODE
c d e
64.81 kg D.01.04
48.00 bh BN
749.48 kg D.01.03
254.56 kg D.01.03
32.89 kg D.01.04
65.88 kg D.01.04
84.21 kg D.01.04
77.83 kg D.01.04
36.00 bh D.09.04
33.12 m1 M.06.8
11.22 kg D.01.03
18.00 bh BN
VOLUME SAT. KODE
c d e
3,107.54 kg D.01.03
VOLUME SAT. KODE
c d e
337.71 kg D.01.03
857.65 kg D.01.03
431.36 kg D.01.04
680.19 kg D.01.04
103.69 kg D.01.04
248.67 kg D.01.04
96.00 bh D.09.05
768.00 bh BN
16.00 ttk D.02.16
77.31 kg D.01.04
3,272.64 kg D.01.03
50.75 kg D.01.04
48.00 bh BN
96.14 m2 D.02.17.b
VOLUME SAT. KODE
c d e
9.62 m2 D.04.17.A
277.64 Kg D.01.01
1.15 m3 D.02.09
12.60 Kg D.01.01
VOLUME SAT. KODE
c d e
1,911.37 kg D.01.03
VOLUME SAT. KODE
c d e
138.40 kg D.01.03
310.19 kg D.01.03
291.22 kg D.01.04
381.87 kg D.01.04
64.81 kg D.01.04
217.58 kg D.01.04
84.00 bh D.09.04
416.00 bh BN
14.00 ttk D.02.16
49.64 kg D.01.04
473.09 m1 M.11.12
223.39 m1 D.01.19
213.86 kg D.01.04
264.00 bh BN
113.44 m2 D.02.17.b
VOLUME SAT. KODE
c d e
1,548.26 kg D.01.04a
94.00 bh BN
3.40 m1 D.05.08
28.38 kg D.01.04
1.00 psg F.03.2
0.25 Kg D.01.01
VOLUME SAT. KODE
c d e
4.00 unit L.18
71.10 m3 B.01
14.22 m3 B.05
56.88 m3 B.08
8.30 m3 B.05
25.89 m1 D.05.03
995.42 m1 D.05.01
VOLUME SAT. KODE
c d e
215.64 m1 D.05.05
166.79 m1 D.05.08
13.10 m1 D.05.09
0.36 m3 D.05.12
8.30 m3 D.02.02
747.16 m1 D.05.01
190.63 m1 D.05.05
207.22 m1 D.05.08
0.36 m3 D.05.12
926.15 m1 D.05.01
281.91 m1 D.05.05
225.66 m1 D.05.08
0.52 m3 D.05.12
VOLUME SAT. KODE
c d e
986.80 m1 D.05.01
195.00 m1 D.05.05
177.70 m1 D.05.08
0.36 m3 D.05.12
457.90 m1 D.05.01
232.74 m1 D.05.05
122.83 m1 D.05.08
0.36 m3 D.05.12
481.34 m1 D.05.01
195.90 m1 D.05.05
118.64 m1 D.05.08
0.36 m3 D.05.12
133.37 m1 D.05.01
VOLUME SAT. KODE
c d e
4.10 m1 D.05.08
59.67 m1 D.05.05
97.26 m3 C.01.01
54.51 m2 C.02.15
1,032.00 m2 C.02.05
1,552.00 m2 C.02.11
1,552.00 m2 C.02.13
909.00 m1 C.02.08
514.75 m1 C.03.01
2,623.37 m2 C.02.15
731.73 m2 C.03.03
0.56 m3 C.01.06
882.24 m2 C.02.05
1,130.67 m2 C.02.11
VOLUME SAT. KODE
c d e
1,130.67 m2 C.02.13
774.03 m1 C.02.08
265.30 m1 C.03.01
1,102.78 m2 C.02.15
766.14 m2 C.03.03
199.42 m2 C.03.04
199.42 m2 E.04
275.35 m2 C.02.05
914.03 m2 C.02.05
1,490.55 m2 C.02.11
1,490.55 m2 C.02.13
855.87 m1 C.02.08
583.65 m1 C.03.01
979.41 m2 C.02.15
289.25 m2 C.03.03
192.77 m2 C.03.04
192.77 m2 E.04
VOLUME SAT. KODE
c d e
619.27 m2 C.02.05
987.51 m2 C.02.11
987.51 m2 C.02.13
393.37 m1 C.02.08
529.77 m1 C.03.01
988.19 m2 C.02.15
241.43 m2 C.03.03
152.18 m2 C.03.04
152.18 m2 E.04
581.94 m2 C.02.05
993.21 m2 C.02.11
993.21 m2 C.02.13
404.22 m1 C.02.08
384.09 m1 C.03.01
888.06 m2 C.02.15
VOLUME SAT. KODE
c d e
234.00 m2 C.03.03
76.02 m2 C.03.04
76.02 m2 E.04
618.14 m2 C.02.05
1,063.77 m2 C.02.11
1,063.77 m2 C.02.13
416.49 m1 C.02.08
382.23 m1 C.03.01
856.73 m2 C.02.15
36.05 m2 C.03.03
75.48 m2 C.03.04
75.48 m2 E.04
292.10 m2 C.02.05
572.23 m2 C.02.11
572.23 m2 C.02.13
VOLUME SAT. KODE
c d e
112.02 m1 C.02.08
26.33 m1 C.03.01
132.10 m2 C.02.15
683.30 m2 C.03.04
683.30 m2 E.04
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
29.23 kg D.01.03
30.10 m1 M.11.06
102.51 kg D.01.04
2.00 bh F.04.6
1.00 set F.03.1
4.00 psg F.03.2
c d e
6.00 bh F.03.5
30.42 m1 BN
40.60 kg D.01.03
18.66 m1 M.11.06
55.79 kg D.01.04
2.00 bh F.04.6
2.00 set F.03.1
3.00 psg F.03.2
VOLUME SAT. KODE
c d e
23.14 kg D.01.03
18.66 m1 M.11.06
55.79 kg D.01.04
2.00 bh F.04.6
1.00 set F.03.1
3.00 psg F.03.2
75.52 kg D.01.03
75.30 m1 M.11.06
187.97 kg D.01.04
6.00 bh F.04.6
9.00 set F.03.1
3.00 psg F.03.2
c d e
c d e
4.00 bh F.04.3
103.11 m2 F.02.10
7.66 m2 F.02.4
4.00 bh F.03.7
c d e
148.00 m' F.01.05
100.95 m' F.01.07
100.95 m' F.01.01
37.30 m' F.01.02
90.28 m2 F.02.10
5.00 psg F.03.4c
5.00 bh F.04.1
36.30 m1 BN
c d e
4.00 psg F.03.4c
4.00 bh F.04.1
7.26 m1 BN
121.90 m1 M.11.07
19.50 kg D.01.04
48.00 bh BN
47.70 m1 M.11.07
8.13 kg D.01.04
20.00 bh BN
c d e
c d e
3.00 bh F.03.5
15.21 m1 BN
40.60 kg D.01.03
18.66 m1 M.11.06
55.79 kg D.01.04
2.00 bh F.04.6
2.00 set F.03.1
3.00 psg F.03.2
VOLUME SAT. KODE
c d e
c d e
8.16 kg D.01.07
9.00 bh BN
c d e
4.83 m1 BN
c d e
20.50 m2 F.02.10
7.65 m2 F.02.4
4.00 bh F.03.7
c d e
18.30 m' F.01.05
16.08 m' F.01.07
19.65 m2 F.02.10
c d e
22.70 m' F.01.05
15.33 m' F.01.07
17.46 m2 F.02.10
c d e
90.80 m' F.01.05
115.80 m' F.01.07
17.72 m' F.01.02
74.77 m2 F.02.10
2.00 psg F.03.4c
2.00 bh F.04.1
17.72 m1 BN
c d e
6.00 bh F.04.2
6.00 set F.03.1
6.00 bh F.03.5
30.42 m1 BN
c d e
1.50 psg F.03.2
1.00 psg F.04.8
1.00 bh F.03.5
5.27 m1 BN
c d e
4.00 unit F.05.11
6.00 psg F.03.2
4.00 bh F.04.5
4.00 set F.03.1
19.88 m1 BN
20.30 kg D.01.03
9.33 m1 M.11.06
27.90 kg D.01.04
1.00 bh F.04.6
1.00 set F.03.1
1.50 psg F.03.2
c d e
14.36 m2 F.02.3
6.00 bh F.03.5
6.00 bh F.03.6
34.62 m1 BN
c d e
c d e
3.00 psg F.03.2
2.00 set F.03.1
2.00 bh F.03.5
9.66 m1 BN
c d e
36.30 m' F.01.02
108.46 m2 F.02.10
5.00 psg F.03.4c
5.00 bh F.04.1
36.30 m1 BN
c d e
c d e
c d e
c d e
c d e
5.77 m1 BN
20.30 kg D.01.03
9.33 m1 M.11.06
27.90 kg D.01.04
1.00 bh F.04.6
1.00 set F.03.1
1.50 psg F.03.2
c d e
14.33 m' F.01.07
4.83 m' F.01.03
11.52 m2 F.02.10
1.00 bh F.04.2
1.50 psg F.03.2
1.00 set F.03.1
1.00 bh F.03.5
4.83 m1 BN
c d e
c d e
36.30 m1 BN
c d e
c d e
58.91 m2 F.02.10
2.00 psg F.03.4c
2.00 bh F.04.1
14.52 m1 BN
c d e
7.00 unit F.05.2
10.50 psg F.03.2
7.00 bh F.04.2
7.00 set F.03.1
7.00 bh F.03.5
35.49 m1 BN
c d e
5.27 m' F.01.01
1.00 unit F.05.11
1.50 psg F.03.2
1.00 psg F.04.8
1.00 bh F.03.5
5.27 m1 BN
20.30 kg D.01.03
9.33 m1 M.11.06
27.90 kg D.01.04
1.00 bh F.04.6
1.00 set F.03.1
1.50 psg F.03.2
c d e
c d e
1.00 bh F.04.2
1.50 psg F.03.2
1.00 set F.03.1
1.00 bh F.03.5
4.83 m1 BN
c d e
c d e
c d e
25.35 m1 BN
c d e
5.27 m1 BN
20.30 kg D.01.03
9.33 m1 M.11.06
27.90 kg D.01.04
1.00 bh F.04.6
VOLUME SAT. KODE
c d e
1.00 set F.03.1
1.50 psg F.03.2
c d e
4.83 m1 BN
c d e
73.00 m' F.01.05
62.40 m' F.01.07
54.70 m2 F.02.10
c d e
2.00 bh F.04.1
14.52 m1 BN
20.30 kg D.01.03
9.33 m1 M.11.06
27.90 kg D.01.04
1.00 bh F.04.6
1.00 set F.03.1
1.50 psg F.03.2
23.14 kg D.01.03
18.66 m1 M.11.06
55.79 kg D.01.04
2.00 bh F.04.6
1.00 set F.03.1
3.00 psg F.03.2
VOLUME SAT. KODE
c d e
1,240.00 m2 J.14
VOLUME SAT. KODE
c d e
92.87 m2 J.15
67.66 m2 J.04
6.83 m2 J.05
514.75 m' J.12
176.77 m' J.10
VOLUME SAT. KODE
c d e
42.06 m2 J.06
139.77 m2 J.07
60.66 m2 J.11
38.51 m2 J.11
VOLUME SAT. KODE
c d e
1.05 m2 J.27
VOLUME SAT. KODE
c d e
4.40 m2 J.27
38.36 m2 J.09
25.76 m2 C.02.15
729.00 m2 J.14
VOLUME SAT. KODE
c d e
9.50 m2 J.15
59.11 m2 J.04
265.30 m' J.12
129.81 m' J.10
VOLUME SAT. KODE
c d e
42.06 m2 J.06
139.77 m2 J.07
VOLUME SAT. KODE
c d e
1.05 m2 J.27
VOLUME SAT. KODE
c d e
4.40 m2 J.27
49.84 m2 J.09
208.86 m2 J.48
155.56 m2 J.54
55.05 m2 J.57
VOLUME SAT. KODE
c d e
213.52 m2 J.57
227.80 m2 J.57
74.24 m2 J.57
VOLUME SAT. KODE
c d e
50.71 m2 C.02.15
732.00 m2 J.14
59.11 m2 J.04
583.65 m' J.12
129.81 m' J.10
VOLUME SAT. KODE
c d e
62.73 m2 J.06
191.25 m2 J.07
VOLUME SAT. KODE
c d e
1.05 m2 J.27
VOLUME SAT. KODE
c d e
6.45 m2 J.27
38.36 m2 J.09
188.62 m2 J.48
35.12 m2 C.02.15
VOLUME SAT. KODE
c d e
976.00 m2 J.14
59.11 m2 J.04
529.77 m' J.12
129.81 m' J.10
VOLUME SAT. KODE
c d e
42.06 m2 J.06
139.77 m2 J.07
VOLUME SAT. KODE
c d e
1.05 m2 J.27
VOLUME SAT. KODE
c d e
4.40 m2 J.27
38.36 m2 J.09
50.44 m2 C.02.15
746.00 m2 J.14
VOLUME SAT. KODE
c d e
445.14 m2 J.03
59.11 m2 J.04
384.09 m' J.12
129.81 m' J.10
VOLUME SAT. KODE
c d e
42.47 m2 J.06
139.77 m2 J.07
VOLUME SAT. KODE
c d e
1.05 m2 J.27
VOLUME SAT. KODE
c d e
4.40 m2 J.27
38.36 m2 J.09
57.84 m2 C.02.15
199.99 m2 J.13
VOLUME SAT. KODE
c d e
510.00 m2 J.14
25.50 m2 J.04
382.23 m' J.12
129.81 m' J.10
VOLUME SAT. KODE
c d e
42.47 m2 J.06
139.77 m2 J.07
VOLUME SAT. KODE
c d e
1.05 m2 J.27
VOLUME SAT. KODE
c d e
4.40 m2 J.27
38.36 m2 J.09
57.94 m2 C.02.15
9.00 m2 J.14
VOLUME SAT. KODE
c d e
26.33 m' J.12
10.68 m2 C.02.15
VOLUME SAT. KODE
c d e
1,162.09 m2 I.20
VOLUME SAT. KODE
c d e
10.05 m2 I.24
VOLUME SAT. KODE
c d e
65.20 m2 I.21
VOLUME SAT. KODE
c d e
134.63 m2 I.23
c d e
280.50 m2 I.20
VOLUME SAT. KODE
c d e
16.53 m2 I.24
VOLUME SAT. KODE
c d e
221.86 m2 I.21
VOLUME SAT. KODE
c d e
148.81 m2 I.23
VOLUME SAT. KODE
c d e
153.48 m2 I.22
VOLUME SAT. KODE
c d e
409.02 m2 I.14
c d e
829.31 m2 I.20
VOLUME SAT. KODE
c d e
10.05 m2 I.24
VOLUME SAT. KODE
c d e
176.08 m2 I.21
VOLUME SAT. KODE
c d e
129.87 m2 I.23
VOLUME SAT. KODE
c d e
209.86 m2 I.14
c d e
900.26 m2 I.20
VOLUME SAT. KODE
c d e
10.05 m2 I.24
VOLUME SAT. KODE
c d e
306.45 m2 I.21
VOLUME SAT. KODE
c d e
129.87 m2 I.23
VOLUME SAT. KODE
c d e
162.04 m2 I.14
c d e
449.41 m2 I.20
VOLUME SAT. KODE
c d e
10.05 m2 I.24
VOLUME SAT. KODE
c d e
305.89 m2 I.21
VOLUME SAT. KODE
c d e
56.68 m2 I.23
VOLUME SAT. KODE
c d e
154.61 m2 I.14
c d e
585.09 m2 I.20
VOLUME SAT. KODE
c d e
10.05 m2 I.24
VOLUME SAT. KODE
c d e
93.94 m2 I.21
VOLUME SAT. KODE
c d e
56.44 m2 I.23
VOLUME SAT. KODE
c d e
1.00 bh I.13
VOLUME SAT. KODE
c d e
38.79 m2 I.20
VOLUME SAT. KODE
c d e
1.00 bh I.13
1,451.88 m2 K.02
2,462.06 m2 K.01
1,361.92 m2 K.03
731.73 m2 K.03
VOLUME SAT. KODE
c d e
715.49 m2 K.02
1,363.85 m2 K.01
667.70 m2 K.03
766.14 m2 K.03
56.77 m2 K.20
199.42 m2 K.21
700.87 m2 K.02
1,681.85 m2 K.01
1,135.26 m2 K.03
289.25 m2 K.03
82.86 m2 K.20
192.77 m2 K.21
722.47 m2 K.02
1,090.07 m2 K.01
VOLUME SAT. KODE
c d e
1,336.58 m2 K.03
241.43 m2 K.03
56.77 m2 K.20
152.18 m2 K.21
751.95 m2 K.02
773.68 m2 K.01
811.98 m2 K.03
234.00 m2 K.03
56.77 m2 K.20
76.02 m2 K.21
630.92 m2 K.02
1,100.60 m2 K.01
735.47 m2 K.03
36.05 m2 K.03
57.18 m2 K.20
VOLUME SAT. KODE
c d e
75.48 m2 K.21
495.36 m2 K.02
249.77 m2 K.01
38.79 m2 K.03
683.30 m2 K.21
VOLUME SAT. KODE
c d e
c d e
2.85 m' L.13.a
4.98 m' L.13.a
5.98 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
0.89 m' L.14.a
4.84 m' L.14.a
VOLUME SAT. KODE
c d e
c d e
2.79 m' L.13.a
6.38 m' L.13.a
4.98 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
5.19 m' L.13.a
5.19 m' L.13.a
6.19 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
6.63 m' L.14.a
5.00 m' L.14.a
5.02 m' L.14.a
6.35 m' L.14.a
VOLUME SAT. KODE
c d e
c d e
5.19 m' L.13.a
6.59 m' L.13.a
5.19 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
c d e
2.85 m' L.13.a
4.98 m' L.13.a
5.98 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
1.79 m' L.14.a
4.84 m' L.14.a
6.35 m' L.14.a
VOLUME SAT. KODE
c d e
c d e
2.79 m' L.13.a
6.38 m' L.13.a
4.98 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
2.85 m' L.13.a
4.98 m' L.13.a
5.98 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
1.79 m' L.14.a
4.84 m' L.14.a
6.35 m' L.14.a
VOLUME SAT. KODE
c d e
c d e
2.79 m' L.13.a
6.38 m' L.13.a
4.98 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
2.85 m' L.13.a
5.98 m' L.13.a
7.18 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
1.79 m' L.14.a
4.84 m' L.14.a
6.35 m' L.14.a
VOLUME SAT. KODE
c d e
c d e
2.79 m' L.13.a
6.38 m' L.13.a
7.17 m' L.13.a
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
c d e
1.79 m' L.14.a
4.84 m' L.14.a
6.35 m' L.14.a
VOLUME SAT. KODE
c d e
c d e
250.68 m2 AK.02
171.32 m1 M.09A.02
1.05 m2 D.01.18
161.00 bh BN
2.01 kg D.01.07
c d e
0.26 m3 C.02.16
234.32 m2 AK.02
166.86 m1 M.09A.02
1.44 m2 D.01.18
192.00 bh BN
VOLUME SAT. KODE
c d e
250.68 m2 AK.02
171.32 m1 M.09A.02
1.05 m2 D.01.18
161.00 bh BN
2.01 kg D.01.07
0.26 m3 C.02.16
VOLUME SAT. KODE
c d e
234.32 m2 AK.02
166.86 m1 M.09A.02
1.44 m2 D.01.18
192.00 bh BN
967.80 m2 AK.02
VOLUME SAT. KODE
c d e
611.81 m1 M.09A.02
5.28 m2 D.01.18
704.00 bh BN
658.00 m2 AK.02
VOLUME SAT. KODE
c d e
444.95 m1 M.09A.02
3.84 m2 D.01.18
512.00 bh BN
565.00 m2 AK.02
391.59 m1 M.09A.02
2.40 m2 D.01.18
368.00 bh BN
VOLUME SAT. KODE
c d e
4.59 kg D.01.07
0.58 m3 C.02.16
835.70 m2 AK.02
538.44 m1 M.09A.02
3.30 m2 D.01.18
506.00 bh BN
6.31 kg D.01.07
VOLUME SAT. KODE
c d e
0.86 m3 C.02.16
VOLUME SAT. KODE
c d e
12.09 m2 C.03.23
VOLUME SAT. KODE
c d e
12.09 m2 C.03.23
12.09 m2 C.03.23
12.09 m2 C.03.23
12.09 m2 C.03.23
12.09 m2 C.03.23
52.27 m2 E.06
VOLUME SAT. KODE
c d e
47.97 m2 E.31
14.52 m1 E.32
84.35 m2 AK.03
c d e
7.44 m2 F.02.10
c d e
c d e
19.11 m2 F.02.10
c d e
c d e
39.85 m' F.01.01
5.80 m' F.01.02
11.68 m2 F.02.10
1.00 bh F.04.2
1.50 psg F.03.2
1.00 bh F.03.5
5.80 m1 BN
c d e
3.82 m2 F.02.4
2.00 bh F.03.7
c d e
c d e
836.32 kg D.01.07
136.00 bh BN
496.89 kg D.01.07
VOLUME SAT. KODE
c d e
64.00 bh BN
443.52 kg D.01.07
48.00 bh BN
VOLUME SAT. KODE
c d e
71.72 m' F.01.01
2.00 psg F.03.9
2.00 bh F.03.10
2.00 bh F.04.3
24.55 m2 F.02.10
3.82 m2 F.02.4
2.00 bh F.03.7
30.24 m2 G.16
64.44 m2 G.14
64.44 m2 K.01
82.89 tube BN
57.60 m1 BN
4.64 m2 D.02.17.a
5.16 m' G.19
10.08 m2 G.16
VOLUME SAT. KODE
c d e
21.48 m2 G.14
21.48 m2 K.01
17.42 tube BN
9.60 m1 BN
1.55 m2 D.02.17.a
1.72 m' G.19
5.34 m2 G.16
11.25 m2 G.14
11.25 m2 K.01
11.61 tube BN
4.80 m1 BN
0.81 m2 D.02.17.a
0.90 m' G.19
13.20 m2 G.16
27.98 m2 G.14
VOLUME SAT. KODE
c d e
27.98 m2 K.01
22.31 tube BN
7.20 m1 BN
2.02 m2 D.02.17.a
2.24 m' G.19
2.88 m2 G.16
6.24 m2 G.14
6.24 m2 K.01
10.22 tube BN
9.60 m1 BN
0.45 m2 D.02.17.a
0.50 m' G.19
1.68 m2 G.16
3.74 m2 G.14
3.74 m2 K.01
VOLUME SAT. KODE
c d e
8.22 tube BN
9.60 m1 BN
0.30 m2 D.02.17.a
0.30 m' G.19
c d e
c d e
41.08 m2 J.55
41.08 m2 G.20
121.00 bh BN
4.23 m' G.23
13.49 m2 J.55
13.49 m2 G.20
VOLUME SAT. KODE
c d e
35.00 bh BN
3.38 m' G.23
11.01 m2 J.55
11.01 m2 G.20
43.00 bh BN
2.14 m' G.23
6.52 m2 J.55
6.52 m2 G.20
36.00 bh BN
18.80 m2 J.55
18.80 m2 G.20
45.00 bh BN
4.72 m' G.23
VOLUME SAT. KODE
c d e
15.49 m2 J.55
15.49 m2 G.20
53.00 bh BN
3.05 m' G.23
42.80 m2 C.02.05
42.80 m2 C.02.11
42.80 m2 C.02.10
42.80 m2 K.01
103.74 m2 J.48
38.26 m2 C.02.05
38.26 m2 C.02.11
38.26 m2 C.02.10
VOLUME SAT. KODE
c d e
38.26 m2 K.01
125.95 m2 J.48
30.62 m2 AN.01
36.92 m2 I.29
VOLUME SAT. KODE
c d e
0.19 m3 D.02.01
2.00 unit AP.01
VOLUME SAT. KODE
c d e
c d e
c d e
c d e
5.00 m1 S.10.8
2.00 set BN
2.00 set BN
1.00 unit BN
1.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
2.00 bh BN
1.00 bh BN
2.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
2.00 bh BN
2.00 bh BN
2.00 bh BN
4.00 bh BN
4.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
1.00 bh BN
4.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
2.00 bh BN
1.00 bh BN
2.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
2.00 bh BN
2.00 bh BN
2.00 bh BN
4.00 bh BN
4.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
4.00 bh BN
1.00 bh BN
1.00 bh BN
2.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 set BN
6.00 m1 S.10.10
6.00 m1 M.03.03
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
4.00 bh BN
4.00 bh BN
1.00 bh BN
4.00 bh BN
4.00 bh BN
4.00 bh BN
4.00 bh BN
4.00 bh BN
4.00 bh BN
4.00 bh BN
VOLUME SAT. KODE
c d e
4.00 bh BN
4.00 bh BN
4.00 bh BN
1.00 bh BN
6.00 bh BN
6.00 bh BN
6.00 bh BN
1.00 bh BN
3.00 bh BN
2.00 bh BN
4.00 bh BN
4.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 set BN
6.00 m1 S.10.10
6.00 m1 M.03.03
1.00 ls -
VOLUME SAT. KODE
c d e
27.10 m1 S.13.1
11.50 m1 S.10.10
11.50 m1 M.03.03
1.00 set AA.04
1.00 unit C.03.13
12.00 m' BN
27.80 m1 S.10.0
27.80 m1 M.03.01
1.00 set AA.04
1.00 unit C.03.13
12.00 m' BN
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
4.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
7.00 bh BN
VOLUME SAT. KODE
c d e
2.00 bh BN
6.00 bh BN
1.00 set BN
6.00 m1 S.10.10
6.00 m1 M.03.03
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
35.00 bh BN
11.00 bh BN
1.00 bh BN
2.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
23.00 bh BN
1.00 set BN
VOLUME SAT. KODE
c d e
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
VOLUME SAT. KODE
c d e
3.00 bh BN
7.00 bh BN
2.00 bh BN
1.00 bh BN
2.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
2.00 bh BN
2.00 bh BN
2.00 bh BN
4.00 bh BN
2.00 bh BN
1.00 set BN
1.00 ls -
VOLUME SAT. KODE
c d e
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
2.00 bh BN
7.00 bh BN
VOLUME SAT. KODE
c d e
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
3.00 bh BN
19.00 bh BN
12.00 bh BN
1.00 bh BN
4.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
19.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
19.00 bh BN
9.00 bh BN
VOLUME SAT. KODE
c d e
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
VOLUME SAT. KODE
c d e
20.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
50.00 bh BN
10.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
17.00 bh BN
1.00 set BN
1.00 ls -
VOLUME SAT. KODE
c d e
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
30.00 bh BN
7.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
3.00 bh BN
11.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
9.00 bh BN
6.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
9.00 bh BN
1.00 set BN
1.00 ls -
VOLUME SAT. KODE
c d e
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
5.00 bh BN
2.00 bh BN
1.00 BN
1.00 bh BN
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
1.00 bh BN
2.00 BN
1.00 set BN
1.00 ls -
1.00 unit BN
VOLUME SAT. KODE
c d e
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
3.00 bh BN
2.00 bh BN
2.00 bh BN
VOLUME SAT. KODE
c d e
1.00 set BN
1.00 ls -
1.00 unit BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
3.00 bh BN
3.00 bh BN
1.00 bh BN
1.00 bh BN
1.00 bh BN
VOLUME SAT. KODE
c d e
3.00 bh BN
2.00 bh BN
1.00 bh BN
1.00 set BN
1.00 ls -
VOLUME SAT. KODE
c d e
79.50 m1 S.04.1
VOLUME SAT. KODE
c d e
79.50 m1 S.03.1
20.15 m3 B.01
2.88 m3 B.05
71.98 m1 C.03.11
12.19 m3 B.08
4.00 bh BN
7.00 m1 S.04.1
7.00 m1 S.03.1
15.10 m1 S.04.1
15.10 m1 S.03.1
VOLUME SAT. KODE
c d e
19.00 m1 S.01.18
VOLUME SAT. KODE
c d e
9.20 m1 S.01.18
VOLUME SAT. KODE
c d e
9.90 m1 S.01.18
20.00 m1 S.06.9
20.00 m1 S.06.4
21.00 m1 S.06.1
79.00 m1 S.06.7
VOLUME SAT. KODE
c d e
53.30 m1 S.01.08
52.40 m1 S.01.08
56.60 m1 S.01.08
60.80 m1 S.01.08
65.00 m1 S.01.08
VOLUME SAT. KODE
c d e
69.20 m1 S.01.07
54.20 m1 S.01.05
53.20 m1 S.01.05
57.40 m1 S.01.05
61.60 m1 S.01.05
65.80 m1 S.01.05
70.00 m1 S.01.05
29.50 m1 S.01.08
86.00 m1 S.01.09
86.00 m1 S.01.17
86.00 m1 S.01.07
75.20 m1 S.01.08
55.20 m1 S.01.14
VOLUME SAT. KODE
c d e
20.00 m1 S.10.6
20.00 m1 S.10.1
79.00 m1 S.10.4
VOLUME SAT. KODE
c d e
53.30 m1 S.10.4
52.40 m1 S.10.4
56.60 m1 S.10.4
60.80 m1 S.10.4
VOLUME SAT. KODE
c d e
65.00 m1 S.10.4
69.20 m1 S.10.3
54.20 m1 S.10.1
53.20 m1 S.10.1
57.40 m1 S.10.1
61.60 m1 S.10.1
65.80 m1 S.10.1
70.00 m1 S.10.1
29.50 m1 S.10.4
86.00 m1 S.10.5
86.00 m1 S.10.10
86.00 m1 S.10.3
75.20 m1 S.10.4
55.20 m1 S.10.8
VOLUME SAT. KODE
c d e
c d e
8.00 Titik T.01.5
71.00 Titik T.01.2
77.00 bh T.02.0
11.00 bh T.02.3
56.00 bh T.02.4
13.00 bh T.02.4a
56.00 bh T.02.5
7.00 bh T.02.5a
8.00 bh T.02.21
19.00 bh T.03.4
20.00 bh T.03.3
2.00 bh T.03.2
3.00 bh T.03.1
38.00 bh T.04.2
29.00 bh T.04.1
3.00 bh T.04.3
1.00 bh T.04.2
VOLUME SAT. KODE
c d e
268.00 Titik T.01.1
59.00 Titik T.01.2
41.00 bh T.02.0
11.00 bh T.02.3
70.00 bh T.02.4
44.00 bh T.02.19
23.00 bh T.02.22
4.00 bh T.02.23
11.00 bh T.02.5
3.00 bh T.02.5a
60.00 bh T.02.9
1.00 bh T.02.8
15.00 bh T.03.4
19.00 bh T.03.3
3.00 bh T.03.2
45.00 bh T.04.2
13.00 bh T.04.1
1.00 bh T.04.2
VOLUME SAT. KODE
c d e
c d e
82.00 Titik T.01.2
112.00 bh T.02.0
11.00 bh T.02.3
12.00 bh T.02.4
19.00 bh T.02.19
11.00 bh T.02.5
3.00 bh T.02.5a
1.00 bh T.02.8
14.00 bh T.03.4
13.00 bh T.03.3
3.00 bh T.03.2
40.00 bh T.04.2
41.00 bh T.04.1
1.00 bh T.04.2
c d e
56.00 bh T.02.0
11.00 bh T.02.3
6.00 bh T.02.4
19.00 bh T.02.19
11.00 bh T.02.5
3.00 bh T.02.5a
1.00 bh T.02.8
10.00 bh T.02.20
7.00 bh T.03.4
11.00 bh T.03.3
3.00 bh T.03.2
21.00 bh T.04.2
10.00 bh T.04.3
19.00 bh T.04.1
1.00 bh T.04.2
c d e
28.00 bh T.02.0
11.00 bh T.02.3
42.00 bh T.02.4
11.00 bh T.02.4a
13.00 bh T.02.5
5.00 bh T.02.5a
1.00 bh T.02.8
14.00 bh T.03.4
11.00 bh T.03.3
1.00 bh T.03.2
2.00 bh T.03.1
27.00 bh T.04.2
1.00 bh T.04.2
c d e
2.00 bh T.03.3
1.00 bh T.03.1
2.00 bh T.04.2
VOLUME SAT. KODE
c d e
c d e
1.00 unit U.03.2
2.00 unit U.03.1.1
VOLUME SAT. KODE
c d e
129.00 m1 S.05.3
4.00 bh U.04.01
VOLUME SAT. KODE
c d e
12.00 Titik U.01.03
2.00 bh S.05.5
38.70 m3 B.01
5.16 m3 B.05
129.00 m1 M.10.01
24.43 m3 B.08
7.00 bh BN
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
42.30 m1 S.05.2
VOLUME SAT. KODE
c d e
50.30 m1 S.05.2
54.50 m1 S.05.2
58.70 m1 S.05.2
VOLUME SAT. KODE
c d e
62.90 m1 S.05.2
67.10 m1 S.05.2
12.00 bh U.04.01
6.00 unit U.03.6
6.00 bh S.05.5
6.00 Titik U.01.03
VOLUME SAT. KODE
c d e
1.00 ls BN
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
5.00 bh U.02.01
VOLUME SAT. KODE
c d e
20.00 bh U.02.02
c d e
c d e
c d e
8.00 bh U.02.01
VOLUME SAT. KODE
c d e
10.00 bh U.02.02
c d e
c d e
c d e
15.00 bh U.02.01
VOLUME SAT. KODE
c d e
13.00 bh U.02.02
c d e
c d e
c d e
2.00 bh U.02.01
VOLUME SAT. KODE
c d e
38.00 bh U.02.02
c d e
c d e
c d e
1.00 bh U.02.01
VOLUME SAT. KODE
c d e
19.00 bh U.02.02
c d e
c d e
c d e
3.00 bh U.02.01
c d e
c d e
c d e
1.00 titik AF.01.01
1.00 unit V.02.01
1.00 unit V.02.03
2.00 bh V.02.02
c d e
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
8.00 titik V.01.01
5.00 unit V.02.04
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
7.00 titik V.01.01
5.00 unit V.02.04
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
6.00 titik V.01.01
4.00 unit V.02.04
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
6.00 titik V.01.01
2.00 unit V.02.04
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
4.00 titik V.01.01
4.00 unit V.02.04
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
VOLUME SAT. KODE
c d e
29.30 m1 W.01.02
36.50 m1 W.01.02
40.70 m1 W.01.02
1.00 bh W.03.01
1.00 bh W.03.02
1.00 bh W.03.03
1.00 bh W.03.04
1.00 unit W.04.01
c d e
c d e
c d e
1.00 bh Z.02.06
5.00 unit Z.02.04
1.00 unit Z.02.02
1.00 unit Z.02.09.2
46.10 m1 S.12.1
53.50 m1 S.12.1
57.70 m1 S.12.1
61.90 m1 S.12.1
66.10 m1 S.12.1
70.30 m1 S.12.1
c d e
4.00 bh Z.02.11
15.00 bh Z.02.12
c d e
c d e
1.00 unit Z.02.01
18.00 bh Z.02.10
3.00 bh Z.02.11
4.00 bh Z.02.12
VOLUME SAT. KODE
c d e
c d e
1.00 Titik T.01.2
1.00 bh AF.02.01
1.00 bh T.04.2
1.00 unit AF.03.02
1.00 unit AF.03.04
1.00 bh AF.03.01
c d e
1.00 bh AF.02.01
1.00 bh T.04.2
1.00 unit AF.03.02
1.00 unit AF.03.03
1.00 bh AF.03.01
c d e
3.00 bh AD.03
3.00 bh AD.04
1.00 bh AD.05
2.00 bh AD.06
1.00 bh AD.11
1.00 bh AD.12
4.20 m' AD.07
4.20 m' AD.08
c d e
5.10 m' AD.08
c d e
1.00 bh AD.05
1.00 bh AD.06
1.00 bh AD.11
1.00 bh AD.12
4.20 m' AD.07
4.20 m' AD.08
c d e
c d e
c d e
54.00 m1 S.11.1
54.00 m1 S.06.0
1.00 ls BN
45.00 m1 S.11.1
54.00 m1 S.11.1
58.20 m1 S.11.1
62.40 m1 S.11.1
66.60 m1 S.11.1
70.80 m1 S.11.1
45.00 m1 S.06.0
VOLUME SAT. KODE
c d e
54.00 m1 S.06.0
58.20 m1 S.06.0
62.40 m1 S.06.0
66.60 m1 S.06.0
70.80 m1 S.11.1
13.00 m1 S.06.0
70.00 m1 S.06.0
6.00 m1 S.06.0
38.00 m1 S.06.0
44.40 m1 S.06.0
48.60 m1 S.06.0
52.80 m1 S.06.0
57.00 m1 S.06.0
61.20 m1 S.06.0
39.90 m1 S.06.0
44.10 m1 S.06.0
48.30 m1 S.06.0
VOLUME SAT. KODE
c d e
52.50 m1 S.06.0
56.70 m1 S.06.0
60.90 m1 S.06.0
c d e
1.00 unit AB.03.01
3.00 unit AB.03.02a
2.00 unit AB.03.04
1.00 unit AB.03.03
38.00 unit AB.03.06
2.00 unit AB.03.07
2.00 set AB.03.08
2.00 set AB.03.09
3.00 titik AB.03.10
c d e
2.00 set AB.03.09
3.00 titik AB.03.10
c d e
2.00 unit AB.03.04
1.00 unit AB.03.03
27.00 unit AB.03.06
2.00 unit AB.03.07
2.00 set AB.03.08
2.00 set AB.03.09
3.00 titik AB.03.10
c d e
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
1.00 bh AA.03
115.00 m1 S.01.00
VOLUME SAT. KODE
c d e
115.00 m1 M.03.03
2.00 m1 M.05.04
2.00 set AA.04
2.00 unit C.03.13
24.00 m' BN
1.00 ls -
1.00 ls BN
VOLUME SAT. KODE
c d e
c d e
11.00 unit T.02.16
34.23 m3 B.01
9.78 m3 B.05
326.03 m1 C.03.11
1.42 m3 B.08
17.00 bh BN
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
6.00 m1 M.06.10
1.00 bh BN
1.00 ls BN
1.00 bh BN
1.00 unit AJ.02
17.70 m1 S.01.18
17.70 m1 S.12.1
12.00 m1 S.01.02
8.00 m1 S.10.8
8.00 m1 M.03.03
1.00 set AA.04
1.00 unit C.03.13
12.00 m' BN
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
66.80 m1 S.06.6
66.80 m1 S.10.3
VOLUME SAT. KODE
c d e
2.00 unit AE.10.14
4.60 m2 AE.08.1
18.60 m2 AE.08.1
4.30 m2 AE.08.1
3.80 m2 AE.08.1
12.00 bh AE.09.16
2.00 bh AE.09.15
1.00 bh AE.09.13
1.00 bh AE.09.12
27.70 m1 M.11.11
23.28 m1 M.11.04
9.36 kg D.01.04
0.16 m3 D.02.02
VOLUME SAT. KODE
c d e
1.42 m2 D.04.11.A
2.26 m2 D.01.05
11.64 Kg D.01.01
0.34 m3 D.02.02
96.00 bh D.09.02
11.32 Kg E.09
8.00 bh E.11
VOLUME SAT. KODE
c d e
c d e
1.00 unit C.03.22
c d e
c d e
VOLUME SAT. KODE
c d e
173.60 m1 Z.03.00
VOLUME SAT. KODE
c d e
12.00 unit BN
2.00 unit Z.03.04
2.00 unit Z.03.05
2.00 unit Z.03.06
1.00 unit Z.03.07
1.00 unit Z.03.08
1.00 unit Z.03.09
1.00 unit Z.03.10
1.00 unit Z.03.11
1.00 set Z.03.12
2.00 unit Z.03.13
1.00 unit Z.03.14
1.00 unit Z.03.15
1.00 ls BN
112.70 m1 Z.01.03
1.00 unit Z.03.01
1.00 unit Z.02.04
VOLUME SAT. KODE
c d e
1.00 set Z.03.02
6.00 unit Z.03.03
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
2.00 unit BN
1.00 ls BN
1.00 ls BN
100.00 m1 BN
1.00 unit BN
100.00 m1 BN
85.00 m1 BN
15.00 m1 BN
5.00 m3 BN
4.00 m3 BN
60.00 m1 BN
1.00 ls BN
1.00 ls BN
1.00 ls BN
1.00 ls BN
1.18 m3 B.01
0.17 m3 B.05
VOLUME SAT. KODE
c d e
0.17 m3 D.02.01
0.24 m3 B.08
3.20 m1 D.05.02
3.08 m2 C.02.02
6.16 m2 C.02.07
6.16 m2 C.02.10
12.25 kg D.01.04
0.40 Kg D.01.01
141.00 m1 S.01.02
135.00 m1 S.01.04
135.00 m1 S.10.0
1.00 bh O.03.01
1.00 bh M.13.06.2
100.00 bh M.13.06.2
1.00 unit O.01.01
VOLUME SAT. KODE
c d e
45.00 m1 M.05.04
2.00 unit M.14.01
1.00 unit M.13.17.1
1.00 unit M.13.14.2
2.00 bh M.13.03.6
66.00 m1 S.01.02
16.00 m1 S.01.04
16.00 m1 S.10.0
2.00 bh O.03.01
2.00 bh M.13.06.2
12.00 m1 M.05.04
1.00 set O.01.02.1
VOLUME SAT. KODE
c d e
4.00 m1 M.05.06
2.00 m1 M.05.04
4.00 bh M.13.03.6
2.00 unit M.13.10.2
4.00 unit M.13.11.4
2.00 unit M.13.01.7
1.00 bh M.13.02.1
1.00 unit M.14.01
33.00 m1 M.05.04
65.00 m1 M.05.04
10.00 m1 M.05.01
1.00 bh M.13.03.6
VOLUME SAT. KODE
c d e
4.00 bh M.13.03.3
25.00 m1 S.01.04
25.00 m1 S.10.0
1.00 paket O.01.03
VOLUME SAT. KODE
c d e
7.50 m1 M.05.06
5.50 m1 M.05.03
3.00 m1 M.03.03
7.00 bh M.13.03.6
5.00 bh M.13.03.3
2.00 bh M.13.03.1
2.00 unit M.13.10.2
4.00 unit M.13.11.4
2.00 unit M.13.01.7
c d e
1.00 bh M.13.03.4
4.00 bh M.13.03.3
2.05 m3 D.02.01
1.00 bh M.13.03.4
1.00 unit M.14.10
1.00 m1 M.03.06
67.80 m1 M.03.01
3.70 m1 M.03.02
11.70 m1 M.03.03
4.60 m1 M.03.04
4.00 set M.15.19
2.00 set M.15.20
1.00 bh M.13.03.4
1.00 unit M.14.10
6.00 m1 M.03.06
VOLUME SAT. KODE
c d e
116.30 m1 M.03.01
3.70 m1 M.03.02
12.10 m1 M.03.03
4.60 m1 M.03.04
4.00 set M.15.19
2.00 set M.15.20
1.00 bh M.13.03.4
1.00 unit M.14.10
5.00 m1 M.03.06
109.20 m1 M.03.01
46.20 m1 M.03.02
37.50 m1 M.03.03
7.90 m1 M.03.04
4.00 set M.15.19
2.00 set M.15.20
VOLUME SAT. KODE
c d e
1.00 bh M.13.03.4
1.00 unit M.14.10
6.00 m1 M.03.06
67.80 m1 M.03.01
3.70 m1 M.03.02
11.70 m1 M.03.03
4.60 m1 M.03.04
4.00 set M.15.19
2.00 set M.15.20
1.00 bh M.13.03.4
1.00 unit M.14.10
6.00 m1 M.03.06
122.60 m1 M.03.01
8.70 m1 M.03.02
11.70 m1 M.03.03
5.10 m1 M.03.04
4.00 set M.15.19
VOLUME SAT. KODE
c d e
2.00 set M.15.20
1.00 bh M.13.03.4
1.00 unit M.14.10
10.00 m1 M.03.06
67.80 m1 M.03.01
3.70 m1 M.03.02
11.70 m1 M.03.03
4.70 m1 M.03.04
4.00 set M.15.19
2.00 set M.15.20
5.00 m1 M.03.06
3.00 m1 M.03.03
14.50 m1 M.03.06
2.00 set M.15.20
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
6.00 m1 M.03.09
19.00 m1 M.03.08
20.00 m1 M.03.04
103.00 m1 M.03.08
29.00 m1 M.03.09
46.00 m1 M.03.10
6.00 bh N.16
4.00 set M.15.19
8.00 set M.15.20
6.00 m1 M.03.09
16.00 m1 M.03.08
55.00 m1 M.03.04
4.00 m1 M.03.06
27.00 m1 M.03.08
1.00 bh N.16
2.00 set M.15.19
VOLUME SAT. KODE
c d e
8.00 set M.15.20
5.00 m1 M.03.09
2.00 m1 M.03.08
35.00 m1 M.03.04
4.00 m1 M.03.06
50.00 m1 M.03.08
2.00 bh N.16
2.00 set M.15.19
6.00 set M.15.20
5.00 m1 M.03.09
22.00 m1 M.03.04
4.00 m1 M.03.06
27.00 m1 M.03.08
1.00 bh N.16
2.00 set M.15.19
VOLUME SAT. KODE
c d e
2.00 set M.15.20
5.00 m1 M.03.09
22.00 m1 M.03.04
4.00 m1 M.03.06
27.00 m1 M.03.08
1.00 bh N.16
2.00 set M.15.19
2.00 set M.15.20
2.00 m1 M.03.09
22.00 m1 M.03.04
5.00 m1 M.03.06
26.00 m1 M.03.08
1.00 bh N.16
2.00 set M.15.19
2.00 set M.15.20
VOLUME SAT. KODE
c d e
2.00 m1 M.03.06
2.00 unit M.14.08
VOLUME SAT. KODE
c d e
5.00 m1 M.03.10
VOLUME SAT. KODE
c d e
20.00 m1 M.03.09
50.00 m1 M.03.11
151.00 m1 M.03.10
99.00 m1 M.03.09
33.00 m1 M.03.06
5.00 bh N.17
2.00 set M.15.19
8.00 set M.15.20
20.77 m3 B.01
20.77 m3 B.02
16.62 m3 B.03
2.08 m3 B.05
2.08 m3 D.02.01
9.78 m3 B.08
17.01 m2 D.04.11.A
VOLUME SAT. KODE
c d e
328.98 Kg D.01.01
3.40 m3 D.02.11
43.20 m2 D.04.12.A
485.82 Kg D.01.01
4.32 m3 D.02.11
17.01 m2 D.04.11.A
328.98 Kg D.01.01
3.40 m3 D.02.11
50.09 m2 K.20
18.00 m1 D.09.01
0.51 Kg D.01.01
5.18 Kg D.01.01
VOLUME SAT. KODE
c d e
53.00 m1 S.01.04
53.00 m1 S.10.0
