Professional Documents
Culture Documents
Report Plts
Report Plts
PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
MAS Firdaus Pangalengan - Indonesia
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
PVsyst TRIAL
with v7.3.1
Project summary
Geographical Site Situation Project settings
MAS Firdaus Pangalengan Latitude -7.18 °S Albedo 0.20
Indonesia Longitude 107.57 °E
Altitude 1359 m
Time zone UTC+7
Meteo data
MAS Firdaus Pangalengan
Meteonorm 8.1 (2016-2021), Sat=100% - Synthetic
System summary
PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 27 units Nb. of units 3 units
Pnom total 9.18 kWp Pnom total 9.00 kWac
Pnom ratio 1.020
Results summary
Produced Energy 14729 kWh/year Specific production 1604 kWh/kWp/year Perf. Ratio PR 84.34 %
PVsyst TRIAL
Project and results summary
Main results
Loss diagram
Predef. graphs
Table of contents
PVsyst TRIAL
PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 2/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
PVsyst TRIAL
with v7.3.1
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 30 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model Mono 340 Wp Twin 120 half-cells Model 3 kWac inverter
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 340 Wp Unit Nom. Power 3.00 kWac
Number of PV modules 27 units Number of inverters 3 units
Nominal (STC) 9.18 kWp Total power 9.0 kWac
Modules 3 Strings x 9 In series Operating voltage 125-440 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.02
Pmpp 8.26 kWp
U mpp 268 V
I mpp 31 A
PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 9 kWp Total power 9 kWac
Total 27 modules Number of inverters 3 units
Module area 50.4 m² Pnom ratio 1.02
Cell area 44.7 m²
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 147 mΩ Loss Fraction -0.4 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290
PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 3/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
PVsyst TRIAL
with v7.3.1
Main results
System Production
Produced Energy 14729 kWh/year Specific production 1604 kWh/kWp/year
Performance Ratio PR 84.34 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 155.8 71.48 15.38 131.1 126.7 1061 1023 0.850
March 163.5 76.64 16.14 154.3 150.0 1240 1196 0.845
April 159.1 59.76 16.41 168.3 165.2 1342 1295 0.838
May 160.7 64.04 16.87 184.1 181.1 1476 1426 0.844
June 157.7 50.63 16.36 189.5 187.1 1516 1466 0.843
July 162.2 52.82 16.15 190.8 188.4 1524 1471 0.840
August 170.2 61.08 16.23 185.4 182.5 1479 1428 0.839
September 172.1 63.28 16.16 170.2 166.4 1358 1311 0.839
October 189.6 84.39 16.55 167.1 162.0 1340 1294 0.844
November 154.6 78.34 16.02 125.3 120.5 1012 976 0.849
December 154.5 78.30 16.01 118.8 113.8 961 926 0.849
Year 1951.6 812.94 16.16 1902.3 1856.6 15260 14729 0.843
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 4/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
PVsyst TRIAL
with v7.3.1
Loss diagram
1952 kWh/m² Global horizontal irradiation
+0.37%
-2.10%
-1.07%
PV loss due to temperature
PVsyst TRIAL
0.00% Inverter Loss due to voltage threshold
14729 kWh Available Energy at Inverter Output
14729 kWh Energy injected into grid
PVsyst TRIAL
PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 5/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
PVsyst TRIAL
with v7.3.1
Predef. graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 6/7
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
with v7.3.1