No. ITEM PEKERJAAN PERHITUNGAN VOLUME KETERANGAN 1. DRAINASE BETON SAMPING KIRI JALAN 31,71 m3 Cor Beton POTONGAN 1 - 1 I - PEKERJAAN DRAINASE BETON SAMPING KIRI JALAN L = 106.50 M (POTONGAN 1 - 1) 1. V.1 Dinding Kiri Drainase Beton Panjang = 106,50 m Tebal = 0,12 m Tinggi = 0,40 m Volume = 106,50 x 0,12 x 0,40 = 5,11 m3 2. V.2 Dinding Kanan Drainase Beton Panjang = 106,50 m Tebal = 0,12 m Tinggi = 0,40 m Volume = 106,50 x 0,12 x 0,40 = 5,11 m3 3. V.3 Lantai Drainase Beton Panjang = 106,50 m Tebal = 0,10 m Lebar = 0,54 m Volume = 106,50 x 0,10 x 0,54 = 5,75 m3
2. DRAINASE BETON SAMPING KANAN JALAN
POTONGAN 2 - 2 II - PEKERJAAN DRAINASE BETON SAMPING KANAN JALAN L = 104.90 M (POTONGAN 2 - 2) 1. V.1 Dinding Kiri Drainase Beton Panjang = 104,90 m Tebal = 0,12 m Tinggi = 0,40 m Volume = 104,90 x 0,12 x 0,40 = 5,04 m3 2. V.2 Dinding Kanan Drainase Beton Panjang = 104,90 m Tebal = 0,12 m Tinggi = 0,40 m Volume = 104,90 x 0,12 x 0,40 = 5,04 m3 PERHITUNGAN PEKERJAAN DRAINASE BETON DUKUH REMBUL, DESA TUMBREP, KECAMATAN BANDAR No. ITEM PEKERJAAN PERHITUNGAN VOLUME KETERANGAN 3. V.3 Lantai Drainase Beton Panjang = 104,90 m Tebal = 0,10 m Lebar = 0,54 m Volume = 104,90 x 0,10 x 0,54 = 5,66 m3