2.00 unit M.13.01.8
6.00 m1 M.03.09
1.00 set O.01.07
c d e
22.32 m3 B.01
22.32 m3 B.02
22.32 m3 B.03
3.91 m3 B.04
2.23 m3 B.05
26.72 m3 B.05
VOLUME SAT. KODE
c d e
2.23 m3 D.02.01
12.14 m3 B.08
22.30 m2 D.04.11.A
419.93 Kg D.01.01
4.46 m3 D.02.11
51.45 m2 C.02.02
19.60 m1 D.05.04
11.30 m1 D.05.02
19.60 m1 D.05.06
22.33 m2 D.04.11.A
316.89 Kg D.01.01
3.35 m3 D.02.09
VOLUME SAT. KODE
c d e
1.29 m2 D.04.11.A
25.55 Kg D.01.01
0.09 m3 D.02.09
2.00 Kg D.01.01
1.13 m3 B.01
1.13 m3 B.02
1.13 m3 B.03
1.13 m3 B.04
1.85 m3 B.05
2.67 m3 B.08
4.00 m' C.03.12
1.00 m3 B.20
1.00 m3 D.02.01
1.00 m3 BN
0.64 m2 D.04.11.A
22.10 Kg D.01.01
VOLUME SAT. KODE
c d e
0.16 m3 D.02.02
0.13 m3 D.02.01
0.20 m2 C.02.02
0.47 m2 C.02.07
0.47 m2 C.02.10
61.31 kg D.01.03
2.43 m2 E.31
2.21 m2 E.04
6.00 m1 M.03.10
16.00 m1 M.03.09
19.00 m1 M.03.09
9.00 m1 M.03.06
1.00 bh N.17
VOLUME SAT. KODE
c d e
2.00 set M.15.19
8.00 set M.15.20
5.00 m1 M.03.10
3.00 m1 M.03.09
35.00 m1 M.03.09
9.00 m1 M.03.06
1.00 bh N.17
2.00 set M.15.19
8.00 set M.15.20
5.00 m1 M.03.10
19.00 m1 M.03.09
9.00 m1 M.03.06
1.00 bh N.17
2.00 set M.15.19
2.00 set M.15.20
VOLUME SAT. KODE
c d e
5.00 m1 M.03.10
19.00 m1 M.03.09
9.00 m1 M.03.06
1.00 bh N.17
2.00 set M.15.19
2.00 set M.15.20
2.00 m1 M.03.10
19.00 m1 M.03.09
9.00 m1 M.03.06
1.00 bh N.17
2.00 set M.15.19
2.00 set M.15.20
2.00 m1 M.03.06
VOLUME SAT. KODE
c d e
1.00 unit M.14.08
VOLUME SAT. KODE
c d e
5.00 m1 M.04.02
VOLUME SAT. KODE
c d e
15.00 m1 M.04.01
36.00 m1 M.04.00
2.00 set M.15.19
2.00 set M.15.20
6.00 m1 M.04.02
17.00 m1 M.04.01
44.00 m1 M.04.00
2.00 set M.15.19
2.00 set M.15.20
5.00 m1 M.04.02
139.00 m1 M.04.01
55.00 m1 M.04.00
2.00 set M.15.19
2.00 set M.15.20
VOLUME SAT. KODE
c d e
5.00 m1 M.04.02
16.00 m1 M.04.01
36.00 m1 M.04.00
2.00 set M.15.19
2.00 set M.15.20
5.00 m1 M.04.02
16.00 m1 M.04.01
36.00 m1 M.04.00
2.00 set M.15.19
2.00 set M.15.20
10.00 m1 M.04.02
5.00 m1 M.04.01
16.00 m1 M.04.01
36.00 m1 M.04.00
VOLUME SAT. KODE
c d e
2.00 set M.15.19
6.00 set M.15.20
3.00 m1 M.04.02
2.00 m1 M.04.01
1.00 m1 M.04.02
1.00 m1 M.04.01
1.00 unit M.14.08
2.00 bh N.02.1
7.00 bh N.02.1
9.00 bh N.03
5.00 set N.10
VOLUME SAT. KODE
c d e
c d e
6.00 bh N.07
2.00 bh N.09
6.00 unit N.13
2.00 bh N.12
1.00 bh N.01.1
VOLUME SAT. KODE
c d e
2.00 bh N.02.1
9.00 bh N.03
5.00 set N.10
c d e
6.00 bh N.07
VOLUME SAT. KODE
c d e
2.00 bh N.09
7.00 unit N.13
2.00 bh N.12
2.00 bh N.02.1
1.00 bh N.27
13.00 bh N.03
9.00 set N.10
VOLUME SAT. KODE
c d e
c d e
10.00 bh N.07
2.00 bh N.09
10.00 unit N.13
VOLUME SAT. KODE
c d e
2.00 bh N.12
2.00 bh N.02.1
9.00 bh N.03
5.00 set N.10
c d e
c d e
6.00 bh N.07
2.00 bh N.09
6.00 unit N.13
2.00 bh N.12
2.00 bh N.02.1
2.00 bh N.02.1
9.00 bh N.03
5.00 set N.10
VOLUME SAT. KODE
c d e
c d e
6.00 bh N.07
2.00 bh N.09
6.00 unit N.13
2.00 bh N.12
VOLUME SAT. KODE
c d e
2.00 bh N.02.1
9.00 bh N.03
5.00 set N.10
c d e
6.00 bh N.07
VOLUME SAT. KODE
c d e
2.00 bh N.09
6.00 unit N.13
2.00 bh N.12
356.85 m3 B.01
42.48 m3 B.01
96.00 m3 B.08
4.26 m3 B.05
8.66 m3 D.02.01
70.00 m' P.08
332.19 m' P.09
44.37 m' P.12
877.43 m' C.03.02
VOLUME SAT. KODE
c d e
70.00 m' P.10
332.19 m' P.11
30.54 m3 B.01
30.54 m3 B.02
30.54 m3 B.03
30.54 m3 B.04
49.88 m3 B.05
72.28 m3 B.08
108.00 m' C.03.12
4.75 m3 B.02
0.22 m3 D.02.01
6.28 m3 BN
16.96 m2 D.04.11.A
585.53 Kg D.01.01
VOLUME SAT. KODE
c d e
4.24 m3 D.02.02
285.10 m1 M.04.03
7.04 m3 B.01
7.04 m3 B.02
4.58 m3 B.03
0.70 m3 B.05
0.70 m3 D.02.01
4.91 m3 B.08
5.04 m2 D.04.11.A
109.62 Kg D.01.01
1.01 m3 D.02.11
20.70 m2 D.04.12.A
VOLUME SAT. KODE
c d e
250.05 Kg D.01.01
1.55 m3 D.02.11
5.04 m2 D.04.11.A
109.62 Kg D.01.01
1.01 m3 D.02.11
20.15 m2 K.20
9.20 m1 D.09.01
0.51 Kg D.01.01
4.15 Kg D.01.01
87.00 m1 S.01.04
87.00 m1 S.10.0
1.00 bh M.13.03.6
1.00 unit M.13.01.7
8.50 m1 M.03.06
VOLUME SAT. KODE
c d e
34.70 m1 M.03.05
77.70 m1 M.03.04
135.00 m1 M.03.03
101.30 m1 M.03.02
1.00 set O.01.09
5.94 m3 B.01
5.94 m3 B.02
0.59 m3 B.03
0.59 m3 B.05
0.59 m3 D.02.01
3.42 m3 B.08
VOLUME SAT. KODE
c d e
4.14 m2 D.04.11.A
90.26 Kg D.01.01
0.83 m3 D.02.11
18.45 m2 D.04.12.A
253.42 Kg D.01.01
1.38 m3 D.02.11
4.14 m2 D.04.11.A
90.26 Kg D.01.01
0.83 m3 D.02.11
13.50 m2 K.20
8.20 m1 D.09.01
0.51 Kg D.01.01
VOLUME SAT. KODE
c d e
67.00 m1 S.01.04
67.00 m1 S.10.0
12.10 m1 M.03.09
1.00 set O.01.08
VOLUME SAT. KODE
c d e
6.00 m1 M.04.04
VOLUME SAT. KODE
c d e
168.00 m1 M.04.03
5.00 m1 M.04.02
61.00 m1 M.03.10
192.00 m1 M.03.09
1.00 m1 M.03.08
28.00 set M.15.20
6.00 m1 M.04.04
152.00 m1 M.04.03
3.00 m1 M.03.09
27.00 m1 M.03.08
28.00 set M.15.20
5.00 bh N.01.1
9.00 bh N.01.2
218.00 m' C.03.08
5.00 m1 M.04.04
VOLUME SAT. KODE
c d e
125.00 m1 M.04.03
23.00 m1 M.03.08
28.00 set M.15.20
14.00 bh N.01.2
194.00 m' C.03.08
5.00 m1 M.04.04
116.00 m1 M.04.03
35.00 m1 M.03.08
28.00 set M.15.20
14.00 bh N.01.2
216.00 m' C.03.08
5.00 m1 M.04.04
104.00 m1 M.04.03
45.00 m1 M.03.08
16.00 set M.15.20
VOLUME SAT. KODE
c d e
12.00 bh N.01.1
7.00 bh N.01.2
278.00 m' C.03.08
8.00 m1 M.03.06
94.70 m2 AH.02.1
4.00 m1 M.04.04
69.00 m1 M.04.03
9.00 m1 M.03.10
9.00 m1 M.03.09
16.00 m1 M.03.08
16.00 set M.15.20
VOLUME SAT. KODE
c d e
2.00 bh N.01.1
7.00 bh N.01.2
122.00 m' C.03.08
2.00 m1 M.04.03
2.00 m1 M.03.09
17.00 set M.15.20
17.00 bh N.01.1
164.00 m' C.03.08
42.40 m1 S.01.09
42.40 m1 S.10.5
756.40 m' S.02.02
350.87 m1 S.11.1
2.00 unit AE.02.12
VOLUME SAT. KODE
c d e
9.00 unit AE.02.8
2.00 unit AE.02.1
1.00 unit AE.02.3
4.00 unit AE.02.4
2.00 unit AE.02.5
1.00 unit AE.03.1
1.00 unit AE.03.6
1.00 unit AE.04.1
11.00 unit AE.04.2
9.00 unit AE.04.3
18.00 unit AE.04.4
4.00 unit AE.04.5
9.00 bh T.04.6
20.00 unit AE.04.6
2.00 unit AE.04.7
c d e
67.00 m' AE.07.3
13.00 m' AE.07.4
96.00 m' AE.07.5
72.39 m1 AE.05.2
95.29 m1 AE.05.3
151.98 m1 AE.05.4
65.18 m1 AE.05.5
42.75 m1 AE.05.6
30.11 m1 AE.05.7
91.42 m1 AE.05.8
42.75 m1 AE.05.10
12.00 kg AE.05.11
11.50 m2 AE.08.3
1.60 m2 AE.08.3
13.50 m2 AE.08.3
VOLUME SAT. KODE
c d e
4.80 m2 AE.08.3
14.50 m2 AE.08.3
6.30 m2 AE.08.3
25.70 m2 AE.08.3
1.50 m2 AE.08.3
44.90 m1 S.01.09
44.90 m1 S.10.5
448.80 m' S.02.02
257.38 m1 S.11.1
1.00 unit AE.02.7
1.00 unit AE.02.8
5.00 unit AE.02.9
3.00 unit AE.02.11
2.00 unit AE.02.13
2.00 unit AE.02.14
1.00 unit AE.02.2
VOLUME SAT. KODE
c d e
1.00 unit AE.02.4
1.00 unit AE.03.5
1.00 unit AE.03.7
14.00 unit AE.04.2
2.00 unit AE.04.3
14.00 unit AE.04.4
2.00 bh T.04.6
16.00 unit AE.04.6
2.00 unit AE.04.7
13.71 m1 AE.05.2
88.98 m1 AE.05.3
33.77 m1 AE.05.4
VOLUME SAT. KODE
c d e
93.91 m1 AE.05.5
88.25 m1 AE.05.6
22.39 m1 AE.05.7
35.92 m1 AE.05.8
59.34 m1 AE.05.9
40.39 m1 AE.05.10
12.00 kg AE.05.11
47.90 m1 S.01.09
47.90 m1 S.10.5
608.00 m' S.02.02
263.10 m1 S.11.1
6.00 unit AE.02.8
4.00 unit AE.02.11
2.00 unit AE.02.13
1.00 unit AE.02.2
1.00 unit AE.02.5
VOLUME SAT. KODE
c d e
3.00 unit AE.02.6
1.00 unit AE.03.3
1.00 unit AE.03.7
12.00 unit AE.04.2
5.00 unit AE.04.3
15.00 unit AE.04.4
5.00 bh T.04.6
17.00 unit AE.04.6
2.00 unit AE.04.7
21.13 m1 AE.05.2
VOLUME SAT. KODE
c d e
90.80 m1 AE.05.3
34.65 m1 AE.05.4
138.85 m1 AE.05.5
38.81 m1 AE.05.6
15.16 m1 AE.05.7
27.56 m1 AE.05.8
55.16 m1 AE.05.9
32.81 m1 AE.05.10
12.00 kg AE.05.11
51.40 m1 S.01.09
51.40 m1 S.10.5
467.40 m' S.02.02
217.25 m1 S.11.1
2.00 unit AE.02.10
10.00 unit AE.02.11
2.00 unit AE.02.13
VOLUME SAT. KODE
c d e
2.00 unit AE.03.7
14.00 unit AE.04.2
12.00 unit AE.04.4
14.00 unit AE.04.6
2.00 unit AE.04.7
65.37 m1 AE.05.3
23.74 m1 AE.05.4
89.12 m1 AE.05.5
79.46 m1 AE.05.6
42.97 m1 AE.05.8
24.49 m1 AE.05.9
59.48 m1 AE.05.10
12.00 kg AE.05.11
VOLUME SAT. KODE
c d e
25.40 m1 S.01.09
25.40 m1 S.10.5
243.60 m' S.02.02
116.14 m1 S.11.1
6.00 unit AE.02.11
2.00 unit AE.02.13
1.00 unit AE.03.8
8.00 unit AE.04.2
7.00 unit AE.04.4
8.00 unit AE.04.6
1.00 unit AE.04.7
c d e
45.31 m1 AE.05.3
4.60 m1 AE.05.4
66.54 m1 AE.05.5
37.00 m1 AE.05.6
20.65 m1 AE.05.8
17.00 m1 AE.05.9
25.16 m1 AE.05.10
12.00 kg AE.05.11
24.40 m1 S.01.09
24.40 m1 S.10.5
212.90 m' S.02.02
84.44 m1 S.11.1
2.00 unit AE.02.8
1.00 unit AE.02.10
2.00 unit AE.02.11
VOLUME SAT. KODE
c d e
1.00 unit AE.02.6
1.00 unit AE.03.4
5.00 unit AE.04.2
1.00 unit AE.04.3
5.00 unit AE.04.4
1.00 bh T.04.6
6.00 unit AE.04.6
1.00 unit AE.04.7
4.81 m1 AE.05.2
44.40 m1 AE.05.3
6.64 m1 AE.05.4
VOLUME SAT. KODE
c d e
69.21 m1 AE.05.5
7.62 m1 AE.05.8
29.65 m1 AE.05.9
10.00 kg AE.05.11
10.08 m1 AE.05.2
10.08 m1 AE.05.4
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
c d e
7.00 unit AE.10.9
18.30 m1 M.03.09
6.30 m' AE.08.2
2.00 bh AE.09.3
c d e
2.00 bh AE.09.3
c d e
VOLUME SAT. KODE
c d e
5.00 m1 S.06.3
c d e
VOLUME SAT. KODE
c d e
7.00 m1 S.06.9
VOLUME SAT. KODE
c d e
5.00 m1 S.06.3
VOLUME SAT. KODE
c d e
c d e
7.00 m1 S.06.4
5.00 m1 S.06.3
1.00 unit O.02.03
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
2.00 bh M.13.06.5
1.00 bh M.13.06.2
2.00 unit M.13.04.5
11.00 unit M.13.04.4
2.00 bh M.13.04.0
6.00 unit M.14.02
2.00 unit M.13.11.7
2.00 unit M.13.11.6
2.00 unit M.13.11.4
1.00 unit M.13.14.4
1.00 unit M.13.07.1
2.00 unit M.13.01.9
1.00 unit M.13.01.7
1.00 unit M.13.10.3
1.00 unit M.14.03
6.00 bh M.13.02.1
1.00 set M.13.12.1
VOLUME SAT. KODE
c d e
22.00 m1 M.06.11
33.00 m1 M.06.10
54.00 m1 M.06.9
11.00 m1 M.06.6
17.00 m1 M.06.3
44.00 m1 M.06.1
2.00 bh M.12.01.7
9.00 bh M.12.01.6
2.00 bh M.12.01.3
4.00 bh M.12.01.1
22.00 bh M.12.01.0
VOLUME SAT. KODE
c d e
4.00 bh M.12.03.8
4.00 bh M.12.03.5.b
2.00 bh M.12.04.6
2.00 bh M.12.04.5
4.00 bh M.12.04.0.a
9.00 bh M.12.05.9.c
4.00 unit M.13.18.1
4.00 unit M.13.18.2
9.00 unit M.13.08.4
56.00 unit M.13.08.3
15.00 unit M.13.08.1
8.00 unit M.13.08.0
8.00 bh M.13.09.2
4.00 bh AC.01.01
4.00 bh M.13.03.9
8.00 unit M.13.08.3
VOLUME SAT. KODE
c d e
0.38 m3 D.02.01
4.00 unit C.03.10
1.00 bh AC.01.02
1.00 bh M.13.03.9
1.00 unit M.13.01.8
2.00 unit M.13.08.3
0.10 m3 D.02.01
1.00 unit C.03.10
c d e
168.00 m1 M.06.10
110.00 m1 M.06.9
6.00 m1 M.06.6
10.00 bh M.12.02.3
1.00 bh M.12.02.0
2.00 bh M.12.01.7
8.00 bh M.12.01.6
3.00 bh M.12.01.3
1.00 bh M.12.04.6
3.00 bh M.12.05.9.c
2.00 bh M.12.03.9.a
28.00 bh M.14.04.a
156.00 m3 B.01
23.00 m3 D.02.01
133.00 m3 B.08
VOLUME SAT. KODE
c d e
c d e
1.00 roll AC.01.06
1.00 unit AC.01.08
1.00 unit AC.01.09
1.00 unit AC.01.10
1.00 unit AC.01.11
4.20 m1 M.06.10
VOLUME SAT. KODE
c d e
8.70 m1 M.06.6
255.50 m1 M.06.3
72.80 m1 M.06.4
25.70 m1 M.06.5
67.40 m1 M.06.6
52.90 m1 M.06.7
18.20 m1 M.06.8
57.70 m1 M.06.10
1.00 bh M.12.02.0
3.00 bh M.12.02.1
2.00 bh M.12.02.2
8.00 bh M.12.02.3
60.00 bh M.12.01.1
4.00 bh M.12.01.1.a
1.00 bh M.12.01.2
4.00 bh M.12.01.3
6.00 bh M.12.01.4
VOLUME SAT. KODE
c d e
2.00 bh M.12.01.5
2.00 bh M.12.01.7
23.00 bh M.12.04.0.a
1.00 bh M.12.04.1
1.00 bh M.12.04.3
1.00 bh M.12.04.4
1.00 bh M.12.05.9.b
1.00 bh M.12.05.9.a
1.00 bh M.12.05.7.d
1.00 bh M.12.05.7.c
4.00 bh M.12.05.7.a
8.00 bh M.12.05.6.a
5.00 bh M.12.05.6
1.00 bh M.12.05.4.d
6.00 bh M.12.05.4.c
4.00 bh M.12.05.4.b
1.00 bh M.12.05.3.b
5.00 bh M.12.05.3.a
27.00 bh M.12.05.2
VOLUME SAT. KODE
c d e
2.00 bh M.12.03.7
3.00 bh M.12.03.6
3.00 bh M.12.03.5.b
1.00 bh M.12.03.5.a
3.00 bh M.12.03.4.a
1.00 bh M.12.03.4
21.00 bh M.12.03.3
4.00 bh M.14.04
10.00 bh M.14.04.a
2.00 bh AC.03.01
1.00 bh AC.03.02
VOLUME SAT. KODE
c d e
c d e
1.00 unit AC.01.09
1.00 unit AC.01.10
1.00 unit AC.01.11
10.80 m1 M.06.10
5.50 m1 M.06.6
222.50 m1 M.06.3
VOLUME SAT. KODE
c d e
15.50 m1 M.06.4
13.00 m1 M.06.5
26.30 m1 M.06.6
46.00 m1 M.06.7
20.90 m1 M.06.8
1.00 bh M.12.02.1
58.00 bh M.12.01.1
5.00 bh M.12.01.1.a
4.00 bh M.12.01.4
22.00 bh M.12.04.0.a
1.00 bh M.12.04.3
1.00 bh M.12.04.4
1.00 bh M.12.05.9.b
1.00 bh M.12.05.9.a
1.00 bh M.12.05.7.b
4.00 bh M.12.05.7.a
1.00 bh M.12.05.6.c
VOLUME SAT. KODE
c d e
1.00 bh M.12.05.6.a
15.00 bh M.12.05.6
1.00 bh M.12.05.4.c
9.00 bh M.12.05.4.b
1.00 bh M.12.05.3.b
2.00 bh M.12.05.3.a
6.00 bh M.12.05.2
2.00 bh M.12.03.7
3.00 bh M.12.03.6
3.00 bh M.12.03.5.b
1.00 bh M.12.03.5.a
1.00 bh M.12.03.4.a
2.00 bh M.12.03.4
6.00 bh M.12.03.3
4.00 bh M.14.04
4.00 bh AC.03.01
1.00 bh AC.03.02
VOLUME SAT. KODE
c d e
c d e
1.00 roll AC.01.06
1.00 unit AC.01.08
1.00 unit AC.01.09
1.00 unit AC.01.10
1.00 unit AC.01.11
8.80 m1 M.06.10
VOLUME SAT. KODE
c d e
4.60 m1 M.06.6
199.40 m1 M.06.3
29.40 m1 M.06.4
7.00 m1 M.06.5
26.50 m1 M.06.6
47.10 m1 M.06.7
19.80 m1 M.06.8
51.00 bh M.12.01.1
4.00 bh M.12.01.1.a
5.00 bh M.12.01.4
21.00 bh M.12.04.0.a
1.00 bh M.12.04.3
1.00 bh M.12.04.4
1.00 bh M.12.05.9.b
1.00 bh M.12.05.9.a
1.00 bh M.12.05.7.b
4.00 bh M.12.05.7.a
VOLUME SAT. KODE
c d e
1.00 bh M.12.05.6.b
5.00 bh M.12.05.6.a
5.00 bh M.12.05.6
4.00 bh M.12.05.4.c
3.00 bh M.12.05.4.b
3.00 bh M.12.05.3.a
12.00 bh M.12.05.2
2.00 bh M.12.03.7
3.00 bh M.12.03.6
2.00 bh M.12.03.5.b
1.00 bh M.12.03.5
2.00 bh M.12.03.4
11.00 bh M.12.03.3
4.00 bh M.14.04
2.00 bh AC.03.01
1.00 bh AC.03.02
VOLUME SAT. KODE
c d e
c d e
1.00 unit AC.01.08
1.00 unit AC.01.09
1.00 unit AC.01.10
1.00 unit AC.01.11
8.80 m1 M.06.10
4.60 m1 M.06.6
VOLUME SAT. KODE
c d e
229.60 m1 M.06.3
30.40 m1 M.06.4
8.00 m1 M.06.5
24.10 m1 M.06.6
55.30 m1 M.06.7
23.30 m1 M.06.8
61.00 bh M.12.01.1
5.00 bh M.12.01.1.a
1.00 bh M.12.01.2
5.00 bh M.12.01.4
24.00 bh M.12.04.0.a
1.00 bh M.12.04.3
1.00 bh M.12.04.4
2.00 bh M.12.05.9.b
2.00 bh M.12.05.9.a
1.00 bh M.12.05.7.b
4.00 bh M.12.05.7.a
VOLUME SAT. KODE
c d e
1.00 bh M.12.05.6.c
5.00 bh M.12.05.6.a
7.00 bh M.12.05.6
4.00 bh M.12.05.4.c
5.00 bh M.12.05.4.b
1.00 bh M.12.05.3.b
1.00 bh M.12.05.3.a
15.00 bh M.12.05.2
2.00 bh M.12.03.7
3.00 bh M.12.03.6
2.00 bh M.12.03.5.b
1.00 bh M.12.03.5.a
1.00 bh M.12.03.4.a
1.00 bh M.12.03.4
14.00 bh M.12.03.3
4.00 bh M.14.04
3.00 bh AC.03.01
VOLUME SAT. KODE
c d e
1.00 bh AC.03.02
VOLUME SAT. KODE
c d e
1.00 unit AC.01.04
1.00 roll AC.01.06
1.00 unit AC.01.08
1.00 unit AC.01.09
1.00 unit AC.01.10
1.00 unit AC.01.11
c d e
8.80 m1 M.06.10
4.60 m1 M.06.6
131.70 m1 M.06.3
15.80 m1 M.06.4
8.60 m1 M.06.5
7.40 m1 M.06.6
32.50 m1 M.06.7
11.40 m1 M.06.8
1.00 bh M.12.02.1
61.00 bh M.12.01.1
1.00 bh M.12.01.1.a
3.00 bh M.12.01.2
4.00 bh M.12.01.4
1.00 bh M.12.01.5
14.00 bh M.12.04.0.a
2.00 bh M.12.04.3
1.00 bh M.12.05.9.b
VOLUME SAT. KODE
c d e
1.00 bh M.12.05.9.a
1.00 bh M.12.05.7.b
3.00 bh M.12.05.7.a
8.00 bh M.12.05.6
5.00 bh M.12.05.4.b
4.00 bh M.12.05.3.a
3.00 bh M.12.05.2
1.00 bh M.12.03.7
1.00 bh M.12.03.6
1.00 bh M.12.03.5.b
2.00 bh M.12.03.4.a
1.00 bh M.12.03.4
3.00 bh M.12.03.3
2.00 bh M.14.04
2.00 bh AC.03.01
1.00 bh AC.03.02
VOLUME SAT. KODE
c d e
c d e
2.00 unit AC.01.08
2.00 unit AC.01.09
2.00 unit AC.01.10
2.00 unit AC.01.11
8.80 m1 M.06.10
4.60 m1 M.06.6
VOLUME SAT. KODE
c d e
115.80 m1 M.06.3
5.50 m1 M.06.4
2.80 m1 M.06.5
5.80 m1 M.06.6
66.10 m1 M.06.7
19.20 m1 M.06.8
2.00 bh M.12.02.1
44.00 bh M.12.01.1
1.00 bh M.12.01.1.a
9.00 bh M.12.01.4
1.00 bh M.12.01.5
12.00 bh M.12.04.0.a
2.00 bh M.12.05.9.b
1.00 bh M.12.05.7.e
4.00 bh M.12.05.7.a
1.00 bh M.12.05.6.b
8.00 bh M.12.05.6
VOLUME SAT. KODE
c d e
1.00 bh M.12.05.4.c
4.00 bh M.12.05.4.b
1.00 bh M.12.05.3.a
2.00 bh M.12.05.2
2.00 bh M.12.03.7
1.00 bh M.12.03.6
1.00 bh M.12.03.5.b
1.00 bh M.12.03.5.a
1.00 bh M.12.03.4
2.00 bh M.12.03.3
4.00 bh M.14.04
2.00 bh AC.03.01
1.00 bh AC.03.02
VOLUME SAT. KODE
c d e
c d e
1.50 m1 M.06.10
1.30 m1 M.06.6
1.70 m1 M.06.3
0.70 m1 M.06.6
4.00 bh M.12.01.1
2.00 bh M.12.01.3
2.00 bh M.12.03.9
VOLUME SAT. KODE
c d e
VOLUME SAT. KODE
c d e
79.00 m1 S.01.07
VOLUME SAT. KODE
c d e
79.00 m1 S.10.3
c d e
1,050.10 m3 B.16
1,274.50 m3 B.09
14.00 btg C.03.24
2.00 bh BN
319.00 m1 J.56
21.10 m2 K.22
VOLUME SAT. KODE
c d e
14.00 bh C.03.25
99.95 m3 B.01
9.29 m3 B.05
90.66 m3 B.08
91.46 m3 C.01.01
30.74 m2 C.02.15
36.76 m3 B.05
73.52 m3 D.02.01
14.06 m3 B.05
281.29 m2 J.17.03
56.67 m2 J.57
9.60 m2 J.57
9.60 m2 J.57
138.25 m2 J.58
49.25 m2 J.58
13.70 m3 B.05
27.40 m3 D.02.01
274.01 m2 E.04
VOLUME SAT. KODE
c d e
135.21 m3 B.01
27.93 m3 B.05
107.28 m3 B.08
128.64 m3 C.01.01
159.00 m1 M.03.08
122.50 m2 C.02.15
436.50 m3 B.09
434.01 m3 B.01
25.43 m3 B.05
180.86 m3 B.08
227.72 m3 C.01.01
189.54 m3 B.05
11.58 m3 D.02.01
229.70 m2 D.04.11.A
VOLUME SAT. KODE
c d e
2,953.48 Kg D.01.01
22.97 m3 D.02.19
38.99 m3 AH.01.1
194.97 m2 AH.01.5
215.55 m2 J.15
410.00 m' J.10
45.44 m' J.12
43.73 m1 D.05.03
23.00 m1 D.05.01
43.73 m1 D.05.05
60.41 m2 C.02.05
120.81 m2 C.02.11
120.81 m2 C.02.13
208.16 m2 K.02
9.81 m2 C.02.15
VOLUME SAT. KODE
c d e
c d e
c d e
15.27 m' L.13.a
9.70 m2 C.02.05
9.70 m2 C.02.11
9.70 m2 C.02.13
0.38 m3 C.01.06
15.40 m1 C.03.01
12.03 m2 C.02.15
17.75 m2 K.19
15.40 m1 D.05.05
0.67 m2 D.04.11.A
5.60 m2 D.01.05
7.90 Kg D.01.01
0.56 m3 D.02.01
VOLUME SAT. KODE
c d e
0.33 m2 D.04.11.A
5.60 m2 D.01.05
7.90 Kg D.01.01
0.28 m3 D.02.01
1.81 m3 C.01.06
21.01 m2 J.15
4.64 m2 AK.02
88.00 m3 B.01
VOLUME SAT. KODE
c d e
3.52 m3 B.05
84.48 m3 B.08
12.71 m1 D.05.03
104.10 m1 D.05.01
19.91 m1 D.05.05
82.72 m3 C.01.01
57.78 m2 C.02.05
78.07 m2 C.02.11
78.07 m2 C.02.13
40.59 m2 K.02
14.77 m2 C.02.15
7.46 m1 M.03.08
82.14 m2 AK.05
17.65 m3 AH.01.1
VOLUME SAT. KODE
c d e
88.25 m2 AH.01.5
54.21 m2 C.02.05
152.69 m2 C.02.11
152.69 m2 C.02.13
78.85 m2 K.02
128.71 m3 B.01
25.24 m3 B.05
103.47 m3 B.08
80.45 m3 C.01.01
630.94 m' J.23
396.80 m3 AH.01.1
1,984.01 m2 AH.01.5
10.00 btg AH.01.6
VOLUME SAT. KODE
c d e
4.00 btg AH.01.4
45.00 btg AH.01.7
28.00 btg AH.01.8
2.00 btg AH.01.9
1,147.63 m3 AM.02
2,295.25 liter AM.06
395.93 ton AM.05
1,004.17 liter AM.03
263.95 ton AM.01
No :
Tangg:
Lokasi: STMM
Owner: STMM
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.1.f (c) - -
1.1.d.(c) - -
Survey Pasar - -
Analisa Standar - -
Analisa Standar - -
1.1.4.b.(a) - -
Analisa Standar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
1.7.2.d - -
2.2.1.1.a.(a) - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
-
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.f (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.f (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.f (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.f (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.f (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.f (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.d (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
1.7.2.d - -
1.7.2.d - -
1.7.2.d - -
1.7.2.d - -
1.7.2.d - -
1.7.2.d - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.2.d - -
1.7.2.d - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Survey pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa non standar - -
Survey pasar - -
Survey Pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa non standar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.a.(a) - -
2.2.1.1.a.(a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.a.(a) - -
2.2.1.1.a.(a) - -
2.2.1.1.a.(a) - -
2.2.1.1.a.(a) - -
2.2.12.a.(a) - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
B.30.a 1 - -
Survey pasar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
B.30.a 1 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
B.30.a 1 - -
Survey pasar - -
A.4.1.1.22. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Survey pasar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.19. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.19. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.19. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.19. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.19. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.19. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.19. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
B.30.a 1 - -
Survey pasar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
B.30.a 1 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
B.30.a 1 - -
Survey pasar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
2.2.7.a.(a) - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
2.2.7.a.(a) - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
2.2.7.a.(a) - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.25. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.20. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.21. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.2.2.1.4 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
Analisa Standar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
A.4.6.2.5. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
Analisa Standar - -
1.7.2.d - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
2.2.1.1.b.(c) - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
2.1.1.d.(a) - -
Survey pasar - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
2.1.1.d.(a) - -
A.4.4.1.25 - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.5.2.44. - -
A.4.4.1.25 - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.5.2.44. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.5.2.44. - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A.4.5.2.44. - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.5.2.44. - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.4.2.20 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.5.2.44. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.10 - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.10 - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey pasar - -
Survey Pasar - -
A.4.6.2.5 - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.4 - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey Pasar - -
Survey pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
Survey pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey pasar - -
Survey Pasar - -
A.4.2.1.24. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.18. - -
A.4.6.2.10 - -
Survey pasar - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.10 - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
A.4.2.1.24. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
Survey pasar - -
A.4.2.1.24. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.10 - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
Survey pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.10 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.10 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
A.4.2.1.24. - -
Analisa standar - -
Analisa standar - -
A.4.6.2.5. - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.17 - -
A.4.6.2.10 - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.4 - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
Analisa standar - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.7 - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Analisa standar - -
A.4.6.2.4 - -
A.4.6.2.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey pasar - -
Analisa standar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
e f g=c x f h
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
3.2.2.(c) - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
3.2.2.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
3.2.2.(c) - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
3.2.2.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Hitung - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Hitung - -
Hitung - -
Hitung - -
Hitung - -
Hitung - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Survey pasar - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.18. - -
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.6.2.19. - -
Survey pasar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Analisa standar - -
A.4.6.2.18. - -
Analisa standar - -
A.4.6.2.5. - -
A.4.6.2.10 - -
Survey Pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A. 4.7.1.10. - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A. 4.7.1.10. - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Analisa standar - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
A.4.2.1.24. - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
A.4.6.2.18. - -
A.4.6.2.19. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.2.1.24. - -
A.4.6.2.18. - -
A.4.2.1.24. - -
A.4.6.2.18. - -
A. 4.7.1.10. - -
Survey pasar - -
Survey Pasar - -
Analisa standar - -
A. 4.7.1.10. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Analisa standar - -
A. 4.7.1.10. - -
Survey pasar - -
Survey Pasar - -
Analisa standar - -
A. 4.7.1.10. - -
Survey pasar - -
Survey Pasar - -
A. 4.7.1.10. - -
Survey pasar - -
Survey Pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A. 4.7.1.10. - -
Survey pasar - -
Survey Pasar - -
Analisa standar - -
A.4.4.1.25 - -
Survey pasar - -
3.2.2.(c) - -
A. 4.7.1.10. - -
A. 4.7.1.10. - -
A.4.4.1.25 - -
Survey pasar - -
3.2.2.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A. 4.7.1.10. - -
A. 4.7.1.10. - -
Survey pasar - -
Survei Pasar - -
Survey pasar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.a.(a) - -
Survei Pasar - -
-
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
A.5.1.1.27. - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
A.5.1.1.27. - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
A.5.1.1 25. - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
A.5.1.1.27. - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
A.5.1.1 29. - -
Analisa Standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.27. - -
A.5.1.1.22. - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
Survey pasar - -
Analisa Standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Analisa standar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
2.2.1.1.b.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.22. - -
2.2.7.a.(a) - -
Analisa Standar - -
2.2.1.1.b.(c) - -
Survey pasar - -
Survey pasar - -
A. 4.2.1.2 (e) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey Pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
-
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.a.(a) - -
Analisa Standar - -
Survey pasar - -
A.4.4.1.11 - -
3.2.2.(c) - -
3.2.2.(c) - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.22. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.22. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.23. - -
A.5.1.1.22. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.22. - -
A.5.1.1.22. - -
A.5.1.1.21. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.23. - -
A.5.1.1.22. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.27. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
2.2.1.1.a.(a) - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
A.5.1.1 25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1 25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
A.5.1.1 25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
A.5.1.1 25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
A.5.1.1 25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
A.5.1.1 25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
A.5.1.1.27. - -
A.5.1.1.29. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.32. - -
A.5.1.1.31. - -
A.5.1.1.27. - -
A.5.1.1.31. - -
A.5.1.1.32. - -
4.1.4.(c) - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1.31. - -
A.5.1.1.27. - -
A.5.1.1.29. - -
A.5.1.1.31. - -
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1.31. - -
A.5.1.1.27. - -
A.5.1.1.29. - -
A.5.1.1.31. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1.27. - -
A.5.1.1.29. - -
A.5.1.1.31. - -
Analisa standar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1.27. - -
A.5.1.1.29. - -
A.5.1.1.31. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1.27. - -
A.5.1.1.29. - -
A.5.1.1.31. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.29. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
4.1.4.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.32. - -
4.1.4.(c) - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.29. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.7.1.1.d (a) - -
1.7.7.1.1.f (a) - -
1.7.2.d - -
2.2.1.1.a.(a) - -
Analisa Standar - -
A.4.1.1.22. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
B.30.a 1 - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
1.7.7.1.1.d (a) - -
1.7.7.1.1.f (a) - -
Analisa Standar - -
1.7.2.d - -
1.7.2.d - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.a.(a) - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.4.1.11 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
Analisa Standar - -
1.7.7.1.1.a (a) - -
1.7.7.1.1.d (a) - -
1.7.7.1.1.f (a) - -
Analisa Standar - -
1.7.2.d - -
Analisa Standar - -
Survey pasar - -
1.7.15.1.f (a) - -
2.2.1.1.a.(a) - -
Survey Pasar - -
A.4.1.1.22. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.b.(c) - -
Survey pasar - -
2.2.1.1.a.(a) - -
A.4.4.1.11 - -
3.2.2.(c) - -
3.2.2.(c) - -
Survey pasar - -
Analisa standar - -
A.4.5.2.44. - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.32. - -
A.5.1.1.29. - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.32. - -
