No 3D scene defined, no shadings
System power: 9.18 kWp

PVsyst TRIAL
MAS Firdaus Pangalengan - Indonesia

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant

PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05

PVsyst TRIAL
with v7.3.1

Project summary
Geographical Site Situation Project settings
MAS Firdaus Pangalengan Latitude -7.18 °S Albedo 0.20
Indonesia Longitude 107.57 °E
Altitude 1359 m
Time zone UTC+7

Meteo data
MAS Firdaus Pangalengan
Meteonorm 8.1 (2016-2021), Sat=100% - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 30 / 0 °

System information
PV Array Inverters
Nb. of modules 27 units Nb. of units 3 units
Pnom total 9.18 kWp Pnom total 9.00 kWac
Pnom ratio 1.020

Results summary
Produced Energy 14729 kWh/year Specific production 1604 kWh/kWp/year Perf. Ratio PR 84.34 %

PVsyst TRIAL
Project and results summary

Main results
Loss diagram
Predef. graphs
Table of contents

General parameters, PV Array Characteristics, System losses


2
3
4
5
6
Single-line diagram 7

PVsyst TRIAL

PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 2/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant

PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05

PVsyst TRIAL
with v7.3.1

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 30 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model Mono 340 Wp Twin 120 half-cells Model 3 kWac inverter
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 340 Wp Unit Nom. Power 3.00 kWac
Number of PV modules 27 units Number of inverters 3 units
Nominal (STC) 9.18 kWp Total power 9.0 kWac
Modules 3 Strings x 9 In series Operating voltage 125-440 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.02
Pmpp 8.26 kWp
U mpp 268 V
I mpp 31 A

PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 9 kWp Total power 9 kWac
Total 27 modules Number of inverters 3 units
Module area 50.4 m² Pnom ratio 1.02
Cell area 44.7 m²

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 147 mΩ Loss Fraction -0.4 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000

PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 3/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant

PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05

PVsyst TRIAL
with v7.3.1

Main results
System Production
Produced Energy 14729 kWh/year Specific production 1604 kWh/kWp/year
Performance Ratio PR 84.34 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 151.7 72.18 15.63 117.6 112.9 951 915 0.847

PVsyst TRIAL
February 155.8 71.48 15.38 131.1 126.7 1061 1023 0.850
March 163.5 76.64 16.14 154.3 150.0 1240 1196 0.845
April 159.1 59.76 16.41 168.3 165.2 1342 1295 0.838
May 160.7 64.04 16.87 184.1 181.1 1476 1426 0.844
June 157.7 50.63 16.36 189.5 187.1 1516 1466 0.843
July 162.2 52.82 16.15 190.8 188.4 1524 1471 0.840
August 170.2 61.08 16.23 185.4 182.5 1479 1428 0.839
September 172.1 63.28 16.16 170.2 166.4 1358 1311 0.839
October 189.6 84.39 16.55 167.1 162.0 1340 1294 0.844
November 154.6 78.34 16.02 125.3 120.5 1012 976 0.849
December 154.5 78.30 16.01 118.8 113.8 961 926 0.849
Year 1951.6 812.94 16.16 1902.3 1856.6 15260 14729 0.843

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 4/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant

PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05

PVsyst TRIAL
with v7.3.1

Loss diagram
1952 kWh/m² Global horizontal irradiation

-2.52% Global incident in coll. plane


-2.40% IAM factor on global

1857 kWh/m² * 50 m² coll. Effective irradiation on collectors

efficiency at STC = 18.20% PV conversion

17046 kWh Array nominal energy (at STC effic.)


-0.63% PV loss due to irradiance level

PVsyst TRIAL -7.33%

+0.37%

-2.10%

-1.07%
PV loss due to temperature

Module quality loss

Mismatch loss, modules and strings

Ohmic wiring loss


15260 kWh Array virtual energy at MPP

-3.48% Inverter Loss during operation (efficiency)

0.00% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold

PVsyst TRIAL
0.00% Inverter Loss due to voltage threshold
14729 kWh Available Energy at Inverter Output
14729 kWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 5/7
Project: Madrasah Aliyah Firdaus Pangalengan
Variant: New simulation variant

PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05

PVsyst TRIAL
with v7.3.1

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
11/01/23 PVsyst Evaluation mode Page 6/7
PVsyst V7.3.1
VC0, Simulation date:
11/01/23 12:05
with v7.3.1

You might also like