You are on page 1of 1

Test & Commissioning Rev. No.

for SI210 Controller Doc. No. 695-108

FOD Page 16/45


Overseas Support Team
PCB Date MAR. 2003

5.2 Detail of DPC PCB


1) Check connector connection before power input
① In case of 60~105m/min, verify that connector VA(Control power), VB(CT), VC(C1VD),
VE(1/0,1/F), VG(GDC), VJ(DPC PCB= Brake control current) are connected.
※ VD(Used for ALP function), VDA(D/A CARD), VH(SERIAL) and VF(Control power for
120~150m/min) are not connected.
2) Check Jumper
- Verify that Jumper, inverter H/W over-current detector, are set according to the table
Table 1) Setting of J5H(DPC-111,112) and JP4(DPC120) Jumper
Jumper No. IPM, IGBT Capacity Motor Capacity

No. 1 ~ 2 50A, 75A, 150A 4.4KW~7.5KW. 13KW~15KW

No. 3 ~ 4 100A, 200A 9.5KW~11KW. 18KW~22KW

Table 2) JP1(DPC-120)

Jumper No. Function Motor Capacity

MP 50A, 75A, 150A

MC 100A, 200A

Table 3) JP3(DPC-120)

Jumper No. Function Motor Capacity

SIGMA For Sigma Model Same as unified CP, Brake control current

DI1,2 For Di model

3) Check J1J, J1G(DPC-111,112) or JP2(DPC-120) Jumper


① Jumper must be inserted to 1~2 pin of J1G at ordinary times(DPC-111.112)
(Move jumper to 3~4 pin when you do DSP SPEC writing )
Jumper pin must be inserted to NC pin of JP2 at ordinary times(DPC-120)
(Move jumper to 'WE' when you do DSP SPEC writing)
② Insert jumper to 1~2pin of J1J during software booting(DPC-111,112)
③ Set the jumper to 1~2 of J1G(DPC-111,112) or 'NC' of JP2(DPC-120) when you reset
the DOC PCB after DSP SPEC writing.

4) Check control power when inputting power


① As power voltage is set in the factory, checking is usually unnecessary.
If circuit operation is abnormal, check the voltage according to the table 4.
If the measured value is out of the regular range, never reset the value, and
Measure again with another instrument in case of measuring equipment failure.

You might also like