A.5.1.1.29. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.29. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.29. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.29. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.32. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1 29. - -
A.5.1.1 28. - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1 29. - -
A.5.1.1 28. - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1 29. - -
A.5.1.1 28. - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.32. - -
A.5.1.1 29. - -
A.5.1.1 28. - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1 29. - -
A.5.1.1 28. - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1 29. - -
A.5.1.1 29. - -
A.5.1.1 28. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1 29. - -
A.5.1.1.32. - -
A.5.1.1 29. - -
Survey pasar - -
A.5.1.1.35. - -
A.5.1.1.35. - -
A.5.1.1.36 - -
A.5.1.1.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.5. - -
A.5.1.1.1. - -
A.5.1.1.1. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.4. - -
Analisa Standar - -
Survey pasar - -
A.4.6.2.20. - -
Analisa standar - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.35. - -
A.5.1.1.36 - -
A.5.1.1.5. - -
A.5.1.1.5. - -
A.5.1.1.1. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.1. - -
A.5.1.1.4. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.6.2.20. - -
Analisa standar - -
A.5.1.1.35. - -
Analisa standar - -
A.5.1.1.36 - -
A.5.1.1.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.5. - -
A.5.1.1.1. - -
A.5.1.1.1. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.4. - -
Analisa Standar - -
Survey pasar - -
A.4.6.2.20. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.5.1.1.35. - -
A.5.1.1.36 - -
A.5.1.1.5. - -
A.5.1.1.5. - -
A.5.1.1.1. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.1. - -
A.5.1.1.4. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Survey pasar - -
A.4.6.2.20. - -
Analisa standar - -
A.5.1.1.35. - -
A.5.1.1.35. - -
A.5.1.1.36 - -
A.5.1.1.5. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.5. - -
A.5.1.1.1. - -
A.5.1.1.1. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.4. - -
Analisa Standar - -
Survey pasar - -
A.4.6.2.20. - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.35. - -
A.5.1.1.36 - -
A.5.1.1.5. - -
A.5.1.1.5. - -
A.5.1.1.1. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.1. - -
A.5.1.1.4. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.6.2.20. - -
Analisa standar - -
1.7.7.1.1.a (a) - -
1.7.7.1.1.a (a) - -
Analisa Standar - -
1.7.2.d - -
2.2.1.1.a.(a) - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.7.1.1.d (a) - -
1.7.7.1.1.f (a) - -
Analisa Standar - -
1.7.2.d - -
Analisa Standar - -
Survey pasar - -
1.7.7.1.1.d (a) - -
2.2.1.1.a.(a) - -
Survey Pasar - -
A.4.1.1.22. - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.b.(c) - -
A.5.1.1.32. - -
1.7.7.1.1.a (a) - -
1.7.7.1.1.d (a) - -
1.7.7.1.1.f (a) - -
1.7.2.d - -
2.2.1.1.a.(a) - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
B.30.a 1 - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.29. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.28. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
A.5.1.1.26. - -
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.7.1.1.d (a) - -
1.7.7.1.1.f (a) - -
1.7.2.d - -
2.2.1.1.a.(a) - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.23. - -
Analisa Standar - -
Analisa Standar - -
A.4.1.1.22. - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
B.30.a 1 - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
4.1.4.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.32. - -
A.5.1.1.32. - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.31. - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.32. - -
A.5.1.1.31. - -
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
4.1.4.(c) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.32. - -
A.5.1.1.31. - -
Survey pasar - -
Analisa Standar - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.31. - -
Survey pasar - -
Analisa Standar - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.31. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
A.5.1.1.29. - -
Survey pasar - -
4.1.4.(c) - -
A.5.1.1.32. - -
4.1.4.(c) - -
A.5.1.1.32. - -
A.5.1.1.31. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
A.5.1.1.32. - -
A.5.1.1.32. - -
Survey pasar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.26. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.25. - -
A.5.1.1.25. - -
A.5.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.5.1.1.25. - -
A.5.1.1.27. - -
A.5.1.1.27. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.25. - -
A.5.1.1.25. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.5.1.1.32. - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
A.5.1.1.24. - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
2.2.1.1.a.(a) - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
2.2.1.1.a.(a) - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
2.2.1.1.a.(a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
A.5.1.1.24. - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
1.7.7.1.1.a (a) - -
2.2.1.1.a.(a) - -
Analisa Standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.49) - -
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.49) - -
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.49) - -
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.49) - -
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
Analisa standar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A. 6.1.1. (ix.45) - -
A. 6.1.1. (ix.49) - -
A. 6.1.1. (ix.49) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa standar - -
Analisa standar - -
Analisa standar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Analisa Standar - -
Analisa Standar - -
1.7.3.1.b.3 (a) - -
Survey Pasar - -
Analisa standar - -
Survey Pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
Analisa Standar - -
2.1.1.d.(a) - -
Survey pasar - -
1.7.2.d - -
2.2.1.1.a.(a) - -
1.7.2.d - -
A.4.4.3.64. - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
Survey Pasar - -
1.7.2.d - -
2.2.1.1.a.(a) - -
A.4.5.2.44. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.7.1.1.a (a) - -
1.7.2.d - -
Analisa Standar - -
2.1.1.d.(a) - -
A.5.1.1.31. - -
Survey pasar - -
Analisa Standar - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
Analisa Standar - -
2.1.1.d.(a) - -
1.7.2.d - -
2.2.1.1.a.(a) - -
A.4.1.1.22. - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Analisa Standar - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Analisa standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
2.1.1.d.(a) - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey pasar - -
A.4.1.1.22. - -
2.2.7.a.(a) - -
Analisa Standar - -
2.2.1.1.a.(a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
A.4.1.1.22. - -
2.2.7.a.(a) - -
Analisa Standar - -
2.2.1.1.a.(a) - -
2.1.1.d.(a) - -
Analisa standar - -
Survey pasar - -
Survei Pasar - -
1.7.7.1.1.a (a) - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
1.7.2.d - -
Analisa Standar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
2.1.1.d.(a) - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
Survey pasar - -
A.5.1.1.31. - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
A.4.4.1.25 - -
Survey pasar - -
Survey pasar - -
A. 4.7.1.10. - -
1.7.7.1.1.a (a) - -
1.7.2.d - -
Analisa Standar - -
2.1.1.d.(a) - -
HSPK 3.8.1.13 - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
HAR JUM
GA LAH
REF. BOBOT
SAT HAR
UAN GA
(Rp.) (Rp.)
e f g=c x f h
Survey pasar - -
Survey pasar - -
Survey pasar - -
Survey pasar - -
5.1.(1) - -
Survey pasar - -
6.3.(5a) - -
Survey pasar - -
6.3.(5a) - -
-
-
No :
PENGADAAN KONSULTAN PERANCANG KONSTRUKSI
PEMBANGUNAN GEDUNG TRANSFORMASI DIGITAL DAFTAR HARGA Tanggal :
SEKOLAH TINGGI MULTI MEDIA
TAHUN ANGGARAN 2023
SATUAN PEKERJAAN Lokasi : STMM
Owner : STMM
HARGA SATUAN
No. KODE ITEM PEKERJAAN SAT REFERENSI
(Rp)
0 1 2 5 6
A PEKERJAAN PERSIAPAN
1 A.01 1 m¹ Uitzet & bouwplank m¹ 1.1.d.(c) -
2 A.02 1 bln Pekerjaan air dan listrik kerja bln Survey Pasar -
3 A.03 1 m2 Kantor sementara/ Rumah jaga/ Gudang semen dan peralatan lantai plesteran, dinding setengah tembok (sew m2 Analisa Standar -
4 A.04 1 m' Pagar sementara dari seng gelombang tinggi 2 meter (sewa) m' Analisa Standar -
5 A.05 1 unit Papan Nama pekerjaan menggunakan multiplek 9 mm, frame kayu dan tiang kayu, printing banner plastik unit 1.1.4.b.(a) -
6 A.06 1 m2 Pembersihan Lapangan m2 1.1.f (c) -
7 A.07 1 bln tower crane (sewa) bln Survey Pasar -
8 A.15 1 titik Pengujian PDA test titik Survey Pasar -
3 D.01.03 1 kg Mengerjakan Baja profil + cat zinhcromate + cat besi kg Survey pasar -
4 D.01.04 1 kg Mengerjakan Baja plat + cat zinhcromate + cat besi kg Analisa Standar -
5 D.01.04a 1 kg Mengerjakan Baja plat + cat zinhcromate + cat besi (tanpa pengelasan) kg Analisa Standar -
6 D.01.05 1 m2 Pembesian wiremesh M8-150 untuk pelat atau dinding atau ferrocement secara manual m2 2.2.7.a.(a) -
7 D.01.07 1 kg Mengerjakan Besi siku + cat zinhcromate + cat besi kg Survey pasar -
8 D.01.18 1 m2 Plat alumunium, tebal 3 mm m2 Analisa Standar -
9 D.01.19 1 m1 Mengerjakan bending besi hollow m1 Survey pasar -
D.02 BETON
1 D.02.01 1 m3 Membuat beton mutu f'c = 1,8 s.d 3,7 MPa (BO: K-40 s.d K-100) setara (camp. 1pc : 3ps : 5kr) m3 2.2.1.1.a.(a) -
2 D.02.02 1 m3 Membuat beton mutu f'c ~ 14.5 MPa (K-175) setara (camp. 1pc : 2ps : 3kr) m3 2.2.1.1.b.(c) -
3 D.02.03 1 m3 Pengecoran pakai pompa beton, T = 30 m' m3 2.2.4.1.f.(a) -
4 D.02.04 1 m3 Pemadatan beton pada saat pengecoran dengan vibrator m3 2.2.5.a.(a) -
5 D.02.06 1 m3 Pengecoran beton menggunakan ready mixed f'c 25 MPa m3 B.13.a1 -
6 D.02.07 1 m3 Pengecoran beton menggunakan ready mixed f'c 28 MPa m3 B.13.a1 -
7 D.02.09 1 m3 Pengecoran beton menggunakan ready mixed f'c 25 MPa + pompa + vibrator m3 Analisa Standar -
8 D.02.11 1 m3 Pengecoran beton menggunakan ready mixed f'c 28 MPa + pompa + vibrator m3 Analisa Standar -
9 D.02.14 1 titik Bobokan kepala borepile titik Analisa non standar -
10 D.02.15 1 m3 Pemakaian pipa tremie m3 Survey Pasar -
11 D.02.16 1 ttk Pekerjaan grouting dengan semen instan ttk Survey pasar -
12 D.02.17.a 1 m2 pemasangan Papan fiber semen, tebal 6 mm m2 Survey pasar -
13 D.02.17.b 1 m2 pemasangan Papan fiber semen, tebal 20 mm m2 Survey pasar -
14 D.02.18 1 m3 Pengecoran beton menggunakan ready mixed f'c 21 MPa m3 B.13.a1 -
15 D.02.19 1 m3 Pengecoran beton menggunakan ready mixed f'c 21 MPa + pompa + vibrator m3 Analisa Standar -
D.04 BEKISTING
1 D.04.08.A 1 m2 Pemasangan bekisting untuk sloof beton bangunan gedung (dipakai 2x) m2 A.4.1.1.19. -
2 D.04.09.A 1 m2 Pemasangan bekisting untuk kolom beton bangunan gedung (dipakai 3x) m2 A.4.1.1.20. -
3 D.04.10.A 1 m2 Pemasangan bekisting untuk balok bangunan gedung (dipakai 2x) m2 A.4.1.1.21. -
4 D.04.11.A 1 m2 Pemasangan bekisting untuk plat lantai beton bangunan gedung (dipakai 2x) m2 A.4.1.1.22. -
5 D.04.12.A 1 m2 Pemasangan bekisting untuk dinding sheerwall (dipakai 2x) m2 A.4.1.1.23. -
6 D.04.13.A 1 m2 Pemasangan bekisting untuk tangga beton bangunan gedung (dipakai 2x) m2 A.4.1.1.25. -
7 D.04.17.A 1 m2 Pemasangan bekisting floordeck (termasuk perancach dan pembongkaran bekisting) m2 Analisa Standar -
E PEKERJAAN ATAP
1 E.04 1 m2 Roofmesh 3315 penyangga aluminium foil m2 A.4.5.2.44. -
2 E.06 1 m2 Usuk dan reng baja ringan terpasang m2 Survey pasar -
3 E.07 1 Kg Sagrod Ø 12 mm Kg Survey pasar -
4 E.08 1 Kg Tierod Ø 12 mm Kg Survey pasar -
5 E.09 1 Kg Trekstang Ø 16 mm Kg Survey pasar -
6 E.11 1 bh Spanskrof Ø 16 mm bh A. 4.2.1.2 (e) -
7 E.29 1 m' Papan ruiter 20/200 m' Survey pasar -
8 E.31 1 m2 Atap galvalum, tebal 0.35 mm (BMT) m2 Analisa standar -
9 E.32 1 m1 Pemasangan talang BJLS 0.30, lebar 900 mm m1 Analisa standar -
3 F.01.03 1 m' Pemasangan Frame pintu aluminium, tebal 1.3 mm m' Analisa standar -
4 F.01.05 1 m' Pemasangan Back mulion m' A.4.2.1.24. -
5 F.01.07 1 m' Pemasangan Expose transome m' A.4.2.1.24. -
G PEKERJAAN PARTISI
FRAME DAN AKSESORIS PARTISI
1 G.14 1 m2 Pemasangan gypsum board, tebal 12 mm m2 Survey pasar -
2 G.16 1 m2 Pekerjaan frame partisi - Wall track tebal 0.40 mm (BMT) & stud 76 mm tebal 0.70 mm (BMT) m2 Survey pasar -
3 G.19 1 m' Pemasangan Plint partisi homogenouse tile, uk. 100 x 600 mm (polished) m' Analisa standar -
4 G.20 1 m2 Pemasangan panel akustik, tebal 12 mm m2 Survey pasar -
5 G.23 1 m' Pemasangan Plint conwood, uk. 100 x 3050 mm (polished) m' Analisa standar -
UNIT PARTISI
1 G.01.2 1 unit Partisi Geser, tipe PG01 unit Survey pasar -
2 G.01.3 1 unit Partisi Geser, tipe PG02 unit Survey pasar -
3 G.01.4 1 unit Partisi Geser, tipe PG03 unit Survey pasar -
H PEKERJAAN PLAFON
1 I.01 1 m' Pemasangan list plafon - Shadow line m' Survey pasar -
2 I.13 1 bh Pemasangan maintenance hole, uk. 600 x 600 mm bh Survey pasar -
3 I.14 1 m2 Pemasangan metal ceiling m2 Survey pasar -
4 I.20 1 m2 Pemasangan plafond gypsum, tebal 9 mm dengan rangka metal furing m2 Analisa non standar -
5 I.21 1 m2 Pemasangan plafon fiber semen, tebal 4 mm dengan rangka metal furing m2 Analisa non standar -
6 I.22 1 m2 Pemasangan plafond akustik, tebal 12 mm dengan rangka metal furring m2 Analisa non standar -
7 I.23 1 m2 Pemasangan drop ceiling fiber semen, tebal 4 mm dengan rangka metal furing m2 Analisa non standar -
8 I.24 1 m2 Pemasangan Drop ceiling gypsum, tebal 9 mm + rangka metal furing m2 Analisa non standar -
9 I.28 1 m2 Multipleks tebal 18 mm m2 Analisa Standar -
10 I.29 1 m2 Multipleks tebal 9 mm m2 Analisa Standar -
4 J.06 1 m2 Homogeneous tile matte, uk. 600 x 600 mm - Lantai toilet m2 Analisa standar -
5 J.07 1 m2 Pekerjaan dinding homogeneous tile, uk. 300 x 600 mm (polished) - Toilet m2 Survey pasar -
6 J.09 1 m2 Finishing dinding homogeneous tile, uk. 300 x 600 mm (polished) - Jamb lift m2 Survey pasar -
7 J.10 1 m' Pemasangan stepnosing, uk. 80 x 600 mm (unpolished) m' Survey pasar -
8 J.11 1 m2 Pemasangan keramik, uk. 300 x 300 mm - Groundtank m2 Analisa standar -
9 J.12 1 m' Homogenouse plint, uk. 100 x 600 mm (polished) m' Survey pasar -
10 J.13 1 m2 Pekerjaan lantai batu plastik komposit, tebal 4 mm m2 Analisa standar -
11 J.14 1 m2 Homogeneous tile matte, uk. 600 x 600 mm m2 Analisa standar -
12 J.15 1 m2 Homogeneous tile rustic, uk. 600 x 600 mm m2 Analisa standar -
13 J.17.03 1 m2 Paving block K-200, tebal 60 mm m2 A.4.4.3.64. -
14 J.23 1 m' Pasangan Kansteen m' HSPK 3.8.1.13 -
15 J.26 1 m2 Memasang pelapis HPL m2 Survey Pasar -
16 J.27 1 m2 Granit slab, tebal 18 mm m2 Survey pasar -
17 J.48 1 m2 Pemasangan karpet tile, tebal 6.5 mm (terpasang) m2 A. 4.7.1.10. -
18 J.54 1 m2 Pemasangan vinyl, tebal 2 mm m2 A. 4.7.1.10. -
19 J.55 1 m2 Pemasangan insulasi rockwool density 80kg/m3, tebal 25 mm m2 A. 4.7.1.10. -
20 J.56 1 m1 Pekerjaan tactile m1 Analisa standar -
21 J.57 1 m2 Pekerjaan Pebblescape Terrazo (terpasang) m2 Survey Pasar -
22 J.58 1 m2 Finishing lantai seamless system (terpasang) m2 Survey Pasar -
J PENGECATAN
1 K.01 1 m2 Cat dinding interior m2 A. 4.7.1.10. -
2 K.02 1 m2 Cat dinding eksterior m2 A. 4.7.1.10. -
3 K.03 1 m2 Cat plafon m2 A. 4.7.1.10. -
4 K.19 1 m2 Cat tekstur m2 A. 4.7.1.10. -
5 K.20 1 m2 Pengecatan waterproofing cementitious m2 Survey pasar -
6 K.21 1 m2 Pengecatan waterproofing polyurethane m2 Survey pasar -
7 K.22 1 m2 Pengecatan garis parkir m2 Survey Pasar -
L PEKERJAAN RAILING
1 L.11 1 m' Pemasangan Pagar BRC, tinggi 1200 mm m' Survey pasar -
2 L.13.a 1 m' Pemasangan railing tangga dengan handrail pipa black steel m' Survey pasar -
3 L.14.a 1 m' Pemasangan railing tangga gedung dengan handrail hollow besi m' Survey pasar -
4 L.15.a 1 m' Pemasangan railing ramp plaza dengan handrail hollow stainless steel m' Survey pasar -
5 L.13.a 1 m' Pemasangan railing tangga dengan handrail pipa black steel m' Survey pasar -
6 L.16.a 1 m' Pemasangan railing tangga grand stair dengan handrail pipa black steel m' Survey pasar -
7 L.17 1 unit Tangga maintenance, panjang 21.88 m unit Survey pasar -
8 L.18 1 unit Tangga maintenance, panjang 2.25 m unit Survey pasar -
2 M.06.3 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 1" (25 mm) m1 Analisa standar -
3 M.06.4 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 1-1/4" (32 mm) m1 Analisa standar -
4 M.06.5 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 1-1/2" (40 mm) m1 Analisa standar -
5 M.06.6 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 2" (50 mm) m1 Analisa standar -
6 M.06.7 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 2-1/2" (65 mm) m1 Analisa standar -
7 M.06.8 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 3" (75 mm) m1 Analisa standar -
8 M.06.9 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 4" (100 mm) m1 A.5.1.1.24. -
9 M.06.10 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 6" (150 mm) m1 Analisa standar -
10 M.06.11 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 8" (200 mm) m1 Analisa standar -
P PEKERJAAN SALURAN
1 P.07 1 unit Bak kontrol unit Survey pasar -
2 P.08 1 m' Saluran U-ditch 400 x 400 mm m' Survey pasar -
3 P.09 1 m' Saluran U-ditch 500 x 700 mm m' Survey pasar -
4 P.10 1 m' Penutup Saluran U-ditch 400 x 600 mm m' Survey pasar -
5 P.11 1 m' Penutup Saluran U-ditch 500 x 600 mm m' Survey pasar -
6 P.12 1 m' Saluran Box Culvert 600 x 600 mm m' Survey pasar -
S Pengkabelan
S.01 Kabel NYY
1 S.01.00 1 m1 Penarikan Kabel NYY 1 x 70 mm2 m1 Survey pasar -
1 S.01.02 1 m1 Penarikan Kabel NYY 3 x 2.5 mm2 m1 Survey pasar -
2 S.01.04 1 m1 Penarikan Kabel NYY 4 x 2.5 mm2 m1 Survey pasar -
3 S.01.05 1 m1 Penarikan Kabel NYY 4 x 4 mm2 m1 Survey pasar -
4 S.01.07 1 m1 Penarikan Kabel NYY 4 x 10 mm² m1 Survey pasar -
5 S.01.08 1 m1 Penarikan Kabel NYY 4 x 16 mm² m1 Survey pasar -
6 S.01.09 1 m1 Penarikan Kabel NYY 4 x 25 mm² m1 Survey pasar -
7 S.01.14 1 m1 Penarikan Kabel NYY 4 x 150 mm² m1 Survey pasar -
8 S.01.17 1 m1 Penarikan Kabel NYY 4 x (1x300 mm²) m1 Survey pasar -
9 S.01.18 1 m1 Penarikan Kabel NYY 8 x (1x300 mm²) m1 Survey pasar -
W PEKERJAAN TELEPON
W.01 PEKERJAAN INSTALASI
1 W.01.01 1 Titik Instalasi Telephone dengan Kabel ITC 1 x 2 x 0.6 mm2 Titik Survey pasar -
2 W.01.02 1 m1 Penarikan Kabel ITC 10 x 2 x 0.6 mm2 m1 Survey pasar -
3 AA.04 1 set Pemasangan grounding rod Ø 5/8 lengkap dengan clamp, coupler, driving stud dan drill head set Survey pasar -
8 AE.02.8 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 36.000 Btu/H unit Survey pasar -
9 AE.02.9 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 42.000 Btu/H unit Survey pasar -
10 AE.02.10 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 48.000 Btu/H unit Survey pasar -
11 AE.02.11 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H unit Survey pasar -
12 AE.02.12 1 unit Pemasangan Indoor unit air conditioner split duct, kap. 28.000 Btu/H unit Survey pasar -
13 AE.02.13 1 unit Pemasangan Indoor unit air conditioner cassette ceiling round 360°, kap. 36.000 Btu/H unit Survey pasar -
14 AE.02.14 1 unit Pemasangan Indoor unit air conditioner cassette ceiling round 360°, kap. 48.000 Btu/H unit Survey pasar -
AF PEKERJAAN PROJECTOR
AF.01 PEKERJAAN INSTALASI
1 AF.01.01 1 titik Instalasi projector dengan kabel HDMI titik Survey pasar -
2 AF.01.02 1 m' penarikan kabel HDMI m' Survey pasar -
AG PEKERJAAN LIFT
1 AG.01 1 unit Passenger Elevator Kap. 1000 kg (6 Lantai) unit Survey pasar -
2 AG.02 1 unit Passenger Elevator Kap. 2000 kg (6 Lantai) unit Survey pasar -
3 AG.03 1 unit Suspension hook dudukan lift unit A.2.2.1.4 -
AJ PEKERJAAN GENSET
1 AJ.01 1 unit Genset 650 kVA unit Survey pasar -
2 AJ.02 1 unit Pompa Solar unit Survey pasar -
AK PEKERJAAN FASAD
1 AK.01.2 1 unit Logo STMM unit Survey pasar -
2 AK.01.3 1 unit Identitas gedung Logo STMM unit Survey pasar -
3 AK.02 1 m2 Pasangan Alumunium Composite Panel (ACP), tebal 4 mm m2 Survey pasar -
4 AK.03 1 m2 Pemasangan GRC Cetak, tebal 10 mm m2 Survey pasar -
5 AK.05 1 m2 Pemasangan GRC Cetak, tebal 10 mm m2 Survey pasar -
AN PEKERJAAN INTERIOR
1 AN.01 1 m2 pemasangan click on hollow 50x50 mm m2 Survei Pasar -
AO PEKERJAAN SCULPTURE
1 AO.01 1 unit Ornamen Besi Tempa 2 mm unit Survei Pasar -
AP PEKERJAAN GAZEBO
1 AP.01 1 unit Gazebo kayu glugu kelapa, uk. 2.5 x 2.5 m unit Survei Pasar -
NO. KODE KOEFISIEN SATUAN URAIAN HARGA SATUAN (RP) JUMLAH HARGA (RP) TOTAL (RP)
a b c d e f g h
A PEKERJAAN PERSIAPAN
1 A.01 1 m¹ Uitzet & bouwplank 1.1.d.(c)
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
0.0200 kg Paku Rp - Rp -
0.0070 m3 Kayu papan 3/20 cm Rp - Rp -
0.0120 m3 Kayu 5/7 cm Rp - Rp - Rp -
Tenaga Kerja :
0.0100 OH Kepala tukang kayu Rp - Rp -
0.1000 OH Tukang kayu Rp - Rp -
0.1000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 A.03 1 m2 Kantor sementara/ Rumah jaga/ Gudang semen dan peralatan lantai plesteran, dinding setengah tembok (sewa) Analisa Standar
Bahan : Permen PUPR No.1 tahun 2022 - 1.1.e
1.2500 btg Dolken kayu dia. 8-10 cm / 400 cm Rp - Rp -
0.1800 m3 Kayu Rp - Rp -
0.0800 kg Paku Rp - Rp -
1.1000 kg Besi strip Rp - Rp -
35.0000 kg Semen Portland Rp - Rp -
0.1500 m3 Pasir pasang Rp - Rp -
0.1000 m3 Pasir beton Rp - Rp -
0.1500 m3 Krikil beton Rp - Rp -
30.0000 bh Bata merah Rp - Rp -
0.2500 lbr Seng plat Rp - Rp -
0.2000 bh Jendela nako Rp - Rp -
0.0800 m2 Kaca polos Rp - Rp -
0.1500 bh Kunci tanam Rp - Rp -
0.0600 lbr Multiplek, tebal 4 mm Rp - Rp - Rp -
Tenaga Kerja :
2.0000 OH Pekerja Rp - Rp -
2.0000 OH Tukang kayu Rp - Rp -
1.0000 OH Tukang batu Rp - Rp -
0.3000 OH Kepala tukang batu Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga sewa : Rp -
4 A.04 1 m' Pagar sementara dari seng gelombang tinggi 2 meter (sewa) Analisa Standar
Bahan : Permen PUPR No.1 tahun 2022 - 1.1.b
1.2500 btg Dolken kayu dia. 8-10 cm / 400 cm Rp - Rp -
1.2000 lbr Seng gelombang BJLS 0,3 Rp - Rp -
2.5000 kg Semen portland Rp - Rp -
0.0050 m3 Pasir beton Rp - Rp -
0.0090 m3 Krikil beton Rp - Rp -
0.0720 m3 Kayu 5/7 cm Rp - Rp -
0.4500 liter Meni besi Rp - Rp -
0.0600 kg Paku Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 44
Tenaga Kerja :
0.4000 OH Tukang kayu Rp - Rp -
0.0200 OH Kepala tukang kayu Rp - Rp -
0.2000 OH Pekerja Rp - Rp -
0.0200 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga sewa : Rp -
5 A.05 1 unit Papan Nama pekerjaan menggunakan multiplek 9 mm, frame kayu dan tiang kayu, printing banner plastik 1.1.4.b.(a)
Bahan : Permen PUPR No.1 tahun 2022
0.0210 m3 Tiang Kayu 5/7 cm, t = 3 m' Rp - Rp -
0.4800 m2 Printing banner plastik 60x80 cm2 Rp - Rp -
1.2500 kg Paku Rp - Rp -
0.1800 lbr Multiplek 9 mm Rp - Rp -
0.0028 m3 Frame kayu 10x1 cm Rp - Rp -
1.5000 kg Cat kayu Rp - Rp - Rp -
Tenaga Kerja :
0.7500 OH Tukang kayu Rp - Rp -
0.1000 OH Kepala tukang kayu Rp - Rp -
0.7500 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
B PEKERJAAN TANAH
1 B.01 1 m3 Penggalian tanah biasa sedalam s.d. 1 m untuk volume 200 m3 s.d 2000 m3 1.7.7.1.1.a (a)
Tenaga Kerja : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
0.5630 OH Pekerja Rp - Rp -
0.0563 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 B.02 1 m3 Penggalian tanah biasa sedalam > 1 m s.d. 2 m untuk volume 200 s.d 2000 m3 1.7.7.1.1.d (a)
Tenaga Kerja : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
0.6750 OH Pekerja Rp - Rp -
0.0675 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 B.03 1 m3 Penggalian tanah biasa sedalam > 2 m s.d. 3 m untuk volume 200 s.d 2000 m3 1.7.7.1.1.f (a)
Tenaga Kerja : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
0.7600 OH Pekerja Rp - Rp -
0.0760 OH Mandor Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 45
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 B.04 1 m3 Penggalian tanah biasa sedalam > 3 m s.d. 5 m untuk volume 200 s.d 2000 m3 Analisa Standar
Tenaga Kerja : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - 1.7.7.1.1.f (a) & 1.7.7.1.1.h (a)
0.9100 OH Pekerja Rp - Rp -
0.0910 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 B.06 1 m3 Timbunan atau urugan kembali tanah biasa / liat berpasir (tanah urug bekas galian) 1.7.14.a (a)
Tenaga kerja : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
0.1000 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 B.06.01 1 m3 Timbunan atau urugan kembali tanah biasa / liat berpasir (mendatangkan tanah urug) 1.7.14.a (a)
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
1.4000 m3 Tanah urug Rp - Rp - Rp -
Tenaga Kerja :
0.1000 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
9 B.08 1 m3 Timbunan tanah atau urugan tanah kembali (tanah urug bekas galian) + pemadatan Analisa Standar
PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM- 1.7.14.a (a) & 1.7.14.c (a)
1.0000 m3 Timbunan tanah bekas galian sebagai bahan pengisi Rp - Rp -
1.0000 m3 Pemadatan tanah Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
10 B.09 1 m3 Timbunan tanah atau urugan tanah dengan tanah urug baru + pemadatan Analisa Standar
1.0000 m3 Timbunan atau urugan dengan tanah baru Rp - Rp -
1.0000 m3 Pemadatan tanah Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
14 B.20 1 m3 Mengangkut agregat kasar atau koral, jarak angkut >50 s.d 100 1.7.15.1.f (a)
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
1.2000 m3 Batu pecah, uk. 1/2 cm Rp - Rp - Rp -
Tenaga kerja :
0.3440 OH Pekerja Rp - Rp -
0.0172 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 C.01.05 1 m3 pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 sp dan 40 % batu belah, manual 2.2.12.a.(a)
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
0.5810 m3 Batu kali 15/20 Rp - Rp -
227.5000 kg Semen portland (PC) Rp - Rp -
0.3789 m3 Pasir beton Rp - Rp -
0.5320 m3 Kerikil beton Rp - Rp -
150.1000 liter Air Rp - Rp - Rp -
Tenaga Kerja :
0.2896 OH Tukang Batu Rp - Rp -
1.4480 OH Pekerja Rp - Rp -
0.1448 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 C.01.06 1 m3 Pemasangan rollag bata merah (5x11x22) cm campuran 1SP : 6PP 2.1.1.d.(a)
AHSP : 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM
70.0000 bh Bata merah Rp - Rp -
8.3200 kg Semen portland (PC) Rp - Rp -
0.0490 m3 Pasir pasang Rp - Rp - Rp -
Tenaga Kerja :
0.1000 OH Tukang batu Rp - Rp -
Analisa Harga Satuan Pekerjaan 47
0.0100 OH Kepala tukang batu Rp - Rp -
0.3000 OH Pekerja Rp - Rp -
0.0150 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m3 : Rp -
1 C.02.02 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP A.4.4.1.11
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
70.0000 bh Bata merah Rp - Rp -
8.3200 kg Semen portland (PC) Rp - Rp -
0.0490 m3 Pasir pasang Rp - Rp - Rp -
Tenaga Kerja :
0.1000 OH Tukang batu Rp - Rp -
0.0100 OH Kepala tukang batu Rp - Rp -
0.3000 OH Pekerja Rp - Rp -
0.0150 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
10 C.02.15 1 m2 Finishing beton ekspose, plesteran + acian (mortar instan) Survey pasar
Bahan :
1.0000 m2 Plesteran dinding dengan mortar instan Rp - Rp -
1.0000 m2 Acian dinding dengan mortar instan Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 49
Jumlah : Rp -
Jumlah harga : Rp -
2 C.03.02 1 m' Sambungan nat pada Uditch tinggi 100 mm, tebal 15 mm Survey pasar
1 m2 Pemasangan plesteran 1SP : 3PP tebal 15 mm PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - 3.2.1.(c)
Bahan :
0.7776 kg Semen portland (PC) Rp - Rp -
0.0023 m3 Pasir pasang Rp - Rp - Rp -
Tenaga Kerja :
0.0150 OH Tukang batu Rp - Rp -
0.0015 OH Kepala tukang batu Rp - Rp -
0.0300 OH Pekerja Rp - Rp -
0.0015 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m1 : Rp -
6 D.01.03 1 kg Mengerjakan Baja profil + cat zinhcromate + cat besi Survey pasar
Bahan :
1.0000 kg Pemasangan baja profil Rp - Rp -
0.6600 cm Pengerjaan pengelasan dengan las listrik Rp - Rp -
0.0300 m2 Pengecatan permukaan baja dengan zinchromate + cat besi Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
7 D.01.04 1 kg Mengerjakan Baja plat + cat zinhcromate + cat besi Analisa Standar
Bahan :
1.0000 kg Pemasangan baja plat Rp - Rp -
16.0000 cm Pengerjaan pengelasan dengan las listrik Rp - Rp -
0.0100 m2 Pengecatan permukaan baja dengan zinchromate + cat besi Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
8 D.01.04a 1 kg Mengerjakan Baja plat + cat zinhcromate + cat besi (tanpa pengelasan) Analisa Standar
Bahan :
1.0000 kg Pemasangan baja plat Rp - Rp -
0.0100 m2 Pengecatan permukaan baja dengan zinchromate + cat besi Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
9 D.01.05 1 m2 Pembesian wiremesh M8-150 untuk pelat atau dinding atau ferrocement secara manual 2.2.7.a.(a)
1 kg Pemasangan 1 kg Jaring Ayaman Tulangan Tunggal (Wiremesh) PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV CIPTA KARYA - A.4.1.1.17.
