Total 14.985.333.345
Over Head 749.266.667
Grand Total 15.734.600.012
Rounded 15.734.000.000
A Preliminary
Preparation Works
Signboard ls 1,00 1.929.750 1.929.750
Safety equipments & devices ls 1,00 5.602.500 5.602.500
Temporary Works
Contractor's site office & storage ls 1,00 112.050.000 112.050.000
Temporary protection ls 1,00 14.566.500 14.566.500
General scaffolding and staging ls 1,00 33.233.200 33.233.200
Mobilization & demobilization ls 1,00 12.450.000 12.450.000
A. 2 Site Expenses
Testing Works
Samples of materials ls - - -
Testing of materials ls - - -
Total 524.198.950
A. CIVIL WORK
Project : New Warehouse - Option 01 Summary Civil Works
Owner : PT. Sanko Gosei Technology Indonesia
Location : Jl. Surya Utama Jl. Kw. Industri No.21A,
Kutanegara, Suryacipta, Karawang 11/10/2023
AMOUNT
NO DESCRIPTION UNIT Q'ty
(Rp)
A Civil Works
A Civil Works
1 Demolish Work
Existing Canopy m² 1.311,00 130.800 171.478.800
Structure parking area m² 200,00 118.300 23.660.000
Canopy parking area m² 108,00 118.300 12.776.400
2 Eart Work
Excavation soil & disposal m³ 2.734,00 124.500 340.383.000
Backfill soil m³ 546,80 49.800 27.230.640
Compaction m² 2.734,00 18.675 51.057.450
1 Foundation
Lean concrete m² 40,32 88.695 3.576.184
Unexposed Formwork m² 80,64 283.536 22.864.367
Reinforcement kg 4.750,70 18.675 88.719.397
Structural Concrete K - 250 (Readymix) m³ 24,19 1.201.425 29.064.874
2 Beam
Lean concrete m² 64,20 88.695 5.694.222
Unexposed Formwork m² 137,00 283.536 38.844.473
Reinforcement kg 3.362,92 18.675 62.802.566
Structural Concrete K - 250 (Readymix) m³ 17,13 1.201.425 20.574.403
3 Column
Unexposed Formwork m² 56,00 283.536 15.878.033
Reinforcement kg 1.374,63 18.675 25.671.122
Structural Concrete K - 250 (Readymix) m³ 7,00 1.201.425 8.409.975
4 Concrete Slab
Unexposed Formwork m² 535,50 283.536 151.833.689
Reinforcement Wiremesh M8-150 mm - double layer m² 2.734,00 201.387 550.592.501
Structural Concrete K - 300 (Readymix) m³ 546,80 1.213.875 663.746.850
Plastic sheet m² 2.734,00 18.675 51.057.450
Dowel bar kg 5.468,00 18.675 102.114.900
Extra rebar to supporting kg 2.528,95 18.675 47.228.141
Flexible pipe m' 2.466,00 24.900 61.403.400
Finish trowel & floor hardener 5 kg/m2 m² 2.734,00 49.800 136.153.200
Cutting & sealant fill (Selant PU Ex. SIKA) m' 1.233,00 43.575 53.727.975
4 Painting Works
Exterior partition finish painting- weathershiel ex jotun m² 56,00 80.253 4.494.151
A Civil Works
1 Earth Work
Land Clearing m² 3.008,63 18.700 56.261.381
Excavation soil m² 3.008,63 124.500 374.574.435
Excavation soil : Drainage m³ 334,00 124.500 41.583.000
Disposal rubish & soil m³ 3.342,63 93.400 312.201.642
Sub base compaction m² 3.008,63 18.700 56.261.381
Basecourse and compaction, T = 200 mm m² 3.008,63 93.400 281.006.042
Limestone and compaction, T = 400 mm m² 3.008,63 219.200 659.491.696
3 CBR Test
Sub base area test 4-7% nos 7,00 354.900 2.484.300
Limestone area test 40-60% nos 7,00 354.900 2.484.300
Basecourse area test 60-80% nos 7,00 354.900 2.484.300
3 Drainage
Install U-Ditch drainage - size 60x60 cm m' 205,00 958.700 196.533.500
Install U-Ditch drainage - size 80x80 cm m' 141,00 1.417.300 199.839.300
Install U-Ditch drainage - size 80x100 cm m' 55,00 1.620.600 89.133.000
Sutructur beam suppotr m' 100,00 291.400 29.140.000
Install Box Culvert drainage - size 100x100 cm m' 15,00 4.818.200 72.273.000
Toral 3.900.043.166
A. CIVIL WORK
Project : New Concrete Option 05 Breakdown
Owner : PT. Sanko Gosei Technology Indonesia
Scope of Work : Civil
11/10/2023
A Civil Works
3 Roofing Works
Roof metal zincalume corrugated sheet; t = 0.5 mm m² 1.404,90 215.800 303.177.420
Metal facia zincalume corrugated sheet; t = 0.45 mm m' 237,30 207.500 49.239.750
A Civil Works
AMOUNT
NO DESCRIPTION UNIT Q'ty
(Rp)
B Electrical Work
1 Lighting System at Canopy
Lighting Fixture LED 150W Fortimo Phillips unit 96,00 6.157.521 591.122.016
HighBay
Lighting Fixture Led 18W-2 TCW 06s unit 84,00 1.205.783 101.285.730
w/ Acrylic Cover