Bahan :
1.0200 kg Wiremesh M8-150 Rp - Rp -
0.0050 kg Kawat ikat beton Rp - Rp - Rp -
Tenaga Kerja :
0.0025 OH Tukang besi Rp - Rp -
0.0025 OH Kepala tukang besi Rp - Rp -
0.0025 OH Pekerja Rp - Rp -
0.0001 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per kg : Rp -
Harga per m2 : Rp -
10 D.01.07 1 kg Mengerjakan Besi siku + cat zinhcromate + cat besi Survey pasar
Bahan :
Analisa Harga Satuan Pekerjaan 53
1.0000 kg Pemasangan besi siku Rp - Rp -
1.0000 cm Pengerjaan pengelasan dengan las listrik Rp - Rp -
0.0100 m2 Pengecatan permukaan baja dengan zinchromate + cat besi Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
D.02 BETON
1 D.02.01 1 m3 Membuat beton mutu f'c = 1,8 s.d 3,7 MPa (BO: K-40 s.d K-100) setara (camp. 1pc : 3ps : 5kr) 2.2.1.1.a.(a)
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - Hal.264
227.0000 kg PC / Portland cement Rp - Rp -
0.6207 m3 PB / Pasir beton Rp - Rp -
0.7407 m3 Kr / Kerikil Rp - Rp -
215.0000 ltr Air Rp - Rp - Rp -
Tenaga Kerja :
0.2000 OH Tukang batu Rp - Rp -
0.0200 OH Kepala tukang batu Rp - Rp -
1.2000 OH Pekerja Rp - Rp -
0.1200 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 D.02.02 1 m3 Membuat beton mutu f'c ~ 14.5 MPa (K-175) setara (camp. 1pc : 2ps : 3kr) 2.2.1.1.b.(c)
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - Hal.265
326.0000 kg Semen portland (SP) Rp - Rp -
0.5430 m3 Pasir beton Rp - Rp -
0.7620 m3 Kerikil Rp - Rp -
215.0000 ltr Air Rp - Rp - Rp -
Tenaga Kerja :
0.2750 OH Tukang batu Rp - Rp -
0.0280 OH Kepala tukang batu Rp - Rp -
1.6500 OH Pekerja Rp - Rp -
0.0830 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 D.02.09 1 m3 Pengecoran beton menggunakan ready mixed f'c 25 MPa + pompa + vibrator Analisa Standar
Analisa harga satuan :
1.0000 m3 Pengecoran beton menggunakan ready mixed f'c 25 MPa Rp - Rp -
1.0000 m3 Pengecoran pakai pompa beton, T = 30 m' Rp - Rp -
1.0000 m3 Pemadatan beton pada saat pengecoran dengan vibrator Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
8 D.02.11 1 m3 Pengecoran beton menggunakan ready mixed f'c 28 MPa + pompa + vibrator Analisa Standar
Analisa harga satuan :
1.0000 m3 Pengecoran beton menggunakan ready mixed f'c 28 MPa Rp - Rp -
1.0000 m3 Pengecoran pakai pompa beton, T = 30 m' Rp - Rp -
1.0000 m3 Pemadatan beton pada saat pengecoran dengan vibrator Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
16 D.02.19 1 m3 Pengecoran beton menggunakan ready mixed f'c 21 MPa + pompa + vibrator Analisa Standar
Analisa harga satuan :
1.0000 m3 Pengecoran beton menggunakan ready mixed f'c 21 MPa Rp - Rp -
1.0000 m3 Pengecoran pakai pompa beton, T = 30 m' Rp - Rp -
1.0000 m3 Pemadatan beton pada saat pengecoran dengan vibrator Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
2 D.04.09.A 1 m2 Pemasangan bekisting untuk kolom beton bangunan gedung (dipakai 3x) A.4.1.1.20.
Pekerjaan bekisting sudah termasuk pembongkarannya PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV CIPTA KARYA
Bahan :
0.4000 kg Paku 5 cm - 12 cm Rp - Rp -
0.2000 ltr Minyak bekisting Rp - Rp -
0.0050 m3 Balok kayu kelas III Rp - Rp -
0.0133 m3 Papan Kayu kelas III Rp - Rp -
Dolken kayu Ø 8-
0.6667 btg Rp - Rp -
10cm –panjang 4 m
Analisa Harga Satuan Pekerjaan 56
0.1167 lbr Multiplek, tebal 9 mm Rp - Rp - Rp -
Tenaga Kerja :
0.3300 OH Tukang kayu Rp - Rp -
0.0330 OH Kepala tukang kayu Rp - Rp -
0.6600 OH Pekerja Rp - Rp -
0.0330 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 D.04.10.A 1 m2 Pemasangan bekisting untuk balok bangunan gedung (dipakai 2x) A.4.1.1.21.
Pekerjaan bekisting sudah termasuk pembongkarannya PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV CIPTA KARYA
Bahan :
0.0090 m3 Balok kayu kelas III Rp - Rp -
0.2000 ltr Minyak bekisting Rp - Rp -
0.0200 m3 Papan Kayu kelas III Rp - Rp -
0.4000 kg Paku 5 cm - 12 cm Rp - Rp -
Dolken kayu Ø 8-
1.0000 btg Rp - Rp -
10cm –panjang 4 m
0.1750 lbr Multiplek, tebal 9 mm Rp - Rp - Rp -
Tenaga Kerja :
0.3300 OH Tukang kayu Rp - Rp -
0.0330 OH Kepala tukang kayu Rp - Rp -
0.6600 OH Pekerja Rp - Rp -
0.0330 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 D.04.11.A 1 m2 Pemasangan bekisting untuk plat lantai beton bangunan gedung (dipakai 2x) A.4.1.1.22.
Pekerjaan bekisting sudah termasuk pembongkarannya PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV CIPTA KARYA
Bahan :
0.0075 m3 Balok kayu kelas III Rp - Rp -
0.2000 ltr Minyak bekisting Rp - Rp -
0.0200 m3 Papan Kayu kelas III Rp - Rp -
0.4000 kg Paku 5 cm - 12 cm Rp - Rp -
Dolken kayu Ø 8-
3.0000 btg Rp - Rp -
10cm –panjang 4 m
0.1750 lbr Multiplek, tebal 9 mm Rp - Rp - Rp -
Tenaga Kerja :
0.3300 OH Tukang kayu Rp - Rp -
0.0330 OH Kepala tukang kayu Rp - Rp -
0.6600 OH Pekerja Rp - Rp -
0.0330 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 D.04.13.A 1 m2 Pemasangan bekisting untuk tangga beton bangunan gedung (dipakai 2x) A.4.1.1.25.
Pekerjaan bekisting sudah termasuk pembongkarannya PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV CIPTA KARYA
Bahan :
0.0075 m3 Balok kayu kelas III Rp - Rp -
0.1500 ltr Minyak bekisting Rp - Rp -
0.0150 m3 Papan Kayu kelas III Rp - Rp -
0.4000 kg Paku 5 cm - 12 cm Rp - Rp -
Analisa Harga Satuan Pekerjaan 57
Dolken kayu Ø 8-
1.0000 btg Rp - Rp -
10cm –panjang 4 m
0.1750 lbr Multiplek, tebal 9 mm Rp - Rp - Rp -
Tenaga Kerja :
0.3300 OH Tukang kayu Rp - Rp -
0.0330 OH Kepala tukang kayu Rp - Rp -
0.6600 OH Pekerja Rp - Rp -
0.0330 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 D.04.15.A 1 m2 Perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m, JAT < 60 cm Analisa Standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.II SDA - B.11.d
0.0200 m3 Kaso 5/7 cm Rp - Rp -
0.2500 kg Paku 5 cm dan 7 cm Rp - Rp - Rp -
Tenaga Kerja :
0.1500 OH Tukang kayu Rp - Rp -
0.0150 OH Kepala tukang kayu Rp - Rp -
0.3000 OH Pekerja Rp - Rp -
0.0300 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
10 D.04.17.A 1 m2 Pemasangan bekisting floordeck (termasuk perancach dan pembongkaran bekisting) Analisa Standar
Analisa harga satuan :
1.0000 m2 Pemasangan bekisting lantai floordeck (JAP ≤ 0.8 m) Rp - Rp -
1.0000 m2 Perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m Rp - Rp -
1.0000 m2 Bongkar perancah secara biasa Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
2 D.05.02 1 m1 Kolom praktis (KP2), uk. 120 x 120 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.35
0.0022 m3 Kayu kelas III Rp - Rp -
0.0109 kg Paku 2'-5" Rp - Rp -
3.2727 kg Besi beton Rp - Rp -
0.4909 kg Kawat ikat beton Rp - Rp -
4.3636 kg Semen Portland Rp - Rp -
0.0065 m3 Pasir pasang Rp - Rp -
0.0098 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0218 OH Tukang besi Rp - Rp -
0.0218 OH Tukang batu Rp - Rp -
0.0218 OH Tukang kayu Rp - Rp -
0.0065 OH Kepala tukang Rp - Rp -
0.1964 OH Pekerja Rp - Rp -
0.0098 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 D.05.03 1 m1 Sloof praktis (SP1), uk. 100x200 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.36
0.0040 m3 Kayu kelas III Rp - Rp -
0.0267 kg Paku 2'-5" Rp - Rp -
3.3750 kg Besi beton Rp - Rp -
0.0667 kg Kawat ikat beton Rp - Rp -
7.3333 kg Semen Portland Rp - Rp -
0.0120 m3 Pasir pasang Rp - Rp -
0.0200 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0440 OH Tukang besi Rp - Rp -
0.0440 OH Tukang batu Rp - Rp -
0.0440 OH Tukang kayu Rp - Rp -
0.0133 OH Kepala tukang Rp - Rp -
0.3960 OH Pekerja Rp - Rp -
0.0200 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 D.05.04 1 m1 Sloof praktis (SP2), uk. 120x200 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.36
0.0048 m3 Kayu kelas III Rp - Rp -
0.0320 kg Paku 2'-5" Rp - Rp -
4.3200 kg Besi beton Rp - Rp -
0.0800 kg Kawat ikat beton Rp - Rp -
8.8000 kg Semen Portland Rp - Rp -
0.0144 m3 Pasir pasang Rp - Rp -
0.0240 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0528 OH Tukang besi Rp - Rp -
0.0528 OH Tukang batu Rp - Rp -
0.0528 OH Tukang kayu Rp - Rp -
0.0160 OH Kepala tukang Rp - Rp -
0.4752 OH Pekerja Rp - Rp -
0.0240 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 D.05.05 1 m1 Balok praktis (BP1), uk. 100 x 200 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.36
0.0040 m3 Kayu kelas III Rp - Rp -
0.0267 kg Paku 2'-5" Rp - Rp -
3.3750 kg Besi beton Rp - Rp -
0.0667 kg Kawat ikat beton Rp - Rp -
7.3333 kg Semen Portland Rp - Rp -
0.0120 m3 Pasir pasang Rp - Rp -
Analisa Harga Satuan Pekerjaan 59
0.0200 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0440 OH Tukang besi Rp - Rp -
0.0440 OH Tukang batu Rp - Rp -
0.0440 OH Tukang kayu Rp - Rp -
0.0133 OH Kepala tukang Rp - Rp -
0.3960 OH Pekerja Rp - Rp -
0.0200 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 D.05.06 1 m1 Balok praktis (BP2), uk. 120 x 200 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.36
0.0048 m3 Kayu kelas III Rp - Rp -
0.0320 kg Paku 2'-5" Rp - Rp -
4.3200 kg Besi beton Rp - Rp -
0.0800 kg Kawat ikat beton Rp - Rp -
8.8000 kg Semen Portland Rp - Rp -
0.0144 m3 Pasir pasang Rp - Rp -
0.0240 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0528 OH Tukang besi Rp - Rp -
0.0528 OH Tukang batu Rp - Rp -
0.0528 OH Tukang kayu Rp - Rp -
0.0160 OH Kepala tukang Rp - Rp -
0.4752 OH Pekerja Rp - Rp -
0.0240 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 D.05.08 1 m1 Balok lateiu (BL1), uk. 100 x 100 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.36
0.0020 m3 Kayu kelas III Rp - Rp -
0.0133 kg Paku 2'-5" Rp - Rp -
2.4000 kg Besi beton Rp - Rp -
0.0333 kg Kawat ikat beton Rp - Rp -
3.6667 kg Semen Portland Rp - Rp -
0.0060 m3 Pasir pasang Rp - Rp -
0.0100 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0220 OH Tukang besi Rp - Rp -
0.0220 OH Tukang batu Rp - Rp -
0.0220 OH Tukang kayu Rp - Rp -
0.0067 OH Kepala tukang Rp - Rp -
0.1980 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
1 D.05.09 1 m1 Balok lateiu (BL2), uk. 120 x 100 mm (camp. beton 1pc : 3Ps : 5Kr) Survey pasar
Bahan : A.4.1.1.36
0.0024 m3 Kayu kelas III Rp - Rp -
0.0160 kg Paku 2'-5" Rp - Rp -
2.8800 kg Besi beton Rp - Rp -
0.0400 kg Kawat ikat beton Rp - Rp -
4.4000 kg Semen Portland Rp - Rp -
0.0072 m3 Pasir pasang Rp - Rp -
0.0120 m3 Kerikil Rp - Rp - Rp -
Tenaga Kerja :
0.0220 OH Tukang besi Rp - Rp -
0.0220 OH Tukang batu Rp - Rp -
0.0220 OH Tukang kayu Rp - Rp -
0.0067 OH Kepala tukang Rp - Rp -
0.1980 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
10 D.09.02 1 bh Pemasangan Angkur baut mutu tinggi (galvanis) M10x95 mm & Injectable adhesive mortar Survey pasar
Bahan :
1.0000 bh Angkur baut mutu tinggi (galvanis) M10x95 mm Rp - Rp -
8.0000 ml Injectable adhesive anchor Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
11 D.09.03 1 bh Pemasangan Angkur baut mutu tinggi (galvanis) M16x190 mm & Injectable adhesive mortar Survey pasar
Bahan :
1.0000 bh Angkur baut mutu tinggi (galvanis) M16x190 mm Rp - Rp -
29.0000 ml Injectable adhesive anchor Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
12 D.09.04 1 bh Pemasangan Angkur baut mutu tinggi (galvanis) M20x400 mm & Injectable adhesive mortar Survey pasar
Bahan :
1.0000 bh Angkur baut mutu tinggi (galvanis) M20x400 mm Rp - Rp -
92.0000 ml Injectable adhesive anchor Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
13 D.09.05 1 bh Pemasangan Angkur baut mutu tinggi (galvanis) M20x240 mm & Injectable adhesive mortar Survey pasar
Bahan :
1.0000 bh Angkur baut mutu tinggi (galvanis) M20x240 mm Rp - Rp -
65.0000 ml Injectable adhesive anchor Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
E PEKERJAAN ATAP
1 E.04 1 m2 Roofmesh 3315 penyangga aluminium foil A.4.5.2.44.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV /BID.CIPTA KARYA
1.0000 m2 Roofmesh 3315, uk. 75x75x1.3 mm Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang kayu Rp - Rp -
0.0050 OH Kepala tukang kayu Rp - Rp -
Analisa Harga Satuan Pekerjaan 61
0.0500 OH Pekerja Rp - Rp -
0.0080 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 F.01.02 1 m' Pemasangan Frame jendela / bouvenlich aluminium, tebal 1.3 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV /BID.CIPTA KARYA - A.4.2.1.24.
1.0000 m' Frame jendela/ bouvent, tebal 1.3 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0430 OH Tukang alumunium Rp - Rp -
0.0043 OH Kepala tukang alumunium Rp - Rp -
0.0430 OH Pekerja Rp - Rp -
0.0021 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 F.01.03 1 m' Pemasangan Frame pintu aluminium, tebal 1.3 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV /BID.CIPTA KARYA - A.4.2.1.24.
1.0000 m' Frame daun pintu Rp - Rp - Rp -
Tenaga Kerja :
0.0430 OH Tukang alumunium Rp - Rp -
0.0043 OH Kepala tukang alumunium Rp - Rp -
0.0430 OH Pekerja Rp - Rp -
0.0021 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
0.17
OH Tukang Kayu Rp - Rp -
0.017
OH Kepala Tukang kayu Rp - Rp -
0.017
OH Pekerja Rp - Rp -
0.0009
OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
2 F.04.2 1 bh Pemasangan Pull handle stainless steel, panjang 300 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID. CIPTA KARYA - A.4.6.2.12.
1.0000 bh Pull handle stainless steel, panjang 300 mm Rp - Rp - Rp -
Tenaga Kerja :
0.5000 OH Tukang Kayu Rp - Rp -
0.0500 OH Kepala Tukang kayu Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 F.04.3 1 bh Pemasangan Pull handle stainless steel, panjang 600 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID. CIPTA KARYA - A.4.6.2.12.
1.0000 bh Pull handle stainless steel, panjang 600 mm Rp - Rp - Rp -
Tenaga Kerja :
0.5000 OH Tukang Kayu Rp - Rp -
0.0500 OH Kepala Tukang kayu Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 F.04.8 1 psg Pemasangan Pull handle difabel stainless steel, panjang 600 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID. CIPTA KARYA - A.4.6.2.12.
1.0000 psg Pull handle difabel stainless steel, panjang 600 mm Rp - Rp - Rp -
Tenaga Kerja :
0.5000 OH Tukang Kayu Rp - Rp -
Analisa Harga Satuan Pekerjaan 67
0.0500 OH Kepala Tukang kayu Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 F.05.9 1 unit Pemasangan Daun pintu alumunium tebal 1.3 mm, uk. 700 x 2065 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID. CIPTA KARYA - A.4.2.1.8.
1.0000 unit Daun pintu alumunium tebal 1.3 mm, uk. 700 x 2065 mm Rp - Rp - Rp -
Tenaga Kerja :
0.4400 OH Tukang Kayu Rp - Rp -
0.0440 OH Kepala Tukang kayu Rp - Rp -
0.4400 OH Pekerja Rp - Rp -
0.0220 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
6 F.05.11 1 unit Pemasangan Daun pintu alumunium tebal 1.1 mm, uk. 1000 x 2065 mm Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID. CIPTA KARYA - A.4.2.1.8.
Analisa Harga Satuan Pekerjaan 68
1.0000 unit Daun pintu alumunium tebal 1.1 mm, uk. 1000 x 2065 mm Rp - Rp - Rp -
Tenaga Kerja :
0.4400 OH Tukang Kayu Rp - Rp -
0.0440 OH Kepala Tukang kayu Rp - Rp -
0.4400 OH Pekerja Rp - Rp -
0.0220 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Jumlah harga : Rp -
G PEKERJAAN PARTISI
1 G.14 1 m2 Pemasangan gypsum board, tebal 12 mm Survey pasar
Bahan : A.4.5.1.5.
0.3500 lbr Gypsum board, tebal 12 mm Rp - Rp -
0.0200 sak Compound Rp - Rp -
0.0200 roll UB tape Rp - Rp -
10.0000 bh Drywall screw 25 mm Rp - Rp -
0.3400 tube Sealant Rp - Rp - Rp -
Tenaga Kerja :
0.1000 OH Tukang kayu Rp - Rp -
0.0100 OH Kepala tukang kayu Rp - Rp -
0.1000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 G.16 1 m2 Pekerjaan frame partisi - Wall track tebal 0.40 mm (BMT) & stud 76 mm tebal 0.70 mm (BMT) Survey pasar
Bahan : A.4.2.1.20.
0.2500 pcs Wall track, tebal 0.4 mm (BMT) Rp - Rp -
0.7500 pcs Wall stud, tebal 0.7 mm (BMT) Rp - Rp -
2.0000 bh Dynabolt Ø 10 mm Rp - Rp -
12.5000 bh Drywall screw 25 mm Rp - Rp - Rp -
Tenaga Kerja :
0.2500 OH Tukang besi Rp - Rp -
0.0250 OH Kepala tukang besi Rp - Rp -
0.2500 OH Pekerja Rp - Rp -
0.0130 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 G.19 1 m' Pemasangan Plint partisi homogenouse tile, uk. 100 x 600 mm (polished) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.39.
1.6667 bh Plint homogenouse tile, uk. 100 x 600 mm (polished) Rp - Rp -
1.1400 kg Semen instan perekat plint Rp - Rp - Rp -
Tenaga Kerja :
0.0900 OH Tukang batu Rp - Rp -
0.0090 OH Kepala tukang batu Rp - Rp -
0.0900 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 G.23 1 m' Pemasangan Plint conwood, uk. 100 x 3050 mm (polished) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.39.
0.3279 bh Plint homogenouse tile, uk. 100 x 600 mm (polished) Rp - Rp -
Analisa Harga Satuan Pekerjaan 69
1.1400 kg Semen instan perekat plint Rp - Rp - Rp -
Tenaga Kerja :
0.0900 OH Tukang batu Rp - Rp -
0.0090 OH Kepala tukang batu Rp - Rp -
0.0900 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
I PEKREJAAN PLAFON
1 I.01 1 m' Pemasangan list plafon - Shadow line Survey pasar
Bahan :
1.0500 m1 Shadow line Rp - Rp - Rp -
Tenaga Kerja :
1.0000 m1 Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 I.20 1 m2 Pemasangan plafond gypsum, tebal 9 mm dengan rangka metal furing Analisa non standar
Bahan : A.4.2.1.20. + A.4.5.1.7.
0.3500 lbr Gypsum board, tebal 9 mm Rp - Rp -
0.3900 bh Furring Chanel Rp - Rp -
0.2700 bh Top Cross Rail Rp - Rp -
0.0700 btg Wall angle Rp - Rp -
1.6200 bh Connector furring Rp - Rp -
0.8100 bh Suspension clip adjuster Rp - Rp -
0.1400 kg Suspension rod 4 mm Rp - Rp -
0.8100 bh Suspension bracket / bracket Rp - Rp -
0.0200 bag Compound + Calcite Rp - Rp -
0.0200 roll UB tape 75 Lm/roll Rp - Rp -
10.0700 bh Drywall screw 25mm x 083 Rp - Rp - Rp -
Tenaga Kerja :
1.0000 m2 Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 I.21 1 m2 Pemasangan plafon fiber semen, tebal 4 mm dengan rangka metal furing Analisa non standar
Bahan : A.4.2.1.20. + A.4.5.1.7.
0.3500 lbr GRC board, tebal 4 mm Rp - Rp -
0.3900 bh Furring Chanel Rp - Rp -
0.2700 bh Top Cross Rail Rp - Rp -
0.0700 btg Wall angle Rp - Rp -
1.6200 bh Connector furring Rp - Rp -
0.8100 bh Suspension clip adjuster Rp - Rp -
0.1400 kg Suspension rod 4 mm Rp - Rp -
0.8100 bh Suspension bracket / bracket Rp - Rp -
0.0200 bag Compound + Calcite Rp - Rp -
0.0200 roll UB tape 75 Lm/roll Rp - Rp -
10.0700 bh Drywall screw 25mm x 083 Rp - Rp - Rp -
Tenaga Kerja :
1.0000 m2 Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 I.22 1 m2 Pemasangan plafond akustik, tebal 12 mm dengan rangka metal furring Analisa non standar
Bahan : A.4.2.1.20. + A.4.5.1.7.
0.3500 lbr Papan gypsum akustik, uk. 1200 x 2400 x 12 mm Rp - Rp -
0.3900 bh Furring channel, tebal 0.40 mm (BMT) Rp - Rp -
0.2700 bh Top cross rail, tebal 0.40 mm (BMT) Rp - Rp -
0.0700 btg Wall angle, tebal 0.40 mm (BMT) Rp - Rp -
1.6200 bh Connector furring, tebal 0.70 mm (TCT) Rp - Rp -
0.8100 bh Suspension clip adjuster, tebal 4 mm Rp - Rp -
0.1400 kg Suspension rod Ø 4 mm Rp - Rp -
0.8100 bh Suspension bracket, tebal 1.2 mm (TCT) Rp - Rp -
Analisa Harga Satuan Pekerjaan 71
0.0200 bag Compound + Calcite Rp - Rp -
0.0200 roll UB tape 75 Lm/roll Rp - Rp -
10.0700 bh Drywall screw 25mm x 083 Rp - Rp - 0
Tenaga Kerja :
1.0000 m2 Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 I.23 1 m2 Pemasangan drop ceiling fiber semen, tebal 4 mm dengan rangka metal furing Analisa non standar
Bahan : A.4.2.1.20. + A.4.5.1.7.
0.3675 lbr GRC board, tebal 4 mm Rp - Rp -
0.4095 bh Furring Chanel Rp - Rp -
0.2835 bh Top Cross Rail Rp - Rp -
0.0735 btg Wall angle Rp - Rp -
1.7010 bh Connector furring Rp - Rp -
0.8505 bh Suspension clip adjuster Rp - Rp -
0.1470 kg Suspension rod 4 mm Rp - Rp -
0.8505 bh Suspension bracket / bracket Rp - Rp -
0.0210 bag Compound + Calcite Rp - Rp -
0.0210 roll UB tape 75 Lm/roll Rp - Rp -
10.5735 bh Drywall screw 25mm x 083 Rp - Rp - Rp -
Tenaga Kerja :
1.0000 m2 Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 I.24 1 m2 Pemasangan Drop ceiling gypsum, tebal 9 mm + rangka metal furing Analisa non standar
Bahan : A.4.2.1.20. + A.4.5.1.7.
0.3675 lbr GRC board, tebal 4 mm Rp - Rp -
0.4095 bh Furring Chanel Rp - Rp -
0.2835 bh Top Cross Rail Rp - Rp -
0.0735 btg Wall angle Rp - Rp -
1.7010 bh Connector furring Rp - Rp -
0.8505 bh Suspension clip adjuster Rp - Rp -
0.1470 kg Suspension rod 4 mm Rp - Rp -
0.8505 bh Suspension bracket / bracket Rp - Rp -
0.0210 bag Compound + Calcite Rp - Rp -
0.0210 roll UB tape 75 Lm/roll Rp - Rp -
10.5735 bh Drywall screw 25mm x 083 Rp - Rp - Rp -
Tenaga Kerja :
1.0000 m2 Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 J.04 1 m2 Homogeneous tile matte, uk. 600 x 600 mm - Tangga Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.13.
1.0500 m2 Homogeneous tile matte, uk. 600 x 600 mm Rp - Rp -
8.1900 kg Semen portland (PC) Rp - Rp -
0.1340 kg Semen warna Rp - Rp -
0.0450 m3 Pasir pasang Rp - Rp - Rp -
Tenaga Kerja :
0.1200 OH Tukang batu Rp - Rp -
0.0120 OH Kepala tukang batu Rp - Rp -
0.2400 OH Pekerja Rp - Rp -
0.0120 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 J.05 1 m2 Homogeneous tile rustic, uk. 600 x 600 mm - Tangga Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.13.
1.0500 m2 Homogeneous tile rustic, uk. 600 x 600 mm Rp - Rp -
8.1900 kg Semen portland (PC) Rp - Rp -
0.1340 kg Semen warna Rp - Rp -
0.0450 m3 Pasir pasang Rp - Rp - Rp -
Tenaga Kerja :
0.1200 OH Tukang batu Rp - Rp -
0.0120 OH Kepala tukang batu Rp - Rp -
0.2400 OH Pekerja Rp - Rp -
0.0120 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 J.06 1 m2 Homogeneous tile matte, uk. 600 x 600 mm - Lantai toilet Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.13.
1.0500 m2 Homogeneous tile matte, uk. 600 x 600 mm Rp - Rp -
8.1900 kg Semen portland (PC) Rp - Rp -
0.1340 kg Semen warna Rp - Rp -
0.0450 m3 Pasir pasang Rp - Rp - Rp -
Tenaga Kerja :
0.1200 OH Tukang batu Rp - Rp -
0.0120 OH Kepala tukang batu Rp - Rp -
0.2400 OH Pekerja Rp - Rp -
0.0120 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 J.07 1 m2 Pekerjaan dinding homogeneous tile, uk. 300 x 600 mm (polished) - Toilet Survey pasar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.53. & A.4.4.3.54.
1.0500 m2 Homogeneous tile, uk. 300 x 600 mm (polished) Rp - Rp -
12.4400 kg Semen portland (PC) Rp - Rp -
0.0250 m3 Pasir pasang Rp - Rp -
0.6500 kg Semen warna Rp - Rp -
0.0758 kg Paku Rp - Rp - Rp -
Tenaga Kerja :
0.4500 OH Tukang batu Rp - Rp -
0.0450 OH Kepala tukang batu Rp - Rp -
Analisa Harga Satuan Pekerjaan 73
0.9000 OH Pekerja Rp - Rp -
0.0450 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 J.09 1 m2 Finishing dinding homogeneous tile, uk. 300 x 600 mm (polished) - Jamb lift Survey pasar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.53. & A.4.4.3.54.
1.0500 m2 Homogeneous tile, uk. 300 x 600 mm (polished) Rp - Rp -
12.4400 kg Semen portland (PC) Rp - Rp -
0.0250 m3 Pasir pasang Rp - Rp -
0.6500 kg Semen warna Rp - Rp -
0.0758 kg Paku Rp - Rp - Rp -
Tenaga Kerja :
0.4500 OH Tukang batu Rp - Rp -
0.0450 OH Kepala tukang batu Rp - Rp -
0.9000 OH Pekerja Rp - Rp -
0.0450 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
9 J.12 1 m' Homogenouse plint, uk. 100 x 600 mm (polished) Survey pasar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.CIPTA KARYA - A.4.4.3.39.
1.6667 bh Plint homogenouse tile, uk. 100 x 600 mm (polished) Rp - Rp -
1.1400 kg Semen portland (PC) Rp - Rp -
0.0030 m3 Pasir pasang Rp - Rp -
0.0500 kg Semen warna Rp - Rp - Rp -
Tenaga Kerja :
0.0900 OH Tukang batu Rp - Rp -
0.0090 OH Kepala tukang batu Rp - Rp -
0.0900 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
0.0170 OH Pekerja 0 0
0.0020 OH Mandor 0 0
Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
K PEKERJAAN PENGECATAN
1 K.01 1 m2 Cat dinding interior A. 4.7.1.10.
Bahan :
0.1000 kg Plamir Rp - Rp -
0.1000 kg Cat dasar dinding interior (1 lapis) Rp - Rp -
0.2600 kg Cat dinding interior (2 lapis) Rp - Rp - Rp -
Tenaga Kerja :
0.0630 OH Tukang cat Rp - Rp -
0.0063 OH Kepala tukang cat Rp - Rp -
0.0200 OH Pekerja Rp - Rp -
0.0025 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
L PEKERJAAN RAILING
GEDUNG UNY PTBB Survey pasar
1 L.11 1 m' Pemasangan Pagar BRC, tinggi 1200 mm Survey pasar
Panjang modul pagar BRC
Bahan :
1.0000 bh Pagar BRC, uk. 1200x2400 mm Rp - Rp -
2.0000 bh Tiang pagar BRC Ø 1-1/2", tinggi 1200 mm Rp - Rp -
6.0000 bh Dynabolt Ø 10 mm Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m1 : Rp -
2 L.13.a 1 m' Pemasangan railing tangga dengan handrail pipa black steel Survey pasar
Modul tangga tipe A - Railing R02, panjang 4.99m
Bahan :
4.9987 m1 Pipa black steel Ø 2", tebal 1.6 mm Rp - Rp -
0.4897 m1 Pipa black steel Ø 1/2", tebal 1.6 mm Rp - Rp -
0.4376 kg Plat besi, tebal 3 mm (finish zinchromate & cat besi) Rp - Rp -
1.6053 m2 Finishing pipa black steel dengan zincromate dan cat besi Rp - Rp -
24.0000 bh Angkur baut Ø 12 mm Rp - Rp -
2.0000 bh End cap pipa stainless steel Ø 2" Rp - Rp -
6.0000 bh Flange bulat Ø 2" daun lebar Rp - Rp -
19.9491 cm Pengelasan Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 78
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m1 : Rp -
3 L.14.a 1 m' Pemasangan railing tangga gedung dengan handrail hollow besi Survey pasar
Modul tangga tipe B - Railing R07, panjang 5.02 m
Bahan :
5.0231 m1 Hollow besi, uk. 30x60x2 mm (finish zinchromate & cat besi) Rp - Rp -
4.8600 m1 Hollow besi, uk. 40x40x2 mm (finish zinchromate & cat besi) Rp - Rp -
4.9333 m1 Hollow besi, uk. 50x50x2 mm (finish zinchromate & cat besi) Rp - Rp -
29.2835 m1 Pipa black steel Ø 1-1/2", tebal 1.6 mm Rp - Rp -
1.4586 kg Plat besi, tebal 3 mm (finish zinchromate & cat besi) Rp - Rp -
0.0536 kg Plat besi, tebal 5 mm (finish zinchromate & cat besi) Rp - Rp -
3.5051 m2 Finishing pipa besi dengan zincromate dan cat besi Rp - Rp -
24.0000 bh Angkur baut Ø 12 mm Rp - Rp -
4.0000 bh Flange kotak, uk. 40x40 mm Rp - Rp -
443.3894 cm Pengelasan Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m1 : Rp -
4 L.15.a 1 m' Pemasangan railing ramp plaza dengan handrail hollow stainless steel Survey pasar
Modul tangga railing plaza - panjang 3.61 m
Bahan :
7.5930 m1 Hollow stainless steel 304, uk. 30x60x1 mm Rp - Rp -
17.8750 m1 Pipa stainless steel 304 Ø 1", tebal 1 mm Rp - Rp -
0.0216 m2 Plat stainless steel, tebal 3 mm Rp - Rp -
0.0375 m2 Plat stainless steel, tebal 5 mm Rp - Rp -
16.0000 bh Angkur baut Ø 12 mm Rp - Rp -
4.0000 bh Flange kotak, uk. 25x75 mm Rp - Rp -
259.3894 cm Pengelasan Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m1 : Rp -
5 L.16.a 1 m' Pemasangan railing tangga grand stair dengan handrail pipa black steel Survey pasar
Modul tangga grand stair - Railing R01, panjang 3.53m
Bahan :
3.5300 m1 Pipa black steel Ø 2", tebal 1.6 mm Rp - Rp -
0.4376 kg Plat besi, tebal 3 mm (finish zinchromate & cat besi) Rp - Rp -
1.1267 m2 Finishing pipa black steel dengan zincromate dan cat besi Rp - Rp -
8.0000 bh Angkur baut Ø 12 mm Rp - Rp -
2.0000 bh Flange bulat Ø 2" daun lebar Rp - Rp -
15.9593 cm Pengelasan Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Harga per m1 : Rp -
2 M.05.03 1 m1 Pemasangan Pipa galvanis medium Ø 1-1/2" (SNI 0039 : 2013) A.5.1.1.22.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.0050 m1 Pipa galvanis medium Ø 1-1/2" (SNI 0039 : 2013) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang batu Rp - Rp -
0.0180 OH Kepala tukang batu Rp - Rp -
0.1080 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.05.04 1 m1 Pemasangan Pipa galvanis medium Ø 2" (SNI 0039 : 2013) A.5.1.1.22.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.0050 m1 Pipa galvanis medium Ø 2" (SNI 0039 : 2013) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang batu Rp - Rp -
0.0180 OH Kepala tukang batu Rp - Rp -
0.1080 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.05.06 1 m1 Pemasangan Pipa galvanis medium Ø 3" (SNI 0039 : 2013) A.5.1.1.23.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.0050 m1 Pipa galvanis medium Ø 3" (SNI 0039 : 2013) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2250 OH Tukang batu Rp - Rp -
0.0230 OH Kepala tukang batu Rp - Rp -
0.1350 OH Pekerja Rp - Rp -
0.0070 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.06.4 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 1-1/4" (32 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA - A.5.1.1.21.
1.0000 m1 Pipa black steel SCH. 40 Ø 1-1/4" (32 mm) Rp - Rp -
0.1571 m2 Finishing cat zinchromate & cat besi Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0900 OH Tukang besi Rp - Rp -
0.0090 OH Kepala tukang besi Rp - Rp -
0.0540 OH Pekerja Rp - Rp -
0.0270 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.06.5 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 1-1/2" (40 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA - A.5.1.1.22.
1.0000 m1 Pipa black steel SCH. 40 Ø 1-1/2" (40 mm) Rp - Rp -
0.1571 m2 Finishing cat zinchromate & cat besi Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang besi Rp - Rp -
0.0180 OH Kepala tukang besi Rp - Rp -
0.1080 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 M.06.6 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 2" (50 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA - A.5.1.1.22.
1.0000 m1 Pipa black steel SCH. 40 Ø 2" (50 mm) Rp - Rp -
0.1571 m2 Finishing cat zinchromate & cat besi Rp - Rp -
0.7500 unit Penggantung pipa (hanger clamp) Ø 2" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.9248 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang besi Rp - Rp -
0.0180 OH Kepala tukang besi Rp - Rp -
0.1080 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 M.06.7 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 2-1/2" (65 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA - A.5.1.1.22.
1.0000 m1 Pipa black steel SCH. 40 Ø 2-1/2" (65 mm) Rp - Rp -
0.1571 m2 Finishing cat zinchromate & cat besi Rp - Rp -
0.7500 unit Penggantung pipa (hanger clamp) Ø 2-1/2" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.9248 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang besi Rp - Rp -
0.0180 OH Kepala tukang besi Rp - Rp -
0.1080 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 85
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 M.06.8 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 3" (75 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA - A.5.1.1.22.
1.0000 m1 Pipa black steel SCH. 40 Ø 3" (75 mm) Rp - Rp -
0.1571 m2 Finishing cat zinchromate & cat besi Rp - Rp -
0.7500 unit Penggantung pipa (hanger clamp) Ø 3" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.9248 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang besi Rp - Rp -
0.0180 OH Kepala tukang besi Rp - Rp -
0.1080 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 M.06.9 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 4" (100 mm) A.5.1.1.24.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.0000 m1 Pipa black steel SCH. 40 Ø 4" (100 mm) Rp - Rp -
0.3142 m2 Finishing cat zinchromate & cat besi Rp - Rp -
0.7500 unit Penggantung pipa (hanger clamp) Ø 4" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.9248 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.2250 OH Tukang besi Rp - Rp -
0.0230 OH Kepala tukang besi Rp - Rp -
0.1350 OH Pekerja Rp - Rp -
0.0070 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
9 M.06.10 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 6" (150 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - 4.1.36.(c)
1.0000 m1 Pipa black steel SCH. 40 Ø 6" (150 mm) Rp - Rp -
0.3142 m2 Finishing cat zinchromate & cat besi Rp - Rp -
0.7500 unit Penggantung pipa (hanger clamp) Ø 6" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.9248 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Peralatan :
0.0040 hari Tripod / tackel (sewa) Rp - Rp - Rp -
Tenaga Kerja :
0.2530 OH Tukang besi Rp - Rp -
0.5060 OH Pekerja Rp - Rp -
0.0510 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
10 M.06.11 1 m1 Pemasangan Pipa black steel SCH. 40 Ø 8" (200 mm) Analisa standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - 4.1.37.(c)
1.0000 m1 Pipa black steel SCH. 40 Ø 8" (200 mm) Rp - Rp -
0.3142 m2 Finishing cat zinchromate & cat besi Rp - Rp -
0.7500 unit Penggantung pipa (hanger clamp) Ø 8" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.9248 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Peralatan :
0.0040 hari Tripod / tackel (sewa) Rp - Rp - Rp -
Tenaga Kerja :
0.3980 OH Tukang besi Rp - Rp -
0.7960 OH Pekerja Rp - Rp -
0.0800 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Analisa Harga Satuan Pekerjaan 86
Jumlah harga : Rp -
2 M.11.05 1 m1 Pemasangan Hollow besi, uk. 40 x 40 x 2 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 40 x 40 x 2 mm Rp - Rp -
0.1680 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.11.06 1 m1 Pemasangan Hollow besi, uk. 40 x 40 x 1.2 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 40 x 40 x 1.2 mm Rp - Rp -
0.1680 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
Analisa Harga Satuan Pekerjaan 87
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.11.07 1 m1 Pemasangan Hollow besi, uk. 50 x 50 x 1.6 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 50 x 50 x 1.6 mm Rp - Rp -
0.1680 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 M.11.08 1 m1 Pemasangan Hollow besi, uk. 30 x 60 x 2 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 30 x 60 x 2 mm Rp - Rp -
0.1680 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 M.11.09 1 m1 Pemasangan Hollow besi, uk. 50 x 50 x 2 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 50 x 50 x 2 mm Rp - Rp -
0.1680 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 M.11.11 1 m1 Pemasangan Hollow besi, uk. 75 x 150 x 3 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 75 x 150 x 3 mm Rp - Rp -
0.1680 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 M.11.12 1 m1 Pemasangan Hollow besi, uk. 50 x 50 x 3 mm (Finishing cat zincromate & cat besi) Survey pasar
Bahan :
1.0050 m1 Hollow besi, uk. 50 x 50 x 3 mm Rp - Rp -
0.2010 m2 Finishing cat zincromate & cat besi Rp - Rp -
2.0000 cm Pengelasan 20 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang besi / Tukang las Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0030 OH Mandor Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 88
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 M.12.01.1 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 1" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 1" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.12.01.1.a 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 1-1/4" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 1-1/4" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.12.01.2 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 1-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 1-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 M.12.01.3 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 2" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 M.12.01.4 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 2-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 2-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 M.12.01.5 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 3" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 3" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 89
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 M.12.01.6 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 4" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 4" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
9 M.12.01.7 1 bh Pemasangan Fitting las elbow 90 deg. Sch. 40 Ø 6" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 90 deg. Sch. 40 Ø 6" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 M.12.02.1 1 bh Pemasangan Fitting las elbow 45 deg. Sch. 40 Ø 2-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 45 deg. Sch. 40 Ø 2-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.12.02.2 1 bh Pemasangan Fitting las elbow 45 deg. Sch. 40 Ø 3" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 45 deg. Sch. 40 Ø 3" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.12.02.3 1 bh Pemasangan Fitting las elbow 45 deg. Sch. 40 Ø 6" Survey pasar
Bahan :
1.0000 bh Fitting las elbow 45 deg. Sch. 40 Ø 6" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 M.12.03.4 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 1 - 1/2" x 1" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 1 - 1/2" x 1" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.12.03.4.a 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 1 - 1/2" x 1-1/4" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 1 - 1/2" x 1-1/4" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.12.03.5 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 2" x 1" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 2" x 1" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 M.12.03.5.a 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 2" x 1-1/4" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 2" x 1-1/4" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 M.12.03.5.b 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 2" x 1-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 2" x 1-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 M.12.03.6 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 2-1/2" x 2" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 2-1/2" x 2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 M.12.03.7 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 3" x 2-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 3" x 2-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Analisa Harga Satuan Pekerjaan 91
Jumlah harga : Rp -
9 M.12.03.8 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 4" x 2-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 4" x 2-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
10 M.12.03.9 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 6" x 1-1/2" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 6" x 1-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
11 M.12.03.9.a 1 bh Pemasangan Fitting las reducer Sch. 40 Ø 6" x 4" Survey pasar
Bahan :
1.0000 bh Fitting las reducer Sch. 40 Ø 6" x 4" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.13.01.9 1 unit Pemasangan Check valve flange end PN-16 Ø 6" Analisa Standar
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.I BID.UMUM - 4.3.1.(c)
1.0000 unit Check valve flange end PN-16 Ø 6" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.7150 OH Tukang batu Rp - Rp -
1.4290 OH Pekerja Rp - Rp -
0.1430 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 M.13.03.9 1 bh Pemasangan Gate valve flange end PN-16 Ø 4" Survey pasar
Bahan :
1.0000 bh Gate valve flange end PN-16 Ø 4" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1000 OH Tukang batu Rp - Rp -
0.0100 OH Pekerja Rp - Rp -
0.0100 OH Kepala tukang batu Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 M.13.04.1 1 bh Pemasangan Butterfly valve gear flange end PN-16 Ø 2-1/2" Survey pasar
Bahan :
1.0000 bh Butterfly valve gear flange end PN-16 Ø 2-1/2" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1000 OH Tukang batu Rp - Rp -
0.0100 OH Pekerja Rp - Rp -
0.0100 OH Kepala tukang batu Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.13.04.2 1 unit Pemasangan Butterfly valve gear flange end PN-16 Ø 3" Survey pasar
Bahan :
1.0000 unit Butterfly valve gear flange end PN-16 Ø 3" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 M.13.04.4 1 unit Pemasangan Butterfly valve gear flange end PN-16 Ø 6" Survey pasar
Bahan :
1.0000 unit Butterfly valve gear flange end PN-16 Ø 6" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 97
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 M.13.04.5 1 unit Pemasangan Butterfly valve gear flange end PN-16 Ø 8" Survey pasar
Bahan :
1.0000 unit Butterfly valve gear flange end PN-16 Ø 8" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
1 M.13.08.1 1 unit Pemasangan Flange PN-16 Ø 2" c/w gasket ANSI 150 Survey pasar
Bahan :
1.0000 unit Flange PN-16 Ø 2" c/w gasket ANSI 150 Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Analisa Harga Satuan Pekerjaan 98
2 M.13.08.3 1 unit Pemasangan Flange PN-16 Ø 4" c/w gasket ANSI 150 Survey pasar
Bahan :
1.0000 unit Flange PN-16 Ø 4" c/w gasket ANSI 150 Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.13.08.4 1 unit Pemasangan Flange PN-16 Ø 6" c/w gasket ANSI 150 Survey pasar
Bahan :
1.0000 unit Flange PN-16 Ø 6" c/w gasket ANSI 150 Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 M.13.11.6 1 unit Pemasangan Flexible joint flange end PN16 Ø 6" Survey pasar
Bahan :
1.0000 unit Flexible joint flange end PN16 Ø 6" Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 M.13.11.7 1 unit Pemasangan Flexible joint flange end PN16 Ø 8" Survey pasar
Bahan :
1.0000 unit Flexible joint flange end PN16 Ø 8" Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Analisa Harga Satuan Pekerjaan 99
M.13.12 PEKERJAAN MAIN CONTROL VALVE
1 M.13.12.1 1 set Pemasangan Main control valve Ø 6" Survey pasar
Bahan :
1.0000 set Main control valve Ø 6" Rp - Rp -
OS&Y Gate Valve Flange End (Fig. No.: 3299)
Wet Alarm Valve c/w basic trimming (Fig. AV-1-300)
Retard Chamber (Fig RC-1)
Alarm Gong (Fig. WMA-1) Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 M.13.14.4 1 unit Pemasangan Flow meter flange end Ø 6" Survey pasar
Bahan :
1.0000 unit Flow meter flange end Ø 6" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 M.14.05 1 unit Pemasangan Union joint / female union Ø 1" Survey pasar
Bahan :
1.0000 unit Union joint / female union Ø 1" Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Analisa Harga Satuan Pekerjaan 101
Jumlah harga : Rp -
2 M.15.20 1 set Klem pipa multi dengan Besi Kanal Survey pasar
Bahan :
2.8080 kg Besi kanal, uk. 100x50x5x7.5 mm (finish zinchromate) Rp - Rp -
0.3060 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
3.0000 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
13 N.13 1 unit Pemasangan Kaca cermin tebal 5 mm, Uk. 600 x 900 mm A.4.6.2.20.
Analisa harga satuan :
0.5400 m2 Kaca cermin, tebal 5 mm Rp - Rp - Rp -
Bahan :
4.0000 bh Baut Akrilik Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 O.01.02.1 1 set Pemasangan Pompa transfer (head/debit : 40 m/ 2x150 lpm) Survey pasar
Bahan :
1.0000 set Pompa transfer (head/debit : 40 m/ 2x150 lpm) Rp - Rp -
Terdiri dari 2 pompa
Include Panel Kontrol
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 O.01.03 1 paket Pemasangan Pompa booster (head/debit : 12 m/2x85 lpm) Survey pasar
Bahan :
1.0000 paket Pompa booster (head/debit : 12 m/2x85 lpm) Rp - Rp -
Terdiri dari 2 pompa
Include Panel Kontrol
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 O.01.08 1 set Pemasangan Pompa sump pit (Debit/head : 300 lpm / 8 m) Survey pasar
Bahan :
1.0000 set Pompa sump pit (Debit/head : 300 lpm / 8 m) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 O.01.09 1 set Pemasangan Pompa bak penampung air hujan (Debit/head : 150 lpm / 8 m) Survey pasar
Bahan :
1.0000 set Pompa bak penampung air hujan (Debit/head : 150 lpm / 8 m) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 O.02.02 1 unit Pemasangan Electric fire pump (head/debit : 110 m / 750 USGpm) Survey pasar
Bahan :
1.0000 unit Electric fire pump (head/debit : 110 m / 750 USGpm) Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 O.02.03 1 unit Pemasangan Jockey pump (head/debit : 110 m / 25 USGpm) Survey pasar
Bahan :
1.0000 unit Jockey pump (head/debit : 110 m / 25 USGpm) Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
P PEKERJAAN SALURAN
1 P.07 1 unit Bak kontrol Survey pasar
Bahan :
1.2100 m3 Galian tanah sedalam 1 meter Rp - Rp -
0.2420 m3 Galian tanah sedalam 2 meter Rp - Rp -
0.1210 m3 Urugan pasir, tebal 100 mm Rp - Rp -
0.0810 m3 Rabat beton, tebal 100 mm Rp - Rp -
0.1350 m3 Cor kosong Rp - Rp -
0.4400 m3 Timbunan tanah atau urugan tanah kembali (tanah urug bekas g Rp - Rp -
0.0563 m3 Plat beton, tebal 100 mm Rp - Rp -
2.4000 m2 Pas. Dinding 1/2 bata merah (Camp. 1 PC : 3 PS) Rp - Rp -
2.4000 m2 Plesteran dinding, tebal 15 mm (Camp. 1 PC : 3 PS) Rp - Rp -
2.4000 m2 Acian dinding bata merah Rp - Rp -
0.4069 kg Pengait - Besi Ø8 mm Rp - Rp - Rp -
Rp -
Jumlah harga : Rp -
4 R.27 1 unit Pemasangan Transformator 630 kVA, 24kV / 400V / YnYn0 Survey pasar
Bahan :
1.0000 unit Transformator 630 kVA, 24kV / 400V / YnYn0 Rp - Rp -
1.0000 set Endplate kiri dan kanan Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
S PEKERJAAN PENGKABELAN
S.01 KABEL NYY
1 S.01.00 1 m1 Penarikan Kabel NYY 1 x 70 mm2 Survey pasar
Bahan :
1.0000 m1 Kabel NYY 1 x 70 mm2 Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0250 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
0.01
OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
0.025
OH Pekerja Rp - Rp -
0.0125 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
0.05
OH Pekerja Rp - Rp -
0.0250 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
0.1
OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Analisa Harga Satuan Pekerjaan 109
8 S.01.14 1 m1 Penarikan Kabel NYY 4 x 150 mm² Survey pasar
Bahan :
1.0000 m1 Kabel NYY 4 x 150 mm² Rp - Rp -
1.0000 m1 Pipa conduit PVC 20 mm Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2250 OH Tukang listrik Rp - Rp -
0.1500 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 S.05.3 1 m1 Penarikan Kabel fiber optic single mode 12 core Survey pasar
Bahan :
1.0000 m1 Kabel fiber optic single mode 12 core Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Tukang listrik Rp - Rp -
0.05
OH Pekerja Rp - Rp -
0.0250 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 S.05.5 1 bh Penarikan Kabel patchcord fiber optic singlemode SC-LC, panjang 5 meter Survey pasar
Bahan :
1.0000 bh Kabel patchcord fiber optic singlemode SC-LC, panjang 5 meter Rp - Rp - Rp -
Tenaga Kerja :
0.0375 OH Tukang listrik Rp - Rp -
0.0250 OH Pekerja Rp - Rp -
0.0125 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
S.06
Kabel Fire Resistance Cabel (FRC)
1 S.06.0 1 m1 Penarikan Kabel FRC 2 x 1.5 mm2 Survey pasar
Bahan :
1.0000 m1 Kabel FRC 2 x 1.5 mm2 Rp - Rp -
1.0000 m1 Pipa conduit PVC 20mm² Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0150 OH Tukang listrik Rp - Rp -
0.0100 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 T.01.2 1 Titik instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² Survey pasar
Bahan :
10.0000 m1 Kabel NYM 3 x 2.5 mm Rp - Rp -
10.0000 m1 Pipa conduit PVC 20mm² Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1500 OH Tukang listrik Rp - Rp -
0.1000 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 T.01.5 1 Titik instalasi penerangan dengan kabel NYY 2 x 2.5 mm² Survey pasar
Bahan :
15.0000 m1 Kabel NYY 2 x 2.5 mm Rp - Rp -
15.0000 m1 Pipa conduit PVC 20mm² Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2250 OH Tukang listrik Rp - Rp -
0.1500 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
T.02
PERANGKAT PENERANGAN / LAMPU
1 T.02.0 1 bh Pemasangan LED Panel 600 x 600 mm 40 W Ceiling Survey pasar
Bahan :
1.0000 bh LED Panel 600 x 600 mm 40 W Ceiling Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Tukang listrik Rp - Rp -
0.0750 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 T.02.4a 1 bh Pemasangan Armature downlight inbow Ø 5" + LED bulb emergency 9 watt Survey pasar
Bahan :
1.0000 bh Armature downlight inbow Ø 5" Rp - Rp -
Analisa Harga Satuan Pekerjaan 115
1.0000 bh LED bulb emergency 9 watt Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Pekerja listrik Rp - Rp -
0.0750 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 T.02.5a 1 bh Pemasangan Armature downlight outbow Ø 5" + LED bulb emergency 9 watt Survey pasar
Bahan :
1.0000 bh Armature downlight outbow Ø 5"
Rp - Rp -
1.0000 bh LED bulb emergency 9 watt Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Pekerja listrik Rp - Rp -
0.0750 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 T.02.8 1 bh Pemasangan Lampu exit LED 2 sisi (inc. nicad baterai) Survey pasar
Bahan :
1.0000 bh Lampu exit LED 2 sisi (inc. nicad baterai) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Tukang listrik Rp - Rp -
0.0750 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
8 T.02.9 1 bh Pemasangan LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K, panjang 1.5 m Survey pasar
Bahan :
1.5000 m' LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K Rp - Rp -
1.0000 bh LED Transformer 60W 24VDC Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2000 OH Tukang listrik Rp - Rp -
0.2000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
9 T.02.10 1 bh Pemasangan LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K, panjang 2.414 m Survey pasar
Bahan :
2.4140 m' LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K Rp - Rp -
1.0000 bh LED Transformer 60W 24VDC Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2000 OH Tukang listrik Rp - Rp -
0.2000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Analisa Harga Satuan Pekerjaan 116
10 T.02.11 1 bh Pemasangan LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K, panjang 2.574 m Survey pasar
Bahan :
2.5740 m' LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K Rp - Rp -
1.0000 bh LED Transformer 60W 24VDC Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2000 OH Tukang listrik Rp - Rp -
0.2000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
11 T.02.12 1 bh Pemasangan LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K, panjang 3.695 m Survey pasar
Bahan :
3.6950 m' LED Strip Outdoor 5050 IP65 7.2 W/m 3000 K Rp - Rp -
1.0000 bh LED Transformer 60W 24VDC Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2000 OH Tukang listrik Rp - Rp -
0.2000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
12 T.02.16 1 unit PJU Single LED 70 W Solar + tiang lampu 1 lengan tinggi 7 m Survey pasar
Bahan : A. 6.1.1. (iii.27)
1.0000 bh LED Street Light 40 W Solar Panel Rp - Rp -
1.0000 bh Tiang PJU pipa bulat, tinggi 7 m 1 lengan Rp - Rp -
1.0000 ls Material bantu Rp - Rp -
0.6400 m3 Galian pondasi Rp - Rp -
0.5120 m3 Pasangan batu kali Rp - Rp -
0.1280 m3 Cor Beton 1pcc : 3ps : 5kr Rp - Rp -
4.0000 bh Angkur baut Ø 19 mm Rp - Rp -
32.3351 kg Plat Rib t = 8 mm Rp - Rp -
20.7216 kg Plat Plendes 16 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0750 OH Tukang listrik Rp - Rp -
0.0750 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 U.02.02 1 bh Pemasangan Kotak kontak lantai data RJ.45 Cat. 6 Survey pasar
Bahan :
1.0000 bh Kotak kontak lantai data RJ.45 Cat. 6 Rp - Rp -
(Inbowdos menjadi satu dengan kotak kontak lantai)
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 U.03.13 1 unit Pemasangan Uninterruptible Power Supply (UPS) 1200 VA Survey pasar
Bahan :
1.0000 unit Uninterruptible Power Supply (UPS) 1200 VA Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 U.03.14 1 unit Pemasangan Access switch CCTV 16 Port PoE Survey pasar
Bahan :
1.0000 unit Access switch CCTV 16 Port PoE Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
W PEKERJAAN TELEPON
W.01 PEKERJAAN INSTALASI
1 W.01.01 1 Titik Instalasi Telephone dengan Kabel ITC 1 x 2 x 0.6 mm2 Survey pasar
Bahan :
30.0000 m1 Kabel ITC 1 x 2 x 0.6 mm2 Rp - Rp -
30.0000 m1 Pipa conduit PVC 20mm² Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.4500 OH Tukang listrik Rp - Rp -
0.3000 OH Pekerja Rp - Rp -
0.1500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 X.02 1 unit Pemasangan Wall mount rack 6U, uk. 450 (D) x 600 (W) x 340 (H) mm Survey pasar
Bahan :
1.0000 unit Wall mount rack 6U, uk. 450 (D) x 600 (W) x 340 (H) mm Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
1 X.04 1 set Pemasangan Cabinet Rack Sound System 21U Survey pasar
Bahan :
1.0000 set Cabinet Rack Sound System 21U Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
Analisa Harga Satuan Pekerjaan 124
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 Z.01.02 1 Titik Instalasi attenuator dengan kabel NYMHY 3 x 1.5 mm Survey pasar
Bahan :
15.0000 m1 Kabel NYMHY 3x1,5mm Rp - Rp -
15.0000 m1 Pipa Conduit PVC 20mm Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1800 OH Tukang listrik Rp - Rp -
0.1200 OH Pekerja Rp - Rp -
0.0600 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
11 Z.03.10 1 unit Pemasangan Wireless Set (Dual Lavalier And Handheld) Survey pasar
Bahan :
1.0000 unit Wireless Set (Dual Lavalier And Handheld) Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
13 Z.03.12 1 set Pemasangan Flight Case 16U w/ Acc & Squencer Survey pasar
Bahan :
1.0000 set Flight Case 16U w/ Acc & Squencer Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Analisa Harga Satuan Pekerjaan 128
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 AA.04 1 set Pemasangan grounding rod Ø 5/8 lengkap dengan clamp, coupler, driving stud dan drill head Survey pasar
Bahan :
1.0000 bh Driving stud Ø 5/8 (baja) Rp - Rp -
3.0000 btg Copper rod tembaga Ø 5/8", panjang 2 m Rp - Rp -
2.0000 bh Clamp tembaga Ø 5/8" Rp - Rp -
3.0000 bh Coupler/connector tembaga Ø 5/8" Rp - Rp -
1.0000 bh Drill head Ø 5/8" (baja) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang dan instalasi Rp - Rp - Rp -
Jumlah : Rp -
Analisa Harga Satuan Pekerjaan 129
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 AB.03.05 1 unit Pemasangan Rate of rise heat detector (konvensional) Survey pasar
Bahan :
1.0000 unit Rate of rise heat detector (konvensional) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan 130
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 AB.03.07 1 unit Manual Call Point lengkap dengan back box Survey pasar
Bahan :
1.0000 unit Manual Call Point lengkap dengan back box Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 AC.01.03 1 unit Pemasangan Outdoor hydrant box, uk. 660 (W) x 950 (H) x 200 (D) mm Survey pasar
Bahan :
1.0000 unit Outdoor hydrant box, uk. 660 (W) x 950 (H) x 200 (D) mm Rp - Rp -
1.0000 unit Fire hose Ø 2.5" x 30 meter Rp - Rp -
1.0000 unit Hose nozle Ø 2.5" Rp - Rp -
0.1728 m3 Pondasi - Cor kosong (camp. 1pc : 3ps : 5kr) Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang dan instalasi Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 AC.01.04 1 unit Pemasangan Indoor hydrant box, uk. 750 (W) x 1250 (H) x 180 (D) mm Survey pasar
Bahan :
1.0000 unit Indoor hydrant box, uk. 750 (W) x 1250 (H) x 180 (D) mm Rp - Rp -
1.0000 unit Fire hose Ø 1.5" x 30 meter Rp - Rp -
1.0000 unit Hose nozle Ø 1.5" Rp - Rp -
1.0000 unit Hose rack Ø 1.5" Rp - Rp -
1.0000 unit Hydrant valve Ø 2.5" Rp - Rp -
1.0000 unit Hydrant valve Ø 1.5" Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang dan instalasi Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 AE.02.3 1 unit Pemasangan Indoor unit air conditioner wall mounted, kap. 9.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner wall mounted, kap. 9.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit wall mounted Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
4 AE.02.4 1 unit Pemasangan Indoor unit air conditioner wall mounted, kap. 12.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner wall mounted, kap. 12.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit wall mounted Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
5 AE.02.5 1 unit Pemasangan Indoor unit air conditioner wall mounted, kap. 15.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner wall mounted, kap. 15.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit wall mounted Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
6 AE.02.6 1 unit Pemasangan Indoor unit air conditioner wall mounted, kap. 18.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner wall mounted, kap. 18.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit wall mounted Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
7 AE.02.7 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 28.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner 4 way cassette, kap. 28.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit 4-way ceiling cassette Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
9 AE.02.9 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 42.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner 4 way cassette, kap. 42.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit 4-way ceiling cassette Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
10 AE.02.10 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 48.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner 4 way cassette, kap. 48.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit 4-way ceiling cassette Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
11 AE.02.11 1 unit Pemasangan Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor unit 4-way ceiling cassette Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
12 AE.02.12 1 unit Pemasangan Indoor unit air conditioner split duct, kap. 28.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner split duct, kap. 28.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor split duct Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
13 AE.02.13 1 unit Pemasangan Indoor unit air conditioner cassette ceiling round 360°, kap. 36.000 Btu/H Survey pasar
Bahan :
1.0000 unit Indoor unit air conditioner cassette ceiling round 360°, kap. 36. Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Instalasi dan pemasangan indoor cassette ceiling round Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
2 AE.03.3 1 unit Pemasangan Outdoor unit, kap. 229.300 Btu/H Survey pasar
Bahan :
1.0000 unit Outdoor unit, kap. 229.300 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang outdoor unit Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
3 AE.03.4 1 unit Pemasangan Outdoor unit, kap. 248.400 Btu/H Survey pasar
Bahan :
1.0000 unit Outdoor unit, kap. 248.400 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang outdoor unit Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
4 AE.03.5 1 unit Pemasangan Outdoor unit, kap. 305.700 Btu/H Survey pasar
Bahan :
1.0000 unit Outdoor unit, kap. 305.700 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang outdoor unit Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
5 AE.03.6 1 unit Pemasangan Outdoor unit, kap. 343.900 Btu/H Survey pasar
Bahan :
1.0000 unit Outdoor unit, kap. 343.900 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang outdoor unit Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
Analisa Harga Satuan Pekerjaan 138
6 AE.03.7 1 unit Pemasangan Outdoor unit, kap. 363.000 Btu/H Survey pasar
Bahan :
1.0000 unit Outdoor unit, kap. 363.000 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang outdoor unit Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
7 AE.03.8 1 unit Pemasangan Outdoor unit, kap. 401.300 Btu/H Survey pasar
Bahan :
1.0000 unit Outdoor unit, kap. 401.300 Btu/H Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang outdoor unit Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
2 AE.04.2 1 unit Pemasangan Wired remocon / wired remote controller Survey pasar
Bahan :
1.0000 unit Wired remocon / wired remote controller Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang wired remocon / wired remote controller Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Jumlah harga : Rp -
4 AE.04.4 1 unit Pemasangan Percabangan pipa reffrigerant (Refnet joint / Y-Branch) Survey pasar
Bahan :
1.0000 unit Percabangan pipa reffrigerant (Refnet joint / Y-Branch) Rp - Rp -
Include material bantu (unit hanger + accessories) Rp -
Jumlah harga unit : Rp -
Tenaga Kerja :
1.0000 ls Upah pasang percabangan pipa reffrigerant (Refnet joint / Y-Bra Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga instalasi: Rp -
Analisa Harga Satuan Pekerjaan 139
Jumlah harga : Rp -
2 AE.05.3 1 m1 Pemasangan Pipa refrigerant Ø 9.58 mm (3/8") + Isolasi Ø 9.58 mm, tebal 13 mm A.5.1.1.25.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m1 Pipa refrigerant Ø 9.58 mm (3/8") Rp - Rp -
1.2000 m1 Isolasi Ø 9.58 mm, tebal 13 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - Rp -
Klem :
0.7500 unit Klem pipa Ø 1/2" Rp - Rp -
0.0107 kg Paku 5 cm - 12 cm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 AE.05.4 1 m1 Pemasangan Pipa refrigerant Ø 12.7 mm (1/2") + Insulasi Ø 12.7 mm, tebal 13 mm A.5.1.1.25.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m1 Pipa refrigerant Ø 12.7 mm (1/2") Rp - Rp -
Analisa Harga Satuan Pekerjaan 140
1.2000 m1 Insulasi Ø 12.7 mm, tebal 13 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - Rp -
Klem :
0.7500 unit Klem pipa Ø 1/2" Rp - Rp -
0.0107 kg Paku 5 cm - 12 cm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 AE.05.5 1 m1 Pemasangan Pipa refrigerant Ø 15.88 mm (5/8") + Insulasi Ø 15.88 mm, tebal 19 mm A.5.1.1.25.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m1 Pipa refrigerant Ø 15.88 mm (5/8") Rp - Rp -
1.2000 m1 Insulasi Ø 15.88 mm, tebal 19 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - Rp -
Klem :
0.7500 unit Klem pipa Ø 1/2" Rp - Rp -
0.0107 kg Paku 5 cm - 12 cm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 AE.05.6 1 m1 Pemasangan Pipa refrigerant Ø 19.05 mm (3/4") + Insulasi Ø 19.05 mm, tebal 19 mm A.5.1.1.25.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m1 Pipa refrigerant Ø 19.05 mm (3/4") Rp - Rp -
1.2000 m1 Insulasi Ø 19.05 mm, tebal 19 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - Rp -
Klem :
0.7500 unit Penggantung pipa (hanger clamp) Ø 1" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.4624 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 AE.05.7 1 m1 Pemasangan Pipa refrigerant Ø 22.2 mm (7/8") + Insulasi Ø 22.2 mm, tebal 19 mm A.5.1.1.26.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m1 Pipa refrigerant Ø 22.2 mm (7/8") Rp - Rp -
1.2000 m1 Insulasi Ø 22.2 mm, tebal 19 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - Rp -
Penggantung :
0.7500 unit Penggantung pipa (hanger clamp) Ø 1" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.4624 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
7 AE.05.8 1 m1 Pemasangan Pipa refrigerant Ø 28.58 mm (1-1/8") + Insulasi Ø 28.58 mm, tebal 19 mm A.5.1.1.27.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m1 Pipa refrigerant Ø 28.58 mm (1-1/8") Rp - Rp -
Analisa Harga Satuan Pekerjaan 141
1.2000 m1 Insulasi Ø 28.58 mm, tebal 19 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - Rp -
Penggantung :
0.7500 unit Penggantung pipa (hanger clamp) Ø 1" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.4624 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : 0
Profit & overhead : 10.00% 0
Jumlah harga : 0
8 AE.05.9 1 m1 Pemasangan Pipa refrigerant Ø 34.9 mm (1-3/8") + Insulasi Ø 34.9 mm, tebal 19 mm A.5.1.1.27.
9 AE.05.10 1 m1 Pemasangan Pipa refrigerant Ø 41.3 mm (1-5/8") + Insulasi Ø 41.3 mm, tebal 19 mm A.5.1.1.27.
Bahan : PERMEN PUPR NO.01 TAHUN 2022 / BAG.IV BID.CIPTA KARYA
1.2000 m
1
Pipa refrigerant Ø 41.3 mm (1-5/8") Rp - Rp -
1.2000 m
1
Insulasi Ø 41.3 mm, tebal 19 mm Rp - Rp -
1.0000 ls Fitting Rp - Rp - 0
Penggantung :
0.7500 unit Penggantung pipa (hanger clamp) Ø 1" Rp - Rp -
0.1148 kg Besi siku, uk. 50x50x5 mm (finish zinchromate) Rp - Rp -
0.4624 kg Suspension rod besi Ø 10 mm Rp - Rp -
0.7500 bh Dynabolt Ø 10 mm Rp - Rp - Rp -
Tenaga Kerja :
0.0600 OH Tukang batu Rp - Rp -
0.0060 OH Kepala tukang batu Rp - Rp -
0.0360 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - 0
Jumlah : 0
Profit & overhead : 10.00% 0
Jumlah harga : 0
4 AE.08.4 1 m' Pemasangan Kabel Duct uk. 100 x 150 mm Survey pasar
Bahan :
Analisa Harga Satuan Pekerjaan 143
1.0000 m' Kabel Duct uk. 100 x 150 mm
Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 AE.09.4 1 bh Pemasangan Exhaust air grille (EAG), uk. 300 x 300 mm (12 x 12") Survey pasar
Bahan :
1.0000 bh Exhaust air grille (EAG), uk. 300 x 300 mm (12 x 12") Rp - Rp -
1.0000 ls Material bantu / Perlengkapan air grille Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 AE.09.10 1 bh Pemasangan Fresh air grille (FAG), uk. 300 x 300 mm (12 x 12") Survey pasar
Bahan :
1.0000 bh Fresh air grille (FAG), uk. 300 x 300 mm (12 x 12") Rp - Rp -
1.0000 ls Material bantu / Perlengkapan air grille Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 AE.09.12 1 bh Pemasangan Fresh air grille (FAG), uk. 400 x 400 mm (16 x 16") Survey pasar
Bahan :
1.0000 bh Fresh air grille (FAG), uk. 400 x 400 mm (16 x 16") Rp - Rp -
1.0000 ls Material bantu / Perlengkapan air grille Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 AE.09.13 1 bh Pemasangan Fresh air grille (FAG), uk. 450 x 450 mm (18 x 18") Survey pasar
Bahan :
1.0000 bh Fresh air grille (FAG), uk. 450 x 450 mm (18 x 18") Rp - Rp -
1.0000 ls Material bantu / Perlengkapan air grille Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 AE.09.15 1 bh Pemasangan Fresh air grille (FAG), uk. 800 x 800 mm (32 x 32") Survey pasar
Bahan :
1.0000 bh Fresh air grille (FAG), uk. 800 x 800 mm (32 x 32") Rp - Rp -
1.0000 ls Material bantu / Perlengkapan air grille Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 AE.09.16 1 bh Pemasangan Fresh air grille (FAG), uk. 1000 x 600 mm (40 x 24") Survey pasar
Bahan :
1.0000 bh Fresh air grille (FAG), uk. 1000 x 600 mm (40 x 24") Rp - Rp -
Analisa Harga Satuan Pekerjaan 144
1.0000 ls Material bantu / Perlengkapan air grille Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
2 AE.10.2 1 Titik instalasi axial fan dengan kabel NYM 3 x 2.5 mm² Survey pasar
Bahan :
15.0000 m1 Kabel NYM 3 x 2.5 mm Rp - Rp -
15.0000 m1 Pipa conduit PVC 20mm² Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2250 OH Tukang listrik Rp - Rp -
0.1500 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
3 AE.10.8 1 unit Pemasangan Axial Fan 20" 3150 CMH 2200 W Survey pasar
Bahan :
1.0000 unit Axial Fan 20" 3150 CMH 2200 W Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
4 AE.10.9 1 unit Pemasangan Exhaust fan Sirocco 10" 180 CMH 19 W Survey pasar
Bahan :
1.0000 unit Exhaust fan Sirocco 10" 180 CMH 19 W Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
5 AE.10.13 1 unit Pemasangan Wall exhaust fan 14" 3110 CMH 150 W Survey pasar
Bahan :
1.0000 unit Wall exhaust fan 14" 3110 CMH 150 W Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
6 AE.10.14 1 unit Pemasangan Pressurized fan 28" 10655 CFM 3000 W Survey pasar
Analisa Harga Satuan Pekerjaan 145
Bahan :
1.0000 unit Pressurized fan 28" 10655 CFM 3000 W Rp - Rp -
Include :
Motor IP 55 class F
Impeller ALU (Alumunium)
GRN (Glass Reinforced Nylon)
1.0000 ls
Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
AF PEKERJAAN PROJECTOR
AF.01 PEKERJAAN INSTALASI
1 AF.01.01 1 titik Instalasi projector dengan kabel HDMI Survey pasar
Bahan :
10.0000 m1 Projektor HDMI Cable Rp - Rp -
10.0000 m1 Pipa conduit PVC 20 mm² Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.1500 OH Tukang listrik Rp - Rp -
0.1000 OH Pekerja Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
AF.02
PEKERJAAN OUTLET / KOTAK KONTAK
1 AF.02.01 1 bh Outlet HDMI 2 gang Survey pasar
Bahan :
1.0000 bh Outlet HDMI 2 gang Rp - Rp -
1.0000 bh Inbowdoos Rp - Rp - Rp -
Tenaga Kerja :
0.0500 OH Tukang listrik Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
AF.03
PEKERJAAN OUTLET / KOTAK KONTAK
1 AF.03.01 1 bh Projector Bracket Survey pasar
Bahan :
1.0000 bh Projector Bracket Rp - Rp -
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
0.2000 OH Tukang listrik Rp - Rp -
0.2000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
AG PEKERJAAN LIFT
1 AG.01 1 unit Passenger Elevator Kap. 1000 kg (6 Lantai) Survey pasar
Bahan :
1.0000 unit Passenger Elevator (6 lantai) Rp - Rp -
1000 Kg, Include ARD
1.0000 unit Earthquake device elevator Rp - Rp -
1.0000 unit Dry AC elevator Rp - Rp -
Tenaga Kerja :
1.0000 ls Pemasangan Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
AJ PEKERJAAN GENSET
1 AJ.01 1 unit Genset 650 kVA Survey pasar
Bahan :
1.0000 bh Genset 650 kVA silent type Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Tenaga kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
AK PEKERJAAN FASAD
1 AK.01.2 1 unit Logo STMM Survey pasar
Bahan :
2.5943 m2 Bahan plat galvalum, tebal 0.8 mm Rp - Rp -
Embosse 40 mm
1.0000 ls Perlengkapan Rp - Rp - Rp -
Tenaga Kerja :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
1.0000 m2 Stiffener Rp - Rp -
1.0000 m2 Sealant & Backup Rp - Rp -
1.0000 m2 Baut, Sekrup dan Dinabolt Rp - Rp - Rp -
Tenaga Kerja :
1.0000 m2 Tenaga Pemasangan Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : 10.00% Rp -
Jumlah harga : Rp -
Jumlah Harga : Rp -
Jumlah Harga : Rp -
Jumlah Harga : Rp -
Jumlah Harga : Rp -
Jumlah Harga : Rp -
AN PEKERJAAN INTERIOR
1 AN.01 1 m2 pemasangan click on hollow 50x50 mm Survei Pasar
Bahan :
3.1500 m1 Click on Hollow 50x50 Rp - Rp -
2.0000 m1 Tracker X60 Rp - Rp -
20.0000 bh Screw Rp - Rp - Rp -
Upah :
1.0000 m2 Upah Pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : Rp 0.10 Rp -
Jumlah Harga : Rp -
AO PEKERJAAN SCULPTURE
1 AO.01 1 unit Ornamen Besi Tempa 2 mm Survei Pasar
Bahan :
23.6100 m2 Besi Tempa 2 mm Rp - Rp - Rp -
Upah :
1.0000 ls Upah Pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : Rp 0.10 Rp -
Jumlah Harga : Rp -
AP PEKERJAAN GAZEBO
1 AP.01 1 unit Gazebo kayu glugu kelapa, uk. 2.5 x 2.5 m Survei Pasar
Bahan :
1.0000 unit Gazebo kayu glugu kelapa, uk. 2.5 x 2.5 m Rp - Rp - Rp -
Ukuran 2,5 m x 2,5 m
Balok kayu glugu, uk. 120 x 80 mm
Papan kayu glugu, uk. 200 x 30 mm
Kolom kayu glugu, uk. 150 x 150 mm
Atap sirap
Finishing natural
Upah :
- ls Upah Pasang Rp - Rp - Rp -
Jumlah : Rp -
Profit & overhead : Rp 0.10 Rp -
Jumlah Harga : Rp -
a b c d e
HARGA UPAH :
1 Tukang batu OH
2 Tukang kayu OH
3 Tukang besi OH
4 Tukang cat OH
5 Tukang las OH
6 Tukang alumunium OH
7 Tukang listrik OH
8 Kepala tukang batu OH
9 Kepala tukang kayu OH
10 Kepala tukang besi OH
11 Kepala tukang cat OH
12 Kepala tukang las OH
13 Kepala tukang alumunium OH
14 Pekerja OH
15 Mandor OH
HARGA BAHAN :
A PASIR, BATA DAN SEMEN
1 Pasir beton m3
2 Pasir pasang m3
3 Pasir urug m3
4 Batu pecah, uk. 1/2 cm m3
5 Batu belah 15/20 m3
6 Kerikil beton m3
7 Tanah subur /katel / tanah media tanam m3
8 Tanah urug m3
9 Bata Merah bh
10 Bata ringan bh
11 Semen Portland (PC) kg
12 Semen instan untuk pasangan bata ringan kg
13 Semen instan untuk pekerjaan plesteran kg
14 Semen instan untuk pekerjaan acian kg
15 Semen instan untuk pasangan batu alam kg
16 Semen instan untuk pengisi nat kg
17 Semen instan untuk screeding kg
18 Semen instan untuk grouting kg
19 Skim coat kg
20 Batako bh
21 Ijuk ikat, uk.100 x 200 x 400 mm m3
Partisi Geser
1 Panel Unfinish 65mm Single Runner PG-01 (Mod. 900<1200mm) m2
2 Track ACD 300+Joint+PlateEscaping+Hanger+Rod Track Lurus+Bracing+Fastener m1
3 Hanger+Rod Track Lurus+Bracing+Fastener m1
4 Sound barrier (di atas jalur movable partition) m2
5 Finishing panel wallpaper m2
6 Jasa pemasangan movable partition m2
Pekerjaan Interior
1 Click on Hollow 50x50 mm m1
2 Tracker X60 m1
Pekerjaan Sculpture
1 Ornamen Besi Tempa m2
E KAYU
1 Kayu papan kelas III (bekisting) m3
2 Balok Kayu kelas III (bekisting) m3
3 Minyak bekisting ltr
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
F PEKERJAAN ATAP
1 Roofmesh 3315, uk. 75x75x1.3 mm m2
2 Usuk dan reng baja ringan (G550) m2
3 Atap galvalum, tebal 0.35 mm (BMT) m2
4 Seng plat BJLS, tebal 0.30 mm m'
Daun pintu
1 Engineering door flush core, uk. 800x2365 mm, tebal 40 mm unit
2 Pintu fire door uk. 1000 x 2100 mm + aksesoris terpasang unit
3 Pintu shaft single, uk. 700 x 1200 mm + aksesoris (terpasang) unit
4 Daun pintu alumunium, uk. 800x2100 mm unit
Kaca
1 Kaca bening, tebal 5 mm m2
2 Kaca bening, tebal 10 mm m2
3 Kaca tempered, tebal 12 mm m2
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
I PENGECATAN
1 Cat anti karat kg
2 Cat besi / kayu kg
3 Plamir Kg
4 Cat dasar dinding interior kg
5 Cat dasar dinding eksterior ltr
6 Cat dasar plafon kg
7 Cat dinding interior Kg
8 Cat dasar dinding eksterior ltr
9 Cat dasar plafon kg
10 Waterproofing cementitious kg
11 Waterproofing polyurethane kg
12 Cat tekstur (lapisan dasar dan top coat) m2
13 Fiber net m2
PIPA PVC AW
1 Pipa PVC AW Ø 1/2" m1
2 Pipa PVC AW Ø 3/4" m1
3 Pipa PVC AW Ø 1" m1
4 Pipa PVC AW Ø 1-1/4" m1
5 Pipa PVC AW Ø 1-1/2" m1
6 Pipa PVC AW Ø 2" m1
7 Pipa PVC AW Ø 3" m1
8 Pipa PVC AW Ø 4" m1
9 Pipa PVC AW Ø 6" m1
10 Pipa PVC AW Ø 8" m1
FITTING PIPA
PIPA PVC D
1 Pipa PVC D Ø 1-1/4" m1
2 Pipa PVC D Ø 2" m1
3 Pipa PVC D Ø 3" m1
4 Pipa PVC D Ø 4" m1
5 Pipa PVC D Ø 6" m1
HOLLOW ALUMINIUM
1 Hollow aluminium, uk. 50x100x3 mm m1
HOLLOW BESI
1 Hollow besi, uk. 30 x 60 x 2 mm m1
2 Hollow besi, uk. 40 x 40 x 1.2 mm m1
3 Hollow besi, uk. 40 x 40 x 1.6 mm m1
4 Hollow besi, uk. 40 x 40 x 2 mm m1
5 Hollow besi, uk. 40 x 60 x 1.2 mm m1
6 Hollow besi, uk. 50 x 50 x 1.80 mm m1
7 Hollow besi, uk. 50 x 50 x 2 mm m1
8 Hollow besi, uk. 50 x 50 x 3 mm m1
9 Hollow besi, uk. 50 x 100 x 1.60 mm m1
10 Hollow besi, uk. 75 x 150 x 3 mm m1
Check Valve
1 Check valve flange end PN-16 Ø 2" bh
2 Check valve flange end PN-16 Ø 4" bh
3 Check valve flange end PN-16 Ø 6" bh
Ball Valve
1 Ball valve screwed PN-10 Ø 1/2" bh
Gate Valve
1 Gate valve screwed PN-10 Ø 1/2" bh
2 Gate valve screwed PN-10 Ø 1" bh
3 Gate valve screwed PN-10 Ø 1-1/4" bh
4 Gate valve screwed PN-10 Ø 2" bh
5 Gate valve flange end PN-10 Ø 4" bh
Butterfly Valve
1 Butterfly valve gear flange end PN-16 Ø 2" bh
2 Butterfly valve gear flange end PN-16 Ø 2-1/2" unit
3 Butterfly valve gear flange end PN-16 Ø 3" unit
4 Butterfly valve gear flange end PN-16 Ø 6" unit
5 Butterfly valve gear flange end PN-16 Ø 8" unit
Foot Valve
1 Foot valve / Tusen klep Ø 2" (screwed) bh
2 Filter foot valve / tusen klep Ø 2" bh
3 Foot valve flange end PN-16 Ø 8" bh
Flange
1 Flange PN-16 Ø 1-1/2" c/w gasket ANSI 150 unit
2 Flange PN-16 Ø 2" c/w gasket ANSI 150 unit
3 Flange PN-16 Ø 4" c/w gasket ANSI 150 unit
4 Flange PN-16 Ø 6" c/w gasket ANSI 150 unit
Blind Flange
1 Blind flange PN-16 Ø 6" bh
Strainer
1 Strainer screwed PN-10 Ø 2" unit
2 Strainer flange PN-16 Ø 6" unit
Flexible Joint
1 Flexible joint flange end PN16 Ø 2" unit
2 Flexible joint flange end PN16 Ø 6" unit
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
Globe Valve
1 Globe Valve PN10 Ø 2" unit
Lain lain
1 Weld Outlet 2" unit
2 Thread Outlet 1" unit
3 Chainsaw (sewa) hari
4 Pengecatan garis parkir (terpasang) m2
Peralatan saniter
1 Kran Ø 1/2 " bh
2 Kran washtafel Ø 1/2 " bh
3 Floor drain bh
4 Roof drain Ø 4" bh
5 Roof drain Ø 3" bh
6 Kloset duduk untuk difable unit
7 Kloset duduk unit
8 Jet washer unit
9 Urinoir unit
10 Urinoir partition unit
11 Wastafel meja - Self Rimming Lavatory unit
12 Wastafel dinding - Wall Hung Lavatory unit
13 Pegangan stainless steel (grab bar) unit
14 Rooftank stainless steel 2000L unit
15 Clean out stainless steel Ø 3" bh
16 Clean out stainless steel Ø 4" bh
17 Hand shower set bh
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
Pompa Air
1 Pompa suplai (head/debit : 100 m/250 lpm) inc. control panel unit
2 Pompa transfer (head/debit : 40 m/ 2x150 lpm) inc. control panel set
3 Pompa booster (head/debit : 12 m/ 2x85 lpm) inc. control panel paket
4 Pompa sewage pit (Debit/head : 2x300 lpm / 20 m) set
5 Pompa sump pit (Debit/head : 300 lpm / 8 m) set
6 Pompa bak penampung air hujan (Debit/head : 150 lpm / 8 m) set
7 Material bantu Pompa Transfer, Ground Tank ke Roof Tank ls
8 Material bantu Pompa Booster ls
9 Material bantu Rooftank stainless steel 2000L ls
10 Upah pasang pompa unit
Pompa Hydrant
1 Diesel engine fire pump (head/debit : 110 m / 750 USGPM) unit
2 Electric fire pump (head/debit : 110 m / 750 USGPM) unit
3 Jockey pump (head/debit : 120 m / 25 USGPM) unit
Drainage
1 Buis beton U Ø 300 mm, tinggi 1000 mm m'
2 Buis beton Ø 800 mm tinggi 500 mm bh
3 U-ditch 400 x 400 x 1200 mm unit
4 U-ditch 500 x 700 x 1200 mm unit
5 Cover U-Ditch 400 x 600 mm bh
6 Cover U-Ditch 500 x 600 mm bh
7 Box Culvert 600 x 600 x 1000 mm bh
KABEL NYMHY
1 Kabel NYMHY 2 x 1.5 mm2 m1
2 Kabel NYMHY 2 x 2.5 mm2 m1
3 Kabel NYMHY 3 x 1.5 mm2 m1
KABEL NYM
1 Kabel NYM 2 x 2.5 mm2 m1
2 Kabel NYM 3 x 2.5 mm2 m1
KABEL NYY
1 Kabel NYY 1 X 70 mm2 m1
2 Kabel NYY 1 X 300 mm2 m1
3 Kabel NYY 2 X 2.5 mm2 m1
4 Kabel NYY 3 X 2.5 mm2 m1
5 Kabel NYY 4 x 2.5 mm2 m1
6 Kabel NYY 4 x 4 mm2 m1
7 Kabel NYY 4 x 10 mm2 m1
8 Kabel NYY 4 x 16 mm2 m1
9 Kabel NYY 4 X 25 mm2 m1
10 Kabel NYY 4 X 150 mm2 m1
KABEL NYFGbY
1 Kabel NYFGbY 2 x 2,5 mm2 m1
2 Kabel NYFGbY 4 x 185 mm2 m1
Kabel NYA
1 Kabel NYA 2.5 mm² m1
2 Kabel NYA 4 mm² m1
3 Kabel NYA 10 mm² m1
4 Kabel NYA 16 mm² m1
5 Kabel NYA 25 mm² m1
6 Kabel NYA 35 mm² m1
7 Kabel NYA 70 mm² m1
8 Kabel NYA 150 mm² m1
Kabel N2XSEbY
1 Kabel N2XSEbY 3 x 70 mm2 m1
Kabel N2XSY
1 Kabel N2XSY 70 mm2 m1
Kabel FRC
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
Box Panel
1 Box panel floor standing, uk. 2100 (H) x 1400 (W) x 800 (D) mm unit
2 Box panel wall mounted, uk. 900 (H) x 700 (W) x 300 (D) mm unit
3 Box panel wall mounted, uk. 800 (H) x 600 (W) x 230 (D) mm unit
4 Box panel wall mounted, uk. 700 (H) x 500 (W) x 230 (D) mm unit
5 Box panel wall mounted, uk. 600 (H) x 500 (W) x 230 (D) mm unit
6 Box panel wall mounted, uk. 500 (H) x 400 (W) x 230 (D) mm unit
LBS
1 LBS 1000 A / 4P bh
MCCB 10kA
1 MCCB 20 A / 3P / 10 kA bh
2 MCCB 30 A / 3P / 10 kA bh
3 MCCB 50 A / 3P / 10 kA bh
4 MCCB 100 A / 3P / 10 kA bh
MCCB 18kA
1 MCCB 20 A / 3P / 18 kA bh
2 MCCB 25 A / 3P / 18 kA bh
3 MCCB 40 A / 3P / 18 kA bh
4 MCCB 50 A / 3P / 18 kA bh
5 MCCB 60 A / 3P / 18 kA bh
6 MCCB 75 A / 3P / 18 kA bh
7 MCCB 100 A / 3P / 18 kA bh
MCCB 25kA
1 MCCB 175-250 A / 3P / 25 kA bh
2 MCCB 200 A / 3P / 25 kA bh
MCCB 36 kA
1 MCCB 350-500 A / 3P / 36 kA bh
ACB 50 kA
1 ACB 1000 A / 3P / 50 kA bh
MCB 6 kA
1 MCB 6 A / 1P / 6 kA bh
2 MCB 10 A / 1P / 6 kA bh
MCB 10 kA
1 MCB 10 A / 1P / 10 kA bh
2 MCB 16 A / 1P / 10 kA bh
3 MCB 10 A / 3P / 10 kA bh
4 MCB 16 A / 3P / 10 kA bh
MCB 15 kA
1 MCB 125 A / 3P / 15 kA bh
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
2 MCB 40 A / 3P / 15 kA bh
3 MCB 32 A / 3P / 15 kA bh
AKSESORIS PANEL
1 Digital power meter PM 5560 bh
2 Digital power meter PM 2220 bh
3 Power regulator 12 step bh
4 Plat busbar tembaga, uk. 4 x 40 mm set
5 Busbar tembaga 5 x 1600 A set
6 Busbar tembaga 5 x 1000 A set
7 Busbar tembaga 5 x 500 A set
8 Busbar tembaga 5 x 400 A set
9 Busbar tembaga 5 x 100 A set
10 Incoming Cubicle unit
11 Outgoing Cubicle unit
12 Lightning Arrester Cubicle unit
13 Transformator 630 kVA, 24kV / 400V / YnYn0 unit
14 Endplate kiri dan kanan set
15 Upah pasang cubicle ls
16 Current transformer 40 / 5A bh
17 Current transformer 50 / 5A bh
18 Current transformer 75 / 5A bh
19 Current transformer 250 / 5A bh
20 Current transformer 500 / 5A bh
21 Current transformer 1000 / 5A bh
22 Terminasi Raychem Trafo set
23 Terminasi Raychem Cubicle PLN set
24 Terminasi Raychem Cubicle Pelanggan set
25 Gear Motor (MCH) for ACB (F/T) bh
26 Kontak bantu bh
27 Under voltage release bh
28 Push button ON (green) bh
29 Push button OFF (red) bh
30 Emergency stop bh
31 Selector switch M-O-A 2P bh
32 Shunt trip bh
33 Pilot lamp 230/240V (red) bh
34 Pilot lamp 230/240V (yellow) bh
35 Pilot lamp 230/240V (green) bh
36 STI (fuse carrier) bh
37 Tabung sekring (fuse catridge) bh
38 Socket Relay bh
39 Relay 230VAC bh
40 Timer delay bh
41 Exhaust fan 220 300 m3/h 230V IP53 bh
42 Indicator alarm bh
43 Thermostat bh
44 Contactor 9 A bh
45 Capasitor bank 15 KVAR bh
46 Capasitor bank 25 KVAR bh
47 Capasitor bank 50 KVAR bh
48 Contactor 3P 32A bh
49 Contactor 3P 50A bh
50 Contactor 3P 100A bh
51 Timer 24H bh
52 Contactor 1NO 16A bh
12 Inbowdoos seng bh
13 Saklar tukar tunggal bh
14 Saklar tukar ganda bh
15 Saklar 1 gang (saklar tunggal) bh
16 Saklar 2 gang (saklar ganda) bh
17 LED Transformer 60W 24VDC bh
18 Lampu exit LED 2 sisi (inc. nicad baterai) bh
19 LED Street Light 40 W Solar Panel bh
20 Tiang PJU pipa bulat, tinggi 7 m 1 lengan bh
21 LED bulb emergency 9 watt bh
22 Material bantu kabel lot
23 Material bantu lampu lot
24 Material bantu elektrikal tipe 1 lot
25 Material bantu elektrikal tipe 2 lot
26 Stop kontak AC lot
27 Linier Light 52 W bh
28 Lampu Uplight LED 12 W bh
29 Lampu LED Spotlight Outdoor IP65 6 W bh
TATA UDARA
Peralatan Utama
1 Wall mounted air conditioning, kap. 2 PK unit
Indoor Unit
1 Indoor unit air conditioner wall mounted, kap. 5.000 Btu/H unit
2 Indoor unit air conditioner wall mounted, kap. 7.000 Btu/H unit
3 Indoor unit air conditioner wall mounted, kap. 9.000 Btu/H unit
4 Indoor unit air conditioner wall mounted, kap. 12.000 Btu/H unit
5 Indoor unit air conditioner wall mounted, kap. 15.000 Btu/H unit
6 Indoor unit air conditioner wall mounted, kap. 18.000 Btu/H unit
7 Indoor unit air conditioner 4 way cassette, kap. 28.000 Btu/H unit
8 Indoor unit air conditioner 4 way cassette, kap. 36.000 Btu/H unit
9 Indoor unit air conditioner 4 way cassette, kap. 42.000 Btu/H unit
10 Indoor unit air conditioner 4 way cassette, kap. 48.000 Btu/H unit
11 Indoor unit air conditioner 4 way cassette, kap. 54.000 Btu/H unit
12 Indoor unit air conditioner split duct, kap. 28.000 Btu/H unit
13 Indoor unit air conditioner cassette ceiling round 360°, kap. 36.000 Btu/H unit
14 Indoor unit air conditioner cassette ceiling round 360°, kap. 48.000 Btu/H unit
Outdoor Unit
1 Outdoor unit, kap. 152.900 Btu/H unit
2 Outdoor unit, kap. 229.300 Btu/H unit
3 Outdoor unit, kap. 248.400 Btu/H unit
4 Outdoor unit, kap. 305.700 Btu/H unit
5 Outdoor unit, kap. 343.900 Btu/H unit
6 Outdoor unit, kap. 363.000 Btu/H unit
7 Outdoor unit, kap. 401.300 Btu/H unit
Perangkat pendukung
1 Sentral kontrol AC unit
2 Standard wired remocon / Wired remote controller unit
3 Wireless Remocon unit
4 Percabangan pipa reffrigerant (Refnet joint / Y-Branch) unit
5 Outdoor Pipe Connection unit
6 Dudukan indoor unit unit
7 Dudukan outdoor unit unit
Instalasi Ducting
1 Ducting BJLS 0.5 m2
2 Flexible Duct Ø 4" m'
3 Ducting Polyisocyanurate (PIR) + perakitan m2
4 Kabel Duct uk. 100 x 150 mm m'
Pemasangan
1 Upah pasang indoor unit wall mounted ls
2 Upah pasang indoor unit 4-way cassette ls
3 Upah pasang indoor split duct ls
4 Upah pasang outdoor unit ls
5 Upah pasang AC split ls
6 Upah pasang sentral kontrol AC ls
7 Upah pasang wired remocon / wired remote controller ls
8 Upah pasang percabangan pipa reffrigerant (Refnet joint / Y-Branch) ls
TELEPON
1 Private Automatic Branch Exchane (PABX) 3 line, 16 extension bh
2 Neogate bh
3 O2 Module bh
4 EX08 bh
5 IP Phone (operator) unit
6 IP Phone (staff) unit
NETWORKING
1 Kotak kontak dinding data RJ.45 Cat. 6 bh
2 Kotak kontak lantai data, F50RJ5EM bh
3 Core Switch 24 Port unit
4 Access switch 48 port PoE bh
5 Optical terminal box 12 core unit
6 Ceiling access point bh
7 10GBASE-LR, SFP+, 10Gbps bh
8 Penyambungan Fiber Optik Backbone Pusat ls
9 Roset fiber optic 4 core bh
10 Access switch CCTV 16 Port PoE bh
PEKERJAAN CLOSED CIRCUIT TELEVISION (CCTV)
1 Network Video Recorder (NVR) System, 32 channel unit
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
TATA SUARA
1 Sound terminal box unit
2 Ceiling speaker 6 W bh
3 Attenuator 30W bh
4 Pagging Microphone unit
5 Wall speaker 6 W bh
6 10 Zone speaker selector system unit
7 Power amplifier extension 240 W unit
8 Mixer Pre Amplifier bh
9 Wireless mic (2 unit) set
10 Wall speaker 30 W unit
11 Cabinet rack 8U unit
12 Kabel Audio Tipe AWG 14 m'
13 Connector jack RCA Male unit
PROJECTOR
1 Screen projector 70" bh
2 Screen projector 120" bh
3 Kabel HDMI type A m'
4 Kotak kontak dinding HDMI type A bh
5 Projector Bracket bh
6 Projector unit
Sprinkler Head
1 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C unit
K3 DAN ASURANSI
1 Penyiapan RKK set
2 Induksi K3 (Safety Induction) org
3 Papan informasi K3, uk. 2000 x 750 mm bh
4 Jaring pengamanan ls
5 Topi pelindung bh
6 Pelindung mata psg
7 Tameng Muka psg
8 Pelindung pernafasan dan mulut (masker habis pakai) bh
9 Sarung tangan (habis pakai) psg
10 Sepatu keselamatan psg
11 Rompi keselamatan bh
12 Penunjang seluruh tubuh (Full Body Harness) bh
13 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat luka, Perban, dll) ls
14 Rambu-Rambu proyek, uk. 2000 x 750 bh
15 Jalur evakuasi, uk. 2000 x 750 ls
16 Alat pemadam api ringan (sewa) bh
17 Bendera K3, uk. 1350 x 900 mm bh
18 Asuransi dan Perizinan BPJS ls
Lain-lain
1 Air kerja ltr
ELEVATOR / LIFT
1 Passenger Elevator (6 lantai), kap. 1000 kg unit
2 Passenger Elevator (6 lantai), kap. 2000 kg unit
3 Earthquake device elevator unit
4 AC Dry Elevator unit
5 Upah pemasangan elevator 1000 kg ls
6 Upah pemasangan elevator 2000 kg ls
7 Patok Penanda Kabel bh
PROTEKSI PETIR
1 Sertifikasi proteksi petir dari Depnaker ls
2 Air terminal Kurn R-150 unit
3 Driving stud Ø 5/8 (baja) bh
4 Copper rod tembaga Ø 5/8", panjang 2 m btg
5 Clamp tembaga Ø 5/8" bh
6 Coupler/connector tembaga Ø 5/8" bh
7 Drill head Ø 5/8" (baja) bh
8 Connecting sleeve pcs
GREEN ROOF
1 Membrane, Thickness (1.27mm) 10’ x 100’ (92.9 m2/roll) Size: 3.048m x 30.48m m2
2 Bonding Adhesive 18.9 Litres/Pail pail
3 Solvent Based Liquid Cleaner 15.2 Litres/pax (4 cans/pax) cans
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
VEGETASI
1 Rumput manila m2
2 Pohon tanjung, tinggi 3000 mm btg
3 Pohon bungur, tinggi 3000 mm btg
4 Pohon kiara payung, tinggi 2500 mm btg
5 Pohon tabebuya, tinggi 4000 mm btg
6 Pohon pucuk merah, tinggi 2000 mm btg
PENGEBORAN BOREPILE
1 Pengeboran dengan preliminary casing Ø 800 mm m'
2 Pengadaan dan aplikasi slurry stabilizer m3
3 Angkat besi kg
4 Pipa tremie m3
5 Mobilisasi dan demobilisasi alat bor ls
Sumur Bor
1 Mobilisasi dan demobilisasi pek. sumur bor unit
2 Pembuatan bak dan tampungan sirkulasi bentonit ls
3 Bentonite ls
4 Pekerjaan pemboran pilot hole 8" m1
5 Logging test unit
6 Reaming 12" m1
7 Pengadaan pipa casing GIP 6" m1
8 Pengadaan screen stainless steel 6" m1
9 Pengadaan kerikil pembalut gravel pack m3
10 Grouting m3
11 Pengadaan pipa pizzo meter 1" galvanis m1
12 Pencucian sumur metode air jetting ls
13 Pumping test dan analisa air pengecoran sumur ls
14 Apron bak (bak kontrol sumur) ls
15 Perizinan ls
FASAD
1 ACP PVDF coating alloy 5005 m2
2 Rangka holow aluminium 40x40x1 & braket siku 40x40x3 Zinc Finish m2
3 Stiffener m2
4 Sealant & Backup m2
5 Baut, Sekrup dan Dinabolt m2
6 Tenaga Pemasangan ACP m2
7 GRC cetak, tebal 10 mm m2
8 GRC cetak (model flat), tebal 10 mm m2
9 Huruf timbul galvalum, tebal 0.8 mm (finish akrilik) m2
Alat Berat
1 Tackel (sewa) hr
2 Tripod (sewa) hr
3 Stamper (sewa) Jam
4 Excavator, kap. 1 m3 (sewa) jam
5 Sewa concrete pump min. 3 jam hari
6 Sewa concrete pump min. 3 jam jam
7 Las listrik (sewa) Jam
8 Concrete Vibrator (sewa) hari
9 Jack hammer (sewa) hari
10 Wheel loader (sewa) jam
11 Dump truck (sewa) jam
12 Tandem roller (sewa) Jam
13 Motor grader (sewa) jam
LAIN-LAIN
1 Sambung daya listrik 1 Kva ke PLN va
2 Biaya listrik per bulan bln
NO URAIAN SPESIFIKASI BAHAN / SATUAN HARGA SATUAN
SOUND PRO
1 Slim Line Array Speaker bh
2 Subwoofer System bh
3 Speaker System bh
4 Digital Speaker Processor bh
5 Multi Channel Power Amplifier bh
6 Dual Power Amplifier bh
7 Wireless Set (Dual Lavalier And Handheld) bh
8 Media Player (with adapter) bh
9 Flight Case 16U w/ Acc & Squencer set
10 Dynamic Microphone w/ Floor Stand bh
11 Powered Box Speaker bh
12 16-Channel Mixing Console bh
13 Testing & Comissioning ls
GENSET
1 Genset 650 kVA silent type unit
2 Ducting Radiator Genset (BJLS 0.6 Rangka besi siku 40 x 40 x 4 mm) ls
3 Material bantu genset ls
4 Upah pasang ls
5 Pompa solar unit
6 Tangki solar 2000 liter bh
7 Sertifikat laik operasi (SLO) genset bh
TOWER CRANE
1 Tower crane (sewa) bln
2 Biaya operator TC + Mess operator bln
3 Asuransi TC bln
4 Biaya perizinan tower crane ls
5 Pemasangan tower crane ls
6 Pembongkaran tower crane set
7 Mobilisasi tower crane unit
8 Demobilisasi tower crane hr
9 Pemasangan / setting angkur TC ls
10 Claim angkut TC tidak di bongkar kembali / rusak ls
19 Lightning rod, bucket, sling, lamp for night lighting ls
PEKERJAAN PEMBONGKARAN
1 Pemindahan tiang listrik ls
PEKERJAAN GAZEBO
1 Gazebo kayu glugu kelapa, uk. 2,5 x 2,5 m kg
PERKERASAN JALAN
1 Aspal emulsi kg
2 Kerosen / Minyak Tanah liter
4 Asphalt Distributor (sewa) jam
5 Compressor (sewa) jam
6 Agregat lolos screen ukuran (5-10&10-15) m3
7 Agregat lolos screen ukuran (0-5) m3
8 Bahan Agr.Base Kelas A m3
10 Asphalt Mixing Plant (AMP) (Sewa) Jam
11 Genset (sewa) Jam
12 Asphalt Finisher (sewa) Jam
13 Pneumatic Tire Roller (sewa) Jam
15 Vibratory roller (sewa) Jam
HSBGN
1 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Surabaya (Bangunan m2 7,539,000.00
Gedung > 2 lantai dan luas > 500 m2)
2 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Surabaya (Bangunan m2 4,796,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
3 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Surabaya (Bangunan m2 7,539,000.00
Gedung > 2 lantai dan luas > 500 m2)
4 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Surabaya (Bangunan m2 4,796,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
5 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Jember (Bangunan m2 6,063,000.00
Gedung > 2 lantai dan luas > 500 m2)
6 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Jember (Bangunan Gedung m2 4,066,000.00
≤ 2 lantai dan luas ≤ 500 m2)
7 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Jember (Bangunan m2 6,063,000.00
Gedung > 2 lantai dan luas > 500 m2)
8 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Jember (Bangunan Gedung m2 4,066,000.00
≤ 2 lantai dan luas ≤ 500 m2)
9 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Jember (tidak sederhana, luas m2 5,212,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
10 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Jember (tidak sederhana, luas m2 4,697,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
11 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
12 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
13 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
14 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Jember (tidak sederhana, luas m2 5,212,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
15 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Jember (tidak sederhana, luas m2 4,697,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
16 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
17 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
18 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
19 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Jember (tidak sederhana, luas m2 5,212,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
20 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Jember (tidak sederhana, luas m2 4,697,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
21 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
22 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
23 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Jember (sederhana, luas m2 4,108,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
24 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab Jember (tinggi minimal 1,5 m) m' 2,249,000.00
25 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab Jember (tinggi minimal 2 m) m' 1,944,000.00
26 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab Jember (tinggi minimal 2 m) m' 1,881,000.00
27 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab Jember (tinggi minimal 1,5 m) m' 2,070,000.00
28 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab Jember (tinggi minimal 2 m) m' 1,230,000.00
29 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab Jember (tinggi minimal 2 m) m' 1,177,000.00
30 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Tidak Sederhana Kab. Bojonegoro (Bangunan m2 6,661,000.00
Gedung > 2 lantai dan luas > 500 m2)
31 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Sederhana Kab. Bojonegoro (Bangunan Gedung ≤ 2 m2 4,707,000.00
lantai dan luas ≤ 500 m2)
32 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Tidak Sederhana Kab. Bojonegoro (Bangunan m2 6,661,000.00
Gedung > 2 lantai dan luas > 500 m2)
33 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Sederhana Kab. Bojonegoro (Bangunan Gedung ≤ 2 m2 4,707,000.00
lantai dan luas ≤ 500 m2)
34 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bojonegoro (tidak sederhana, m2 5,852,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
35 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bojonegoro (tidak sederhana, m2 5,590,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
36 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
37 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
38 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
39 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bojonegoro (tidak sederhana, m2 5,852,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
40 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bojonegoro (tidak sederhana, m2 5,590,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
41 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
42 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
43 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
44 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bojonegoro (tidak sederhana, m2 5,852,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
45 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bojonegoro (tidak sederhana, m2 5,590,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
46 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
47 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
48 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bojonegoro (sederhana, luas m2 5,075,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
49 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Bojonegoro (tinggi minimal 1,5 m) m' 2,680,000.00
50 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Bojonegoro (tinggi minimal 2 m) m' 1,335,000.00
51 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Bojonegoro (tinggi minimal 2 m) m' 2,238,000.00
52 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Bojonegoro (tinggi minimal 1,5 m) m' 2,690,000.00
53 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Bojonegoro (tinggi minimal 2 m) m' 1,471,000.00
54 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Bojonegoro (tinggi minimal 2 m) m' 1,429,000.00
55 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Batu (Bangunan m2 6,042,000.00
Gedung > 2 lantai dan luas > 500 m2)
56 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota. Batu (Bangunan Gedung ≤ m2 5,096,000.00
2 lantai dan luas ≤ 500 m2)
57 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Batu (Bangunan m2 6,042,000.00
Gedung > 2 lantai dan luas > 500 m2)
58 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota. Batu (Bangunan Gedung ≤ m2 5,096,000.00
2 lantai dan luas ≤ 500 m2)
59 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Batu (tidak sederhana, luas m2 5,768,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
60 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Batu (tidak sederhana, luas m2 5,611,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
61 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
62 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
63 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
64 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Batu (tidak sederhana, luas m2 5,768,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
65 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Batu (tidak sederhana, luas m2 5,611,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
66 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
67 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
68 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
69 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Batu (tidak sederhana, luas m2 5,768,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
70 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Batu (tidak sederhana, luas m2 5,611,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
71 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
72 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
73 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Batu (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
74 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Batu (tinggi minimal 1,5 m) m' 2,364,000.00
75 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Batu (tinggi minimal 2 m) m' 2,175,000.00
76 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Batu (tinggi minimal 2 m) m' 2,102,000.00
77 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Batu (tinggi minimal 1,5 m) m' 2,112,000.00
78 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Batu (tinggi minimal 2 m) m' 1,450,000.00
79 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Batu (tinggi minimal 2 m) m' 1,303,000.00
80 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Sidoarjo (Bangunan m2 5,632,000.00
Gedung > 2 lantai dan luas > 500 m2)
81 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Sidoarjo (Bangunan m2 6,924,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
82 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Sidoarjo (Bangunan m2 5,632,000.00
Gedung > 2 lantai dan luas > 500 m2)
83 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Sidoarjo (Bangunan m2 6,924,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
84 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sidoarjo (tidak sederhana, luas m2 6,819,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
85 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sidoarjo (tidak sederhana, luas m2 6,640,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
86 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
87 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
88 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
89 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sidoarjo (tidak sederhana, luas m2 6,819,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
90 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sidoarjo (tidak sederhana, luas m2 6,640,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
91 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
92 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
93 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
94 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sidoarjo (tidak sederhana, luas m2 6,819,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
95 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sidoarjo (tidak sederhana, luas m2 6,640,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
96 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
97 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
98 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sidoarjo (sederhana, luas m2 5,296,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
99 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Sidoarjo (tinggi minimal 1,5 m) m' 2,501,000.00
100 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Sidoarjo (tinggi minimal 2 m) m' 2,554,000.00
101 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Sidoarjo (tinggi minimal 2 m) m' 2,438,000.00
102 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Sidoarjo (tinggi minimal 1,5 m) m' 2,764,000.00
103 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Sidoarjo (tinggi minimal 2 m) m' 1,608,000.00
104 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Sidoarjo (tinggi minimal 2 m) m' 1,503,000.00
105 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Kediri (Bangunan m2 6,105,000.00
Gedung > 2 lantai dan luas > 500 m2)
106 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Kediri (Bangunan Gedung ≤ m2 4,728,000.00
2 lantai dan luas ≤ 500 m2)
107 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Kediri (Bangunan m2 6,105,000.00
Gedung > 2 lantai dan luas > 500 m2)
108 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Kediri (Bangunan Gedung ≤ m2 4,728,000.00
2 lantai dan luas ≤ 500 m2)
109 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Kediri (tidak sederhana, luas m2 5,590,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
110 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Kediri (tidak sederhana, luas m2 5,296,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
111 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
112 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
113 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
114 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Kediri (tidak sederhana, luas m2 5,590,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
115 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Kediri (tidak sederhana, luas m2 5,296,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
116 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
117 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
118 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
119 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Kediri (tidak sederhana, luas m2 5,590,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
120 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Kediri (tidak sederhana, luas m2 5,296,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
121 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
122 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
123 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Kediri (sederhana, luas m2 4,655,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
124 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Kediri (tinggi minimal 1,5 m) m' 2,291,000.00
125 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Kediri (tinggi minimal 2 m) m' 2,007,000.00
126 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Kediri (tinggi minimal 2 m) m' 1,955,000.00
127 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Kediri (tinggi minimal 1,5 m) m' 2,091,000.00
128 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Kediri (tinggi minimal 2 m) m' 1,366,000.00
129 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Kediri (tinggi minimal 2 m) m' 1,219,000.00
130 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Tidak Sederhana Kab. Kediri (Bangunan Gedung > 2 m2 6,357,000.00
lantai dan luas > 500 m2)
131 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Sederhana Kab. Kediri (Bangunan Gedung ≤ 2 m2 5,390,000.00
lantai dan luas ≤ 500 m2)
132 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Tidak Sederhana Kab. Kediri (Bangunan Gedung > 2 m2 6,357,000.00
lantai dan luas > 500 m2)
133 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Sederhana Kab. Kediri (Bangunan Gedung ≤ 2 m2 5,390,000.00
lantai dan luas ≤ 500 m2)
134 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Kediri (tidak sederhana, luas m2 6,357,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
135 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Kediri (tidak sederhana, luas m2 6,241,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
136 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
137 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
138 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
139 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Kediri (tidak sederhana, luas m2 6,357,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
140 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Kediri (tidak sederhana, luas m2 6,241,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
141 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
142 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
143 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
144 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Kediri (tidak sederhana, luas m2 6,357,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
145 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Kediri (tidak sederhana, luas m2 6,241,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
146 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
147 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
148 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Kediri (sederhana, luas m2 6,000,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
149 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Kediri (tinggi minimal 1,5 m) m' 2,501,000.00
150 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Kediri (tinggi minimal 2 m) m' 2,123,000.00
151 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Kediri (tinggi minimal 2 m) m' 2,039,000.00
152 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Kediri (tinggi minimal 1,5 m) m' 2,301,000.00
153 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Kediri (tinggi minimal 2 m) m' 1,429,000.00
154 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Kediri (tinggi minimal 2 m) m' 1,272,000.00
155 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Pacitan (Bangunan m2 5,138,000.00
Gedung > 2 lantai dan luas > 500 m2)
156 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Pacitan (Bangunan Gedung m2 5,432,000.00
≤ 2 lantai dan luas ≤ 500 m2)
157 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Pacitan (Bangunan m2 5,138,000.00
Gedung > 2 lantai dan luas > 500 m2)
158 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Pacitan (Bangunan Gedung m2 5,432,000.00
≤ 2 lantai dan luas ≤ 500 m2)
159 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pacitan (tidak sederhana, luas m2 6,042,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
160 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pacitan (tidak sederhana, luas m2 5,737,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
161 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
162 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
163 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
164 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pacitan (tidak sederhana, luas m2 6,042,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
165 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pacitan (tidak sederhana, luas m2 5,737,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
166 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
167 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
168 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
169 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pacitan (tidak sederhana, luas m2 6,042,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
170 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pacitan (tidak sederhana, luas m2 5,737,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
171 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
172 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
173 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pacitan (sederhana, luas m2 4,770,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
174 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Pacitan (tinggi minimal 1,5 m) m' 2,522,000.00
175 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Pacitan (tinggi minimal 2 m) m' 2,238,000.00
176 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Pacitan (tinggi minimal 2 m) m' 2,154,000.00
177 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Pacitan (tinggi minimal 1,5 m) m' 2,322,000.00
178 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Pacitan (tinggi minimal 2 m) m' 1,524,000.00
179 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Pacitan (tinggi minimal 2 m) m' 1,356,000.00
180 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Ponorogo m2 6,903,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
181 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Ponorogo (Bangunan m2 5,191,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
182 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Ponorogo m2 6,903,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
183 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Ponorogo (Bangunan m2 5,191,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
184 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Ponorogo (tidak sederhana, m2 6,504,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
185 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Ponorogo (tidak sederhana, m2 6,073,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
186 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
187 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
188 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
189 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Ponorogo (tidak sederhana, m2 6,504,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
190 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Ponorogo (tidak sederhana, m2 6,073,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
191 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
192 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
193 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
194 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Ponorogo (tidak sederhana, m2 6,504,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
195 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Ponorogo (tidak sederhana, m2 6,073,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
196 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
197 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
198 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Ponorogo (sederhana, luas m2 5,065,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
199 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Ponorogo (tinggi minimal 1,5 m) m' 2,511,000.00
200 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Ponorogo (tinggi minimal 2 m) m' 2,480,000.00
201 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Ponorogo (tinggi minimal 2 m) m' 2,375,000.00
202 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Ponorogo (tinggi minimal 1,5 m) m' 2,301,000.00
203 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Ponorogo (tinggi minimal 2 m) m' 1,703,000.00
204 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Ponorogo (tinggi minimal 2 m) m' 1,503,000.00
205 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Trengggalek m2 6,105,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
206 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Trenggalek (Bangunan m2 4,508,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
207 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Trengggalek m2 6,105,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
208 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Trenggalek (Bangunan m2 4,508,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
209 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Trengggalek (tidak sederhana, m2 5,527,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
210 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Trengggalek (tidak sederhana, m2 5,128,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
211 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
212 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
213 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
214 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Trengggalek (tidak sederhana, m2 5,527,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
215 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Trengggalek (tidak sederhana, m2 5,128,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
216 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
217 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
218 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
219 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Trengggalek (tidak sederhana, m2 5,527,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
220 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Trengggalek (tidak sederhana, m2 5,128,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
221 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
222 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
223 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Trengggalek (sederhana, luas m2 4,476,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
224 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Trengggalek (tinggi minimal 1,5 m) m' 2,511,000.00
225 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Trengggalek (tinggi minimal 2 m) m' 2,480,000.00
226 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Trengggalek (tinggi minimal 2 m) m' 2,375,000.00
227 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Trengggalek (tinggi minimal 1,5 m) m' 2,301,000.00
228 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Trengggalek (tinggi minimal 2 m) m' 1,703,000.00
229 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Trengggalek (tinggi minimal 2 m) m' 1,513,000.00
230 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Tulungagung m2 6,084,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
231 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Tulungagung (Bangunan m2 4,602,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
232 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Tulungagung m2 6,084,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
233 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Tulungagung (Bangunan m2 4,602,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
234 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Tulungagung (tidak sederhana, m2 5,663,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
235 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Tulungagung (tidak sederhana, m2 5,233,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
236 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
237 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
238 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
239 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Tulungagung (tidak sederhana, m2 5,663,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
240 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Tulungagung (tidak sederhana, m2 5,233,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
241 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
242 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
243 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
244 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Tulungagung (tidak sederhana, m2 5,663,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
245 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Tulungagung (tidak sederhana, m2 5,233,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
246 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
247 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
248 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Tulungagung (sederhana, luas m2 4,508,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
249 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Tulungagung (tinggi minimal 1,5 m) m' 2,585,000.00
250 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Tulungagung (tinggi minimal 2 m) m' 2,039,000.00
251 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Tulungagung (tinggi minimal 2 m) m' 1,976,000.00
252 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Tulungagung (tinggi minimal 1,5 m) m' 2,396,000.00
253 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Tulungagung (tinggi minimal 2 m) m' 1,387,000.00
254 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Tulungagung (tinggi minimal 2 m) m' 1,240,000.00
255 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Blitar (Bangunan m2 5,863,000.00
Gedung > 2 lantai dan luas > 500 m2)
256 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Blitar (Bangunan Gedung ≤ m2 4,907,000.00
2 lantai dan luas ≤ 500 m2)
257 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Blitar (Bangunan m2 5,863,000.00
Gedung > 2 lantai dan luas > 500 m2)
258 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Blitar (Bangunan Gedung ≤ m2 4,907,000.00
2 lantai dan luas ≤ 500 m2)
259 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Blitar (tidak sederhana, luas m2 5,684,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
260 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Blitar (tidak sederhana, luas m2 5,348,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
261 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
262 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
263 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
264 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Blitar (tidak sederhana, luas m2 5,684,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
265 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Blitar (tidak sederhana, luas m2 5,348,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
266 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
267 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
268 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
269 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Blitar (tidak sederhana, luas m2 5,684,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
270 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Blitar (tidak sederhana, luas m2 5,348,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
271 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
272 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
273 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Blitar (sederhana, luas m2 4,592,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
274 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Blitar (tinggi minimal 1,5 m) m' 2,154,000.00
275 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Blitar (tinggi minimal 2 m) m' 2,039,000.00
276 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Blitar (tinggi minimal 2 m) m' 1,955,000.00
277 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Blitar (tinggi minimal 1,5 m) m' 1,976,000.00
278 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Blitar (tinggi minimal 2 m) m' 1,366,000.00
279 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Blitar (tinggi minimal 2 m) m' 1,219,000.00
280 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Malang (Bangunan m2 6,357,000.00
Gedung > 2 lantai dan luas > 500 m2)
281 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Malang (Bangunan m2 4,928,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
282 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Malang (Bangunan m2 6,357,000.00
Gedung > 2 lantai dan luas > 500 m2)
283 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Malang (Bangunan m2 4,928,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
284 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Malang (tidak sederhana, luas m2 5,937,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
285 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Malang (tidak sederhana, luas m2 5,632,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
286 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
287 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
288 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
289 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Malang (tidak sederhana, luas m2 5,937,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
290 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Malang (tidak sederhana, luas m2 5,632,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
291 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
292 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
293 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
294 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Malang (tidak sederhana, luas m2 5,937,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
295 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Malang (tidak sederhana, luas m2 5,632,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
296 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
297 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
298 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Malang (sederhana, luas m2 5,012,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
299 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Malang (tinggi minimal 1,5 m) m' 2,732,000.00
300 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Malang (tinggi minimal 2 m) m' 2,238,000.00
301 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Malang (tinggi minimal 2 m) m' 2,165,000.00
302 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Malang (tinggi minimal 1,5 m) m' 2,522,000.00
303 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Malang (tinggi minimal 2 m) m' 1,429,000.00
304 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Malang (tinggi minimal 2 m) m' 1,366,000.00
305 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Lumajang m2 5,474,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
306 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Lumajang (Bangunan m2 4,077,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
307 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Lumajang m2 5,474,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
308 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Lumajang (Bangunan m2 4,077,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
309 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Lumajang (tidak sederhana, m2 5,012,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
310 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Lumajang (tidak sederhana, m2 4,802,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
311 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
312 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
313 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
314 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Lumajang (tidak sederhana, m2 5,012,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
315 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Lumajang (tidak sederhana, m2 4,802,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
316 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
317 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
318 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
319 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Lumajang (tidak sederhana, m2 5,012,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
320 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Lumajang (tidak sederhana, m2 4,802,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
321 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
322 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
323 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Lumajang (sederhana, luas m2 3,940,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
324 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Lumajang (tinggi minimal 1,5 m) m' 2,070,000.00
325 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Lumajang (tinggi minimal 2 m) m' 1,766,000.00
326 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Lumajang (tinggi minimal 2 m) m' 1,703,000.00
327 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Lumajang (tinggi minimal 1,5 m) m' 1,839,000.00
328 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Lumajang (tinggi minimal 2 m) m' 1,125,000.00
329 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Lumajang (tinggi minimal 2 m) m' 1,072,000.00
330 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Banyuwangi m2 5,443,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
331 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Banyuwangi (Bangunan m2 4,277,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
332 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Banyuwangi m2 5,443,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
333 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Banyuwangi (Bangunan m2 4,277,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
334 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Banyuwangi (tidak sederhana, m2 5,149,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
335 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Banyuwangi (tidak sederhana, m2 4,917,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
336 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
337 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
338 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
339 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Banyuwangi (tidak sederhana, m2 5,149,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
340 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Banyuwangi (tidak sederhana, m2 4,917,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
341 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
342 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
343 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
344 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Banyuwangi (tidak sederhana, m2 5,149,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
345 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Banyuwangi (tidak sederhana, m2 4,917,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
346 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
347 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
348 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Banyuwangi (sederhana, luas m2 4,182,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
349 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Banyuwangi (tinggi minimal 1,5 m) m' 2,133,000.00
350 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Banyuwangi (tinggi minimal 2 m) m' 1,850,000.00
351 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Banyuwangi (tinggi minimal 2 m) m' 1,787,000.00
352 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Banyuwangi (tinggi minimal 1,5 m) m' 1,944,000.00
353 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Banyuwangi (tinggi minimal 2 m) m' 1,251,000.00
354 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Banyuwangi (tinggi minimal 2 m) m' 1,114,000.00
355 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Bondowoso m2 6,168,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
356 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Bondowoso (Bangunan m2 4,739,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
357 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Bondowoso m2 6,168,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
358 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Bondowoso (Bangunan m2 4,739,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
359 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bondowoso (tidak sederhana, m2 5,296,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
360 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bondowoso (tidak sederhana, m2 4,991,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
361 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
362 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
363 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
364 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bondowoso (tidak sederhana, m2 5,296,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
365 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bondowoso (tidak sederhana, m2 4,991,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
366 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
367 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
368 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
369 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bondowoso (tidak sederhana, m2 5,296,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
370 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bondowoso (tidak sederhana, m2 4,991,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
371 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
372 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
373 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bondowoso (sederhana, luas m2 4,529,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
374 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Bondowoso (tinggi minimal 1,5 m) m' 2,291,000.00
375 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Bondowoso (tinggi minimal 2 m) m' 2,039,000.00
376 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Bondowoso (tinggi minimal 2 m) m' 1,986,000.00
377 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Bondowoso (tinggi minimal 1,5 m) m' 2,102,000.00
378 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Bondowoso (tinggi minimal 2 m) m' 1,293,000.00
379 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Bondowoso (tinggi minimal 2 m) m' 1,251,000.00
380 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Situbondo m2 6,640,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
381 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Situbondo (Bangunan m2 5,201,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
382 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Situbondo m2 6,640,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
383 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Situbondo (Bangunan m2 5,201,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
384 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Situbondo (tidak sederhana, m2 5,779,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
385 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Situbondo (tidak sederhana, m2 5,674,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
386 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
387 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
388 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type D Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
389 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Situbondo (tidak sederhana, m2 5,779,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
390 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Situbondo (tidak sederhana, m2 5,674,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
391 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
392 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
393 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type D Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
394 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Situbondo (tidak sederhana, m2 5,779,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
395 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Situbondo (tidak sederhana, m2 5,674,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
396 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
397 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
398 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type D Kab. Situbondo (sederhana, luas m2 4,959,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
399 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Situbondo (tinggi minimal 1,5 m) m' 2,564,000.00
400 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Situbondo (tinggi minimal 2 m) m' 2,343,000.00
401 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Situbondo (tinggi minimal 2 m) m' 1,892,000.00
402 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Situbondo (tinggi minimal 1,5 m) m' 2,217,000.00
403 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Situbondo (tinggi minimal 2 m) m' 1,492,000.00
404 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Situbondo (tinggi minimal 2 m) m' 1,450,000.00
405 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Probolinggo m2 5,768,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
406 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Probolinggo (Bangunan m2 4,487,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
407 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Probolinggo m2 5,768,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
408 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Probolinggo (Bangunan m2 4,487,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
409 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Probolinggo (tidak sederhana, m2 5,579,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
410 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Probolinggo (tidak sederhana, m2 5,264,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
411 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
412 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
413 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
414 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Probolinggo (tidak sederhana, m2 5,579,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
415 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Probolinggo (tidak sederhana, m2 5,264,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
416 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
417 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
418 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
419 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Probolinggo (tidak sederhana, m2 5,579,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
420 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Probolinggo (tidak sederhana, m2 5,264,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
421 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
422 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
423 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Probolinggo (sederhana, luas m2 4,539,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
424 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Probolinggo (tinggi minimal 1,5 m) m' 2,522,000.00
425 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Probolinggo (tinggi minimal 2 m) m' 2,060,000.00
426 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Probolinggo (tinggi minimal 2 m) m' 1,997,000.00
427 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Probolinggo (tinggi minimal 1,5 m) m' 2,343,000.00
428 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Probolinggo (tinggi minimal 2 m) m' 1,303,000.00
429 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Probolinggo (tinggi minimal 2 m) m' 1,251,000.00
430 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Pasuruan (Bangunan m2 5,611,000.00
Gedung > 2 lantai dan luas > 500 m2)
431 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Pasuruan (Bangunan m2 4,466,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
432 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Pasuruan (Bangunan m2 5,611,000.00
Gedung > 2 lantai dan luas > 500 m2)
433 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Pasuruan (Bangunan m2 4,466,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
434 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pasuruan (tidak sederhana, luas m2 5,390,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
435 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pasuruan (tidak sederhana, luas m2 5,264,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
436 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
437 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
438 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
439 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pasuruan (tidak sederhana, luas m2 5,390,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
440 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pasuruan (tidak sederhana, luas m2 5,264,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
441 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
442 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
443 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
444 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pasuruan (tidak sederhana, luas m2 5,390,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
445 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pasuruan (tidak sederhana, luas m2 5,264,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
446 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
447 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
448 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pasuruan (sederhana, luas m2 4,539,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
449 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Pasuruan (tinggi minimal 1,5 m) m' 2,343,000.00
450 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Pasuruan (tinggi minimal 2 m) m' 1,997,000.00
451 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Pasuruan (tinggi minimal 2 m) m' 1,923,000.00
452 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Pasuruan (tinggi minimal 1,5 m) m' 2,144,000.00
453 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Pasuruan (tinggi minimal 2 m) m' 1,272,000.00
454 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Pasuruan (tinggi minimal 2 m) m' 1,198,000.00
455 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Mojokerto m2 6,956,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
456 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Mojokerto (Bangunan m2 5,768,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
457 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Mojokerto m2 6,956,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
458 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Mojokerto (Bangunan m2 5,768,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
459 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Mojokerto (tidak sederhana, m2 6,935,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
460 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Mojokerto (tidak sederhana, m2 6,682,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
461 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
462 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
463 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
464 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Mojokerto (tidak sederhana, m2 6,935,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
465 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Mojokerto (tidak sederhana, m2 6,682,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
466 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
467 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
468 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
469 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Mojokerto (tidak sederhana, m2 6,935,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
470 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Mojokerto (tidak sederhana, m2 6,682,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
471 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
472 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
473 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Mojokerto (sederhana, luas m2 5,495,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
474 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Mojokerto (tinggi minimal 1,5 m) m' 2,690,000.00
475 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Mojokerto (tinggi minimal 2 m) m' 2,522,000.00
476 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Mojokerto (tinggi minimal 2 m) m' 2,406,000.00
477 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Mojokerto (tinggi minimal 1,5 m) m' 2,942,000.00
478 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Mojokerto (tinggi minimal 2 m) m' 1,597,000.00
479 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Mojokerto (tinggi minimal 2 m) m' 1,503,000.00
480 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Jombang (Bangunan m2 6,231,000.00
Gedung > 2 lantai dan luas > 500 m2)
481 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Jombang (Bangunan m2 4,928,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
482 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Jombang (Bangunan m2 6,231,000.00
Gedung > 2 lantai dan luas > 500 m2)
483 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Jombang (Bangunan m2 4,928,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
484 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Jombang (tidak sederhana, luas m2 5,873,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
485 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Jombang (tidak sederhana, luas m2 5,747,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
486 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
487 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
488 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
489 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Jombang (tidak sederhana, luas m2 5,873,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
490 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Jombang (tidak sederhana, luas m2 5,747,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
491 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
492 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
493 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
494 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Jombang (tidak sederhana, luas m2 5,873,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
495 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Jombang (tidak sederhana, luas m2 5,747,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
496 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
497 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
498 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Jombang (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
499 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Jombang (tinggi minimal 1,5 m) m' 2,417,000.00
500 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Jombang (tinggi minimal 2 m) m' 2,123,000.00
501 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Jombang (tinggi minimal 2 m) m' 2,039,000.00
502 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Jombang (tinggi minimal 1,5 m) m' 2,217,000.00
503 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Jombang (tinggi minimal 2 m) m' 1,440,000.00
504 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Jombang (tinggi minimal 2 m) m' 1,282,000.00
505 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Nganjuk (Bangunan m2 5,852,000.00
Gedung > 2 lantai dan luas > 500 m2)
506 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Nganjuk (Bangunan m2 4,518,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
507 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Nganjuk (Bangunan m2 5,852,000.00
Gedung > 2 lantai dan luas > 500 m2)
508 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Nganjuk (Bangunan m2 4,518,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
509 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Nganjuk (tidak sederhana, luas m2 5,159,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
510 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Nganjuk (tidak sederhana, luas m2 5,033,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
511 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
512 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
513 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
514 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Nganjuk (tidak sederhana, luas m2 5,159,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
515 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Nganjuk (tidak sederhana, luas m2 5,033,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
516 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
517 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
518 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
519 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Nganjuk (tidak sederhana, luas m2 5,159,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
520 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Nganjuk (tidak sederhana, luas m2 5,033,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
521 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
522 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
523 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Nganjuk (sederhana, luas m2 4,140,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
524 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Nganjuk (tinggi minimal 1,5 m) m' 2,165,000.00
525 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Nganjuk (tinggi minimal 2 m) m' 1,955,000.00
526 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Nganjuk (tinggi minimal 2 m) m' 1,871,000.00
527 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Nganjuk (tinggi minimal 1,5 m) m' 2,438,000.00
528 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Nganjuk (tinggi minimal 2 m) m' 1,240,000.00
529 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Nganjuk (tinggi minimal 2 m) m' 1,156,000.00
530 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Madiun (Bangunan m2 6,210,000.00
Gedung > 2 lantai dan luas > 500 m2)
531 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Madiun (Bangunan Gedung m2 5,065,000.00
≤ 2 lantai dan luas ≤ 500 m2)
532 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Madiun (Bangunan m2 6,210,000.00
Gedung > 2 lantai dan luas > 500 m2)
533 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Madiun (Bangunan Gedung m2 5,065,000.00
≤ 2 lantai dan luas ≤ 500 m2)
534 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Madiun (tidak sederhana, luas m2 5,716,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
535 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Madiun (tidak sederhana, luas m2 5,674,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
536 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
537 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
538 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
539 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Madiun (tidak sederhana, luas m2 5,716,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
540 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Madiun (tidak sederhana, luas m2 5,674,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
541 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
542 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
543 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
544 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Madiun (tidak sederhana, luas m2 5,716,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
545 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Madiun (tidak sederhana, luas m2 5,674,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
546 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
547 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
548 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Madiun (sederhana, luas m2 4,844,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
549 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Madiun (tinggi minimal 1,5 m) m' 2,301,000.00
550 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab.Madiun (tinggi minimal 2 m) m' 2,060,000.00
551 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Madiun (tinggi minimal 2 m) m' 1,986,000.00
552 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Madiun (tinggi minimal 1,5 m) m' 2,112,000.00
553 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Madiun (tinggi minimal 2 m) m' 1,335,000.00
554 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Madiun (tinggi minimal 2 m) m' 1,251,000.00
555 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Magetan (Bangunan m2 5,947,000.00
Gedung > 2 lantai dan luas > 500 m2)
556 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Magetan (Bangunan m2 4,508,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
557 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Magetan (Bangunan m2 5,947,000.00
Gedung > 2 lantai dan luas > 500 m2)
558 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Magetan (Bangunan m2 4,508,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
559 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Magetan (tidak sederhana, luas m2 5,443,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
560 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Magetan (tidak sederhana, luas m2 5,170,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
561 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
562 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
563 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
564 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Magetan (tidak sederhana, luas m2 5,443,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
565 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Magetan (tidak sederhana, luas m2 5,170,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
566 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
567 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
568 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
569 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Magetan (tidak sederhana, luas m2 5,443,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
570 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Magetan (tidak sederhana, luas m2 5,170,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
571 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
572 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
573 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Magetan (sederhana, luas m2 4,634,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
574 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Magetan (tinggi minimal 1,5 m) m' 2,501,000.00
575 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab.Magetan (tinggi minimal 2 m) m' 2,091,000.00
576 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Magetan (tinggi minimal 2 m) m' 2,007,000.00
577 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Magetan (tinggi minimal 1,5 m) m' 232,000.00
578 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Magetan (tinggi minimal 2 m) m' 1,419,000.00
579 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Magetan (tinggi minimal 2 m) m' 1,261,000.00
580 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Ngawi (Bangunan m2 6,315,000.00
Gedung > 2 lantai dan luas > 500 m2)
581 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Ngawi (Bangunan Gedung m2 4,886,000.00
≤ 2 lantai dan luas ≤ 500 m2)
582 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Ngawi (Bangunan m2 6,315,000.00
Gedung > 2 lantai dan luas > 500 m2)
583 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Ngawi (Bangunan Gedung m2 4,886,000.00
≤ 2 lantai dan luas ≤ 500 m2)
584 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Ngawi (tidak sederhana, luas m2 5,926,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
585 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Ngawi (tidak sederhana, luas m2 5,663,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
586 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
587 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
588 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
589 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Ngawi (tidak sederhana, luas m2 5,926,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
590 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Ngawi (tidak sederhana, luas m2 5,663,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
591 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
592 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
593 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
594 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Ngawi (tidak sederhana, luas m2 5,926,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
595 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Ngawi (tidak sederhana, luas m2 5,663,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
596 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
597 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
598 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Ngawi (sederhana, luas m2 4,833,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
599 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Ngawi (tinggi minimal 1,5 m) m' 2,480,000.00
600 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Ngawi (tinggi minimal 2 m) m' 2,207,000.00
601 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Ngawi (tinggi minimal 2 m) m' 2,133,000.00
602 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Ngawi (tinggi minimal 1,5 m) m' 2,280,000.00
603 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Ngawi (tinggi minimal 2 m) m' 1,419,000.00
604 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Ngawi (tinggi minimal 2 m) m' 1,345,000.00
605 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Tuban (Bangunan m2 6,252,000.00
Gedung > 2 lantai dan luas > 500 m2)
606 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Tuban (Bangunan Gedung m2 4,644,000.00
≤ 2 lantai dan luas ≤ 500 m2)
607 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Tuban (Bangunan m2 6,252,000.00
Gedung > 2 lantai dan luas > 500 m2)
608 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Tuban (Bangunan Gedung m2 4,644,000.00
≤ 2 lantai dan luas ≤ 500 m2)
609 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Tuban (tidak sederhana, luas m2 5,527,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
610 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Tuban (tidak sederhana, luas m2 5,243,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
611 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
612 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
613 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
614 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Tuban (tidak sederhana, luas m2 5,527,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
615 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Tuban (tidak sederhana, luas m2 5,243,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
616 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
617 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
618 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
619 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Tuban (tidak sederhana, luas m2 5,527,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
620 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Tuban (tidak sederhana, luas m2 5,243,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
621 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
622 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
623 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Tuban (sederhana, luas m2 4,980,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
624 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Tuban (tinggi minimal 1,5 m) m' 2,396,000.00
625 Pagar Permanen Pembangunan BaruPagar Gedung Negara Belakang Kab. Tuban (tinggi minimal 2 m) m' 2,175,000.00
626 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Tuban (tinggi minimal 2 m) m' 2,123,000.00
627 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Tuban (tinggi minimal 1,5 m) m' 2,186,000.00
628 Pagar Permanen Pembangunan BaruPagar Rumah Negara Belakang Kab. Tuban (tinggi minimal 2 m) m' 1,408,000.00
629 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Tuban (tinggi minimal 2 m) m' 1,314,000.00
630 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Lamongan m2 6,073,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
631 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Lamongan (Bangunan m2 4,718,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
632 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Lamongan m2 6,073,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
633 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Lamongan (Bangunan m2 4,718,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
634 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Lamongan (tidak sederhana, m2 5,747,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
635 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Lamongan (tidak sederhana, m2 5,474,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
636 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
637 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
638 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
639 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Lamongan (tidak sederhana, m2 5,747,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
640 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Lamongan (tidak sederhana, m2 5,474,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
641 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
642 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
643 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
644 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Lamongan (tidak sederhana, m2 5,747,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
645 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Lamongan (tidak sederhana, m2 5,474,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
646 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
647 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
648 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Lamongan (sederhana, luas m2 4,728,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
649 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Lamongan (tinggi minimal 1,5 m) m' 2,459,000.00
650 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Lamongan (tinggi minimal 2 m) m' 2,186,000.00
651 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Lamongan (tinggi minimal 2 m) m' 2,102,000.00
652 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Lamongan (tinggi minimal 1,5 m) m' 2,207,000.00
653 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Lamongan (tinggi minimal 2 m) m' 1,408,000.00
654 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Lamongan (tinggi minimal 2 m) m' 1,429,000.00
655 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Gresik (Bangunan m2 6,535,000.00
Gedung > 2 lantai dan luas > 500 m2)
656 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Gresik (Bangunan Gedung m2 5,895,000.00
≤ 2 lantai dan luas ≤ 500 m2)
657 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Gresik (Bangunan m2 6,535,000.00
Gedung > 2 lantai dan luas > 500 m2)
658 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Gresik (Bangunan Gedung m2 5,895,000.00
≤ 2 lantai dan luas ≤ 500 m2)
659 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Gresik (tidak sederhana, luas m2 6,336,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
660 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Gresik (tidak sederhana, luas m2 6,378,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
661 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
662 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
663 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
664 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Gresik (tidak sederhana, luas m2 6,336,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
665 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Gresik (tidak sederhana, luas m2 6,378,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
666 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
667 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
668 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
669 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Gresik (tidak sederhana, luas m2 6,336,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
670 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Gresik (tidak sederhana, luas m2 6,378,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
671 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
672 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
673 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Gresik (sederhana, luas m2 5,306,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
674 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Gresik (tinggi minimal 1,5 m) m' 2,701,000.00
675 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Gresik (tinggi minimal 2 m) m' 2,322,000.00
676 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Gresik (tinggi minimal 2 m) m' 2,217,000.00
677 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Gresik (tinggi minimal 1,5 m) m' 2,511,000.00
678 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Gresik (tinggi minimal 2 m) m' 1,492,000.00
679 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Gresik (tinggi minimal 2 m) m' 1,387,000.00
680 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Bangkalan m2 6,493,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
681 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Bangkalan (Bangunan m2 4,907,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
682 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Bangkalan m2 6,493,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
683 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Bangkalan (Bangunan m2 4,907,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
684 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bangkalan (tidak sederhana, m2 6,252,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
685 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bangkalan (tidak sederhana, m2 5,947,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
686 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
687 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
688 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
689 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bangkalan (tidak sederhana, m2 6,252,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
690 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bangkalan (tidak sederhana, m2 5,947,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
691 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
692 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
693 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
694 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Bangkalan (tidak sederhana, m2 6,252,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
695 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Bangkalan (tidak sederhana, m2 5,947,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
696 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
697 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
698 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Bangkalan (sederhana, luas m2 5,149,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
699 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Bangkalan (tinggi minimal 1,5 m) m' 2,501,000.00
700 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Bangkalan (tinggi minimal 2 m) m' 2,280,000.00
701 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Bangkalan (tinggi minimal 2 m) m' 2,175,000.00
702 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Bangkalan (tinggi minimal 1,5 m) m' 2,427,000.00
703 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Bangkalan (tinggi minimal 2 m) m' 1,461,000.00
704 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Bangkalan (tinggi minimal 2 m) m' 1,356,000.00
705 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Sampang (Bangunan m2 6,724,000.00
Gedung > 2 lantai dan luas > 500 m2)
706 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Sampang (Bangunan m2 4,823,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
707 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Sampang (Bangunan m2 6,724,000.00
Gedung > 2 lantai dan luas > 500 m2)
708 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Sampang (Bangunan m2 4,823,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
709 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sampang (tidak sederhana, luas m2 6,126,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
710 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sampang (tidak sederhana, luas m2 5,895,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
711 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
712 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
713 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
714 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sampang (tidak sederhana, luas m2 6,126,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
715 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sampang (tidak sederhana, luas m2 5,895,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
716 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
717 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
718 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
719 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sampang (tidak sederhana, luas m2 6,126,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
720 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sampang (tidak sederhana, luas m2 5,895,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
721 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
722 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
723 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sampang (sederhana, luas m2 5,506,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
724 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Sampang (tinggi minimal 1,5 m) m' 2,995,000.00
725 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Sampang (tinggi minimal 2 m) m' 2,543,000.00
726 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Sampang (tinggi minimal 2 m) m' 2,480,000.00
727 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Sampang (tinggi minimal 1,5 m) m' 2,774,000.00
728 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Sampang (tinggi minimal 2 m) m' 1,629,000.00
729 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Sampang (tinggi minimal 2 m) m' 1,545,000.00
730 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Pamekasan m2 6,136,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
731 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Pamekasan (Bangunan m2 5,422,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
732 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Pamekasan m2 6,136,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
733 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Pamekasan (Bangunan m2 5,422,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
734 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pamekasan (tidak sederhana, m2 6,126,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
735 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pamekasan (tidak sederhana, m2 6,115,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
736 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
737 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
738 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
739 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pamekasan (tidak sederhana, m2 6,126,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
740 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pamekasan (tidak sederhana, m2 6,115,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
741 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
742 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
743 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
744 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Pamekasan (tidak sederhana, m2 6,126,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
745 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Pamekasan (tidak sederhana, m2 6,115,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
746 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
747 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
748 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Pamekasan (sederhana, luas m2 5,306,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
749 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Pamekasan (tinggi minimal 1,5 m) m' 2,984,000.00
750 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Pamekasan (tinggi minimal 2 m) m' 2,301,000.00
751 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Pamekasan (tinggi minimal 2 m) m' 2,207,000.00
752 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Pamekasan (tinggi minimal 1,5 m) m' 1,734,000.00
753 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Pamekasan (tinggi minimal 2 m) m' 1,492,000.00
754 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Pamekasan (tinggi minimal 2 m) m' 1,387,000.00
755 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Sumenep (Bangunan m2 7,050,000.00
Gedung > 2 lantai dan luas > 500 m2)
756 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Sumenep (Bangunan m2 5,243,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
757 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kab. Sumenep (Bangunan m2 7,050,000.00
Gedung > 2 lantai dan luas > 500 m2)
758 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kab. Sumenep (Bangunan m2 5,243,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
759 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sumenep (tidak sederhana, luas m2 6,136,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
760 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sumenep (tidak sederhana, luas m2 5,884,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
761 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
762 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
763 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
764 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sumenep (tidak sederhana, luas m2 6,136,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
765 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sumenep (tidak sederhana, luas m2 5,884,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
766 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
767 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
768 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
769 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kab. Sumenep (tidak sederhana, luas m2 6,136,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
770 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kab. Sumenep (tidak sederhana, luas m2 5,884,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
771 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
772 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
773 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kab. Sumenep (sederhana, luas m2 4,959,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
774 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kab. Sumenep (tinggi minimal 1,5 m) m' 3,814,000.00
775 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kab. Sumenep (tinggi minimal 2 m) m' 2,322,000.00
776 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kab. Sumenep (tinggi minimal 2 m) m' 2,238,000.00
777 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kab. Sumenep (tinggi minimal 1,5 m) m' 3,625,000.00
778 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kab. Sumenep (tinggi minimal 2 m) m' 1,482,000.00
779 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kab. Sumenep (tinggi minimal 2 m) m' 1,398,000.00
780 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Blitar (Bangunan m2 5,537,000.00
Gedung > 2 lantai dan luas > 500 m2)
781 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Blitar (Bangunan Gedung ≤ m2 4,760,000.00
2 lantai dan luas ≤ 500 m2)
782 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Blitar (Bangunan m2 5,537,000.00
Gedung > 2 lantai dan luas > 500 m2)
783 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Blitar (Bangunan Gedung ≤ m2 4,760,000.00
2 lantai dan luas ≤ 500 m2)
784 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Blitar (tidak sederhana, luas m2 5,527,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
785 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Blitar (tidak sederhana, luas m2 5,411,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
786 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
787 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
788 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
789 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Blitar (tidak sederhana, luas m2 5,527,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
790 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Blitar (tidak sederhana, luas m2 5,411,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
791 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
792 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
793 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
794 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Blitar (tidak sederhana, luas m2 5,527,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
795 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Blitar (tidak sederhana, luas m2 5,411,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
796 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
797 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
798 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Blitar (sederhana, luas m2 4,529,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
799 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Blitar (tinggi minimal 1,5 m) m' 2,469,000.00
800 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Blitar (tinggi minimal 2 m) m' 1,850,000.00
801 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Blitar (tinggi minimal 2 m) m' 1,787,000.00
802 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Blitar (tinggi minimal 1,5 m) m' 2,312,000.00
803 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Blitar (tinggi minimal 2 m) m' 1,251,000.00
804 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Blitar (tinggi minimal 2 m) m' 1,114,000.00
805 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Malang (Bangunan m2 7,586,000.00
Gedung > 2 lantai dan luas > 500 m2)
806 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Malang (Bangunan Gedung m2 6,063,000.00
≤ 2 lantai dan luas ≤ 500 m2)
807 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Malang (Bangunan m2 7,586,000.00
Gedung > 2 lantai dan luas > 500 m2)
808 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Malang (Bangunan Gedung m2 6,063,000.00
≤ 2 lantai dan luas ≤ 500 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
809 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Malang (tidak sederhana, luas m2 6,819,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
810 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Malang (tidak sederhana, luas m2 6,724,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
811 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
812 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
813 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
814 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Malang (tidak sederhana, luas m2 6,819,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
815 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Malang (tidak sederhana, luas m2 6,724,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
816 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
817 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
818 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
819 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Malang (tidak sederhana, luas m2 6,819,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
820 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Malang (tidak sederhana, luas m2 6,724,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
821 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
822 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
823 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Malang (sederhana, luas m2 5,453,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
824 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Malang (tinggi minimal 1,5 m) m' 3,257,000.00
825 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Malang (tinggi minimal 2 m) m' 2,312,000.00
826 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Malang (tinggi minimal 2 m) m' 2,270,000.00
827 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Malang (tinggi minimal 1,5 m) m' 3,047,000.00
828 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Malang (tinggi minimal 2 m) m' 1,461,000.00
829 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Malang (tinggi minimal 2 m) m' 1,419,000.00
830 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Probolinggo m2 5,453,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
831 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Probolinggo (Bangunan m2 4,045,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
832 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Probolinggo m2 5,453,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
833 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Probolinggo (Bangunan m2 4,045,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
834 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Probolinggo (tidak sederhana, m2 5,117,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
835 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Probolinggo (tidak sederhana, m2 4,760,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
836 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
837 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
838 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
839 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Probolinggo (tidak sederhana, m2 5,117,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
840 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Probolinggo (tidak sederhana, m2 4,760,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
841 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
842 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
843 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
844 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Probolinggo (tidak sederhana, m2 5,117,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
845 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Probolinggo (tidak sederhana, m2 4,760,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
846 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
847 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
848 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Probolinggo (sederhana, luas m2 4,655,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
849 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Probolinggo (tinggi minimal 1,5 m) m' 2,039,000.00
850 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Probolinggo (tinggi minimal 2 m) m' 1,776,000.00
851 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Probolinggo (tinggi minimal 2 m) m' 1,871,000.00
852 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Probolinggo (tinggi minimal 1,5 m) m' 1,198,000.00
853 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Probolinggo (tinggi minimal 2 m) m' 1,072,000.00
854 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Probolinggo (tinggi minimal 2 m) m' 1,020,000.00
855 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Pasuruan (Bangunan m2 5,001,000.00
Gedung > 2 lantai dan luas > 500 m2)
856 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Pasuruan (Bangunan m2 4,171,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
857 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Pasuruan (Bangunan m2 5,001,000.00
Gedung > 2 lantai dan luas > 500 m2)
858 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Pasuruan (Bangunan m2 4,171,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
859 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Pasuruan (tidak sederhana, luas m2 4,875,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
860 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Pasuruan (tidak sederhana, luas m2 4,802,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
861 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
862 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
863 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
864 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Pasuruan (tidak sederhana, luas m2 4,875,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
865 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Pasuruan (tidak sederhana, luas m2 4,802,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
866 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
867 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
868 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
869 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Pasuruan (tidak sederhana, luas m2 4,875,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
870 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Pasuruan (tidak sederhana, luas m2 4,802,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
871 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
872 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
873 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Pasuruan (sederhana, luas m2 3,909,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
874 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Pasuruan (tinggi minimal 1,5 m) m' 2,081,000.00
875 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Pasuruan (tinggi minimal 2 m) m' 1,871,000.00
876 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Pasuruan (tinggi minimal 2 m) m' 1,808,000.00
877 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Pasuruan (tinggi minimal 1,5 m) m' 1,881,000.00
878 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Pasuruan (tinggi minimal 2 m) m' 1,198,000.00
879 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Pasuruan (tinggi minimal 2 m) m' 1,125,000.00
880 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Mojokerto m2 8,101,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
881 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Mojokerto (Bangunan m2 5,800,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
882 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Mojokerto m2 8,101,000.00
(Bangunan Gedung > 2 lantai dan luas > 500 m2)
883 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Mojokerto (Bangunan m2 5,800,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
884 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Mojokerto (tidak sederhana, m2 4,854,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
885 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Mojokerto (tidak sederhana, m2 7,061,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
886 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
887 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
888 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
889 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Mojokerto (tidak sederhana, m2 4,854,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
890 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Mojokerto (tidak sederhana, m2 7,061,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
891 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
892 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
893 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
894 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Mojokerto (tidak sederhana, m2 4,854,000.00
Permanen luas bangunan 250 m2, luas tanah 600 m2)
895 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Mojokerto (tidak sederhana, m2 7,061,000.00
Permanen luas bangunan 120 m2, luas tanah 350 m2)
896 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
897 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
898 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Mojokerto (sederhana, luas m2 6,042,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
899 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Mojokerto (tinggi minimal 1,5 m) m' 3,173,000.00
900 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Mojokerto (tinggi minimal 2 m) m' 2,585,000.00
901 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Mojokerto (tinggi minimal 2 m) m' 2,469,000.00
902 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Mojokerto (tinggi minimal 1,5 m) m' 2,974,000.00
903 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Mojokerto (tinggi minimal 2 m) m' 1,660,000.00
904 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Mojokerto (tinggi minimal 2 m) m' 1,566,000.00
905 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Madiun (Bangunan m2 6,346,000.00
Gedung > 2 lantai dan luas > 500 m2)
906 Bangunan Gedung Kantor Permanen Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Madiun (Bangunan m2 5,022,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
907 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Tidak Sederhana Kota Madiun (Bangunan m2 6,346,000.00
Gedung > 2 lantai dan luas > 500 m2)
908 Bangunan Gedung Permanen Lainnya Pembangunan Baru Bangunan Gedung Negara Sederhana Kota Madiun (Bangunan m2 5,022,000.00
Gedung ≤ 2 lantai dan luas ≤ 500 m2)
909 Rumah Negara Golongan I Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Madiun (tidak sederhana, luas m2 6,178,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
910 Rumah Negara Golongan I Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Madiun (tidak sederhana, luas m2 5,916,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
911 Rumah Negara Golongan I Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
912 Rumah Negara Golongan I Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
913 Rumah Negara Golongan I Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
914 Rumah Negara Golongan II Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Madiun (tidak sederhana, luas m2 6,178,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
915 Rumah Negara Golongan II Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Madiun (tidak sederhana, luas m2 5,916,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
916 Rumah Negara Golongan II Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
917 Rumah Negara Golongan II Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
918 Rumah Negara Golongan II Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
919 Rumah Negara Golongan III Tipe A Pembangunan Baru Bangunan Rumah Negara Type A Kota Madiun (tidak sederhana, luas m2 6,178,000.00
Permanen bangunan 250 m2, luas tanah 600 m2)
920 Rumah Negara Golongan III Tipe B Pembangunan Baru Bangunan Rumah Negara Type B Kota Madiun (tidak sederhana, luas m2 5,916,000.00
Permanen bangunan 120 m2, luas tanah 350 m2)
921 Rumah Negara Golongan III Tipe C Pembangunan Baru Bangunan Rumah Negara Type C Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 70 m2, luas tanah 200 m2)
922 Rumah Negara Golongan III Tipe D Pembangunan Baru Bangunan Rumah Negara Type D Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 50 m2, luas tanah 120 m2)
923 Rumah Negara Golongan III Tipe E Pembangunan Baru Bangunan Rumah Negara Type E Kota Madiun (sederhana, luas m2 4,718,000.00
Permanen bangunan 36 m2, luas tanah 100 m2)
924 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Depan Kota Madiun (tinggi minimal 1,5 m) m' 2,469,000.00
925 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Belakang Kota Madiun (tinggi minimal 2 m) m' 2,112,000.00
926 Pagar Permanen Pembangunan Baru Pagar Gedung Negara Samping Kota Madiun (tinggi minimal 2 m) m' 2,039,000.00
927 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Depan Kota Madiun (tinggi minimal 1,5 m) m' 2,259,000.00
928 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Belakang Kota Madiun (tinggi minimal 2 m) m' 1,429,000.00
929 Pagar Permanen Pembangunan Baru Pagar Rumah Negara Samping Kota Madiun (tinggi minimal 2 m) m' 1,272,000.00
930 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
931 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
932 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
933 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
934 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
935 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
936 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
937 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
938 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
939 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
940 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
941 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
942 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
943 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
944 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
945 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
946 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
947 Pagar Permanen Perencanaan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 36,000,000.00
luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
948 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
949 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
950 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
951 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
952 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
953 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
954 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
955 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
956 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
957 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
958 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
959 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
960 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
961 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
962 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
963 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
964 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
965 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 75,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
966 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
967 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
968 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
969 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
970 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
971 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
972 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
973 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
974 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
975 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
976 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
977 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
978 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
979 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
980 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
981 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
982 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
983 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 paket 123,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
984 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
985 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
986 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
987 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
988 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
989 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
990 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
991 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
992 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
993 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
994 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
995 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
996 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
997 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
998 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
999 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1000 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1001 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 252,500,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1002 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1003 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1004 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1005 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1006 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1007 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1008 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1009 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1010 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1011 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1012 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1013 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1014 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1015 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1016 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1017 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1018 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1019 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1020 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1021 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1022 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1023 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1024 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1025 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1026 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1027 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1028 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1029 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1030 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1031 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1032 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1033 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1034 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1035 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1036 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1037 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 630,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1038 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1039 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1040 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1041 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1042 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1043 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1044 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1045 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1046 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1047 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1048 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1049 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1050 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1051 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1052 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1053 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1054 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1055 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1056 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1057 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1058 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1059 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1060 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1061 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1062 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1063 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1064 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1065 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1066 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1067 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1068 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1069 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1070 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1071 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1072 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1073 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1074 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1075 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1076 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1077 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1078 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1079 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1080 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1081 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1082 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1083 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1084 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1085 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1086 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1087 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1088 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1089 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1090 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1091 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1092 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1093 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1094 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1095 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1096 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1097 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1098 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1099 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1100 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1101 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1102 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1103 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1104 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1105 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1106 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1107 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1108 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1109 Pagar Permanen Perencanaan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1110 Bangunan Gedung Kantor Permanen Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1111 Bangunan Gedung Permanen Lainnya Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1112 Rumah Negara Golongan I Tipe A Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1113 Rumah Negara Golongan I Tipe B Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1114 Rumah Negara Golongan I Tipe C Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1115 Rumah Negara Golongan I Tipe D Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1116 Rumah Negara Golongan I Tipe E Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1117 Rumah Negara Golongan II Tipe A Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1118 Rumah Negara Golongan II Tipe B Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1119 Rumah Negara Golongan II Tipe C Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1120 Rumah Negara Golongan II Tipe D Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1121 Rumah Negara Golongan II Tipe E Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1122 Rumah Negara Golongan III Tipe A Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1123 Rumah Negara Golongan III Tipe B Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1124 Rumah Negara Golongan III Tipe C Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1125 Rumah Negara Golongan III Tipe D Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1126 Rumah Negara Golongan III Tipe E Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1127 Pagar Permanen Perencanaan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 39,600,000.00
dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1128 Bangunan Gedung Kantor Permanen lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1129 Bangunan Gedung Permanen Lainnya lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1130 Rumah Negara Golongan I Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1131 Rumah Negara Golongan I Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1132 Rumah Negara Golongan I Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1133 Rumah Negara Golongan I Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1134 Rumah Negara Golongan I Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1135 Rumah Negara Golongan II Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1136 Rumah Negara Golongan II Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1137 Rumah Negara Golongan II Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1138 Rumah Negara Golongan II Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1139 Rumah Negara Golongan II Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1140 Rumah Negara Golongan III Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1141 Rumah Negara Golongan III Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1142 Rumah Negara Golongan III Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1143 Rumah Negara Golongan III Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1144 Rumah Negara Golongan III Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
Permanen
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1145 Pagar Permanen lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 82,000,000.00
m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1146 Bangunan Gedung Kantor Permanen 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1147 Bangunan Gedung Permanen Lainnya 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1148 Rumah Negara Golongan I Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1149 Rumah Negara Golongan I Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1150 Rumah Negara Golongan I Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1151 Rumah Negara Golongan I Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1152 Rumah Negara Golongan I Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1153 Rumah Negara Golongan II Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1154 Rumah Negara Golongan II Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1155 Rumah Negara Golongan II Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1156 Rumah Negara Golongan II Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1157 Rumah Negara Golongan II Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1158 Rumah Negara Golongan III Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1159 Rumah Negara Golongan III Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1160 Rumah Negara Golongan III Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1161 Rumah Negara Golongan III Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1162 Rumah Negara Golongan III Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung >
1163 Pagar Permanen 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 135,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1164 Bangunan Gedung Kantor Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1165 Bangunan Gedung Permanen Lainnya > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1166 Rumah Negara Golongan I Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1167 Rumah Negara Golongan I Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1168 Rumah Negara Golongan I Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1169 Rumah Negara Golongan I Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1170 Rumah Negara Golongan I Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1171 Rumah Negara Golongan II Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1172 Rumah Negara Golongan II Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1173 Rumah Negara Golongan II Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1174 Rumah Negara Golongan II Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1175 Rumah Negara Golongan II Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1176 Rumah Negara Golongan III Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1177 Rumah Negara Golongan III Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1178 Rumah Negara Golongan III Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1179 Rumah Negara Golongan III Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1180 Rumah Negara Golongan III Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung
1181 Pagar Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 277,500,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1182 Bangunan Gedung Kantor Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1183 Bangunan Gedung Permanen Lainnya > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1184 Rumah Negara Golongan I Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1185 Rumah Negara Golongan I Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1186 Rumah Negara Golongan I Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1187 Rumah Negara Golongan I Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1188 Rumah Negara Golongan I Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1189 Rumah Negara Golongan II Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1190 Rumah Negara Golongan II Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1191 Rumah Negara Golongan II Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1192 Rumah Negara Golongan II Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1193 Rumah Negara Golongan II Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1194 Rumah Negara Golongan III Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1195 Rumah Negara Golongan III Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1196 Rumah Negara Golongan III Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1197 Rumah Negara Golongan III Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1198 Rumah Negara Golongan III Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung
1199 Pagar Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 455,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1200 Bangunan Gedung Kantor Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1201 Bangunan Gedung Permanen Lainnya > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1202 Rumah Negara Golongan I Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1203 Rumah Negara Golongan I Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1204 Rumah Negara Golongan I Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1205 Rumah Negara Golongan I Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1206 Rumah Negara Golongan I Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1207 Rumah Negara Golongan II Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1208 Rumah Negara Golongan II Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1209 Rumah Negara Golongan II Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1210 Rumah Negara Golongan II Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1211 Rumah Negara Golongan II Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1212 Rumah Negara Golongan III Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1213 Rumah Negara Golongan III Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1214 Rumah Negara Golongan III Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1215 Rumah Negara Golongan III Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1216 Rumah Negara Golongan III Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
Permanen
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1217 Pagar Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 730,000,000.00
600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1218 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1219 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1220 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1221 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1222 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1223 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1224 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1225 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1226 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1227 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1228 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1229 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1230 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1231 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1232 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1233 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1234 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1235 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1236 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1237 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1238 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1239 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1240 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1241 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1242 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1243 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1244 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1245 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1246 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1247 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1248 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1249 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1250 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1251 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1252 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1253 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1254 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1255 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1256 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1257 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1258 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1259 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1260 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1261 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1262 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1263 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1264 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1265 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1266 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1267 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1268 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1269 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1270 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1271 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1272 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1273 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1274 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1275 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1276 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1277 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1278 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1279 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1280 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1281 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1282 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1283 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1284 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1285 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1286 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1287 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1288 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Perencanaan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1289 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
1290 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1291 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1292 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1293 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1294 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
1295 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1296 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1297 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1298 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1299 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1300 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1301 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1302 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1303 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1304 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1305 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1306 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
Permanen luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1307 Pagar Permanen Pengawasan Bangunan Gedung Sederhana sd 200 Juta (Bangunan Gedung ≤ 2 lantai dan paket 24,800,000.00
luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1308 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1309 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,001.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1310 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,002.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1311 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,003.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1312 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,004.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1313 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,005.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1314 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,006.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1315 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,007.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1316 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,008.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1317 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,009.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1318 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,010.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1319 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,011.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1320 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,012.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1321 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,013.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1322 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,014.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1323 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,015.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1324 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,016.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1325 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 200 - 500 Juta (Bangunan Gedung ≤ 2 lantai paket 49,000,017.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1326 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1327 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1328 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1329 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1330 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1331 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1332 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1333 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1334 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1335 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1336 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1337 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1338 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1339 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1340 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1341 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1342 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
Permanen dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1343 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 500 - 1.000 Juta (Bangunan Gedung ≤ 2 lantai paket 77,000,000.00
dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1344 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1345 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1346 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1347 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1348 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1349 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1350 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1351 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1352 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1353 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1354 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1355 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1356 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1357 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1358 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1359 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1360 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1361 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung ≤ 2 paket 157,500,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1362 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1363 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1364 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1365 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1366 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1367 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1368 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1369 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1370 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1371 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1372 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1373 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1374 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1375 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1376 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1377 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1378 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1379 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung ≤ 2 paket 255,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1380 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1381 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1382 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1383 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1384 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1385 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1386 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1387 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1388 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1389 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1390 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1391 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1392 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1393 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1394 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1395 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1396 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1397 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung ≤ 2 paket 400,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1398 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1399 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1400 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1401 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1402 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1403 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1404 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1405 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1406 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1407 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1408 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1409 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1410 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1411 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1412 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1413 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1414 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1415 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 10.000 - 25.000 Juta (Bangunan Gedung ≤ 2 paket 775,000,000.00
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1416 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1417 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1418 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1419 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1420 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1421 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1422 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1423 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1424 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1425 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1426 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1427 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1428 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1429 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1430 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1431 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1432 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1433 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 25.000 - 50.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1434 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1435 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1436 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1437 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1438 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1439 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1440 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1441 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1442 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1443 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1444 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1445 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1446 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1447 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1448 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1449 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1450 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
Permanen lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1451 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 50.000 - 100.000 Juta (Bangunan Gedung ≤ 2 paket ###
lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1452 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1453 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1454 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1455 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1456 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
1457 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1458 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1459 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1460 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1461 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1462 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1463 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1464 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1465 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1466 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1467 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1468 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
Permanen 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1469 Pagar Permanen Pengawasan Bangunan Gedung Sederhana > 100.000 - 250.000 Juta (Bangunan Gedung ≤ paket ###
2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas tanah 100-200 m2)
1470 Bangunan Gedung Kantor Permanen Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1471 Bangunan Gedung Permanen Lainnya Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1472 Rumah Negara Golongan I Tipe A Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1473 Rumah Negara Golongan I Tipe B Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1474 Rumah Negara Golongan I Tipe C Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1475 Rumah Negara Golongan I Tipe D Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1476 Rumah Negara Golongan I Tipe E Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1477 Rumah Negara Golongan II Tipe A Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1478 Rumah Negara Golongan II Tipe B Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1479 Rumah Negara Golongan II Tipe C Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1480 Rumah Negara Golongan II Tipe D Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1481 Rumah Negara Golongan II Tipe E Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1482 Rumah Negara Golongan III Tipe A Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1483 Rumah Negara Golongan III Tipe B Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1484 Rumah Negara Golongan III Tipe C Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1485 Rumah Negara Golongan III Tipe D Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1486 Rumah Negara Golongan III Tipe E Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
Permanen dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
1487 Pagar Permanen Pengawasan Bangunan Gedung Tidak Sederhana sd 200 Juta (Bangunan Gedung > 2 lantai paket 28,400,000.00
dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1488 Bangunan Gedung Kantor Permanen lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1489 Bangunan Gedung Permanen Lainnya lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1490 Rumah Negara Golongan I Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1491 Rumah Negara Golongan I Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1492 Rumah Negara Golongan I Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1493 Rumah Negara Golongan I Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1494 Rumah Negara Golongan I Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1495 Rumah Negara Golongan II Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1496 Rumah Negara Golongan II Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1497 Rumah Negara Golongan II Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1498 Rumah Negara Golongan II Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1499 Rumah Negara Golongan II Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1500 Rumah Negara Golongan III Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1501 Rumah Negara Golongan III Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1502 Rumah Negara Golongan III Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1503 Rumah Negara Golongan III Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1504 Rumah Negara Golongan III Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan Gedung > 2
1505 Pagar Permanen lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 58,750,000.00
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1506 Bangunan Gedung Kantor Permanen lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1507 Bangunan Gedung Permanen Lainnya lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1508 Rumah Negara Golongan I Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1509 Rumah Negara Golongan I Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1510 Rumah Negara Golongan I Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1511 Rumah Negara Golongan I Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1512 Rumah Negara Golongan I Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1513 Rumah Negara Golongan II Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1514 Rumah Negara Golongan II Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1515 Rumah Negara Golongan II Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1516 Rumah Negara Golongan II Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1517 Rumah Negara Golongan II Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1518 Rumah Negara Golongan III Tipe A lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1519 Rumah Negara Golongan III Tipe B lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1520 Rumah Negara Golongan III Tipe C lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1521 Rumah Negara Golongan III Tipe D lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1522 Rumah Negara Golongan III Tipe E lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
Permanen
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan Gedung > 2
1523 Pagar Permanen lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350-600 paket 96,000,000.00
m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1524 Bangunan Gedung Kantor Permanen 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1525 Bangunan Gedung Permanen Lainnya 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1526 Rumah Negara Golongan I Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1527 Rumah Negara Golongan I Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1528 Rumah Negara Golongan I Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1529 Rumah Negara Golongan I Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1530 Rumah Negara Golongan I Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1531 Rumah Negara Golongan II Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1532 Rumah Negara Golongan II Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1533 Rumah Negara Golongan II Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1534 Rumah Negara Golongan II Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1535 Rumah Negara Golongan II Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1536 Rumah Negara Golongan III Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1537 Rumah Negara Golongan III Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1538 Rumah Negara Golongan III Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1539 Rumah Negara Golongan III Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1540 Rumah Negara Golongan III Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta (Bangunan Gedung >
1541 Pagar Permanen 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 197,500,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1542 Bangunan Gedung Kantor Permanen 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1543 Bangunan Gedung Permanen Lainnya 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1544 Rumah Negara Golongan I Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1545 Rumah Negara Golongan I Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1546 Rumah Negara Golongan I Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1547 Rumah Negara Golongan I Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1548 Rumah Negara Golongan I Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1549 Rumah Negara Golongan II Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1550 Rumah Negara Golongan II Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1551 Rumah Negara Golongan II Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1552 Rumah Negara Golongan II Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1553 Rumah Negara Golongan II Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1554 Rumah Negara Golongan III Tipe A 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1555 Rumah Negara Golongan III Tipe B 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1556 Rumah Negara Golongan III Tipe C 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1557 Rumah Negara Golongan III Tipe D 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1558 Rumah Negara Golongan III Tipe E 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta (Bangunan Gedung >
1559 Pagar Permanen 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 325,000,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1560 Bangunan Gedung Kantor Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1561 Bangunan Gedung Permanen Lainnya > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1562 Rumah Negara Golongan I Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1563 Rumah Negara Golongan I Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1564 Rumah Negara Golongan I Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1565 Rumah Negara Golongan I Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1566 Rumah Negara Golongan I Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1567 Rumah Negara Golongan II Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1568 Rumah Negara Golongan II Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1569 Rumah Negara Golongan II Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1570 Rumah Negara Golongan II Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1571 Rumah Negara Golongan II Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1572 Rumah Negara Golongan III Tipe A > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1573 Rumah Negara Golongan III Tipe B > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1574 Rumah Negara Golongan III Tipe C > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1575 Rumah Negara Golongan III Tipe D > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1576 Rumah Negara Golongan III Tipe E > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
Permanen
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta (Bangunan Gedung
1577 Pagar Permanen > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas tanah 350- paket 520,000,000.00
600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1578 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1579 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1580 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1581 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1582 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1583 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1584 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1585 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1586 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1587 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1588 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1589 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1590 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1591 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1592 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1593 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1594 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta (Bangunan
1595 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1596 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1597 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1598 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1599 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1600 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1601 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1602 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1603 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1604 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1605 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1606 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1607 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1608 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1609 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1610 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1611 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1612 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta (Bangunan
1613 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1614 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1615 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1616 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1617 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1618 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1619 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1620 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1621 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1622 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1623 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1624 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1625 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1626 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1627 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1628 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1629 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1630 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta (Bangunan
1631 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1632 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1633 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1634 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1635 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1636 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1637 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1638 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1639 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1640 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1641 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1642 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1643 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1644 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1645 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1646 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1647 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1648 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
Permanen
tanah 350-600 m2)
Pengawasan Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta (Bangunan
1649 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket ###
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1668 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1669 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1670 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1671 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1672 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1673 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1674 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1675 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1676 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1677 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1678 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1679 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1680 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1681 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1682 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1683 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1684 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 200 - 500 Juta (Bangunan
1685 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 75,500,000.00
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1686 Bangunan Gedung Kantor Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1687 Bangunan Gedung Permanen Lainnya Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1688 Rumah Negara Golongan I Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1689 Rumah Negara Golongan I Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1690 Rumah Negara Golongan I Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1691 Rumah Negara Golongan I Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1692 Rumah Negara Golongan I Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1693 Rumah Negara Golongan II Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1694 Rumah Negara Golongan II Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1695 Rumah Negara Golongan II Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1696 Rumah Negara Golongan II Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1697 Rumah Negara Golongan II Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1698 Rumah Negara Golongan III Tipe A Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1699 Rumah Negara Golongan III Tipe B Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1700 Rumah Negara Golongan III Tipe C Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1701 Rumah Negara Golongan III Tipe D Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1702 Rumah Negara Golongan III Tipe E Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
Permanen
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta (Bangunan
1703 Pagar Permanen Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 m2, luas paket 125,000,000.00
tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1704 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1705 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1706 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1707 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1708 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1709 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1710 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1711 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1712 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1713 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1714 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1715 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1716 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1717 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1718 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1719 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1720 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 1.000 - 2.500 Juta
1721 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 255,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1722 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1723 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1724 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1725 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1726 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1727 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1728 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1729 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1730 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1731 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1732 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1733 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1734 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1735 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1736 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1737 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1738 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 2.500 - 5.000 Juta
1739 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 420,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1740 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1741 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1742 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1743 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1744 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1745 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1746 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1747 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1748 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1749 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1750 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1751 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1752 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1753 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1754 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1755 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1756 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 5.000 - 10.000 Juta
1757 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 670,000,000.00
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1758 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1759 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1760 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1761 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1762 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1763 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1764 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1765 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1766 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1767 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1768 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1769 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1770 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1771 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1772 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1773 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1774 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 10.000 - 25.000 Juta
1775 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1776 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1777 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1778 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1779 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1780 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1781 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1782 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1783 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1784 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1785 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1786 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1787 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1788 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1789 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1790 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1791 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1792 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 25.000 - 50.000 Juta
1793 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1794 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1795 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1796 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1797 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1798 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1799 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1800 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1801 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1802 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1803 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1804 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1805 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1806 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1807 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1808 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1809 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1810 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 50.000 - 100.000 Juta
1811 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1812 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1813 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1814 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1815 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1816 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1817 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1818 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1819 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1820 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1821 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1822 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1823 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1824 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1825 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1826 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1827 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1828 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
Permanen
m2, luas tanah 350-600 m2)
Manajemen Konstruksi Bangunan Gedung Tidak Sederhana > 100.000 - 250.000 Juta
1829 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket ###
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1830 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1831 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1832 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1833 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1834 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1835 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1836 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1837 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1838 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1839 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1840 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1841 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1842 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1843 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1844 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1845 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1846 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 200 - 500 Juta
1847 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 15,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1848 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1849 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1850 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1851 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1852 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1853 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1854 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1855 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1856 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1857 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1858 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1859 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1860 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1861 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1862 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1863 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1864 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 500 - 1.000 Juta
1865 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 24,600,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1866 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1867 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1868 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1869 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1870 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1871 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1872 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1873 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1874 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1875 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1876 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1877 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1878 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1879 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1880 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1881 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1882 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 1.000 - 2.500 Juta
1883 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 50,500,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1884 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1885 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1886 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1887 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1888 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1889 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1890 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1891 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1892 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1893 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1894 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1895 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1896 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1897 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1898 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1899 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1900 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 2.500 - 5.000 Juta
1901 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 80,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1902 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1903 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1904 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1905 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1906 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1907 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1908 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1909 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1910 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1911 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1912 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1913 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1914 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1915 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1916 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1917 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1918 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 5.000 - 10.000 Juta
1919 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 126,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1920 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1921 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1922 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1923 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1924 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1925 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1926 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1927 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1928 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1929 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1930 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1931 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1932 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1933 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1934 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1935 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1936 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 10.000 - 25.000 Juta
1937 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 240,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1938 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1939 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1940 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1941 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1942 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1943 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1944 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1945 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1946 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1947 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1948 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1949 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1950 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1951 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1952 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1953 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1954 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 25.000 - 50.000 Juta
1955 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 370,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1956 Bangunan Gedung Kantor Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,000.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1957 Bangunan Gedung Permanen Lainnya (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,001.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1958 Rumah Negara Golongan I Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,002.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1959 Rumah Negara Golongan I Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,003.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1960 Rumah Negara Golongan I Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,004.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1961 Rumah Negara Golongan I Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,005.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1962 Rumah Negara Golongan I Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,006.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1963 Rumah Negara Golongan II Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,007.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1964 Rumah Negara Golongan II Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,008.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1965 Rumah Negara Golongan II Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,009.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1966 Rumah Negara Golongan II Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,010.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1967 Rumah Negara Golongan II Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,011.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1968 Rumah Negara Golongan III Tipe A (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,012.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1969 Rumah Negara Golongan III Tipe B (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,013.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1970 Rumah Negara Golongan III Tipe C (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,014.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1971 Rumah Negara Golongan III Tipe D (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,015.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1972 Rumah Negara Golongan III Tipe E (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,016.00
Permanen
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Sederhana > 50.000 - 100.000 Juta
1973 Pagar Permanen (Bangunan Gedung ≤ 2 lantai dan luas ≤ 500 m2; sederhana, luas bangunan 36-70 m2, luas paket 560,000,017.00
tanah 100-200 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1992 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1993 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1994 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1995 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1996 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1997 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1998 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
1999 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2000 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2001 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2002 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2003 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2004 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2005 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2006 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2007 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2008 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 200 - 500 Juta
2009 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 16,400,000.00
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2010 Bangunan Gedung Kantor Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2011 Bangunan Gedung Permanen Lainnya (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2012 Rumah Negara Golongan I Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2013 Rumah Negara Golongan I Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2014 Rumah Negara Golongan I Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2015 Rumah Negara Golongan I Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2016 Rumah Negara Golongan I Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2017 Rumah Negara Golongan II Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2018 Rumah Negara Golongan II Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2019 Rumah Negara Golongan II Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2020 Rumah Negara Golongan II Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2021 Rumah Negara Golongan II Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2022 Rumah Negara Golongan III Tipe A (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2023 Rumah Negara Golongan III Tipe B (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2024 Rumah Negara Golongan III Tipe C (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2025 Rumah Negara Golongan III Tipe D (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2026 Rumah Negara Golongan III Tipe E (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
Permanen
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 500 - 1.000 Juta
2027 Pagar Permanen (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120-250 paket 27,000,000.00
m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2028 Bangunan Gedung Kantor Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2029 Bangunan Gedung Permanen Lainnya Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2030 Rumah Negara Golongan I Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2031 Rumah Negara Golongan I Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2032 Rumah Negara Golongan I Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2033 Rumah Negara Golongan I Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2034 Rumah Negara Golongan I Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2035 Rumah Negara Golongan II Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2036 Rumah Negara Golongan II Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2037 Rumah Negara Golongan II Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2038 Rumah Negara Golongan II Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2039 Rumah Negara Golongan II Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2040 Rumah Negara Golongan III Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2041 Rumah Negara Golongan III Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2042 Rumah Negara Golongan III Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2043 Rumah Negara Golongan III Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2044 Rumah Negara Golongan III Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 1.000 - 2.500
2045 Pagar Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 55,500,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2046 Bangunan Gedung Kantor Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2047 Bangunan Gedung Permanen Lainnya Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2048 Rumah Negara Golongan I Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2049 Rumah Negara Golongan I Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2050 Rumah Negara Golongan I Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2051 Rumah Negara Golongan I Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2052 Rumah Negara Golongan I Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2053 Rumah Negara Golongan II Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2054 Rumah Negara Golongan II Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2055 Rumah Negara Golongan II Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2056 Rumah Negara Golongan II Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2057 Rumah Negara Golongan II Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2058 Rumah Negara Golongan III Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2059 Rumah Negara Golongan III Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2060 Rumah Negara Golongan III Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2061 Rumah Negara Golongan III Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2062 Rumah Negara Golongan III Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 2.500 - 5.000
2063 Pagar Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 91,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2064 Bangunan Gedung Kantor Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2065 Bangunan Gedung Permanen Lainnya Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2066 Rumah Negara Golongan I Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2067 Rumah Negara Golongan I Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2068 Rumah Negara Golongan I Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2069 Rumah Negara Golongan I Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2070 Rumah Negara Golongan I Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2071 Rumah Negara Golongan II Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2072 Rumah Negara Golongan II Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2073 Rumah Negara Golongan II Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2074 Rumah Negara Golongan II Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2075 Rumah Negara Golongan II Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2076 Rumah Negara Golongan III Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2077 Rumah Negara Golongan III Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2078 Rumah Negara Golongan III Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2079 Rumah Negara Golongan III Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2080 Rumah Negara Golongan III Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 5.000 - 10.000
2081 Pagar Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 146,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2082 Bangunan Gedung Kantor Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2083 Bangunan Gedung Permanen Lainnya Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2084 Rumah Negara Golongan I Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2085 Rumah Negara Golongan I Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2086 Rumah Negara Golongan I Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2087 Rumah Negara Golongan I Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2088 Rumah Negara Golongan I Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2089 Rumah Negara Golongan II Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2090 Rumah Negara Golongan II Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2091 Rumah Negara Golongan II Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2092 Rumah Negara Golongan II Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2093 Rumah Negara Golongan II Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2094 Rumah Negara Golongan III Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2095 Rumah Negara Golongan III Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2096 Rumah Negara Golongan III Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2097 Rumah Negara Golongan III Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2098 Rumah Negara Golongan III Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 10.000 - 25.000
2099 Pagar Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 290,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2100 Bangunan Gedung Kantor Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2101 Bangunan Gedung Permanen Lainnya Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2102 Rumah Negara Golongan I Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2103 Rumah Negara Golongan I Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2104 Rumah Negara Golongan I Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
NO. JENIS ASB PADA SIPD SPESIFIKASI SATUAN HARGA SATUAN
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2105 Rumah Negara Golongan I Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2106 Rumah Negara Golongan I Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2107 Rumah Negara Golongan II Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2108 Rumah Negara Golongan II Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2109 Rumah Negara Golongan II Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2110 Rumah Negara Golongan II Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2111 Rumah Negara Golongan II Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2112 Rumah Negara Golongan III Tipe A Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2113 Rumah Negara Golongan III Tipe B Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2114 Rumah Negara Golongan III Tipe C Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2115 Rumah Negara Golongan III Tipe D Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2116 Rumah Negara Golongan III Tipe E Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
Permanen
250 m2, luas tanah 350-600 m2)
Perencanaan (Pengawasan Berkala) Bangunan Gedung Tidak Sederhana > 25.000 - 50.000
2117 Pagar Permanen Juta (Bangunan Gedung > 2 lantai dan luas > 500 m2; tidak sederhana, luas bangunan 120- paket 460,000,000.00
250 m2, luas tanah 350-600 m2)
A. Untuk Tulangan D10 dan D36 yang ujungnya diberi kait standar
Diameter Tulangan db = 19 mm
Jenis Beton = Beton Normal
faktor modifikasi λ = 1
beton ringan = 0.75
beton normal = 1
Ldh = 512.944 mm
Persyaratan
Ldh tidak boleh kurang dari 8db = 152 mm
150mm = 150 mm
Sehingga,
Ldh digunakan Pada Tulangan Tarik = 512.9442 mm